Page 1: InfraCo Developing infrastructure projects  to promote sustainable economic growth

InfraCo

Developing infrastructure projects

to promote sustainable economic growth

Page 2: InfraCo Developing infrastructure projects  to promote sustainable economic growth

2

InfraCo• Privately managed infrastructure development company

• Funded through the Private Infrastructure Development Group (PIDG) comprising of:

• DGIS (Netherlands)• SIDA (Sweden)• SECO (Switzerland) • DFID (United Kingdom)• ADA (Austria)• IrishAid (Ireland)• World Bank

• Develops Infrastructure projects in: Energy, Transportation and Water Sectors among others

• Geographic focus Sub-Saharan Africa

Page 3: InfraCo Developing infrastructure projects  to promote sustainable economic growth

3

InfraCo in Your CountryInfraCo contributes to sustainable Economic Growth:

• Actively indentifies viable projects

• Provides substantial infrastructure expertise, as well as its own risk capital

• Focuses on attainable projects, that will produce social benefits (jobs, improved services and a healthier environment)

• Attracts long term capital

• Balances the interests of host governments, private sector investors and financiers

Page 4: InfraCo Developing infrastructure projects  to promote sustainable economic growth

4

InfraCo• Acts as a principal project developer: Provides risk

capital – InfraCo is not a consultant

• Actively participates in project development: InfraCo is not a passive funding source for development expenses

• Assumes development risk: Unsuccessful projects – InfraCo loses money

• Seeks returns on time and invested capital: At financial closing and through carried interest

Page 5: InfraCo Developing infrastructure projects  to promote sustainable economic growth

5

Major Activities

InfraCo uses its expertise and capital to:

• Develop a viable business plan and build a financial model

• Negotiate long-term anchor tariffs or user agreements to secure sustainable revenues

• Develop technical feasibility studies

• Provide in-depth cost analysis

Page 6: InfraCo Developing infrastructure projects  to promote sustainable economic growth

6

Major Activities (Cont’d)

• Negotiate a fixed-price turnkey, EPC (Engineering, Procurement & Construction) contract

• Negotiate the terms and conditions of a financially viable operation and maintenance agreement

• Arrange long term equity and debt financing – repayment is solely dependent on the economic success of the Project

• Secure all necessary permits for the construction and operation of the Project

Page 7: InfraCo Developing infrastructure projects  to promote sustainable economic growth

7

EPC Contractor:

• Engineering

• Procurement

• Erection

• Civil Construction

• Equipment and Services

O&M Contractor

SPC (Project

Company)

O&M:

• Operator

• Maintenance

Deal Structure

EPC Contractor

Long Term Funding

Owners:

•InfraCo; Other Partners

Long Term Funding:

• Equity

• Debt

Revenues / Offtakers

Concession Rights

Long Term:

• Anchor Tenants

• PPAs ; etc.

Market:

• Short term

• Merchant, etc.

Permits

Land

Page 8: InfraCo Developing infrastructure projects  to promote sustainable economic growth

8

InfraCo Projects In

Ghana

Cape Verde

Zambia

Uganda

Madagascar

Page 9: InfraCo Developing infrastructure projects  to promote sustainable economic growth

9

Uganda• Project Description

– General Infrastructure: Power generation and distribution; water supply; transportation (ferry & roads) for an island in Lake Victoria

• Project Benefits– Power: Current dependency on firewood, paraffin and small diesel

generation– Water: Droughts; insufficient potable water– Transportation: Dirt roads not motorable in all weather conditions; ferry

traffic exceeds capacity

• Total Project Cost: USD 40 Million

• Finance Plan– Output Based Aid (OBA) from PIDG: USD 3.5 Million– Commercial Debt: USD 20 Million– Credit Enhancement from USAID and GuarantCo: USD 12 Million– Private Sector Equity: USD 16.5 Million

9

Page 10: InfraCo Developing infrastructure projects  to promote sustainable economic growth

Cape Verde• Project Description

– Wind Power: 30MW in identified wind farm sites on four different Islands

• Project Benefits– Make use of the abundant wind resources of the country that are

virtually unused– Adding lower cost wind power to the current all-diesel generation

portfolio – Reduce harmful emissions from the oil fired plants

• Total Project Cost: EUR 55 Million

• Finance Plan– IDA, EIAF (Loan)– SIDA / GuarantCo (Guarantee to commercial loans)– WB GEF (Grant)

10

Page 11: InfraCo Developing infrastructure projects  to promote sustainable economic growth

Madagascar• Project Description

– Bulk and Distributed Water Supply: A supply system to 17 communes surrounding the capital, Antananarivo

• Project Benefits– Provides affordable, clean drinking water to populations that do not have

access to clean water• Eliminates water-borne diseases• Improvement of general health levels

– Provides a new supply of bulk water to Antananarivo used by industrial and domestic consumers

– Private management of a PPP

• Total Project Cost: USD 50 Million

• Finance Plan– Grant funding from OBA– Multilateral and bilateral debt and equity– Local equity

11

Page 12: InfraCo Developing infrastructure projects  to promote sustainable economic growth

12

Zambia• Project Description

– Irrigated Farm Development: Full business plan development and implementation of holding and operating company, irrigation Infrastructure, and marketing plan for commercial and small scale wheat and soy farming near the Kafue River in central Zambia

• Project Benefits– Economic: Commercial farming operation – wheat and soy production will

meet local demand shortages; potential to develop a wheat processing mill – Social: Impacts approx. 50,000 residents – increasing local employment

levels and overall economic welfare

• Total Project Cost: USD 25 Million

• Finance Plan– Development costs: InfraCo– Land/water rights : Equity contribution by farmers– Project Equity: Zambian Development Bank, OBA, USAID– Project Debt: Commercial Banks

Page 13: InfraCo Developing infrastructure projects  to promote sustainable economic growth

13

Ghana• Project Description

– Gas Fired Power Plant: 300 – 400 MW power plant in Tema

• Project Benefits– Provide low cost electricity in response to the lack of capacity in the region-

currently the capacity shortages are met by inefficient diesel generators– Utilise capacity from the West African gas pipeline and newly discovered

natural gas offshore Ghana (Tullow and Anadarko)

• Total Project Cost: USD 300 Million

• Finance Plan– Multilateral or ECA and commercial banks– Support from EAIF; ERG; Chinese Exim; Credit Swiss among others

Page 14: InfraCo Developing infrastructure projects  to promote sustainable economic growth

14

InfraCo Board• Keith Palmer: Chairman, former Vice Chairman of NM

Rothschild & Sons, founder and Chairman of Cambridge Economic Policy Associate, Chairman of the Emerging Africa Infrastructure Fund

• Peter Bird: Managing Director of NM Rothschild & Sons

• Valentine Chitalu: Former Head of the Zambian Privatization Agency, entrepreneur in Zambia and Southern Africa specializing in private equity

• Roger Witcomb: Senior Adviser at Actis (formerly CDC), a private equity fund specializing in emerging markets