Transport
Zimbabwe ElectricitySupply Authority
25 Samora MachelHarare
(04) 774491/35
Ministry of Transport and Communication13th Floor Kaguvi Building 4th street and Central AvenueHarare(04) 700991-9
Zimbabwe Investment AuthorityInvestment House, 109 Rotten Row Harare, P.O.BOX 5950, Harare, Zimbabwe, Tel:+2634757931-6, +2634759911-5, +2634780140-5, Fax:+2634773843, Email: [email protected], URL: www.zia.co.zw
Zimbabwe National Road Administration
45 Central AvenueHarare
(04) 703626,705755
Ministry of Public WorksPrivate Bag 7755Causeway, Harare(04) 791446,705584
INVEST IN ZIMBABWE
INFRASTRUCTUREDOING BUSINESS IN ZIMBABWE
8.
9.
10.11.
12.
ROADS: A) Rehabilitation Of Rural Road Network; And Bridges
B) Rehabilitation Of The Trunk Roads; •Constructionoftollgates;and •Installationofcomputerisedaccounting system.
Trunk Roads For Rehabilitation And/Or Upgrade:•Buchwa-Rutenga-Boli-SangoBorderPost•Mt.Darwin-Mukumbura•Bindura-Shamva •Wedza-Sadza •Kwekwe-Lupane •Murambinda-BirchenoughBridge •Gutu-Kurai •Headlands-Mayo •Mvurwi-Kanyemba
RAIL:Rehabilitation of the rail network;•Rehabilitationoftherailtrack;•Refurbishmentoftractionandrollingstock;and•Rehabilitationofthesignallingandtelecommunications system. The following routes will be concessional and all rehabilitation works will be done through PPP funding. Privateplayerswilloperatetheirrollingstock. a)Harare-Machipanda[Forbesborderpost(Zim/Moza)]b)DabukatoChicaulacuala[Sangoborderpost(Zim/Moza)]c)Harare-Dabuka-Beitbridged)Vic.Falls–Bulawayo–Dabuka-Harare
AIR:Replacement/modernisationofAirTerminalEquipmentRehabilitationoftheHarareInternationalAirportrunway
RehabilitationoftheJoshuaMqabukoNkomoairport
203Km80km7km22km40km123km22km40km150km
283km433km721km823km
•Budget•CommunityParticipation
Self-financing from toll gate collections
•Budget•Tollgatecollections
PPPNRZ/Dev.Partners
2010 Budget only and thereafter self-funding
Budget
Min.OfTransportZINARA
Min.OfTransportZINARA
Min.OfTransportZINARA
Min.OfTransportNRZConcessionair
CAAZ
CAAZ
Important Contacts
Energy
Overview of Sector
arrangements. Infrastructure sector in Zimbabwe involves energy, road, rail, water and sanitation,
Fiscal Incentives
Investment allowance of 15% on cost of construction, addition or alterations on industrial or commercial buildings or staff houses can be claimed;
A) Build Own Operate and Transfer (BOOT) and BOT Arrangements
under which he undertakes to construct infrastructure for the state or statutory
B) Industrial Park Developers
residents
C) Preferential Zones ‘Growth Point Areas’
buildings
the cost of new commercial or buildings, or staff housing erected, additions or alterations to existing commercial or industrial buildings or staff housing and
area.
D) Customs and Excise Incentives
Foreign Investors
within the sector they intend to invest in.
Investment Opportunities
1.
2.
3.
4.
5.
Enhancement of billing and collection system for ZESA-
Rehabilitation of Hwange Power Station (Currently
ZESAMin of Energy
ZESAMin of Energy
ZESAMin of Energy
ZESA
ZESA
6
7.
for; and enhancement of billing and collection system including
connections:Harare ($35m)Bulawayo ($5m)Chitungwiza ($5m)Mutare ($10m)Other cities & towns ($45m)
emergency works) Local Authorities
Local Authorities
Councils
Water & Sanitation
Energy
Overview of Sector
arrangements. Infrastructure sector in Zimbabwe involves energy, road, rail, water and sanitation,
Fiscal Incentives
Investment allowance of 15% on cost of construction, addition or alterations on industrial or commercial buildings or staff houses can be claimed;
A) Build Own Operate and Transfer (BOOT) and BOT Arrangements
under which he undertakes to construct infrastructure for the state or statutory
B) Industrial Park Developers
residents
C) Preferential Zones ‘Growth Point Areas’
buildings
the cost of new commercial or buildings, or staff housing erected, additions or alterations to existing commercial or industrial buildings or staff housing and
area.
D) Customs and Excise Incentives
Foreign Investors
within the sector they intend to invest in.
Investment Opportunities
1.
2.
3.
4.
5.
Enhancement of billing and collection system for ZESA-
Rehabilitation of Hwange Power Station (Currently
ZESAMin of Energy
ZESAMin of Energy
ZESAMin of Energy
ZESA
ZESA
6
7.
for; and enhancement of billing and collection system including
connections:Harare ($35m)Bulawayo ($5m)Chitungwiza ($5m)Mutare ($10m)Other cities & towns ($45m)
emergency works) Local Authorities
Local Authorities
Councils
Water & Sanitation
Transport
Zimbabwe ElectricitySupply Authority
25 Samora MachelHarare
(04) 774491/35
Ministry of Transport and Communication13th Floor Kaguvi Building 4th street and Central AvenueHarare(04) 700991-9
Zimbabwe Investment AuthorityInvestment House, 109 Rotten Row Harare, P.O.BOX 5950, Harare, Zimbabwe, Tel:+2634757931-6, +2634759911-5, +2634780140-5, Fax:+2634773843, Email: [email protected], URL: www.zia.co.zw
Zimbabwe National Road Administration
45 Central AvenueHarare
(04) 703626,705755
Ministry of Public WorksPrivate Bag 7755Causeway, Harare(04) 791446,705584
INVEST IN ZIMBABWE
INFRASTRUCTUREDOING BUSINESS IN ZIMBABWE
8.
9.
10.11.
12.
ROADS: A) Rehabilitation Of Rural Road Network; And Bridges
B) Rehabilitation Of The Trunk Roads; •Constructionoftollgates;and •Installationofcomputerisedaccounting system.
Trunk Roads For Rehabilitation And/Or Upgrade:•Buchwa-Rutenga-Boli-SangoBorderPost•Mt.Darwin-Mukumbura•Bindura-Shamva •Wedza-Sadza •Kwekwe-Lupane •Murambinda-BirchenoughBridge •Gutu-Kurai •Headlands-Mayo •Mvurwi-Kanyemba
RAIL:Rehabilitation of the rail network;•Rehabilitationoftherailtrack;•Refurbishmentoftractionandrollingstock;and•Rehabilitationofthesignallingandtelecommunications system. The following routes will be concessional and all rehabilitation works will be done through PPP funding. Privateplayerswilloperatetheirrollingstock. a)Harare-Machipanda[Forbesborderpost(Zim/Moza)]b)DabukatoChicaulacuala[Sangoborderpost(Zim/Moza)]c)Harare-Dabuka-Beitbridged)Vic.Falls–Bulawayo–Dabuka-Harare
AIR:Replacement/modernisationofAirTerminalEquipmentRehabilitationoftheHarareInternationalAirportrunway
RehabilitationoftheJoshuaMqabukoNkomoairport
203Km80km7km22km40km123km22km40km150km
283km433km721km823km
•Budget•CommunityParticipation
Self-financing from toll gate collections
•Budget•Tollgatecollections
PPPNRZ/Dev.Partners
2010 Budget only and thereafter self-funding
Budget
Min.OfTransportZINARA
Min.OfTransportZINARA
Min.OfTransportZINARA
Min.OfTransportNRZConcessionair
CAAZ
CAAZ
Important Contacts