Page 1: Infraestrutura do Zimbabwe

Transport

Zimbabwe ElectricitySupply Authority

25 Samora MachelHarare

(04) 774491/35

Ministry of Transport and Communication13th Floor Kaguvi Building 4th street and Central AvenueHarare(04) 700991-9

Zimbabwe Investment AuthorityInvestment House, 109 Rotten Row Harare, P.O.BOX 5950, Harare, Zimbabwe, Tel:+2634757931-6, +2634759911-5, +2634780140-5, Fax:+2634773843, Email: [email protected], URL: www.zia.co.zw

Zimbabwe National Road Administration

45 Central AvenueHarare

(04) 703626,705755

Ministry of Public WorksPrivate Bag 7755Causeway, Harare(04) 791446,705584

INVEST IN ZIMBABWE

INFRASTRUCTUREDOING BUSINESS IN ZIMBABWE

8.

9.

10.11.

12.

ROADS: A) Rehabilitation Of Rural Road Network; And Bridges

B) Rehabilitation Of The Trunk Roads; •Constructionoftollgates;and •Installationofcomputerisedaccounting system.

Trunk Roads For Rehabilitation And/Or Upgrade:•Buchwa-Rutenga-Boli-SangoBorderPost•Mt.Darwin-Mukumbura•Bindura-Shamva •Wedza-Sadza •Kwekwe-Lupane •Murambinda-BirchenoughBridge •Gutu-Kurai •Headlands-Mayo •Mvurwi-Kanyemba

RAIL:Rehabilitation of the rail network;•Rehabilitationoftherailtrack;•Refurbishmentoftractionandrollingstock;and•Rehabilitationofthesignallingandtelecommunications system. The following routes will be concessional and all rehabilitation works will be done through PPP funding. Privateplayerswilloperatetheirrollingstock. a)Harare-Machipanda[Forbesborderpost(Zim/Moza)]b)DabukatoChicaulacuala[Sangoborderpost(Zim/Moza)]c)Harare-Dabuka-Beitbridged)Vic.Falls–Bulawayo–Dabuka-Harare

AIR:Replacement/modernisationofAirTerminalEquipmentRehabilitationoftheHarareInternationalAirportrunway

RehabilitationoftheJoshuaMqabukoNkomoairport

203Km80km7km22km40km123km22km40km150km

283km433km721km823km

•Budget•CommunityParticipation

Self-financing from toll gate collections

•Budget•Tollgatecollections

PPPNRZ/Dev.Partners

2010 Budget only and thereafter self-funding

Budget

Min.OfTransportZINARA

Min.OfTransportZINARA

Min.OfTransportZINARA

Min.OfTransportNRZConcessionair

CAAZ

CAAZ

Important Contacts

Page 2: Infraestrutura do Zimbabwe

Energy

Overview of Sector

arrangements. Infrastructure sector in Zimbabwe involves energy, road, rail, water and sanitation,

Fiscal Incentives

Investment allowance of 15% on cost of construction, addition or alterations on industrial or commercial buildings or staff houses can be claimed;

A) Build Own Operate and Transfer (BOOT) and BOT Arrangements

under which he undertakes to construct infrastructure for the state or statutory

B) Industrial Park Developers

residents

C) Preferential Zones ‘Growth Point Areas’

buildings

the cost of new commercial or buildings, or staff housing erected, additions or alterations to existing commercial or industrial buildings or staff housing and

area.

D) Customs and Excise Incentives

Foreign Investors

within the sector they intend to invest in.

Investment Opportunities

1.

2.

3.

4.

5.

Enhancement of billing and collection system for ZESA-

Rehabilitation of Hwange Power Station (Currently

ZESAMin of Energy

ZESAMin of Energy

ZESAMin of Energy

ZESA

ZESA

6

7.

for; and enhancement of billing and collection system including

connections:Harare ($35m)Bulawayo ($5m)Chitungwiza ($5m)Mutare ($10m)Other cities & towns ($45m)

emergency works) Local Authorities

Local Authorities

Councils

Water & Sanitation

Page 3: Infraestrutura do Zimbabwe

Energy

Overview of Sector

arrangements. Infrastructure sector in Zimbabwe involves energy, road, rail, water and sanitation,

Fiscal Incentives

Investment allowance of 15% on cost of construction, addition or alterations on industrial or commercial buildings or staff houses can be claimed;

A) Build Own Operate and Transfer (BOOT) and BOT Arrangements

under which he undertakes to construct infrastructure for the state or statutory

B) Industrial Park Developers

residents

C) Preferential Zones ‘Growth Point Areas’

buildings

the cost of new commercial or buildings, or staff housing erected, additions or alterations to existing commercial or industrial buildings or staff housing and

area.

D) Customs and Excise Incentives

Foreign Investors

within the sector they intend to invest in.

Investment Opportunities

1.

2.

3.

4.

5.

Enhancement of billing and collection system for ZESA-

Rehabilitation of Hwange Power Station (Currently

ZESAMin of Energy

ZESAMin of Energy

ZESAMin of Energy

ZESA

ZESA

6

7.

for; and enhancement of billing and collection system including

connections:Harare ($35m)Bulawayo ($5m)Chitungwiza ($5m)Mutare ($10m)Other cities & towns ($45m)

emergency works) Local Authorities

Local Authorities

Councils

Water & Sanitation

Page 4: Infraestrutura do Zimbabwe

Transport

Zimbabwe ElectricitySupply Authority

25 Samora MachelHarare

(04) 774491/35

Ministry of Transport and Communication13th Floor Kaguvi Building 4th street and Central AvenueHarare(04) 700991-9

Zimbabwe Investment AuthorityInvestment House, 109 Rotten Row Harare, P.O.BOX 5950, Harare, Zimbabwe, Tel:+2634757931-6, +2634759911-5, +2634780140-5, Fax:+2634773843, Email: [email protected], URL: www.zia.co.zw

Zimbabwe National Road Administration

45 Central AvenueHarare

(04) 703626,705755

Ministry of Public WorksPrivate Bag 7755Causeway, Harare(04) 791446,705584

INVEST IN ZIMBABWE

INFRASTRUCTUREDOING BUSINESS IN ZIMBABWE

8.

9.

10.11.

12.

ROADS: A) Rehabilitation Of Rural Road Network; And Bridges

B) Rehabilitation Of The Trunk Roads; •Constructionoftollgates;and •Installationofcomputerisedaccounting system.

Trunk Roads For Rehabilitation And/Or Upgrade:•Buchwa-Rutenga-Boli-SangoBorderPost•Mt.Darwin-Mukumbura•Bindura-Shamva •Wedza-Sadza •Kwekwe-Lupane •Murambinda-BirchenoughBridge •Gutu-Kurai •Headlands-Mayo •Mvurwi-Kanyemba

RAIL:Rehabilitation of the rail network;•Rehabilitationoftherailtrack;•Refurbishmentoftractionandrollingstock;and•Rehabilitationofthesignallingandtelecommunications system. The following routes will be concessional and all rehabilitation works will be done through PPP funding. Privateplayerswilloperatetheirrollingstock. a)Harare-Machipanda[Forbesborderpost(Zim/Moza)]b)DabukatoChicaulacuala[Sangoborderpost(Zim/Moza)]c)Harare-Dabuka-Beitbridged)Vic.Falls–Bulawayo–Dabuka-Harare

AIR:Replacement/modernisationofAirTerminalEquipmentRehabilitationoftheHarareInternationalAirportrunway

RehabilitationoftheJoshuaMqabukoNkomoairport

203Km80km7km22km40km123km22km40km150km

283km433km721km823km

•Budget•CommunityParticipation

Self-financing from toll gate collections

•Budget•Tollgatecollections

PPPNRZ/Dev.Partners

2010 Budget only and thereafter self-funding

Budget

Min.OfTransportZINARA

Min.OfTransportZINARA

Min.OfTransportZINARA

Min.OfTransportNRZConcessionair

CAAZ

CAAZ