Infrastructure Capital Improvement Plan 2016-2020Water

PurificationDistribution

Street Broadway OPWC

Page 2: Infrastructure Capital Improvement Plan 2016-2020 Water Purification Distribution Street Broadway OPWC

Water Purification

Water Towers Current Storage 6 million gallons Recommended 10-12 million gallons

Plant Improvements $3-5 million for various plant upgrades including

Algal Bloom

Page 3: Infrastructure Capital Improvement Plan 2016-2020 Water Purification Distribution Street Broadway OPWC
Page 4: Infrastructure Capital Improvement Plan 2016-2020 Water Purification Distribution Street Broadway OPWC

DistributionWater Model recommendations

$7.5m per year on Water Line ImprovementsReplace all Pipe with a C Factor less than 60Replace all Pipe in excess of 60 years of ageReplace all Steel or Cast Iron PipeReplace all Pipe 4 inch in diameter or lessIncreased Redundancy

Page 5: Infrastructure Capital Improvement Plan 2016-2020 Water Purification Distribution Street Broadway OPWC
Page 6: Infrastructure Capital Improvement Plan 2016-2020 Water Purification Distribution Street Broadway OPWC
Page 7: Infrastructure Capital Improvement Plan 2016-2020 Water Purification Distribution Street Broadway OPWC
Page 8: Infrastructure Capital Improvement Plan 2016-2020 Water Purification Distribution Street Broadway OPWC

2015-2020 CIP for Distribution2015

Elyria Ave $ 1.33 mS. Lorain Phase II $5.1 mBroadway Ave $4.0 mS. Lorain Phase III $3.0 mEast Side $3.0 m

2016Near West Side $5.1 mCentral Lorain $5.8 mRed Hill Trans. P.1 $4.0 m

2017 Red Hill P. 2 $3.5mElimination of 4” MainsVarious Locations 32k

LFTTotal Cost Est.: $6.9m

2018-2019 C factor <40 mains Total Cost Est. $15.5m

2020-2021 C Factor Mains <60 Total Cost $35.5 m

Page 9: Infrastructure Capital Improvement Plan 2016-2020 Water Purification Distribution Street Broadway OPWC

Broadway ImprovementsPublic Hearing Notes

No Bike PathIncreased Sidewalk Size Pedestrian Friendly Parking for the businesses Better Line of Sight VisibilityIncreased Lighting

Page 10: Infrastructure Capital Improvement Plan 2016-2020 Water Purification Distribution Street Broadway OPWC
Page 11: Infrastructure Capital Improvement Plan 2016-2020 Water Purification Distribution Street Broadway OPWC
Page 12: Infrastructure Capital Improvement Plan 2016-2020 Water Purification Distribution Street Broadway OPWC
Page 13: Infrastructure Capital Improvement Plan 2016-2020 Water Purification Distribution Street Broadway OPWC
Page 14: Infrastructure Capital Improvement Plan 2016-2020 Water Purification Distribution Street Broadway OPWC
Page 15: Infrastructure Capital Improvement Plan 2016-2020 Water Purification Distribution Street Broadway OPWC
Page 16: Infrastructure Capital Improvement Plan 2016-2020 Water Purification Distribution Street Broadway OPWC
Page 17: Infrastructure Capital Improvement Plan 2016-2020 Water Purification Distribution Street Broadway OPWC
Page 18: Infrastructure Capital Improvement Plan 2016-2020 Water Purification Distribution Street Broadway OPWC

OPWC Round 29Previously passed by Council $2.38m

Crehore St. (Root Rd. to Maple Dr.) West 18th St. (Reid Ave. to Lexington Ave.) Livingston Ave. (W. 18th St. to W. 17th St.) West 20th St. (Reid Ave. to Washington Ave.) West 23rd St. (Reeves to Leavitt) West 29th St. (Marshall to Carmelita Ct.) Reeves Ave. (W. 30th St. to Mark Dr.) East 31th St. (Fulton Rd. to Globe Ave.) Fulton Rd. (E. 31st St. to E. 28th St.) Vassar Ave. (Cambridge Ave. to Kenyon Ave.) Kenyon Ave. (W. 40th St. to Cul-de-Sac) Stanford Ave. (W.40th St. to Kenyon Ave.) Miami Ave. (W.40th St. to W. 37th St.)

Page 19: Infrastructure Capital Improvement Plan 2016-2020 Water Purification Distribution Street Broadway OPWC

Any Questions?