infrastructure responses to sdps evaluation of priority areas
DESCRIPTION
Infrastructure Responses to SDPs Evaluation of Priority Areas (“Priority Areas” – Released for Development 2010-2015) July 2009. Infrastructure Responses to SDPs Evaluation of Priority Areas Spatial Development Plan. Tongaat Residential. Infrastructure Responses to SDPs - PowerPoint PPT PresentationTRANSCRIPT
Infrastructure Responses to SDPs
Evaluation of Priority Areas(“Priority Areas” – Released for Development 2010-2015)
July 2009
Infrastructure Responses to SDPsEvaluation of Priority Areas
Spatial Development Plan
Mpumalanga
KwaXimba
BartlettsEstate
Cato Ridge /Harrison Flats
Hammarsdale
Shongweni
Bridge City
Canelands
Cornubia
DubeTrade Port
TongaatResidential
iQadi
Redcliffe
Molweni
FredvilleTongaat
Industrial
Zwelibomvu
Hillcrest
Craigieburn
Umgababa
Lovu
Inwabi
Folweni
Adam’s Mission
Amanzimtoti
Umlazi
Infrastructure Responses to SDPsEvaluation of Priority Areas
Priority Areas
Infrastructure Responses to SDPsEvaluation of Priority Areas
North
Bridge City
TongaatResidential
Redcliffe
Cornubia
TongaatIndustrial
DubeTrade Port
Canelands
Green:Development can, in principle,
occur immediately,as there is capacity available
Orange:Development can takeplace following some
“simple” interventions
Red:Lack of infrastructure
will be a “showstopper”
Infrastructure Responses to SDPsEvaluation of Priority Areas
North
Bridge City
TongaatResidential
Redcliffe
Cornubia
TongaatIndustrial
DubeTrade Port
Canelands
95 0
Tongaat ResidentialR123m
18 0
Sewer: Orange indicates“Simple” Interventionsrequired to release development.Total sewer infrastructurecost for full developmentfootprint = R95m
Water: Red indicates lack ofwater infrastructure will bea “Showstopper” to release ofdevelopmentTotal water infrastructurecost for full developmentfootprint = R18m
Roads: Green indicatesno additional bulk roadinfrastructure required to release development.Total additional bulk roadsinfrastructure cost for full development footprint = R0m
Electricity: Green indicates noadditional bulk electricityinfrastructure required to release development.Total additional bulk electricityinfrastructure cost for full development footprint = R0m
Red Outline indicates overallinfrastructure index of “Showstopper”.
R123m represents totalinfrastructure cost to service full development footprint
Easy wins- infra capacity present for devt up to a cut-off after which high costs kick in
Rates Return/Infra Spend Social Rank Economic Rank Revenue Generating vs Non-revenue
generating land uses. Bringing in ratios.
Infrastructure Responses to SDPsEvaluation of Priority Areas
North
Bridge City
TongaatResidential
Redcliffe
Cornubia
TongaatIndustrial
DubeTrade Port
Canelands
95 0
Tongaat ResidentialR123m
18 0
0 0
Tongaat IndustrialR0m
0 0
25 210
Dube Trade Port – Phase AR289m
32 22
428 405
Dube Trade Port – Phase BR863m
30 0
453 615
Dube Trade Port – All Phases
R1 152m
62 22
0 20
Canelands– Phase AR45m
25 0
4 10
Canelands– Phase BR14m
0 0
4 30
Canelands– All PhasesR59m
25 0
35 0
RedcliffeR73m
0 38
0 105
Cornubia– Phase AR209m
52 52
147 260
Cornubia– Phase BR459m
0 52
147 365
Cornubia– All PhasesR668m
52 104
0 0
Bridge CityR60m
0 60
Infrastructure Responses to SDPsEvaluation of Priority Areas
Outer West
Zwelibomvu
BartlettsEstate
ShongweniHammarsdale
Mpumalanga Hillcrest
Molweni
iQadi
Fredville
KwaXimba
Cato Ridge /Harrison Flats
100 0
Cato Ridge – Phase A
R168m (w/o Eskom)
68 Eskom
10 700
Cato Ridge – Phase BR710m
0 0
50 5 000 (?)
Cato Ridge – Phase C
R5 090m (?)
40 0
80 0
Cato Ridge – Phase DR84m
4 0
240 5 700 (?)
Cato Ridge – All Phases
R6 052m (?) (w/o Eskom)
112 Eskom (?)
48 250
Bartletts EstateR328m (w/o
Eskom)
30 Eskom (?)
0 0
KwaXimbaR4m (w/o Eskom)
4 Eskom (?)
92 0
FredvilleR104m (w/o
Eskom)
12 Eskom (?)
147 10
HammarsdaleR187m (w/o
Eskom)
30 Eskom (?)
0 10
MpumalangaR10m (w/o
Eskom)
0 Eskom (?)
0 0
MolweniR42m
42 0
0 0
ZwelibomvuR75m
0 75
15 0
iQadiR15m
0 0
21 0
HillcrestR21m
0 0
104 250
Shongweni - Phase A
R354m (w/o Eskom)
0 Eskom(?)
21 0
Shongweni - Phase BR21m
0 0
125 250
Shongweni – All Phases
R375m (w/o Eskom)
0 Eskom (?)
Infrastructure Responses to SDPsEvaluation of Priority Areas
South
Amanzimtoti
Inwabi
Craigieburn
Golokodo
Lovu
Umgababa
Umbumbulu
Umlazi
0 0
UmlaziR0m
0 60
23 0
InwabiR23m
0 0
23 0
GolokodoR61m
0 38
0 0
UmbumbuluR38m
0 38
0 0
AmanzimtotiR0m
0 0
43 0
LovuR55m
12 0
33 0
UmgababaR45m (w/o
Eskom)
12 Eskom (?)
105 0
Craigieburn – Phase A
R117m (w/o Eskom)
12 Eskom (?)
6 0
Craigieburn – Phase BR34m
28 0
24 0
Craigieburn – Phase CR24m
0 0
135 0
Craigieburn – All Phases
R175m (w/o Eskom)
40 Eskom (?)
Infrastructure Responses to SDPs
Evaluation of Priority Areas(“Priority Areas” – Released for Development 2010-2015)
July 2009