InGas 6th months meeting: SPB2/Ecocat
INGAS “General Assembly Meeting ”, “Prague, Czech Republic”, “25-26 May 2009”INGAS “General Assembly Meeting ”, “Prague, Czech Republic”, “25-26 May 2009”
INGAS INtegrated GAS PowertrainINGAS INtegrated GAS Powertrain
2
• Ecocat is taking part in: – WP2.1 (requirements/boundary conditions) – WP2.2 (advanced catalyst development) – WP2.3 (exhaust heating/catalyst concepts)
InGas 6th months meeting: SPB2/Ecocat
INGAS “General Assembly Meeting ”, “Prague, Czech Republic”, “25-26 May 2009”INGAS “General Assembly Meeting ”, “Prague, Czech Republic”, “25-26 May 2009”
INGAS INtegrated GAS PowertrainINGAS INtegrated GAS Powertrain
3
• WP2.1 (requirements/boundary conditions)– The planned objectives in this WP are collection and definition of
relevant information about fuels, exhaust, engine characteristics, ECU functions and testing conditions in order to ensure common working basis and guidelines for different partners.
– In the beginning Ecocat’s role is to deliver reference catalysts to the partners
– In task TB2.1.2 (Catalyst testing/ageing conditions) the reference catalysts have been prepared, which will be used as a reference matrix for the further catalyst (both substrate and washcoat) development
InGas 6th months meeting: SPB2/Ecocat
INGAS “General Assembly Meeting ”, “Prague, Czech Republic”, “25-26 May 2009”INGAS “General Assembly Meeting ”, “Prague, Czech Republic”, “25-26 May 2009”
INGAS INtegrated GAS PowertrainINGAS INtegrated GAS Powertrain
4
InGas 6th months meeting: SPB2/Ecocat
• Reference samples:
Ceramic I Ceramic II Metallic
Dimensions (mm) 118x70 118x50 118x50,8
Volume (dm3) 0,77 0,55 0,56
Wall thickness (Mills/µm)
6 3,5 50
Cell density (cpsi) 400 600 500
INGAS “General Assembly Meeting ”, “Prague, Czech Republic”, “25-26 May 2009”INGAS “General Assembly Meeting ”, “Prague, Czech Republic”, “25-26 May 2009”
INGAS INtegrated GAS PowertrainINGAS INtegrated GAS Powertrain
5
InGas 6th months meeting: SPB2/Ecocat
• Reference samples– Washcoated with stoichiometric NG coating– Washcoat thickness has been specified to 50 g/m2
– Pd-Rh technology; 200 g/cft Pd:Rh 39:1– Sent to:
• Daimler (2 ceramic + 1 metallic)• Kracow (1 ceramic)• Politecnico Milano (1 ceramic)• Universität Stuttgart (1 metallic)
• Reference catalyst powder– Pd containing catalyst powder (6,3 wt-% Pd) – Sent to:
• Krakow (20 g)• Politecnico Milano (20 g)
INGAS “General Assembly Meeting ”, “Prague, Czech Republic”, “25-26 May 2009”INGAS “General Assembly Meeting ”, “Prague, Czech Republic”, “25-26 May 2009”
INGAS INtegrated GAS PowertrainINGAS INtegrated GAS Powertrain
6
InGas 6th months meeting: SPB2/Ecocat
• WP2.2 (advanced catalyst development)– The main work packet objectives during the project are:
• The development of new catalyst formulations for methane oxidation with a light off temperature below 350°C
• A high thermal and sulphur stability, • Development of a modelling tool for methane oxidation • Delivery of kinetic data, control strategy for methane (lambda = 1, lambda >1)
and NOx abatement (lambda>1) • Development of coating methods for catalyst up scaling and canning.
INGAS “General Assembly Meeting ”, “Prague, Czech Republic”, “25-26 May 2009”INGAS “General Assembly Meeting ”, “Prague, Czech Republic”, “25-26 May 2009”
INGAS INtegrated GAS PowertrainINGAS INtegrated GAS Powertrain
7
InGas 6th months meeting: SPB2/Ecocat
• Preliminary washcoat development – Has been started in order to improve catalyst formulation for
requirements introduced in the project
– In Ecocat the development is based on the wide knowledge and the results achieved during the earlier projects in the area
– Both the basic laboratory tests like light off and lambda window tests will be used besides the verification in real engine
– Engine tests are planned to be done in commercial 1.2 LD bi-power vehicle using CNG as a fuel
INGAS “General Assembly Meeting ”, “Prague, Czech Republic”, “25-26 May 2009”INGAS “General Assembly Meeting ”, “Prague, Czech Republic”, “25-26 May 2009”
INGAS INtegrated GAS PowertrainINGAS INtegrated GAS Powertrain
8
• Light off temperatures in laboratory tests (λ=1) for aged samples (20h/LS-
1030°C): Ø 14mm x L 75mm; SV 50 000 1/h
InGas 6th months meeting: SPB2/Ecocat
Light-off Aged
287273
315298
256278
254 254 257
0
50
100
150
200
250
300
350
THC CO Nox
tem
per
atu
re a
t 50
% c
on
vers
ion
Previous generation washcoat Gasoline washcoat New CNG washcoat
INGAS “General Assembly Meeting ”, “Prague, Czech Republic”, “25-26 May 2009”INGAS “General Assembly Meeting ”, “Prague, Czech Republic”, “25-26 May 2009”
INGAS INtegrated GAS PowertrainINGAS INtegrated GAS Powertrain
9
• RAH ageing description
InGas 6th months meeting: SPB2/Ecocat
40 46 56 60
STOICHIOMETRIC CRUISE
POWER ENRICHMENT4% CO
Time (sec)
AIR INJECTION4% O2
900 °C
1050 °C
INGAS “General Assembly Meeting ”, “Prague, Czech Republic”, “25-26 May 2009”INGAS “General Assembly Meeting ”, “Prague, Czech Republic”, “25-26 May 2009”
INGAS INtegrated GAS PowertrainINGAS INtegrated GAS Powertrain
10
• RAH temperature profile
– 40 h ageing corresponds about 80 000 km on road (< 1.4 l vehicle)
InGas 6th months meeting: SPB2/Ecocat
800
850
900
950
1000
1050
1100
0 30 60 90 120 150 180
Gas temperature Inlet Middle Outlet
10mm
10mm
SubstrateSubstrate
INGAS “General Assembly Meeting ”, “Prague, Czech Republic”, “25-26 May 2009”INGAS “General Assembly Meeting ”, “Prague, Czech Republic”, “25-26 May 2009”
INGAS INtegrated GAS PowertrainINGAS INtegrated GAS Powertrain
11
• Engine test results for fresh and aged Pd-Rh samples– 1,2 liter E4 bi-power vehicle– Ø 100mm x L 150mm; 1,18 l; NEDC
InGas 6th months meeting: SPB2/Ecocat
INGAS “General Assembly Meeting ”, “Prague, Czech Republic”, “25-26 May 2009”INGAS “General Assembly Meeting ”, “Prague, Czech Republic”, “25-26 May 2009”
INGAS INtegrated GAS PowertrainINGAS INtegrated GAS Powertrain
12
InGas 6th months meeting: SPB2/Ecocat
• In task TB2.2.4 (Coating methods/Up-scaling) coating methods are identified and applied for an up-scaling of the new catalyst formulations on full-size monoliths
• After the new catalyst formulations were developed in task TB2.2.1, the coating ability with up-scaling at full-size will be identified and thereby will be investigated in an engine bench
• In the beginning the successful coating will be evaluated in terms of stability and reactivity.
INGAS “General Assembly Meeting ”, “Prague, Czech Republic”, “25-26 May 2009”INGAS “General Assembly Meeting ”, “Prague, Czech Republic”, “25-26 May 2009”
INGAS INtegrated GAS PowertrainINGAS INtegrated GAS Powertrain
13
InGas 6th months meeting: SPB2/Ecocat
• WP2.3 (exhaust heating/catalyst concepts)– Planned objectives & starting points
• Definition of the EAT concept with heat exchanger and catalyst /integrated or serial concept)
• Development of a modelling tool for the whole EAT system• Simulation of the behaviour of the EAT depending on operating conditions • Evaluation of the selected concept on a laboratory scale for methane and
NOx removal • Building of 2 prototypes for laboratory investigations and 2 prototypes for
engine/vehicle testing
INGAS “General Assembly Meeting ”, “Prague, Czech Republic”, “25-26 May 2009”INGAS “General Assembly Meeting ”, “Prague, Czech Republic”, “25-26 May 2009”
INGAS INtegrated GAS PowertrainINGAS INtegrated GAS Powertrain
14
InGas 6th months meeting: SPB2/Ecocat
• Work in Ecocat– Ecocat has delivered metal foil samples to USTUTT to be used on
preliminary test for building the heat exchange unit
– The preparation of preliminary small scale samples are in progress in USTUTT
– Fixing trials by brazing or welding are in progress in Ecocat
– After the validation the next step would be to make a complete heat exchanger package for a lab scale reactor
INGAS “General Assembly Meeting ”, “Prague, Czech Republic”, “25-26 May 2009”INGAS “General Assembly Meeting ”, “Prague, Czech Republic”, “25-26 May 2009”
INGAS INtegrated GAS PowertrainINGAS INtegrated GAS Powertrain
15
InGas 6th months meeting: SPB2/Ecocat
• Next– Continue the laboratory scale development for new catalyst materials
• Pd-based for methane • Promoters, stabilizers
– Own engine tests: activity and durability