initial consultation meeting with the state of washington
DESCRIPTION
Initial Consultation Meeting with the State of Washington. October 16, 2014 Lacey, WA. Working together to bring broadband to Public Safety in Washington. Agenda – Washington Initial Consultation. Welcome & Introductions. Introductions. Our History & Mandate. 2004. 2011. - PowerPoint PPT PresentationTRANSCRIPT
www.firstnet.gov
Initial Consultation Meeting with the State of Washington
October 16, 2014Lacey, WA
Working together to bring broadband to Public Safety in Washington
2
Agenda – Washington Initial Consultation
October 16, 2014
Time Agenda Item9:00 Welcoming Remarks
9:30 FirstNet Update & Consultation Process
State’s Update 12:30 Lunch
1:30 Use Case Discussion
User Discussion
Coverage Discussion4:15 Wrap-up & Next Steps
4:30 Adjourn
3October 16, 2014
Welcome & Introductions
Introductions
4
“Recommendation: Congress should support pending legislation which
provides for the expedited and increased assignment of radio
spectrum for public safety purposes….”
Our History & Mandate
October 16, 2014
2004 2011
5
Middle Class Tax Relief and Job Creation Act of 2012
“The First Responder Network Authority shall hold the single public safety wireless license…and take all actions
necessary to ensure the building, deployment, and operation of the nationwide public safety broadband network”
Our History & Mandate
October 16, 2014
6
First Responder Communications
October 16, 2014
Land Mobile RadioPublic Safety
System/Spectrum
Voice
The Current State
Photo Source: Washington presentation, 8 21.14 SIEC-Presentation.ppt, slide 5
Mobile Data Terminal – Commercial LTE Device
Data
Mission CriticalNon-Mission Critical
Smart Phone – Commercial LTE Device
Data Voice
7
The Current State
First Responder Communications
October 16, 2014
Land Mobile RadioPublic Safety
System/Spectrum
Voice
The Near-Term Vision
Photo Source: Washington presentation, 8 21.14 SIEC-Presentation.ppt, slide 5
Mobile Data Terminal – LTE Device
Data
Mission CriticalNon-Mission Critical
Smart Phone – LTE Device
Data VoiceDataData
8
The Near-Term VisionThe Long-Term Vision
First Responder Communications
October 16, 2014
Land Mobile RadioPublic Safety
System/Spectrum
VoicePhoto Source: Washington presentation, 8 21.14 SIEC-Presentation.ppt, slide 5
Mobile Data Terminal – LTE Device
Data
Mission CriticalNon-Mission Critical
Smart Phone – LTE Device
Data VoiceDataData Voice
FirstNet will provide emergency responders with the first nationwide, high-speed, wireless broadband
network dedicated to public safety
9
Leveraging an Evolving Landscape
October 16, 2014
Benefits of Industry
• Existing Infrastructure
• Global Standard
• Economy of Scale
• Built & Maintained
Public Safety Requirements
• Dedicated Spectrum
• Hardened Infrastructure
• Specialized Devices
• Cyber-Security
• Public Safety Applications
10October 16, 2014
Making it a Reality
As we begin the State consultation process, FirstNet is committed to:
• Maintaining a close working relationship
• Understanding unique needs
• Seeking input from all stakeholders
• Gathering and utilizing State data
FirstNet Organization w/ Designees
As of Sept 2014
Chief Administrative OfficerFRANK FREEMAN
Human Resources (Jamesa Moone) Recruitment & Staffing Payroll & Benefits Workforce DevelopmentFacilities Management (Derrek Sanks) Emergency Mgmt & COOPOperations Support Records Management & Training (Saleah Tinsley) Travel Operations (Teryl Smith)
Chief Financial OfficerRANDY LYON
Deputy CFO (David Socolof)Budget and Finance Budget Operations & Controls (Alice Suh) Finance & AccountingDeputy CFO for Strategic Planning (John Quinlan)Performance Measurement & Risk
Management (Lea-Ann Bigelow)
FirstNet Offices and Divisions
Board of Directors
Sue Swenson, ChairwomanBarry Boniface
Tim BryanChris Charles Burbank
Ron Davis (U.S. Attorney General)Brian Deese (OMB)James H. Douglas
Jeff JohnsonKevin McGinnisAnnise D. Parker
Frank PlastinaEd Reynolds
Suzanne Spaulding (DHS)Richard W. Stanek
Teri Takai
GENERAL MANAGERTJ Kennedy (Acting)
DEPUTY GENERAL MANAGERTJ Kennedy
Chief User Advocacy Officer
TJ KENNEDY
Government Affairs (Ed Parkinson)Communications (Corey Ray)Outreach (Amanda Hilliard)Product Management DivisionState Consultation (David Buchanan)State Plans (Richard Reed)Strategy and Business Planning (Jessica Zufolo)
Chief Information OfficerJIM GWINN
IT ServicesOffice Systems Desktop Telecom Peripheral
Chief of StaffStuart Kupinsky
(Acting)
AdvisorLaura Pettus
(Acting)
Office of Chief CounselSTUART KUPINSKY
Deputy Chief Counsel (Jason Karp)General Law (Uzoma Onyeije, Eli Veenendaal, Natasha Coates, Patrick Sullivan, Paul Madison, Kristein Finney, Kathleen O’Rourke & Kevin Green)NEPA (Genevieve Walker, Amanda Pereira, Christopher Eck)Regulatory Strategy Spectrum Management
Chief Technical OfficerALI AFRASHTEH
Deputy CTO (Jeff Bratcher)RANCOREApplicationsDevicesPerformanceBudgetStandardsOperationsDeploymentFirstNet LabsTechnology Planning & Dev.
Program Management and Strategy
Michael LandryJames MitchellDonna Powell
October 16, 2014 11
12
FirstNet Organization (Cont.)How we will interface with Washington
October 16, 2014
Key Issues / Discussion Points
• FirstNet will coordinate with the SPOC throughout State consultation
• Outreach will hire a Regional team with area / state specific expertise
• Government Affairs will endeavor to assist with legislative issues as appropriate
FIRSTNET UPDATES
14
Devices
Understanding Our Boundaries
October 16, 2014
Local Control
Low Cost
Dynamic PriorityUniversal
Coverage
Mission Critical Voice
Use of ExistingAssets
Hardened Assets
Priority
Quality of Service
(QoS)
PushTo Talk(PTT)
Nationwide Approach
Public Safety Vision / Desires
15
FirstNet Mandates Under the ActUnderstanding the Playing Field
October 16, 2014
National Architecture
Roaming
Rural Coverage Consideration
PSAP
Contracts
National Security
Coverage Considerations
Opt-In
Priority / Preemption
Secondary Users
Management / Independent
AuthorityRFPs
Defining Responsibilities and Duties
Public Safety Entity
(Eligible Users)
State Plan Maintenance & Upgrade
Certified Equipment List
Other(s) as Needed
Commercial Infrastructure
Cybersecurity
Standards
PSAC
Promote Equipment
Competition
Public Infrastructure
Consultation
Training
FundingBuilding an Affordable, Self-Sustaining Network
• By law, the network is to be self-funding• Planning and implementation funding is provided through spectrum auctions• Funds available until Sept 30, 2022; unused funds revert to the Treasury
16October 16, 2014
Phase Funds Purpose
Planning $135 Million Grants to assist States/Territories with planning & implementation
$7 BillionImplementation$2 Billion provided to start planning, designing and early implementation
Remaining $5 Billion from spectrum auctions
Growth / Sustainment Ongoing
1. Lease Fee for Excess Network Capacity2. Lease Fee for Network Equipment / Infrastructure3. Network User Fee4. Core Network User Fee
Market Research
• Objective: Identify current market capabilities and best practices
• FirstNet has held meetings with vendors following a methodical and rigorous process
• FirstNet has also leveraged previous RFI responses
• FirstNet provides guidance on Doing Business with FirstNet website page• Note: FirstNet has temporarily suspended accepting new
requests
October 16, 2014 17
Acquisition Strategy
18
RFI Draft RFP
Comprehensive RFP Release
Technical & Economic
Topics
Legal Interpretation
Topics
Notice and
Comment Process
Final Interpretations
Needs & Design Topics
Specific State, local, tribal, PSAC & Federal Consultations
Consultative Processes
RFP Processes
Optional Notice and Comment Processes
Network Policies
October 16, 2014
Public Notice & Comment
19October 16, 2014
Notice & Comment
Available at www.federalregister.gov, keyword: FirstNet
Highlights:• Published 9/24/2014 via
Federal Register
• Responses due by 10/27/2014
•Allows inputs from broad stakeholder group
•Open & transparent process
• FirstNet intends to publish final interpretations
RFI / Statement of Objectives (SOO)
RFI/SOO
20October 16, 2014
Available at www.FedBizOpps.gov, keyword: FirstNet
Highlights:• Posted 9/17 to FedBizOpps
• Responses due by 10/27
•Does NOT dictate a specific solution
• Identifies objectives to encourage innovation
• Focuses on several key questions
• Informs the FirstNet RFP strategy & requirements
Acquisition Next Steps
21
• Prior to the Draft RFP issuance for a Comprehensive Network Solution, FirstNet will complete the following steps:
* These are target dates that may need to be adjusted
Review RFI Responses
Oct *
Release RFI
Sep
Complete Market
Research Reports
Nov *
Coordinate Draft RFP
Dec * Jan *
Develop Draft RFP
October 16, 2014
Develop RFI/SOO
Aug
Consultation
Consultation
22October 16, 2014
23
Final State Plan
Final State Plan Review
Draft State Plan Review
Intermediate Design Review (IDR)
Stakeholder Asset
Evaluation
Prelim. Design Review (PDR) & Data CollectionInitial ConsultationPreparation
Cons
ulta
tion
Tech
nica
lU
ser R
eq. /
Bus
ines
s Ca
se
Send Initial Consultation
Checklist
Coordinated Outreach
Plan
Collect Operations
Data
FirstNetResearch/Planning (FCC/PSAC Reqts)
Assess/Prioritize Public & Private
Assets
IDR Meeting(Assets, Coverage, Priority,
Security, Training)
Identify Best Value Assets & Develop Cost
Estimate
Finalize State Plan
Validate / Verify Asset Suitability -
Core & RAN design
Draft State Plan Review Meeting
(Complete DRAFT Plan)
Final State Plan Review Meeting w/ SPOC & Gov. Office
Final State Plan
Presented to Governor
State Provides Checklist Materials
Draft & Issue RFPs Evaluate RFP Responses
OEC Consultation Prep Workshops
(Voluntary)
OEC’s Mobile Data Survey Tool (MDST)
(Voluntary)
FirstNet Coverage Baseline
Develop Asset Tool
Collect Screening
Info on Assets
PDR & Data Collection Mtg
(Coverage, Data Collection, PS Grade)
RFP Results
Draft State Plan Outreach /
Vetting Process
Initial Consultation(Process, Users,
Coverage, Outreach)
Update Design & Send to State
Cost & User Fees
IDR State Outreach / Vetting Process
Update Plan & Send to State
State Feedback on User Baseline
APCO/NPSTC hardening recs. (PS Grade)
Update Business Case from Asset
Evaluation
Federal Assets and Coverage/User
feedback
Detailed Data
Collection / Suitability
Update Business Cases from Users info,
MDST
Final State Review
Develop Ops Baseline Sections of State Plan
(Security, Priority & Training)
Update Business Case from
Operational Reqts
Update Business Case from IDR
feedback
Finalize Ops Sections of State Plan
(Security, Priority, Training)
Review Priority, Security &
Training Plans
PSAC Tribal Working Group NTIA SLIGP Monitoring/Support ECPC Federal Agency Inputs
Legend:Stakeholder (State / Local / Tribal / Fed)
Joint Stakeholder / FirstNet
FirstNet
Partners (NTIA / DHS / PS Orgs)
NTIA Approval
RFI Response
Review
PSAC Inputs on
Operational Topics
State Review / Feedback of
Coverage Baseline
Develop Asset MOU
Reqts
SLIGP Ph. 2
Develop Asset Data Collection
Plan
Consultation Overview
24
• Construction of a Core and RAN build out• Placement of towers• Coverage areas of the network• Adequacy of hardening, security, reliability,
and resiliency requirements• Assignment of priority to local users• Assignment of priority and selection of
secondary users• Training needs of local users
Mandatory Elements for State Planning
State Consultation
Process
Public Safety Expertise
(PSAC)
Public Comment
Process
October 16, 2014
Note: Tribal consultation requirements under the National Historic Preservation Act will be addressed separately.
25
The State PlanBringing Everything Together
State Plan Requirements
• Completion of the RFP process
• Document proposed build-out in the State
• Funding level for the State
Key Issues / Discussion Points
• Provisioning
• Prioritization
• Applications
• Billing
October 16, 2014
26
Network Components and Choices
October 16, 2014
CORE
RAN
DEVICES / SERVICE
Service Plan
Responsibility
Agency Choice
FirstNet
FirstNet (Opt In)State (Opt Out)
Backhaul / Transport
27
Conceptual Design Approach
October 16, 2014
= FirstNet RAN (Band 14)
= Existing RAN (Band ??)
= Satellite OverlayCo-located Site FirstNet RAN Only Existing RAN Only
Multi-mode, multi-band devices
Satellite Overlay
28
Cons
ulta
tion
Firs
tNet
Acq
uisi
tion
Stak
ehol
der I
nput
PSAC Tribal Working Group NTIA SLIGP Monitoring/Support ECPC Federal Agency Inputs
Updated Consultation Approach
Operations(Provisioning, Training, Priority, Hardening, Security)
Outreach / Education
RFP ResultsRFP
Development
RFP Evaluation
Network ImplementationDraft Plan
Review State
Results & Priorities
RFI
Prep Workshops (OEC, Regional,
State/Local)
Users / Coverage / Outreach
Final State Plan
RFI/RFP Public
Comments
Phase 1 ImplementationFinal State Plan ReviewDraft State Plan ReviewRFP Evaluation Data CollectionInitial ConsultationPreparation
PSAC / Stakeholder
Inputs
www.firstnet.gov
FirstNet and Washington are working together to bring wireless broadband to
Public Safety