innovation behind the assets - re-locating - listening ... · providing impermeability of k =...

34

Upload: others

Post on 27-Jun-2020

1 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Innovation behind the assets - Re-locating - Listening ... · Providing impermeability of k = 1x10-12m/s for containment. High visibility welding strip allowing for testable joints
Page 2: Innovation behind the assets - Re-locating - Listening ... · Providing impermeability of k = 1x10-12m/s for containment. High visibility welding strip allowing for testable joints

• Innovation behind the assets

- B-to-B as close as possible

- Re-using

- Re-locating

- Listening & Learning

Kaskinen; 22nd of March 2017

Page 3: Innovation behind the assets - Re-locating - Listening ... · Providing impermeability of k = 1x10-12m/s for containment. High visibility welding strip allowing for testable joints

AboutBalticTank• Privately held family

company founded

in 1980s

• Focused on providing

cost effective bulk liquid

storage services to

Finnish industry and

transit traffic

• Operating 8 terminals in

Finland and 1 in Estonia

• Membership: EPCA,

Chemical Industry

Federation of Finland

• ISO 9001 & 14001

certified storage

operator

Page 4: Innovation behind the assets - Re-locating - Listening ... · Providing impermeability of k = 1x10-12m/s for containment. High visibility welding strip allowing for testable joints

Key Figures

TOTAL VOLUME OF

PRODUCTS

HANDLED IN 2016:

APPROX.

1.600.000 tons

1.600.000 TONS

GROUP PERSONNEL:

29 PERSONS

29

400.000 M3

14,9 M

GROUP

TURNOVER IN

2016:

14,9 MEUR

TOTAL STORAGECAPACITY:

400.000 M3

(LIQUIDS)

Page 5: Innovation behind the assets - Re-locating - Listening ... · Providing impermeability of k = 1x10-12m/s for containment. High visibility welding strip allowing for testable joints

Handling Capabilites• Caustic Soda

• Sulphuric Acid

• Hydrogen Peroxide

• Styrene

• Bitumen

• Fuel and light fuel oil

• Base oils

• Tall oil

• Bio fuels

• various other chemical

and oil products

Page 6: Innovation behind the assets - Re-locating - Listening ... · Providing impermeability of k = 1x10-12m/s for containment. High visibility welding strip allowing for testable joints

Baltic Tank Terminals• Baltic Tank has strong

presence around the

Northen Baltic Sea area.

• Our terminals are located

in key ports close to the

local industry.

• All terminals have

capabilities for unloading

and loading of ships as

well as truck traffic. In

addition Hamina, Rauma

and Kokkola have also rail

connection which allows

handling of Russian rail

cars.KOTKA

Page 7: Innovation behind the assets - Re-locating - Listening ... · Providing impermeability of k = 1x10-12m/s for containment. High visibility welding strip allowing for testable joints

Terminal overview-Kemi• Storage capacity

35.000 m3

• Tanks with insulation and

heating, stainless steel

lining and epoxy coating

• Truck loading and weigh

bridge

• Room for additional tanks

• Deepwater port,

draft 10 m

Page 8: Innovation behind the assets - Re-locating - Listening ... · Providing impermeability of k = 1x10-12m/s for containment. High visibility welding strip allowing for testable joints

Terminal overview-Oulu• Storage capacity

21.000 cbm

• Shore tanks

2.000 – 8.000 cbm

• Truck loading and weigh

bridge services

• Vessel loading and

unloading services

• Tall Oil products, Bitumen

• Deep water port ,

draft 10,0 m

Page 9: Innovation behind the assets - Re-locating - Listening ... · Providing impermeability of k = 1x10-12m/s for containment. High visibility welding strip allowing for testable joints

Terminal overview-Kokkola• Storage capacity

28.000 m3

• Tanks ready for caustic

soda and sulphuric

acid

• Truck loading and

weigh bridge

• Railway loading facilities

• Deep water port,

draft 9,5 m

Page 10: Innovation behind the assets - Re-locating - Listening ... · Providing impermeability of k = 1x10-12m/s for containment. High visibility welding strip allowing for testable joints

Terminal overview-Kaskinen• Storage capacity

29.000 m3

• Tanks with insulation and

heating, stainless steel

and epoxy coating

• Truck loading and weigh

bridge

• Room for additional tanks

• Draft 9 m / 7,2 m

Page 11: Innovation behind the assets - Re-locating - Listening ... · Providing impermeability of k = 1x10-12m/s for containment. High visibility welding strip allowing for testable joints

Terminal overview-Rauma• Total storage capacity

68.000 m3

• Products handled in

terminal include various

chemicals, flammable

products and heated

products

• Specialized in handling

high temperature

products like bitumen

• Truck loading and weigh

bridge

• Railway connection

• Draft 8,5/6,9 m

Page 12: Innovation behind the assets - Re-locating - Listening ... · Providing impermeability of k = 1x10-12m/s for containment. High visibility welding strip allowing for testable joints

Terminal overview-Turku• Storage capacity

38.000 m3

• Specialized in handling

food grade and non-

classified products

• Truck loading and weigh

bridge (Turku Port)

• Draft 9 m

Page 13: Innovation behind the assets - Re-locating - Listening ... · Providing impermeability of k = 1x10-12m/s for containment. High visibility welding strip allowing for testable joints

Terminal overview-Hamina• Storage capacity

80.500 m3

• Truck loading, rail wagon

handling and weigh

bridge services

• Storage space for various

different products and

chemicals

• Specialized in handling

high temperature

products like bitumen

• Draft 12 m

• Access to three jetties

Page 14: Innovation behind the assets - Re-locating - Listening ... · Providing impermeability of k = 1x10-12m/s for containment. High visibility welding strip allowing for testable joints

Terminal overview-Kunda (EST)• Storage capacity

52.100 m3

• Products handled include

oil products like diesel and

fuel oils, chemicals and

bio fuels

• Truck loading and weigh

bridge, railway delivery

possibilities

• Draft 8,5 m

Page 15: Innovation behind the assets - Re-locating - Listening ... · Providing impermeability of k = 1x10-12m/s for containment. High visibility welding strip allowing for testable joints

Terminal overview-Kotka• Storage capacity

72.400 m3 in two terminals

• Truck loading, rail wagon

handling and weigh

bridge services

• Storage space for various

different oil products and

chemicals

• Access to two jetties

• Room for additional tanks

• Deepwater port,

draft 9 / 13 m

Page 16: Innovation behind the assets - Re-locating - Listening ... · Providing impermeability of k = 1x10-12m/s for containment. High visibility welding strip allowing for testable joints

Kotka StanoilAqcuired 2016 spring

• Old fuel storage,

conversion to chemical

terminal

• Project

- tanks

- pipelines

- documentation

- pumps

- boiler

- foam

- safety bunds (concrete)

- tanks, structure

- pipelines, structure

- truck loading

Page 17: Innovation behind the assets - Re-locating - Listening ... · Providing impermeability of k = 1x10-12m/s for containment. High visibility welding strip allowing for testable joints

Kotka JänskäAqcuired 2016 fall

• Old HFO storage for a power

plant – Conversion to bio-oil

terminal

• Project

- tanks 1x20000m3+3x10000m3

- pipelines

- documentation

- pumps

- heat exchangers

- safety bunds (earth)

- tanks, structure

- pipelines, structure

- no truck loading

Page 18: Innovation behind the assets - Re-locating - Listening ... · Providing impermeability of k = 1x10-12m/s for containment. High visibility welding strip allowing for testable joints

Kotka Upgrade2 terminals

• Upgrade

- design/engineering

- safety bunds

- heating

- tanks, structure

- pipelines

- truck loading

- rtc-gantry

- HSEQ

- automation

- permitting

- maintenance regime

• Actions

- laser 3D modelling

- check and renew

- bring in supply, connect

- complete check

- check and reconfigure

- build on module, in house

- lengthen, revise, automate

- check and implement

- install and implement

- in house fire modelling

- M-files

Page 19: Innovation behind the assets - Re-locating - Listening ... · Providing impermeability of k = 1x10-12m/s for containment. High visibility welding strip allowing for testable joints

3D Modelling

• Laser scanning of the Kotka Stanoil site

• 3D models

• Ability to continue the engineering on the excisting structures

• Accurate

• Very good for commercial purposes also

• 3D model

Page 20: Innovation behind the assets - Re-locating - Listening ... · Providing impermeability of k = 1x10-12m/s for containment. High visibility welding strip allowing for testable joints

Safety bund

• Renewal of the earth based safety bund in Kotka Jänskä terminal

• Bund lining with Concrete Canvas Hydro

• First installation in Finland

• Fiber-reinforced concrete flooring

• Quick as there are no molds and iron

• Easy installation

• Overlapping of materials, membrane backing

Page 21: Innovation behind the assets - Re-locating - Listening ... · Providing impermeability of k = 1x10-12m/s for containment. High visibility welding strip allowing for testable joints

CC’s concrete impregnated fabric technology.

Chemically resistant geomembrane backing.

Providing impermeability of k = 1x10-12m/s for containment.

High visibility welding strip allowing for testable joints.

CC Hydroᵀᴹ combines the company’s concrete impregnated fabric technology with a high impermeability, chemically resistant

geomembrane liner, which allows joints to be thermally bonded for on-site air channel testing.

Page 22: Innovation behind the assets - Re-locating - Listening ... · Providing impermeability of k = 1x10-12m/s for containment. High visibility welding strip allowing for testable joints
Page 23: Innovation behind the assets - Re-locating - Listening ... · Providing impermeability of k = 1x10-12m/s for containment. High visibility welding strip allowing for testable joints

Tank structure and pipeline scanning

• Structure sample pieces for DT(Destructive Testing)

- steel properties like tensile strenght and cold brittleness

• SLOFEC(Saturated Low Frequency Eddy Current) for tank floors

- scanning of top and bottom side of the floor

- corrosion beneath the floor discovered

- Weld seams and difficult areas to be tested with traditional NDT

• GWT(Guided Wave Technology) scanning for pipeline corrosion

- easy to do also on insulated pipelines

- additional checking required, tradional NDT

- Weld seams to checked separately

Page 24: Innovation behind the assets - Re-locating - Listening ... · Providing impermeability of k = 1x10-12m/s for containment. High visibility welding strip allowing for testable joints
Page 25: Innovation behind the assets - Re-locating - Listening ... · Providing impermeability of k = 1x10-12m/s for containment. High visibility welding strip allowing for testable joints
Page 26: Innovation behind the assets - Re-locating - Listening ... · Providing impermeability of k = 1x10-12m/s for containment. High visibility welding strip allowing for testable joints

PermittingFire modelling

• Inhouse fire models, software

- google earth

- SketchUp

- pyrosim

- fixed roof models

- fire models up to date and scenarions can be redone

Page 27: Innovation behind the assets - Re-locating - Listening ... · Providing impermeability of k = 1x10-12m/s for containment. High visibility welding strip allowing for testable joints
Page 28: Innovation behind the assets - Re-locating - Listening ... · Providing impermeability of k = 1x10-12m/s for containment. High visibility welding strip allowing for testable joints
Page 29: Innovation behind the assets - Re-locating - Listening ... · Providing impermeability of k = 1x10-12m/s for containment. High visibility welding strip allowing for testable joints
Page 30: Innovation behind the assets - Re-locating - Listening ... · Providing impermeability of k = 1x10-12m/s for containment. High visibility welding strip allowing for testable joints

MaintenanceRegime and lot more

• M-Files, Enterprise information management

- what instead of where

- Metadata defines the structure

- already implemented from the early stages of a project

- store and view drawings, manuals and instructions

- create the maintenance routine

- also in use for projects and HSEQ

Page 31: Innovation behind the assets - Re-locating - Listening ... · Providing impermeability of k = 1x10-12m/s for containment. High visibility welding strip allowing for testable joints

ENTERPRISEINFORMATION MANAGEMENT

ORGANIZED BY

WHAT WHERESOMETHING IS IT'S BEEN STORED

VS

DOCUMENT TYPE

CUSTOMER

DATE

PERMISSIONS

Page 32: Innovation behind the assets - Re-locating - Listening ... · Providing impermeability of k = 1x10-12m/s for containment. High visibility welding strip allowing for testable joints

Access to documents resembles traditional folder directories

Easy to use

Define views based on document properties

One document can be found several ways

Views are centrally managedAnyone can create views specific to them

View Your Documents and DataAny Way You Want To

Traditional Folder Pitfalls:

Files only have one locationMultiple copies of files may be in different locations

Page 33: Innovation behind the assets - Re-locating - Listening ... · Providing impermeability of k = 1x10-12m/s for containment. High visibility welding strip allowing for testable joints
Page 34: Innovation behind the assets - Re-locating - Listening ... · Providing impermeability of k = 1x10-12m/s for containment. High visibility welding strip allowing for testable joints

Hamina • Kotka • Kaskinen • Kemi • Oulu • Kokkola • Kunda • Rauma• Turku