Succesful Experience of Private European Investmens in RES in LT Ansrius Kasparavičius

TRANSCRIPT

Page 1: Inogate (Minsk)  2014-04-22

Succesful Experience of Private European Investments in RES in LT

Andrius Kasparavicius, Minsk, 22 04 2014

www.inogate.org

Page 2: Inogate (Minsk)  2014-04-22

TODAY I WILL TALK ABOUT...

Page 3: Inogate (Minsk)  2014-04-22
Page 4: Inogate (Minsk)  2014-04-22

Long term vision

Page 5: Inogate (Minsk)  2014-04-22

2020 goals

• 20% of electricity comes from wind and biomass• 60% of centralized heat comes from biomass• 10% of transport used fuel from RES• 1,5% annual growth of energy consumption

efficiency• Less CO2• 30-40% of savings in centralized heating system

Page 6: Inogate (Minsk)  2014-04-22

National Energy Strategy

Page 7: Inogate (Minsk)  2014-04-22

Business

Page 8: Inogate (Minsk)  2014-04-22

Numbers, 2013

Page 9: Inogate (Minsk)  2014-04-22

Capacities, 2013

Page 10: Inogate (Minsk)  2014-04-22

Energy Sources, 2013

Page 11: Inogate (Minsk)  2014-04-22

PROBLEM NO.1: OVERCAPACITY, LOW PRICES FOR ENERGY & A NEED FOR INVESTMENTS

Page 12: Inogate (Minsk)  2014-04-22

Heating

Page 13: Inogate (Minsk)  2014-04-22

Heating price

Page 14: Inogate (Minsk)  2014-04-22

PROBLEM NO.2: HUGE PRICES FOR HEATING & DEPENDENCE ON GAS

Page 15: Inogate (Minsk)  2014-04-22

Waste

Page 16: Inogate (Minsk)  2014-04-22
Page 17: Inogate (Minsk)  2014-04-22

Municipal waste management

Page 18: Inogate (Minsk)  2014-04-22

PROBLEM NO.3: LANDFILLS & EU REQUIREMENTS

Page 19: Inogate (Minsk)  2014-04-22

Three big problems

• Problem No.1: Overcapacity, Low Prices For Energy & A

Need For Investments• Problem No.2:

Huge Prices For Heating & Dependence On Gas

• Problem No.3: Landfills & EU Requirements

Page 20: Inogate (Minsk)  2014-04-22

WHAT TO DO?

Page 21: Inogate (Minsk)  2014-04-22

Finland3 0.3

Sweden32 5.2

Norway18 1.5

Estonia

Latvia

LithuaniaDenmark29 3.5

United Kingdom25 5.7

Ireland1 0.04

Netherlands12 7.2

Belgium18 3.6

Germany75 21.2

Poland*1 0.04

France129 12.9

Luxembourg*1 0.1

Czech Republic3 0.6 Slovakia*

2 0.2Austria13 2.5Switzerland

30 3.5Hungary

1 0.4Slovenia* 1 0.01

Romania

Bulgaria

Greece

Spain**11 2.5

Portugal3 1.1

Italy46 5.8

[email protected] www.cewep.eu

Croatia

W2E in Europe

Page 22: Inogate (Minsk)  2014-04-22

Investment

Page 23: Inogate (Minsk)  2014-04-22

Figures

• 95% of shares – UAB Fortum Heat Lietuva • 5% of shares – AB Klaipėdos energija• 130 million EUR – value of the project • 50 МW – heat capacity• 15 МW – additional heat capacity from smoke condenser

during the winter time • 20 MW – electric capacity• 400 GWh – annual production of heat energy• 140 GWh – annual production of electricity• 40% of heat amount necessary for Klaipėda heat

consumers

Page 24: Inogate (Minsk)  2014-04-22

Facts

• The plant burn up to 245 thousand tons of municipal and industrial waste and biofuel (wood chips) ; 40-42% of municipal waste is biodegradable

• The best available technologies (BAT)used in the plant ensure the best method of waste incineration

• All heat produced is transmitted to the Klaipėda city district heating system, while electricity is supplied to common electricity network

• The new Klaipėda plant, where waste will be used as fuel, is the first object of such type in the Baltic countries

• The company employs 35 professionals• More 30 service agreements

Page 25: Inogate (Minsk)  2014-04-22

Emissions

Page 26: Inogate (Minsk)  2014-04-22

Three major chalenges

BUREAUCRACY SOCIETY TRANSPARENCY

Page 27: Inogate (Minsk)  2014-04-22

Benefits to Klaipėda region and Lithuania

• Decreased dependence on imported fuels• More stable heat prices• Reduced costs for building new landfills• 4 – 5 times smaller amounts of waste disposed in

landfill• Reduced environmental pollution• Competition of heat suppliers• One of the largest “green field” investment in Lithuania• About 35 MEUR civil and constructing works was done

by local companies