Page 1: Inplant Training - Integral Coach Factory

IN-PLANT TRAINING REVIEW

INTEGRAL COACH FACTORY INDIAN RAILWAYS

Sudarshan. MRA1411002040113

Mechanical – ‘B’IIIrd Year

Page 2: Inplant Training - Integral Coach Factory

Introduction• INTEGRAL COACH

FACTORY IS THE ONLY MANUFACTURER OF RAIL COACHES LOCATED IN CHENNAI. IT IS OWNED AND OPERATED BY THE INDIAN RAILWAYS.

• ICF is the first of its kind to be established after Independence for the manufacture of light weight, all steel and all welded Integral railway passenger coaches.

• The plant employs about 13,000 people and manufactures about 1500 coaches per year.

• A total of 50,000 coaches had been produced till 18 Aug 2015 by ICF since its inception

Page 3: Inplant Training - Integral Coach Factory

A Brief History Of IcfTHE INTEGRAL COACH FACTORY WAS SET

UP IN 1951 WITH THE HELP OF M/S SWISS CAR AND ELEVATOR MANUFACTURING CORPORATION LTD., SCHLIEREN-ZURICH (SWITZERLAND).

IT WAS INAUGURATED BY THE THEN PRIME MINISTER OF INDIA PANDIT JAWAHARLAL NEHRU ON 02 OCT 1955.

PRODUCTION BEGAN IN A MODEST MANNER IN 1955 WITH THE MANUFACTURE OF SEVEN THIRD CLASS COACH SHELLS

Page 4: Inplant Training - Integral Coach Factory

INTEGRAL COACH FACTORY

Shell Division Furnishing Division

SHOP 10 & 11 SHEET METAL

PROCESS

SHOP 22SIDE AND END

WALL ASSEMBLY

SHOP 21 ROOF ASSEMBLY

SHOP 30FURNINSHING

SHOP 37 AIR BRAKE ASSEMBLY

SHOP 54PAINTING

Page 5: Inplant Training - Integral Coach Factory

SHOP 10: SHEET METAL PROCESSING• STAGE 1: STRAIGHTENING BY

ROLLERS• STAGE2: RELAXATION• STAGE3: CUTTING OF SHEETS

MATERIALS USED• COR-TEN Steel

6mm• Mild Steel 6mm• Stainless Steel

4mm

Page 6: Inplant Training - Integral Coach Factory

SHOP 10: SHEET METAL PROCESSING

• CUT TO LENGTH MACHINE• ECCENTRIC PRESS• PROFILE BENDING• SEAM WELDING• BLANKING USING HYDRAULIC PRESS OF

TONNAGE 300-1000 TONS.

• LASER CUTTING CNC USING N2,H2, CO2

Page 7: Inplant Training - Integral Coach Factory

SHOP 11: SIDE WALL ASSEMBLY • THE SIDE WALLS OF THE

COACHES ARE BEING ASSEMBLED HERE.

• THE SHEET WHICH ARE CUT IN SHAPE AND BENDED IN REQUIRED PROFILE FROM SHOP 10 IS WELDED TOGETHER HERE.

• SPOT WELDING AND SURFACE WELDING ARE USED.

• THE WALL FIXTURES ARE MOVED BY OVERHEAD HEAVY TONNAGE CRANES.

• IT TAKES ABOUT A WEEK TO PRODUCE APPROX. 4-5 COACHES.

Page 8: Inplant Training - Integral Coach Factory

SHOP 21 AND 22: MAIN ASSEMBLY

Page 9: Inplant Training - Integral Coach Factory

SHOP 21 AND 22: MAIN ASSEMBLY• Shop 21 – Roof Assembly• Roof is assembled by placing

the sheet on special fixtures called Roof Jigs

• Electric Arc welding is mainly used.

• Minor joints are welded by Gas Welding.

• Shop 22 – Body Assembly• The body of four different

coaches are made here.• They are General Coach,

Second Day coach, Second Class Night Coach and Second Class Loading Unloading

Page 10: Inplant Training - Integral Coach Factory

METRO BOGIES SIDE FRAME

Page 11: Inplant Training - Integral Coach Factory

SHOP 30:FURNISHING

• 1. PREPARATORY – BODY IS LINED WITH FOAM AND INSULATION

• 2. FLOORING – PLYWOOD FLOORING IS DONE. MICA SHEETS

• 3. WIRING – INTERNAL WIRING AND OTHER ELECTRICAL FIXTURES

• 4. PVC PASTING • 5. PANELING – I

Page 12: Inplant Training - Integral Coach Factory

SHOP 30:FURNISHING

• 6. PANELING –II• 7. MOLDING• 8. FITTING – THE

FRAMES FOR SEATS OR BERTHS ARE FIXED

• 9. SEATS AND WORKS• 10. PIT LINE

INSPECTION – MANUAL INSPECTION IS DONE

Page 13: Inplant Training - Integral Coach Factory

SHOP 37 - BRAKING SYSTEM

• Air brakes system is generally used.

• Vacuum Brakes are used for minor braking purpose.

• Air brakes is classified into three parts 1. Auto Brake

2. EP Brake 3. Emergency Brake

Page 14: Inplant Training - Integral Coach Factory

SHOP 37 - BRAKING SYSTEM

• Electro Pneumatic Unit is used to control the system

• In this the brake assembly is made as designed.

• Leakage check is done using soap water.• The limit for verification is a 0.2kg pressure drop

in 15 minutes.

Page 15: Inplant Training - Integral Coach Factory

SHOP 54 : PAINTING• DEWHEELING OF BOGIES • FIXING OF DUMMY BOGIE• MASKING

• SHOT BLASTING – SHOTS

OF 2 – 3 MM DIAMETER• DEMASKING• EPOXY PRIMER – A.K.A

METAL PRIMER (2 COATS)• ENAMEL • OVEN

Page 16: Inplant Training - Integral Coach Factory

SHOP 54 : PAINTING• POLYESTER PATTY – TO COVER

DENTS• DUST CLEANING – AIR HOSE• SURFACER OR BASE PAINTING –

TO COVER PINHOLE GAPS• SURFACER FLATTENING – DONE

USING EMERY PAPER MANUALLY• WINDOW AREA SATIN GLUE

ENAMEL• AC BLUE ENAMEL• WHEELING • DISPATCH

Page 17: Inplant Training - Integral Coach Factory

THANK YOU FOR LISTENING