System: GHP + hydraulic kit Installation capacity: 822 kW installation Year: 2013 Background INPS institute is the most complex social security institution in Europe. By implementing standards and laws that govern the world of social security, INPS manages more than 500 articles concerning social security. Each Italian region has provincial headquarters. One of the provincial headquarters in Tuscany is located in Siena, via Lippo Memmi, near the centre of the town just 10 minutes far from the famous square Piazza del Campo. Its GLPHQVLRQ LV VTXDUH PHWHUV DQG LW LV GLYLGHG LQWR WZR ȵRRUV Challenge of the project First challenge: best economical tender. 6HFRQG FKDOOHQJH ΖQ RUGHU WR LPSURYH WKH HQHUJ\ HɝFLHQF\ DQG WKH YDOXH RI WKH EXLOGLQJ WKH RZQHU KDV GHFLGHG WKH UHIXUELVKPHQW RI WKH EXLOGLQJ RɝFH IRU Ζ136 ΖVWLWXWR 1D]LRQDOH 3UHYLGHQ]D 6RFLDOH 7KH EXLOGLQJ LV QHDU VRPH UHVLGHQFHV DQG WKH FRQVXOWDQW QHHGV RXWGRRU XQLWV ZLWK D ORZ OHYHO RI noise and respect the restriction on power to run conventional HVAC installation. The solution The heating and cooling system air to water is composed by 13 Gas Heat Pumps 2 way and 13 hydraulic kits, connected to the existing water indoor INPS Siena PROJECT CLIENT APPLICATION 2ɝFHV RANGE VRF INPS Siena MARKET / TIME Italy / 2013 Air Conditioning | &DVH 6WXGLHV

Upload: others

Post on 13-Apr-2022

2 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: INPS Siena Italy / 2013 VRF

System: GHP + hydraulic kitInstallation capacity: 822 kWinstallation Year: 2013

BackgroundINPS institute is the most complex social security institution in Europe. By implementing standards and laws that govern the world of social security, INPS manages more than 500 articles concerning social security. Each Italian region has provincial headquarters. One of the provincial headquarters in Tuscany is located in Siena, via Lippo Memmi, near the centre of the town just 10 minutes far from the famous square Piazza del Campo. Its

Challenge of the project First challenge: best economical tender.

noise and respect the restriction on power to run conventional HVAC installation.

The solutionThe heating and cooling system air to water is composed by 13 Gas Heat Pumps 2 way and 13 hydraulic kits, connected to the existing water indoor

INPS SienaPROJECT CLIENT

APPLICATION RANGE

VRF

INPS Siena

MARKET / TIME

Italy / 2013

best economical tender, high performance in heating and cooling in severe weather conditions, powerful cooling/heating of the rooms, quite mode of

Control13 wired timer remote controllers were installed to set actions for each day and for service information

INSTALLED SOLUTION

GHP + hydraulic kit

Outdoor units 1 x U-16GE2E5 5 x U-20GE2E5 7 x U-25GE2E5

Indoor units 6 x S-500WX2E5 7 x S-710WX2E5

Controls 13 x CZ-RTC2

Air Conditioning |

Areeya Offices in BangkokAir Conditioning System: VRF 2-Way FSV ME1 Series: 19 systemsSingle split: 67 systemsCooling Capacity: 1,519 kW / 432 USRTIndoor Units:4-Way Cassette: 46 unitsMid-static ducted: 39 unitsControl System:P-AIMS basic software with communication adapter: 1 systemWired remote controller: 46 unitsWireless remote controller: 39 units

Areeya Property PLC is a publicly listed Bangkok-based property developer established in 2000. As well as selling land for development, the company builds residential dwellings and sells already developed residential real estate. Today the company focuses on selling modern-styled townhouses and condominiums located centrally in Bangkok.

Page 2: INPS Siena Italy / 2013 VRF

System: GHP + hydraulic kitInstallation capacity: 822 kWinstallation Year: 2013

BackgroundINPS institute is the most complex social security institution in Europe. By implementing standards and laws that govern the world of social security, INPS manages more than 500 articles concerning social security. Each Italian region has provincial headquarters. One of the provincial headquarters in Tuscany is located in Siena, via Lippo Memmi, near the centre of the town just 10 minutes far from the famous square Piazza del Campo. Its

Challenge of the project First challenge: best economical tender.

noise and respect the restriction on power to run conventional HVAC installation.

The solutionThe heating and cooling system air to water is composed by 13 Gas Heat Pumps 2 way and 13 hydraulic kits, connected to the existing water indoor

best economical tender, high performance in heating and cooling in severe weather conditions, powerful cooling/heating of the rooms, quite mode of

Control13 wired timer remote controllers were installed to set actions for each day and for service information

INSTALLED SOLUTION

GHP + hydraulic kit

Outdoor units 1 x U-16GE2E5 5 x U-20GE2E5 7 x U-25GE2E5

Indoor units 6 x S-500WX2E5 7 x S-710WX2E5

Controls 13 x CZ-RTC2

· Panasonic Gas Heat Pumps 2 way · Panasonic hydraulic kits· Pansonic wired timer remote controllers · Pansonic U-16GE2E5· Pansonic U-20GE2E5· Pansonic U-25GE2E5· Pansonic S-500WX2E5 · Pansonic S-710WX2E5· Pansonic CZ-RTC2

Ortigas Avenue Extension, Taytay, Rizal, 1920 PhilippinesEmail: [email protected] Please contact us for the further information.

Panasonic Việt NamRUNG TÂM HỖ TRỢ KHÁCH HÀNG - TƯ VẤN MIỄN PHÍ CÁC

Hỗ trợ trước và sau mua hàngTư vấn, hướng dẫn sử dụng sản phẩmgiải quyết các thắc mắc, khiếu nại của khách hànghoặc (024) 3767 7360từ 8h15 -17h30 thứ 2 đến chủ nhật

The applicable products and solutions may differ in markets. Please contact us for the further information.