inspection and testing checklists 2.2 - ewa · iec 60364‐6 iec 61010 – laboratory u iec 61557...

36
T Techn co stan for nical onnec ndard Inspe installat Exp ction ds fo B ection an tion of D O www.ewa.bh pert tn guid or the ahra nd Testi Distribu 2.2 October 201 h o dev delin e Kin in ing Chec ted Sola 7 velop nes a gdom cklists ar PV Pla p gri nd m of ants d

Upload: others

Post on 01-Jul-2021

130 views

Category:

Documents


1 download

TRANSCRIPT

Page 1: Inspection and Testing Checklists 2.2 - EWA · IEC 60364‐6 IEC 61010 – laboratory u IEC 61557 – d.c. IEC 61724‐1 IEC 61724‐2 IEC 61724‐3 IEC 61730‐2 IEC 62446‐1 maintenanc

 

 

T

  

  

 

   

 

      

Technco

stan

for i

nicalonnecndard

Inspeinstallat

Expctionds fo

B

ection antion of D

O

www.ewa.bh

pert ton guidor theahra

 

nd TestiDistribu

2.2 

October 201

o devdeline Kinin 

ing Chected Sola

velopnes agdom

cklists ar PV Pla

p grind m of

ants 

d

Page 2: Inspection and Testing Checklists 2.2 - EWA · IEC 60364‐6 IEC 61010 – laboratory u IEC 61557 – d.c. IEC 61724‐1 IEC 61724‐2 IEC 61724‐3 IEC 61730‐2 IEC 62446‐1 maintenanc

     

    

 

1  SCO

2  For

2.1 

2.2 

3  Sol

3.1 3.1.3.1.3.1.

3.2 3.2.3.2.3.2.

4  Me

4.1 

4.2 4.2.4.2.4.2.

4.3 4.3.4.3.4.3.

4.4 4.4.4.4.4.4.

4.5 4.5.4.5.4.5.

4.6 4.6.4.6.4.6.

4.7 4.7.4.7.4.7.

OPE ...........

reword ......

Reference

Terms and

lar PV Desig

PV plants .1  Descript.2  Pass/fail .3  Checklist

Above 11 .1  Descript.2  Pass/fail .3  Checklist

echanical In

Overview 

General on.1  Descript.2  Pass/fail .3  Checklist

Document.1  Descript.2  Pass/fail .3  Checklist

Civil work.1  Descript.2  Pass/fail .3  Checklist

PV module.1  Descript.2  Pass/fail .3  Checklist

Electrical e.1  Descript.2  Pass/fail .3  Checklist

Mechanica.1  Descript.2  Pass/fail .3  Final res

.................

.................

e documents

d definitions

gn Check‐lis

up to 11 kWion .................criteria .........t .....................

kW ............ion .................criteria .........t .....................

nspection Ch

..................

n PV plant aion .................criteria .........t .....................

ts required .ion .................criteria .........t .....................

s and Suppoion .................criteria .........t .....................

es ...............ion .................criteria .........t .....................

equipment iion .................criteria .........t .....................

al Inspectionion .................criteria .........ult page .........

 

Tab

.................

.................

s ..................

 ..................

st ...............

W ....................................................................................

...................

......................

......................

......................

hecklists ....

...................

nd Participa..................................................................

...................

......................

......................

......................

ort structures..................................................................

...................

......................

......................

......................

nstallation a..................................................................

n Final result..................................................................

ble of cont 

..................

..................

...................

...................

..................

...................

......................

......................

......................

...................

......................

......................

......................

..................

...................

ants ...............................................................................

...................

......................

......................

......................

s ...................................................................................

...................

......................

......................

......................

and protecti..................................................................

t ...................................................................................

tents 

..................

..................

...................

...................

..................

..................................................................................

..................................................................................

..................

...................

..................................................................................

..................................................................................

..................................................................................

..................................................................................

on .............................................................................

..................................................................................

..................

..................

...................

...................

..................

.....................................................................................

.....................................................................................

..................

...................

.....................................................................................

.....................................................................................

.....................................................................................

.....................................................................................

.....................................................................................

.....................................................................................

.................

.................

...................

...................

.................

.....................................................................................

.....................................................................................

.................

...................

.....................................................................................

.....................................................................................

.....................................................................................

.....................................................................................

.....................................................................................

.....................................................................................

Page | 2  

............. 5

............. 7

............... 7

............... 7

............. 9

............... 9................. 9................. 9................. 9

............. 10............... 10............... 10............... 10

........... 12

............. 12

............. 12............... 12............... 12............... 12

............. 13............... 13............... 13............... 13

............. 14............... 14............... 14............... 14

............. 15............... 15............... 15............... 15

............. 15............... 15............... 15............... 16

............. 17............... 17............... 17............... 17

Page 3: Inspection and Testing Checklists 2.2 - EWA · IEC 60364‐6 IEC 61010 – laboratory u IEC 61557 – d.c. IEC 61724‐1 IEC 61724‐2 IEC 61724‐3 IEC 61730‐2 IEC 62446‐1 maintenanc

     

    

5  Tes

5.1 

5.2 5.2.5.2.5.2.

5.3 5.3.5.3.5.3.

5.4 5.4.5.4.5.4.

5.5 5.5.5.5.5.5.

5.6 5.6.5.6.5.6.

5.7 5.7.5.7.5.7.

5.8 5.8.5.8.5.8.

6  Tes

6.1 

6.2 6.2.6.2.6.2.

6.3 6.3.6.3.6.3.

6.4 6.4.6.4.6.4.

st without I

Overview 

General on.1  Descript.2  Pass/fail .3  Checklist

Document.1  Descript.2  Pass/fail .3  Checklist

DC system.1  Descript.2  Pass/fail .3  Checklist

AC system.1  Descript.2  Pass/fail .3  Checklist

Labelling a.1  Descript.2  Pass/fail .3  Checklist

PV array t.1  Descript.2  Pass/fail .3  Checklist

Test witho.1  Descript.2  Pass/fail .3  Final res

st with Inte

Overview 

General on.1  Descript.2  Pass/fail .3  Checklist

Document.1  Descript.2  Pass/fail .3  Checklist

Sensors ....1  Descript.2  Pass/fail .3  Checklist

Interconnec

..................

n PV plant aion .................criteria .........t .....................

ts required .ion .................criteria .........t .....................

m inspection ion .................criteria .........t .....................

m inspection ion .................criteria .........t .....................

and identificion .................criteria .........t .....................

est report ..ion .................criteria .........t .....................

out Interconion .................criteria .........ult page .........

erconnection

..................

n PV plant aion .................criteria .........t .....................

ts required .ion .................criteria .........t .....................

..................ion .................criteria .........t .....................

 

ction Check

...................

nd Participa..................................................................

...................

......................

......................

......................

...................

......................

......................

......................

...................

......................

......................

......................

cation ............................................................................

...................

......................

......................

......................

nection Fina..................................................................

n Checklist

...................

nd Participa..................................................................

...................

......................

......................

......................

...................

......................

......................

......................

klist ............

...................

ants ...............................................................................

...................

......................

......................

......................

...................

......................

......................

......................

...................

......................

......................

......................

...................

......................

......................

......................

...................

......................

......................

......................

al result .........................................................................

.................

...................

ants ...............................................................................

...................

......................

......................

......................

...................

......................

......................

......................

..................

...................

..................................................................................

..................................................................................

..................................................................................

..................................................................................

..................................................................................

..................................................................................

..................................................................................

..................

...................

..................................................................................

..................................................................................

..................................................................................

..................

...................

.....................................................................................

.....................................................................................

.....................................................................................

.....................................................................................

.....................................................................................

.....................................................................................

.....................................................................................

..................

...................

.....................................................................................

.....................................................................................

.....................................................................................

.................

...................

.....................................................................................

.....................................................................................

.....................................................................................

.....................................................................................

.....................................................................................

.....................................................................................

.....................................................................................

.................

...................

.....................................................................................

.....................................................................................

.....................................................................................

Page | 3  

........... 18

............. 18

............. 18............... 18............... 18............... 18

............. 19............... 19............... 19............... 19

............. 19............... 19............... 20............... 20

............. 22............... 22............... 22............... 22

............. 23............... 23............... 23............... 23

............. 24............... 24............... 24............... 24

............. 25............... 25............... 25............... 25

........... 27

............. 27

............. 27............... 27............... 27............... 27

............. 28............... 28............... 28............... 28

............. 28............... 28............... 28............... 29

Page 4: Inspection and Testing Checklists 2.2 - EWA · IEC 60364‐6 IEC 61010 – laboratory u IEC 61557 – d.c. IEC 61724‐1 IEC 61724‐2 IEC 61724‐3 IEC 61730‐2 IEC 62446‐1 maintenanc

     

    

6.5 6.5.6.5.6.5.

6.6 6.6.6.6.6.6.

6.7 6.7.6.7.6.7.

7  Pow

7.1 

7.2 7.2.7.2.7.2.

7.3 7.3.7.3.7.3.

7.4 7.4.7.4.7.4.

7.5 7.5.7.5.7.5.

 

 

 

 

 

 

 

 

 

 

 

Performan.1  Descript.2  Pass/fail .3  Checklist

Inspection.1  Descript.2  Pass/fail .3  Checklist

Test with .1  Descript.2  Pass/fail .3  Final res

wer Quality

Overview 

General on.1  Descript.2  Pass/fail .3  Checklist

Document.1  Descript.2  Pass/fail .3  Checklist

Harmonic .1  Descript.2  Pass/fail .3  Checklist

Power Qu.1  Descript.2  Pass/fail .3  Final res

nce test ......ion .................criteria .........t .....................

n and Test ofion .................criteria .........t .....................

Interconnecion .................criteria .........ult page .........

y Measurem

..................

n PV plant aion .................criteria .........t .....................

ts required .ion .................criteria .........t .....................

Tests .........ion .................criteria .........t .....................

ality Measuion .................criteria .........ult page .........

 

...................

......................

......................

......................

f the Interfac..................................................................

tion Final re..................................................................

ments and T

...................

nd Participa..................................................................

...................

......................

......................

......................

...................

......................

......................

......................

rements and..................................................................

...................

......................

......................

......................

ce Protectio..................................................................

esult ..............................................................................

Tests Check

...................

ants ...............................................................................

...................

......................

......................

......................

...................

......................

......................

......................

d Tests Final..................................................................

..................................................................................

n ...............................................................................

..................................................................................

klist ............

...................

..................................................................................

..................................................................................

..................................................................................

 result .......................................................................

.....................................................................................

.....................................................................................

.....................................................................................

..................

...................

.....................................................................................

.....................................................................................

.....................................................................................

.....................................................................................

.....................................................................................

.....................................................................................

.....................................................................................

.................

...................

.....................................................................................

.....................................................................................

.....................................................................................

.....................................................................................

Page | 4  

............. 30............... 30............... 30............... 30

............. 31............... 31............... 31............... 31

............. 31............... 31............... 31............... 31

........... 33

............. 33

............. 33............... 33............... 33............... 33

............. 34............... 34............... 34............... 34

............. 34............... 34............... 34............... 35

............. 35............... 35............... 35............... 35

Page 5: Inspection and Testing Checklists 2.2 - EWA · IEC 60364‐6 IEC 61010 – laboratory u IEC 61557 – d.c. IEC 61724‐1 IEC 61724‐2 IEC 61724‐3 IEC 61730‐2 IEC 62446‐1 maintenanc

     

    

1 SC

This  doproceduof a solaThe Figufinal consolar PVsets are  

 The  FiguDistributtests. Ho

before tDependtests as      

COPE

cument  proures as descrar PV plant inure 1 shows nnection to V plant and wnecessary, w

F

ure  1  showstion Directoowever, EWA

Inspect test and 

install the m

the solar PV ping on the cashown in the

ovides  the  cribed in the In order to cothe general the electric 

we may see twhile for larg

igure 1 – Seq

s  also  that  torate  (EDD), A/EDD shall: 

and approve

meters 

plant can beapacity Pn oe following T

 

check‐lists  tnspection anonnect it to thsequence ofnetwork. Thhat for plantger plants fo

quence of th

the  Applicanor  the Mun 

e the installa

energized.f the Solar PTable 1. 

o  be  used nd testing Guhe public Elef the testing he number ats whose nomur test sets a

he testing ac

nt  ‐  under  tnicipality  for

ation as per t

PV plant the 

to  implemeuidelines  [4]ectric Netwoactivities fro

and type of tminal powerare required

tivities for s

the  eventua  the Mecha

the Regulatio

Applicant sh

ent  the  Inspto be adoptrk in Bahrainom the end otests dependPn is up to 1.  

olar PV plan

l  supervisionnical  Inspect

ons for Elect

hall carry out

pection  andted after the n  [1]. of constructds on the siz100 kW only

nts 

n  of  EWA  Ection  ‐  shall 

trical Installa

t the inspect

Page | 5  

d  Testing erection 

ion to its ze of the  two test 

Electricity make  all 

tions  [2], 

tions and 

Page 6: Inspection and Testing Checklists 2.2 - EWA · IEC 60364‐6 IEC 61010 – laboratory u IEC 61557 – d.c. IEC 61724‐1 IEC 61724‐2 IEC 61724‐3 IEC 61730‐2 IEC 62446‐1 maintenanc

     

    

 

D

LdrTaddr

M(s

IninarCCA

InPfuP

AhAm

(§) (*) 

t(^)  Furthermreported   

Table 

Description

Layout, SLD, drawings, etc.

Technical repodditional diagrawings, etc.

Mechanical insseparate inspe

nspection – genspection before carried out

Category 1 testCategory 2 testAdditional test

nterface protecPerformance munctions

Performance ra

Assessment of armonic conte

Additional measurements report to beno check  listthe performif required a

more, accordd. 

1 – Main ste

datasheets,

ort and grams,

spection ection)

eneral ore all tests

t regime t regime ts

ction monitoring

atio P

f the ent

 delivered wt  is providedance of thesfter assessm

ding to the d

 

eps of the Ins

Pn ≤ 11 kWSyst

X

-

Mecha-

Test withX

X - -

Test wiX X

X Power Quality

-

-

with the resuld  in the presse tests, as wment of the h

description in

 

spection and

Capacity oW 11 kWtem document

anical Inspect

hout interconn

Faith interconnec

y measuremen

lts of the inssent documewell as on theharmonic con

n  [4], the che

d Testing of t

of the Solar PVW < Pn ≤ 100ktation

X

X

tion (§) -

nection (§) X

X -

acultative (*)ction (§)

X X

X nts and tests (§

-

-

pections andent: contracte reporting antent in Erro

ecklists for t

the Solar PV

V plant (Pn) kW P

RecoFac

§)

d tests tor and custnd the deliver! Reference

he solar PV 

V plants 

Pn >100kW

X

X

X

X

X ommended (*)cultative (*)

X X

X

X

X (^)

tomer shall ery of the ree source not 

plant design

Page | 6  

)

agree on esults found. 

n are also 

Page 7: Inspection and Testing Checklists 2.2 - EWA · IEC 60364‐6 IEC 61010 – laboratory u IEC 61557 – d.c. IEC 61724‐1 IEC 61724‐2 IEC 61724‐3 IEC 61730‐2 IEC 62446‐1 maintenanc

     

    

2 FO

2.1 R

[1]

[2]

[3]

[4] [5] [6]

[7]

[8] [9] [10] [11] [12]

[13]  

2.2 T

Active instantaactive poApparenelementVA. UndCable  tyenvironm“H07RNData sheproduct Global hexpresseIMOD_MAX

This is oInspectiselectionIn‐planeupon anarray (PO

OREWORD

Reference

EWA  –  Stannetworks ofMinistry  of electrical insEWA –  Guidnetworks ofEWA – InspeIEC 60364‐6IEC  61010  –laboratory uIEC 61557 – d.c. IEC 61724‐1IEC 61724‐2IEC 61724‐3IEC 61730‐2IEC  62446‐1maintenancinspection IEC 62548 – 

Terms and

power  (P) neous  prodower is the rnt  power  (St or two‐termder sinusoidaype  –  descrment  to  be F”) eet – basic pmanual) horizontal  ired in W/m2 

X_OCPR – PV mften specifieon – examinn and propee irradiance n inclined surOA) irradian

D

documen

ndards  for  Sf the KingdomElectricity 

stallations (Sdelines for Sf the Kingdomection and Te – Low volta–  Safety  requse Electrical sa

 – Photovolt – Photovolt – Photovolt – Photovolt1  –  Photovoe.  Part  1: G

Photovoltaic

d definitio

–  under  peuct  of  currereal part of tS)  –  productminal circuit al conditions,ription  of  a determined

product desc

rradiance  (G

odule maximed by modulenation of an er erection of(Gi or POA) rface parallece. It is expr

 

nts

Solar  PV  Systm of Bahrainand  Water,Second editioolar PV system of Bahrainesting Guidege electrical quirements  f

fety in low v

aic system paic system paic system paic (PV modoltaic  (PV)  syGrid  connect

c (PV) arrays

ns

eriodic  condent  and  volthe complex t  of  the  r.mand the r.m, the apparencable  to  en

d  (Note:  In 

cription and s

GHI) – direct 

mum overcure manufactuelectrical insf electrical eq– the sum ofl to the planeessed in W/m

tems  to  be n   Electricity on, 2004) ems to be Con elines installationsfor  electrica

voltage distri

performanceperformanceperformanceule safety quystems.  Reqion  systems

s. Design req

ditions,  meatage  expresspower. m.s.  voltage m.s. electric cnt power is tnable  its  ramany  coun

specification

plus diffuse

rrent protectrers as the mstallation usiquipment f direct, diffue of the modm2 

connected 

Distribution

onnected ion

s. Part 6: Verl  equipment

ibution syste

. Part 1: Mon

. Part 2: Cap

. Part 3: Eneualification. Pquirements . Document

uirements 

an  value,  tased  in W.  U

between  tcurrent in thethe modulusting  and  suntries  this  is

n (Note: Typi

e  irradiance 

tion rating dmaximum serng all the sen

use, and grodules in the P

in  parallel w

n  Directorate

n in parallel 

rifications t  for measu

ems up to 10

nitoring acity evaluatrgy evaluatioPart 2: Requfor  testing, ation,  comm

aken  over Under  sinuso

he  terminale element or of the compitability  for s  done  via  a

cally one or 

incident on 

etermined bries fuse ratinses in order

und‐reflectePV array, also

with  the  dis

e  –  Regulat

with the dis

rement,  con

000 V a.c. an

tion methodon method irements fordocumenta

missioning,  t

one  periodoidal  conditi

s  of  a  two‐r circuit expplex power. a  particulaa  code  num

two pages, 

a horizonta

by IEC 61730ing) r to ascertai

ed irradianceo known as p

Page | 7  

tribution 

tions  for 

tribution 

ntrol  and 

d 1500 V 

r testing tion  and tests  and 

,  of  the ions,  the 

‐terminal ressed in 

r  use  or mber  e.g. 

not a full 

l  surface 

‐2 (Note: 

n correct 

e incident plane‐of‐

Page 8: Inspection and Testing Checklists 2.2 - EWA · IEC 60364‐6 IEC 61010 – laboratory u IEC 61557 – d.c. IEC 61724‐1 IEC 61724‐2 IEC 61724‐3 IEC 61730‐2 IEC 62446‐1 maintenanc

     

    

Interfacplant  andegradeInverteralternatIrradianIrradiatiPoint ofdistributPower fapparenPV arrayPV  cell conversiPV modPV strinPV  strinovercurrRecord –

RecordinReport –ReportinReportinResiduacurrent Sample SamplinSoiling rthe powSwitch  –conditiofor  a  spconditioStandarjunctionTesting effectiveinstrumeVerificatrelevantstandardVoltage voltages  

e Protectionnd/or  any  gee the safety ar – electric eing current ce (G) – incidion (H) – irraf Connectiontion networkfactor (λ) – unt power S y – assembly– most elemion of radianule – smalleg – circuit ofng  combinerrent protecti– data record

ng interval (– aggregate vng period – tng – recordinl  current  deexceeds the – data acquing interval – ratio (SR) – rwer that wou– Mechanicaons and, whepecified  timeons. d  test  condn temperatur–  impleme

eness  is proents, said vation  –  all  mt ds is checked‐ Unless stas. 

n  (IP)  ‐ The enerating unand reliabilitynergy conve

dent flux of adiance integn or POC ‐ Is k and where under period

y of electricamentary devnt energy intst complete f one or morr  box  –  juncion devices, ded and stor

) – time betvalue based time betweeng of the resevice  (RCD) operating vaired from a stime betweeratio of the ald be expectal  device  caen specified, e,  currents 

ditions  (STC)re (25 °C), anentation  of ved  (Note: lues not beinmeasures  by

d ated otherwi

 

electrical prnit  is disconny of the distrrter that cha

radiant powegrated over athe location the main eleic conditions

lly interconnice  that exho electrical eenvironmene series‐conction  box whelectronics ared in data lo

tween recoron series of en reports ults of inspe–  is  a  sensialue of the dsensor or meen samplesactual powered if the PV apable  of main given opeunder  speci

)  –  referencnd the referemeasures It  includes  ang detectably  means  of 

ise, voltage 

 

rotection  reqnected  for  aribution netwanges direct 

er per unit aa specified tiat which a  ectricity mets, ratio of th

nected PV mohibits  the phenergy ntally protectnected PV mhere  PV  striand/or switcog, based on

ds records 

ection and teitive  safety device easuring dev

r output of tarray were caking,  carryerating overloified  abnorm

ce  values  ofence spectralin  an  electascertaining le by inspectwhich  comp

refers to the

quired  to enany event  thwork. electric curr

rea expresseme interval solar PV genter is installee absolute v

odules, PV stotovoltaic e

ted assemblymodules ngs  are  conch‐disconnecn acquired sa

esting device  that 

ice 

he PV array clean and freing  and  breoad conditiomal  circuit  c

f  in‐plane  irrl irradiance dtrical  instalvalues by mtion) pliance  of  t

e root‐mean

nsure  that ehat  could  im

rent to single

ed in W/m2 expressed inerating pland. alue of the a

trings or PV sffect,  i.e  the

y of intercon

nnected whictors mples 

switches  of

under given ee of soiling aking  currenons. In additioconditions,  s

radiance  (1 defined in IEClation  by  mmeans of  ap

he  electrica

‐square valu

either  the gempair  the  int

e‐phase or p

n kWh/m2 nt is connecte

active power

sub‐arrays. e direct non

nnected PV c

ch may  also

ff when  the 

 soiling cond

nts  in  normon, it is able such  as  sho

000 W/m2)C 60904‐3 means  of  wppropriate m

al  installatio

ue of phase‐

Page | 8  

enerating egrity or 

olyphase 

ed to the 

r P to the 

‐thermal 

ells 

o  contain 

residual 

ditions to 

al  circuit to carry, 

ort‐circuit 

,  PV  cell 

which  its measuring 

n  to  the 

to‐phase 

Page 9: Inspection and Testing Checklists 2.2 - EWA · IEC 60364‐6 IEC 61010 – laboratory u IEC 61557 – d.c. IEC 61724‐1 IEC 61724‐2 IEC 61724‐3 IEC 61730‐2 IEC 62446‐1 maintenanc

     

    

3 SO

3.1 P

3.1.1 The folloplants u 

3.1.2 A positiv 

3.1.3  

Solar P Basic sysProject idRated syskVA ACPV modu(manufacInstallatioCommissCustomeSite addr System dSystem dSystem dSystem dtelephone System inSystem inSystem inSystem intelephone Wiring d

Suitable Array – GPV stringPV arrayAC systeEarthing Other de

Planimet

OLAR PV

PV plants

Description

owing form ip to 11 kW a

Pass/fail cri

ve final resul

Checklist 

PV Design

stem informatdentification rstem power (k

C) ules and invercturers, modelon date sioning date r name

ress

designer infordesigner, Comdesigner, contadesigner, postae, e-mail

nstaller informnstaller, Compnstaller, contanstaller, postae, e-mail

diagram Field

and readable fGeneral specifg information y electrical detem

and overvolta

esign informatField

try and String

DESIGN C

up to 11 k

 

s used to vaas described 

iteria 

lt requires th

n Check-l

tionreference kW DC and

ters ls, quantity)

rmation mpany

act person al address,

mation pany act person al address,

format fications

tails

age protection

tion

layout

 

CHECK-L

kW

lidate the doin the docum

hat only Yes o

list – Pn ≤

Yes Yes

Yes

Yes Yes Yes Yes

Yes Yes Yes

Yes Yes Yes

Yes Compl Compl Compl Compl

n Compl

Yes

IST

ocumentatioment EWA –

or Complete

≤ 11 kW

No No No

No

No No No No

No No No

No No No

Result / V No lete No lete No lete No lete No lete No

Result / V No

n at design A– Inspection a

or Not Appl

ot applicable

Value

Value

Approval stagand Testing G

icable boxes

ge for solar Guidelines  [4

s are checked

Notes

Notes

Page | 9  

PV 4]. 

d. 

Page 10: Inspection and Testing Checklists 2.2 - EWA · IEC 60364‐6 IEC 61010 – laboratory u IEC 61557 – d.c. IEC 61724‐1 IEC 61724‐2 IEC 61724‐3 IEC 61730‐2 IEC 62446‐1 maintenanc

     

    

Solar P DatasheeIP (if appMechanicEmergenShading Esteem oproductio OperatioAll appli

Final r 

3.2 A

3.2.1 The folloplants a 

3.2.2 A positiv 

3.2.3  

Solar P Basic sysProject idRated syskVA ACPV modu(manufacInstallatioCommissCustomeSite addr System dSystem dSystem dSystem dtelephone System inSystem inSystem in

PV Design

et – PV modulplicable) cal design info

ncy system diagram

of the yearly eon

on and maintecable items

result

Above 11 k

Description

owing form ibove 11 kW 

Pass/fail cri

ve final resul

Checklist 

PV Design

stem informatdentification rstem power (k

C) ules and invercturers, modelon date sioning date r name

ress

designer infordesigner, Comdesigner, contadesigner, postae, e-mail

nstaller informnstaller, Compnstaller, conta

n Check-l

les, Inverters,

formation

nergy

enance inform

kW

 

s used to vaas described

iteria 

lt requires th

n Check-l

tionreference kW DC and

ters ls, quantity)

rmation mpany

act person al address,

mation pany act person

 

list – Pn ≤

Yes

Yes Yes Yes Yes

mation Yes

Pass

lidate the dod in the docu

hat only Yes o

list – Pn >

Yes Yes

Yes

Yes Yes Yes Yes

Yes Yes Yes

Yes Yes

≤ 11 kW

No

No No No No No

No

sed N

ocumentatioument EWA –

or Complete

> 11 kW

No No No

No

No No No No

No No No

No No

ot applicable

Not passed

n at design A– Inspection 

or Not Appl

ot applicable

Approval stagand Testing 

icable boxes

P

ge for solar Guidelines  [

s are checked

Page | 10  

PV [4]. 

d. 

Page 11: Inspection and Testing Checklists 2.2 - EWA · IEC 60364‐6 IEC 61010 – laboratory u IEC 61557 – d.c. IEC 61724‐1 IEC 61724‐2 IEC 61724‐3 IEC 61730‐2 IEC 62446‐1 maintenanc

     

    

Solar P System intelephone Technica

PreliminaForewordInput datCharacteand equipSystem adimensioDC sectioAC sectioCivil andShading Performa Wiring d

Suitable Array – GPV stringPV arrayAC systeEarthing Other de

PlanimetDatasheeIP MechanicEmergen OperatioAll appli

Final r    

PV Design

nstaller, postae, e-mail

al report Field

ary informatiod (or differentta ristics of the mpment architecture anoning on on

d mechanical idiagram

ance calculatio

diagram Field

and readable fGeneral specifg information y electrical detem

and overvolta

esign informatField

try and String et – PV modul

cal design infoncy system

on and maintecable items

result

n Check-l

al address,

on tly named)

main devices

nd

installation

on

format fication

tails

age protection

tion

layout les, Inverters,

formation

enance inform

 

list – Pn >

Yes

Compl Compl Compl Compl

Compl

Compl Compl Compl Compl Compl

Yes Compl Compl Compl Compl

n Compl

Yes Yes

Yes Yes

mation Yes

Pass

 

> 11 kW

No

Result / Vlete No lete No lete No lete No

lete No

lete No lete No lete No lete No lete No

Result / V No lete No lete No lete No lete No lete No

Result / V No No

No No No

No

sed N

Value

Value

Value

ot applicable

Not passed

P

Notes

Notes

Notes

Page | 11  

Page 12: Inspection and Testing Checklists 2.2 - EWA · IEC 60364‐6 IEC 61010 – laboratory u IEC 61557 – d.c. IEC 61724‐1 IEC 61724‐2 IEC 61724‐3 IEC 61730‐2 IEC 62446‐1 maintenanc

     

    

4 ME

Mechan 

4.1 O

The purpas the inIt  is  imInterconThe chec

 

4.2 G

4.2.1 This  parMechan 

4.2.2 A positivStreet naParticipaindicate 

4.2.3  

Mecha General Name of Nominal P.O. BoxStreet namLocation City Voltage dPOC PV moduBuilding

ECHANICA

nical Inspecti

Overview

pose of the Mntegrity of alportant  to nnection, whcklist is com

General on P

Documents 

Civil works a

PV modules 

Electrical eq

Mechanical 

General on

Description

rt  refers  to nical Inspecti

Pass/fail cri

ve final resuame and numants  indicated if not alrea

Checklist 

anical Insp

on PV plant f the PV plant

Power [kW] x me and numb

n / Area

delivery

ule installationinstallation (i

AL INSPE

on applies to

Mechanical Il equipmentkeep  this  i

hich is focuseposed by the

PV plant and

required Che

and Support 

Checklist 

quipment ins

Inspection F

n PV plan

 

the  generalon. 

iteria 

lt requires tmber that med  as  Facultady present. 

spection C

ber

n if applicable)

 

ECTION C

o solar PV pla

Inspection isand their conspection  loed on the elee following d

d Participants

ecklist 

structures C

tallation and

Final result 

t and Part

l  data  of  th

hat all itemsay be alternatative may  b

Check-list

240 V

On bui Flat ro

CHECKLIS

ants with Pn

s to verify theorrect displacogically  sepectrical partsdocuments:

s Checklist 

Checklist 

d protection 

rticipants

e  PV  plant 

s are filled wative each otbe  omitted 

(1 phase)

ilding Otooftop Ro

STS

 > 100 kW.

e mechanicacement. arated  from. 

Checklist 

and  to  the 

with correct ither. if  they  are 

415 V (3 ph

her structure (oof flap F

al integrity of

m  the  subse

data  of  the

nformation, 

not  present

ases) 11

(e.g. canopy) açade Oth

P

f the PV plan

equent  Test 

e  participant

 except P.O.

t.  Affiliation 

kV (3 phases

Ground ther

Page | 12  

nt as well 

without 

ts  to  the 

 Box and 

shall  be 

s)

Page 13: Inspection and Testing Checklists 2.2 - EWA · IEC 60364‐6 IEC 61010 – laboratory u IEC 61557 – d.c. IEC 61724‐1 IEC 61724‐2 IEC 61724‐3 IEC 61730‐2 IEC 62446‐1 maintenanc

     

    

Mecha Building

Area of tPV techn

Tracking Participa

Test engiInstaller DesignerInspectorInspectorInspector

Result 

4.3 D

4.3.1 This part 

4.3.2 A positiv 

4.3.3  

Mecha Documen

Final desvariationDeclaratiCommunfrom EWNotificatiApplican

Result  

anical Insp

type (if appli

the PV array [nology

g system if any

ants Role

ineer (mandat(mandatory) r (facultative) r (facultative) r (facultative) r (facultative)

t

Document

Description

t refers to th

Pass/fail cri

ve final resul

Checklist 

anical Insp

nts required Field

sign or As-buins ion of Conform

nication of avaWA

ion of the datent

t

spection C

cable)

m2]

y

tory)

ts required

 

he document

iteria 

lt requires th

spection C

d ilt design in ca

mity ailable periods

es from the

 

Check-list

Villa o School Hotel/R Detent

Mono- Thin-f No trac

d

ts required o

hat all Yes bo

Check-list

Rease of Ye

Yes Ye

Ye

or small housel/University Restaurant tion/Correctio

-crystalline silfilm (specify) acking Sin

Name

Pas

on‐site to pe

oxes are prop

esult / Valuees No

es No es No

es No

ehold Apa Healthcar

Entertainmonal Other

licon Mu. . . . . . . . .

ngle-axis track

ssed N

rform the M

perly checke

Passed

artment block e/Hospital ent Agricr . . . . . . . . . .

lti-crystalline Other (spec

king Two

Independe

Not passed

echanical Ins

d. 

No

Not pa

P

k Offices Industrial

cultural/Stable. . . . . . . . . . .

silicon cify) . . . . . . . o-axes tracking

Affiliation ent licensed e

EWA

d

spection. 

otes

assed

Page | 13  

e . .

. . . . g

engineer

Page 14: Inspection and Testing Checklists 2.2 - EWA · IEC 60364‐6 IEC 61010 – laboratory u IEC 61557 – d.c. IEC 61724‐1 IEC 61724‐2 IEC 61724‐3 IEC 61730‐2 IEC 62446‐1 maintenanc

     

    

4.4 C

4.4.1 With refto the dof comp 

4.4.2 A positiv 

4.4.3  

Mecha Civil wor

FoundatideterioraStructuratolerancePlacemenfoundatioGeneral cand relateWaterproRoof inteprotectiomountingAccess dVentilatioof the cabIntegrity conduits Support sField Mountingand of fixCondition(damagesloss of gacorrosionPlanaritysupportinInclinatiothe toleraBolts andcorresponcheck)

Result 

Civil works

Description

ference to 10rawings andponents and 

Pass/fail cri

ve final resul

Checklist 

anical Insp

rks Field

ons (state, breation of the sural alignments: es set by designt of inserts anons and precasconditions of ed foundationoofing of the cegrity and ingrn (water proog system to th

doors of the caon grills / air bins and layout of

structures

g of supportinxation elemenn of the comps, defects, welalvanic protecn) y of the PV mong structures (on of PV modances set in thd tightening tonding to desig

t

s and Sup

 

00% of the id design documaterials. Th

iteria 

lt requires th

spection C

eakage, rface) within the

gn nd holes in st the cabins

ns cabins ress f) of e roof

abins conditioning

f cableways /

ng structures nts ponents ld quality,

ction,

odules (arrows, sags) dules: within he design orque gn (sample

 

pport stru

nstallation, tuments regahe following 

hat only Yes o

Check-list

Resu Yes

Yes

Yes

Yes

Yes Yes

Yes Yes

Yes

Result / V Yes

Yes

Yes

Yes

Yes

Passe

uctures

this part refearding the qu checks shall

or N/A boxes

ult / Value No N/A

No N/A

No N/A

No N/A

No N/A No N/A

No N/A No N/A

No N/A

Value No N/A

No N/A

No N/A

No N/A

No N/A

ed No

ers to the veuantity, typel be perform

s are checke

A

A

A

A

A A

A A

A

NotesA

A

A

A

A

ot passed

erification of e, sizing, instaed. 

d. 

No

P

f the correspallation and 

otes

Page | 14  

pondence integrity 

Page 15: Inspection and Testing Checklists 2.2 - EWA · IEC 60364‐6 IEC 61010 – laboratory u IEC 61557 – d.c. IEC 61724‐1 IEC 61724‐2 IEC 61724‐3 IEC 61730‐2 IEC 62446‐1 maintenanc

     

    

4.5 P

4.5.1 With refto the dof comp 

4.5.2 A positiv 

4.5.3  

Mecha Visual in

Mechanicmodules incompleIntegrity modules discoloraLabeling Fixation Bolts andcorresponsample bNo obstrumodule Quality oField TighteninCorrect in(clamps, narrow, eAssemblyconnecto

Result 

4.6 E

4.6.1 With refto the dof comp 

4.6.2 A positiv

PV module

Description

ference to 10rawings andponents and 

Pass/fail cri

ve final resul

Checklist 

anical Insp

nspection of PField

cal integrity o(faults, break

ete assembly) functional pa(delamination

ation, dirt, etc. of modules system

d tightening tonding to desigasis) uctions shadin

of cabling

ng of cable glanstallation of sharp edges, f

etc.) y and crimpin

ors

t

Electrical e

Description

ference to 10rawings andponents and 

Pass/fail cri

ve final resul

es

 

00% of the id design documaterials. Th

iteria 

lt requires th

spection C

PV modules

of the downs or

arts of the n, .)

orques gn (on a

ng any PV

ands DC cables folds too

ng of plug-in

equipmen

 

00% of the id design documaterials. Th

iteria 

lt requires th

 

nstallation, tuments regahe following 

hat only Yes o

Check-list

Resu Yes

Yes

Yes Yes Yes

Result / V Yes Yes

Yes

nt installa

nstallation, tuments regahe following 

hat only Yes o

this part refearding the qu checks shall

or N/A boxes

ult / Value No N/A

No N/A

No N/A No N/A No N/A

Value No N/A No N/A

No N/A

P

ation and p

this part refearding the qu checks shall

or N/A boxes

ers to the veuantity, typel be perform

s are checke

A

A

A A A

NotesA A

A

Passed

protection

ers to the veuantity, typel be perform

s are checke

erification of e, sizing, instaed. 

d. 

No

Not pass

n

erification of e, sizing, instaed. 

d. 

P

f the correspallation and 

otes

sed

f the correspallation and 

Page | 15  

pondence integrity 

pondence integrity 

Page 16: Inspection and Testing Checklists 2.2 - EWA · IEC 60364‐6 IEC 61010 – laboratory u IEC 61557 – d.c. IEC 61724‐1 IEC 61724‐2 IEC 61724‐3 IEC 61730‐2 IEC 62446‐1 maintenanc

     

    

 

4.6.3  

Mecha Electrica

PositionicombinerPV stringInstallatiocable shePositioniequipmenswitchgeMechanicequipmenSwitch-dvisible answitch podesign) Emergencall pointof PV plahazard buabove flo ProtectioField IP degreecombinerInstallatiocombinerInstallatioconnectoequipmenPositioniconduits ladders Protectiv(polyuretinlets of cand insecLabeling equipmen

Result 

Checklist 

anical Insp

al equipment iField

ng and fixatior boxes for cogs on of racewayeaths string ng in the cabint: inverters, tar, etc. cal integrity ont (e.g. faults,

disconnectors ond reachable (osition accord

ncy remote cont) to disconneant (ordinary uildings, min.oor)

on of assemble

e of equipmenr boxes, etc. on of equipmer boxes, etc. on of cable gl

ors related to thnt ng of cable duon metallic ca

ve measures agthane foam to conduits and octs (anti-insect of cables, cabnt

t

spection C

installation

on of string onnection of

ys and/or

ins of the transformers,

of the said , breaks) on DC side (all buildings, ding to

ntrol (manual ct a portion and higher eight 1.1 m

led componen

nt, string

ent, string

lands and he above

ucts / ableways /

gainst rodentsobstruct

of cabins) t grilles) ble ducts and

 

Check-list

Resu Yes

Yes

Yes

Yes

Yes

Yes

ts (IP degree)Result / V

Yes

Yes

Yes

Yes

Yes

Yes

ult / Value No N/A

No N/A

No N/A

No N/A

No N/A

No N/A

) Value

No N/A

No N/A

No N/A

No N/A

No N/A

No N/A

P

A

A

A

A

A

A

NotesA

A

A

A

A

A

Passed

No

Not pass

P

otes

sed

Page | 16  

Page 17: Inspection and Testing Checklists 2.2 - EWA · IEC 60364‐6 IEC 61010 – laboratory u IEC 61557 – d.c. IEC 61724‐1 IEC 61724‐2 IEC 61724‐3 IEC 61730‐2 IEC 62446‐1 maintenanc

     

    

4.7 M

4.7.1 This part 

4.7.2 The Megive pos 

4.7.3  

Mecha Participa

Test engi Installer Designer Inspector Inspector Inspector Notes

Final r    

Mechanica

Description

t reports the

Pass/fail cri

chanical  Inspsitive result (

Final result 

anical Insp

ants Role

ineer (mandat

(mandatory)

r (if present)

r (if present)

r (if present)

r (if present)

result

al Inspect

 

e final outcom

iteria 

pection will Passed). 

page 

spection F

tory)

 

ion Final

me of the M

be  successf

Final resul

 

result

echanical Ins

ful  (Passed) 

lt

Name

Pas

spection. 

if all  the che

ssed N

ecklists  in  th

Not passed

P

he above do

Signatur

d

Page | 17  

ocuments 

e

Page 18: Inspection and Testing Checklists 2.2 - EWA · IEC 60364‐6 IEC 61010 – laboratory u IEC 61557 – d.c. IEC 61724‐1 IEC 61724‐2 IEC 61724‐3 IEC 61730‐2 IEC 62446‐1 maintenanc

     

    

5 TE

Test wit 

5.1 O

The purrequiremThe chec

 

5.2 G

5.2.1 This parwithout  

5.2.2 A positivStreet naParticipaindicate 

5.2.3  

Test w General Name of Nominal P.O. BoxStreet naLocationCity Voltage dPOC PV moduBuilding Building

Area of t

EST WITH

hout interco

Overview

pose of the ments of thecklist is com

General on P

Documents 

DC system in

AC system in

Labelling an

PV array tes

Test without

General on

Description

rt refers to tInterconnec

Pass/fail cri

ve final resuame and numants  indicated if not alrea

Checklist 

without Int

on PV plant f the PV plant

Power [kW] x ame and numbn / Area

delivery

ule installationinstallation (itype (if appli

the PV array [

OUT INTE

onnection ap

Test withou PV plant beposed by the

PV plant and

required Che

nspection Ch

nspection Ch

d Identificat

t report Che

t Interconne

n PV plan

 

the general dction. 

iteria 

lt requires tmber that med  as  Facultady present. 

terconnec

ber

n if applicable) icable)

m2]

 

ERCONNE

plies to all so

ut  Interconnefore its conne following d

d Participants

eck‐list 

heck‐list 

heck‐list 

ion Check‐lis

ck‐list 

ection final re

t and Part

data of the 

hat all itemsay be alternatative may  b

ction Chec

240 V

On bui Flat ro Villa o School Hotel/R Detent

ECTION C

olar PV plant

ection  is to vnection to thdocuments:

s Check‐list

st 

esult 

rticipants

PV plant and

s are filled wative each otbe  omitted 

ck-list

(1 phase)

ilding Otooftop Roor small housel/University

/Restaurant tion/Correctio

CHECKLIS

ts. 

verify and tee grid. 

d to the dat

with correct ither. if  they  are 

415 V (3 ph

ther structure (oof flap Fehold Apa Healthcar

Entertainmonal Othe

ST

est the safet

a of the par

nformation, 

not  present

hases) 11

(e.g. canopy) açade Otartment blocke/Hospital

ment Agricr . . . . . . . . . .

P

ty and the fu

rticipants to 

 except P.O.

t.  Affiliation 

kV (3 phases

Ground ther k Offices

Industrial cultural/Stable. . . . . . . . . . .

Page | 18  

unctional 

the Test 

 Box and 

shall  be 

s)

e . . .

Page 19: Inspection and Testing Checklists 2.2 - EWA · IEC 60364‐6 IEC 61010 – laboratory u IEC 61557 – d.c. IEC 61724‐1 IEC 61724‐2 IEC 61724‐3 IEC 61730‐2 IEC 62446‐1 maintenanc

     

    

Test w PV techn

Tracking Participa

Test engiInstaller DesignerInspectorInspectorInspector

Result 

5.3 D

5.3.1 This part 

5.3.2 A positiv 

5.3.3  

Test w Documen

Final descase of vDeclaratiCommunperiods fNotificatApplicanMechaniPn>100 k

Result 

5.4 D

5.4.1 The purpIEC 6036 

without Int

nology

g system if any

ants Role

ineer (mandat(mandatory) r (facultative) r (facultative) r (facultative) r (facultative)

t

Document

Description

t refers to th

Pass/fail cri

ve final resul

Checklist 

without Int

nts required Field

sign or As-buivariations ion of Conform

nication of avafrom EWA tion of the datent cal InspectionkW )

t

DC system

Description

pose of this 64‐6 and IEC 

terconnec

y

tory)

ts required

 

he document

iteria 

lt requires th

terconnec

ilt design in

mity ailable

es from the

n Report ( if

m inspecti

 

document is62548. 

 

ction Chec

Mono- Thin-f No tra

d

ts required o

hat only Yes o

ction Chec

Resul Yes N

Yes N Yes N

Yes N

Yes N

on

s to check th

ck-list

-crystalline silfilm (specify) acking Sin

Name

Pas

on‐site to pe

or N/A boxes

ck-list

lt / Value No

No No

No

No N/A

Pa

hat the entire

licon Mu. . . . . . . . .

ngle-axis track

ssed N

rform the Te

s are checke

assed

e DC system 

lti-crystalline Other (spec

king Two

Independe

Not passed

est without In

d. 

No

Not passe

has been ins

P

silicon cify) . . . . . . . o-axes tracking

Affiliation dent licensed e

EWA

d

nterconnect

otes

ed

spected acco

Page | 19  

. . . . g

engineer

ion 

ording to 

Page 20: Inspection and Testing Checklists 2.2 - EWA · IEC 60364‐6 IEC 61010 – laboratory u IEC 61557 – d.c. IEC 61724‐1 IEC 61724‐2 IEC 61724‐3 IEC 61730‐2 IEC 62446‐1 maintenanc

     

    

5.4.2 A positiv 

5.4.3  

Test w DC syste

The DC sand insta60364 anThe maxthe array All systestructurewithstandsuch as wcorrosionRoof fixiweatherp DC systeField

Protectivvoltage (

Protectioinsulation

DC systeField Galvanicinverter o

Function

PV ArraydetectionrequiremPV Arraydetectionrequirem DC systeField For systeprotectivmaximumthe possibFor systeprotectivaccommocurrent fr

Pass/fail cri

ve final resul

Checklist 

without Int

em – general F

system has bealled to the reqnd IEC 62548 imum PV arra

y location m components have been sed the expectedwind, sandstorn ings and cableproof (where a

em – Protectio

ve measure proSELV / PELV

on by use of cln adopted on t

em – Protectio

c separation inor on the AC s

nal earthing of

y Earth Insulan and alarm sy

ments of IEC 6y Earth Residun and alarm sy

ments of IEC 6

em – Protectio

ems without stve device: IMOD

m series fuse rble reverse cu

ems without stve device: strinodate the max

from parallel s

iteria 

lt requires th

terconnec

ield een designed, quirements of

ay voltage is s

ts and mountinelected and erd external inflrm, temperatu

e entries are applicable)

on against ele

ovided by extrV)

lass II or equivthe DC side

on against the

n place inside tside

f any DC cond

ation Resistancystem is instal2548 ual Current M

ystem is instal2548

on against ove

tring overcurrD_MAX_OCPR (thrating) is greaurrent tring overcurrng cables are sximum combintrings

 

hat only Yes o

ction Chec

specified IEC

suitable for

ng rected to uences re and

ectric shock

ra low

valent

e effects of ins

the

ductor

ce led – to the

Monitoring led – to the

ercurrents

ent he module ater than

ent sized to ned fault

or N/A boxes

ck-list

Result Yes N

Yes N

Yes N

Yes N

Result / Valu Yes N

(alternative toone)

Yes N(Alternative tprevious one)

sulation faultResult / Valu

Yes N(informative)

Yes N(Informative)

Yes N

Yes N

Result / Valu Yes N

Yes N

s are checke

t / Value No

No

No

No N/A

ueNo

o the next

No to the )

ts ue

No )

No )

No

No

ueNo N/A

No N/A

d unless diff

Notes

Notes

Notes

P

ferently indic

Notes

Page | 20  

cated. 

Page 21: Inspection and Testing Checklists 2.2 - EWA · IEC 60364‐6 IEC 61010 – laboratory u IEC 61557 – d.c. IEC 61724‐1 IEC 61724‐2 IEC 61724‐3 IEC 61730‐2 IEC 62446‐1 maintenanc

     

    

Test w For systedevice: sare fittedrequiremFor systeprotectivdevices arequiremFor systea DC bacback-feedmodule mcable am DC systeField Where thearthing functionaand insta62548 Where a earth on tinterrupteIEC 6254Array fraspecifiedIEC 6254Where prbonding parallel t DC systeField To minimthe area osmall as pMeasures(e.g. screWhere SPinstalled DC systeField The PV mpossible All DC coperationDC systeIEC 6254

without Int

ems with stringtring overcurr

d and correctlyments of IEC 6ems with arrayve devices: oveare fitted and c

ments of IEC 6ems where theck-feed into thd current is lomaximum fuse

mpere rating

em – Earthing

he PV system of one of the Dal earth connealled to the req

PV system hathe DC side: aer is provided48 ame bonding ad and installed48 rotective earthconductors ar

to, and bundle

em – Protectio

mize voltages of all wiring lopossible s are in place

eening or the uPDs are fittedto the require

em – Selection

modules are raDC system vo

components arn at DC and atem voltage and48

terconnec

g overcurrent rent protectivey specified to t2548

y / sub-array oercurrent protcorrectly spec2548

e inverter(s) cahe PV array ciower than bothe rating and th

g and bonding

includes funcDC conductor

ection has beenquirements of

as a direct cona functional ea

d to the require

arrangements d to the require

hing and/or eqre installed: thed with, the DC

on against the

induced by ligoops has been

to protect lonuse of SPDs) d, they have beements of IEC

n and erection

ated for the moltage re rated for cot the maximumd current as de

 

ction Chec

protective e devices the

overcurrent ective

cified to the

an produce ircuits: any h the he string

g arrangemen

tional rs: the n specified IEC

nnection to arth fault ements of

have been ements of

quipotential hey are C cables

e effects of lig

ghtning, n kept as

g cables

een 62548

n of electrical

maximum

ntinuous m possible efined in

ck-list

Yes N

Yes N

Yes N

nts Result / Valu

Yes N

Yes N

Yes N

Yes N

ghtning and oResult / Valu

Yes N

Yes N

Yes N

l equipment Result / Valu

Yes N

Yes N

No N/A

No N/A

No N/A

ueNo N/A

No N/A

No

No N/A

vervoltage ue

No

No

No

ueNo

No N/A

Notes

Notes

Notes

PPage | 21  

Page 22: Inspection and Testing Checklists 2.2 - EWA · IEC 60364‐6 IEC 61010 – laboratory u IEC 61557 – d.c. IEC 61724‐1 IEC 61724‐2 IEC 61724‐3 IEC 61730‐2 IEC 62446‐1 maintenanc

     

    

Test w Wiring syerected toinfluencesolar radiMeans ofbeen provsub-arrayA DC swside of th62548 If blockinvoltage rPV string62548) Plug andof the sammanufactrequirem

Result 

5.5 A

5.5.1 The pur60364‐6 

5.5.2 A positiv 

5.5.3  

Test w AC syste

Means ofprovidedAll isolatconnectethe “load“source” Where anfeeding averified taccordingInvertersfor Solar

without Int

ystems have bo withstand thes such as winiation f isolation andvided for the Pys – to the req

witch disconnehe inverter to t

ng diodes are rating is at leasg in which the

d socket conneme type and frturer and com

ments of IEC 6

t

AC system

Description

pose of this6 and IEC 625

Pass/fail cri

ve final resul

Checklist 

without Int

em – General F

f isolating thed on the AC sidtion and switc

ed such that PVd” side and the

side n RCD is instaan inverter, theto ensure it hag to the requir

s are fully comr PV Systems

terconnec

been selected he expected exnd, temperatur

d disconnectioPV array strin

quirements of Iector is fitted tthe requireme

fitted, their rest 2 × Voc (stc

ey are fitted (s

ectors mated tofrom the same

mply with the 2548

m inspecti

 

 document  i548. 

iteria 

lt requires th

terconnec

ield e inverter has bde ching devices V installation e public suppl

alled to the ACe RCD type h

as been selecterements of IEC

mpliant to the s

 

ction Chec

and xternal re, UV and

on have ngs and PV IEC 62548 to the DC ents of IEC

everse c) of the ee IEC

ogether are

on

is to check t

hat only Yes o

ction Chec

been

have been is wired to y to the

C circuit has been ed C 62548 standards

ck-list

Yes N

Yes N

Yes N

Yes N

Yes N

Passed

that the AC 

or N/A boxes

ck-list

Result Yes N

Yes N

Yes N

Yes N

No N/A

No N/A

No N/A

No N/A

No N/A

Not p

system has 

s are checke

t / Value No

No

No N/A

No

passed

been  inspec

d unless diff

P

cted accordin

ferently indic

Notes

Page | 22  

ng to  IEC 

cated. 

Page 23: Inspection and Testing Checklists 2.2 - EWA · IEC 60364‐6 IEC 61010 – laboratory u IEC 61557 – d.c. IEC 61724‐1 IEC 61724‐2 IEC 61724‐3 IEC 61730‐2 IEC 62446‐1 maintenanc

     

    

Test w Interfaceinverter(sInterfacethe standInterfacefor SolarBackup istandardAn UPS system is

Result 

5.6 L

5.6.1 The puraccordin 

5.6.2 A positiv 

5.6.3  

Test w Labelling

All circuterminalsof IEC 60All DC juarray boxthat activa PV arrafrom the Means oflabelled Dual supof intercoA single site Installer ShutdowEmergen(where reAll signsdurable

without Int

e protection (IPs)

e protection (IPdards for Solare device is comr PV Systems interface devic

ds for Solar PVto support the

s present

t

Labelling a

Description

pose of this ng to IEC 603

Pass/fail cri

ve final resul

Checklist 

without Int

g and identifiF

uits, protectives suitably labe0364 and IECunction boxesxes) carry a wve parts insideay and may stiPV inverter af isolation on

pply warning lonnection line wiring di

details are diswn procedures ncy procedureselevant) s and labels ar

terconnec

P) is external

P) is fully comr PV Systems

mpliant to the

ce is complianV Systems e Interface pro

and ident

 

document is364‐6 and IEC

iteria 

lt requires th

terconnec

ication ield

e devices, switelled to the req

C 62548 s (PV generato

warning label ine the boxes areill be live afte

and public supthe AC side is

labels are fitte

iagram is disp

splayed on siteare displayed s are displaye

re suitably affi

 

ction Chec

to

mpliant to

standards

nt to the

otection

ification

s to check thC 62548. 

hat only Yes o

ction Chec

tches and quirements

or and PV ndicating e fed from er isolation pply s clearly

d at point

played on

e on site

d on site

ixed and

ck-list

Yes N(informative)

Yes N

Yes N

Yes N

Yes N

Passed

hat the label

or N/A boxes

ck-list

Result Yes N

Yes N

Yes N

Yes N

Yes N

Yes N Yes N Yes N

Yes N

No )

No

No

No N/A

No N/A

Not p

ls and warni

s are checke

t / Value No

No N/A

No

No

No

No No No N/A

No

passed

ng sign have

d unless diff

P

e been prope

ferently indic

Notes

Page | 23  

erly used 

cated. 

Page 24: Inspection and Testing Checklists 2.2 - EWA · IEC 60364‐6 IEC 61010 – laboratory u IEC 61557 – d.c. IEC 61724‐1 IEC 61724‐2 IEC 61724‐3 IEC 61730‐2 IEC 62446‐1 maintenanc

     

    

Test w

Result 

5.7 P

5.7.1 The purpEach copparallel PV arrayIn case number indepenindicate 

5.7.2 An analy

 

5.7.3  

Test w PV Arra

PV array String

Array parametespecifiedString overcurreprotectivdevice String wi

String tes

without Int

t

PV array te

Description

pose of this dpy of the docon the samey shall be indof more  thaof  indepen

ndent PV arrd for each PV

Pass/fail cri

ysis of the m

All check bo

Sting overcu

Array isolato

String wiring

Voc reading 

The array in

Checklist 

without Int

ay number:

y test report

StrinPV mQuan

ers (as d)

Voc-Isc-s

ent ve

TypeRatinDC rCapa

iring TypeCros

st Voc Isc [A

terconnec

est report

 

document iscument maye PV array adicated in thean one  indepndent  PV  arrray are preseV array. 

iteria 

easured dat

xes are chec

urrent protec

ors fit the sp

g fit the spec

matches the

sulation resi

terconnec

ng reference module ntity -stc [V] stc [A]

e ng [A] rating [V] acity [kA] e ss-sect [mm2] [V] A]

 

ction Chec

t

s to report thy contain test progressivee heading. pendent PVrays,  or  to  aent, will be 

a shall be ma

cked Y or N/A

ction devices

ecific applica

cific applicati

e expected v

stance is hig

ction Chec

Sheet n

ck-list

Passed

he tests madts on up to fe Sheet numb

array be prea multiple  oused. A diff

ade in order

s fit the spec

ation 

ion 

value 

gher than the

ck-list

number:

1

Not p

e on all the sfive strings. Iber and the 

esent, a numof  them  if merent progre

 to check the

cific applicati

e minimum v

2

passed

strings of then case of mosame PV ar

mber of documore  than  fessive PV Ar

e following: 

on 

value require

3

P

e PV array. ore than fiverray number 

uments equfive  strings  prray number

ed 

4

Page | 24  

 stings in for each 

al  to  the per  each r  shall be 

5

Page 25: Inspection and Testing Checklists 2.2 - EWA · IEC 60364‐6 IEC 61010 – laboratory u IEC 61557 – d.c. IEC 61724‐1 IEC 61724‐2 IEC 61724‐3 IEC 61730‐2 IEC 62446‐1 maintenanc

     

    

Test w PV Arra

PV array

Polarity cArray insulationresistanc

Earth conArray iso

Inverter

Result 

5.8 T

5.8.1 This part 

5.8.2 The  Tesdocume 

5.8.3

Test w Participa

Test engi Installer Designer Inspector Inspector Inspector

without Int

ay number:

y test report

Irradcheck OK

n e

Test Pos –Neg

ntinuity (wherolator Ratin

RatinLocaFuncManSeriaFunc

t

Test witho

Description

t reports the

Pass/fail cri

st  without  Ients give pos

Final result 

without Int

ants Role

ineer (mandat

(mandatory)

r (if present)

r (if present)

r (if present)

r (if present)

terconnec

diance [W/m2]

voltage [V] – Earth [M] – Earth [M]

re fitted) Nng [A] ng [V] ation ctional check uf. and modelal number ctioning OK

out Interco

 

e final outcom

iteria 

nterconnectitive result (

page 

terconnec

tory)

 

ction Chec

Sheet n

Y

] N/A Y

l

P

onnection

me of the Te

tion  will  be Passed). 

ction Fina

ck-list

number:

Y N Y

Y N Y

Passed

n Final res

est without In

successful 

 

al result

Name

Y N Y

Y N Y

Not pas

sult

nterconnect

(Passed)  if 

Y N

Y N

ssed

ion. 

all  the  chec

P

Y N

Y N

cklists  in  th

Signatur

Page | 25  

Y N

Y N

he  above 

re

Page 26: Inspection and Testing Checklists 2.2 - EWA · IEC 60364‐6 IEC 61010 – laboratory u IEC 61557 – d.c. IEC 61724‐1 IEC 61724‐2 IEC 61724‐3 IEC 61730‐2 IEC 62446‐1 maintenanc

     

    

Test w Notes

Final r 

without Int

result

terconnec

 

ction Fina

 

al result

Passsed NNot passed

P

d

Page | 26  

Page 27: Inspection and Testing Checklists 2.2 - EWA · IEC 60364‐6 IEC 61010 – laboratory u IEC 61557 – d.c. IEC 61724‐1 IEC 61724‐2 IEC 61724‐3 IEC 61730‐2 IEC 62446‐1 maintenanc

     

    

6 TE

Test witsolar PV 

6.1 O

The purthe PV pThe chec

 

6.2 G

6.2.1 This parwithout  

6.2.2 A positivStreet naParticipaindicate 

6.2.3  

Test w General Name of Nominal P.O. BoxStreet naLocationCity Voltage dPOC PV moduBuilding Building

Area of t

EST WITH

th  interconnV plants > 100

Overview

pose of the plant after itscklist is com

General on P

Documents 

Measureme

Performance

Test with Int

General on

Description

rt refers to tInterconnec

Pass/fail cri

ve final resuame and numants  indicated if not alrea

Checklist 

with Interc

on PV plant f the PV plant

Power [kW] x ame and numbn / Area

delivery

ule installationinstallation (itype (if appli

the PV array [

INTERCO

ection applie0 kW. 

Test with Ints connectionposed by the

PV plant and

required Che

ent system ch

e Test Check

terconnectio

n PV plan

 

the general dction. 

iteria 

lt requires tmber that med  as  Facultady present. 

connection

ber

n if applicable) icable)

m2]

 

ONNECTIO

es to all sola

terconnection to the grid.e following d

d Participants

eck‐list 

heck‐list 

k‐list (for PV 

on final resul

t and Part

data of the 

hat all itemsay be alternatative may  b

n Check-l

240 V

On bui Flat ro Villa o School Hotel/R Detent

ON CHEC

ar PV plants

on is to verif

documents:

s Check‐list

plants > 100

lt 

rticipants

PV plant and

s are filled wative each otbe  omitted 

list

(1 phase)

ilding Otooftop Roor small housel/University

/Restaurant tion/Correctio

CKLIST

. However, p

fy and test th

0 kW) 

d to the dat

with correct ither. if  they  are 

415 V (3 ph

ther structure (oof flap Fehold Apa Healthcar

Entertainmonal Othe

performance

he performa

a of the par

nformation, 

not  present

hases) 11

(e.g. canopy) açade Otartment blocke/Hospital

ment Agricr . . . . . . . . . .

P

e test only a

ance require

rticipants to 

 except P.O.

t.  Affiliation 

kV (3 phases

Ground ther k Offices

Industrial cultural/Stable. . . . . . . . . . .

Page | 27  

pplies to 

ments of 

the Test 

 Box and 

shall  be 

s)

e . . .

Page 28: Inspection and Testing Checklists 2.2 - EWA · IEC 60364‐6 IEC 61010 – laboratory u IEC 61557 – d.c. IEC 61724‐1 IEC 61724‐2 IEC 61724‐3 IEC 61730‐2 IEC 62446‐1 maintenanc

     

    

Test w PV techn

Tracking Participa

Test engiInstaller DesignerInspectorInspectorInspector

Result 

6.3 D

6.3.1 This part 

6.3.2 A positiv 

6.3.3  

Test w Documen

Final descase of vTest withreport OK for Tfrom EW

Result 

6.4 S

6.4.1 This part 

6.4.2 A positivFurtherm(A, B, or

with Interc

nology

g system if any

ants Role

ineer (mandat(mandatory) r (facultative) r (facultative) r (facultative) r (facultative)

t

Document

Description

t refers to th

Pass/fail cri

ve final resul

Checklist 

with Interc

nts required Field

sign (or As-buvariations) hout Interconn

Test with InterWA

t

Sensors

Description

t describes t

Pass/fail cri

ve final resulmore, depenr C) the cells 

connection

y

tory)

ts required

 

he document

iteria 

lt requires th

connection

uilt design in

nection

rconnection

 

the sensors u

iteria 

lt requires thnding on the related to th

 

n Check-l

Mono- Thin-f No tra

d

ts required o

hat only Yes o

n Check-l

Resul Yes N

Yes N

Yes N

used to perfo

hat only Yes oClass of the he used sens

list

-crystalline silfilm (specify) acking Sin

Name

Pas

on‐site to pe

or N/A boxes

list

lt / Value No

No

No

Pa

orm the Test

or N/A boxesmonitoring ors shall be 

licon Mu. . . . . . . . .

ngle-axis track

ssed N

rform the Te

s are checke

assed

t with Interco

s are checkesystem or thproperly fille

lti-crystalline Other (spec

king Two

Independe

Not passed

est with Inter

d. 

No

Not passe

onnection. 

d. he measuremed. 

P

silicon cify) . . . . . . . o-axes tracking

Affiliation dent licensed e

EWA

d

rconnection 

otes

ed

ment system 

Page | 28  

. . . . g

engineer

adopted 

Page 29: Inspection and Testing Checklists 2.2 - EWA · IEC 60364‐6 IEC 61010 – laboratory u IEC 61557 – d.c. IEC 61724‐1 IEC 61724‐2 IEC 61724‐3 IEC 61730‐2 IEC 62446‐1 maintenanc

     

    

 

6.4.3  

Test wi List of sen

In-plane i

Global HoIrradiance

PV modu

Ambient a

Wind spe

Wind dire

Soiling ra

Array vol

Array cur

Array pow

Output vo

Output cu

Output po

Output en

Output po

Reduced l

System ourequest

Result  

Checklist 

ith Interco

nsors Sensor

irradiance (PO

orizontal e

le temperature

air temperatur

ed

ection

atio

ltage (DC)

rrent (DC)

wer (DC)

oltage (AC)

urrent (AC)

ower (AC)

nergy

ower factor

load demand

utput power fa

onnection

OA) Pyr Pho Este Pyr Pho Este

e MeaN/A

re Mea

MeaN/A

Yes

Yes

Yes

Yes

Yes

Yes

Yes

Yes

Yes

Yes

Yes

actor Yes

Pa

 

n Check-li

Type

anometer otodiode eemed anometer

otodiode eemed N/asured E

asured Es

asured E

s No

s No

s No

s No

s No

s No

s No

s No

s No

s No

s No

s No

assed

ist

A

PV Cell

PV Cell

/A Esteemed

steemed

Esteemed

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

Not passe

Accuracy M

ed

Manufacturemodel

P

er and Ca

Ye

Ye N/

Ye N/ Ye

Ye N/ Ye N/ Ye N/ Ye N/ Ye N/ Ye N/ Ye N/ Ye N/ Ye

Ye

Ye N/ Ye N/ Ye N/

Page | 29  

libration

es No

es No /A

es No /A es No

es No /A es No /A es No /A es No /A es No /A es No /A es No /A es No /A es No

es No

es No /A es No /A es No /A

Page 30: Inspection and Testing Checklists 2.2 - EWA · IEC 60364‐6 IEC 61010 – laboratory u IEC 61557 – d.c. IEC 61724‐1 IEC 61724‐2 IEC 61724‐3 IEC 61730‐2 IEC 62446‐1 maintenanc

     

    

6.5 P

6.5.1 This part 

6.5.2 A  positiindicateOnly YesPV plant 

6.5.3  

Test w General

SamplingRecordinStart testhh:mm] Stop testhh:mm] Valid datClass of t Test repoRelevantDescriptiDescriptiDefinitiotaken durdefinitioncollectedDescripticollectedList of anprocedurSummarythe filtereUncertainSummary PerformaTest DurPerformaTemperaRatio (PR(facultatiReferenc(facultati

Performan

Description

t refers to th

Pass/fail cri

ive  final  resd as facultats or N/A boxts with a Pn >

Checklist 

with Interc

Fieldg interval [s] ng interval [mit: date and tim

: date and tim

ta in the time the monitorin

ort t data on the Tion of the site ion of the syst

on of the meteoring the test n of the system

d during the teion of raw dat

d during the teny deviations re y of the correced data nty analysis y of the test re

ance ratios ration (when aance Ratio (PRature-correctedR) [%] ive) ce correction tive)

nce test

 

he results of 

iteria 

sult  requirestive. es are check> 100 kW ma

connection

d

in] me [dd/mm/yyy

me [dd/mm/yyy

interval [%] ng system used

Test Engineer being tested

tem being testorological dat

m output data st ta that were st from the test

ction factors f

esults

applicable) R) [%] d Performance

emperature [°

 

the Test wit

s  that  all  ite

ked in their cay use only a

n Check-l

yy

yy

d A

Yes Yes

ted Yes ta Yes

Yes

Yes

Yes

for Yes

Yes Yes

e

°C]

h Interconne

ems  are  fill

ells. a Class A or B

list

Result / Valu

B C

No No No No

No

No

No N

No N

No N No

ection calcul

ed  with  cor

B monitoring

ue

N/A

N/A

N/A

ated in the p

rrect  inform

g system. 

P

period consid

mation,  exce

Notes

Page | 30  

dered. 

pt  those 

Page 31: Inspection and Testing Checklists 2.2 - EWA · IEC 60364‐6 IEC 61010 – laboratory u IEC 61557 – d.c. IEC 61724‐1 IEC 61724‐2 IEC 61724‐3 IEC 61730‐2 IEC 62446‐1 maintenanc

     

    

Test w

Result 

6.6 In

6.6.1 This part 

6.6.2 A positiv 

6.6.3  

Test w Inspectio

The enabProtectioThe thresEWA The timerequired Interfacepower faInterfaceAfter a pProtectio

Result 

6.7 T

6.7.1 This part 

6.7.2 The Testgive pos 

6.7.3  

Test w Participa

with Interc

t

nspection

Description

t refers to th

Pass/fail cri

ve final resul

Checklist 

with Interc

on and Test ofField

bled functions on are those resholds are tho

es of interventiby EWA

e device switchailure on comme Protection power recoveryon recloses the

t

Test with I

Description

t reports the

Pass/fail cri

t with Intercsitive result (

Final result 

with Interc

ants Role

connection

n and Test

 

he inspection

iteria 

lt requires th

connection

f the Interfacd

of the Interfaequired by EWse required by

ion are those

hes off in casemand of the

y the Interfacee Interface dev

nterconn

 

e final outcom

iteria 

connection wPassed). 

page 

connection

 

n Check-l

Pas

t of the In

n and test of 

hat only Yes o

n Check-l

ce Protection

ace WA

Yes

y Yes

Yes

e of Yes

e vice

Yes

Pas

ection Fin

me of the Te

will be succes

n Final re

list

ssed N

nterface P

f the Interfac

or N/A boxes

list

Result / Valu No

No

No

No

No

ssed N

nal result

est with Inter

ssful (Passed

esult

Name

Not passe

rotection

ce Protection

s are checke

ue

Not passe

rconnection.

d) if all the ch

d

n and its relat

d. 

d

 

hecklists in th

P

ted devices. 

Notes

he above do

Signatur

Page | 31  

ocuments 

re

Page 32: Inspection and Testing Checklists 2.2 - EWA · IEC 60364‐6 IEC 61010 – laboratory u IEC 61557 – d.c. IEC 61724‐1 IEC 61724‐2 IEC 61724‐3 IEC 61730‐2 IEC 62446‐1 maintenanc

     

    

Test w Test engi Installer Designer Inspector Inspector Inspector Notes

Final r  

with Interc

ineer (mandat

(mandatory)

r (if present)

r (if present)

r (if present)

r (if present)

result

connection

tory)

 

n Final re

 

esult

Passsed NNot passed

P

d

Page | 32  

Page 33: Inspection and Testing Checklists 2.2 - EWA · IEC 60364‐6 IEC 61010 – laboratory u IEC 61557 – d.c. IEC 61724‐1 IEC 61724‐2 IEC 61724‐3 IEC 61730‐2 IEC 62446‐1 maintenanc

     

    

7 PO

Power Q 

7.1 O

The purpthe powstandardThe chec

 

7.2 G

7.2.1 This parQuality M 

7.2.2 A positivStreet naParticipaindicate 

7.2.3  

Power General Name of Nominal P.O. BoxStreet naLocationCity Voltage dPOC PV moduBuilding Building

Area of tPV techn

OWER QU

Quality Meas

Overview

pose of the Qwer deliveredds. cklist is com

General on P

Documents 

Harmonic Te

Power Quali

General on

Description

rt refers to thMeasuremen

Pass/fail cri

ve final resuame and numants  indicated if not alrea

Checklist 

r Quality M

on PV plant f the PV plant

Power [kW] x ame and numbn / Area

delivery

ule installationinstallation (itype (if appli

the PV array [nology

UALITY ME

surements an

Quality Measd by the PV p

posed by the

PV plant and

required Che

ests Check‐li

ity Measurem

n PV plan

 

he general dnts and Test

iteria 

lt requires tmber that med  as  Facultady present. 

Measurem

ber

n if applicable) icable)

m2]

 

EASUREM

nd Tests app

surements aplant is not h

e following d

d Participants

eck‐list 

st 

ments and Te

t and Part

data of the P. 

hat all itemsay be alternatative may  b

ments and

240 V

On bui Flat ro Villa o School Hotel/R Detent

Mono- Thin-f

MENTS AN

plies to solar 

and Test is toarmful for th

documents:

s Check‐list

est final resu

rticipants

PV plant and 

s are filled wative each otbe  omitted 

d Tests Ch

(1 phase)

ilding Otooftop Roor small housel/University

/Restaurant tion/Correctio

-crystalline silfilm (specify)

ND TESTS

PV plants wi

o verify and the grid and is

ult 

to the data 

with correct ither. if  they  are 

eck-list

415 V (3 ph

ther structure (oof flap Fehold Apa Healthcar

Entertainmonal Othe

licon Mu. . . . . . . . .

S CHECK

ith Pn > 100 

test that the s under the l

of the partic

nformation, 

not  present

hases) 11

(e.g. canopy) açade Otartment blocke/Hospital

ment Agricr . . . . . . . . . .

lti-crystalline Other (spec

P

KLIST

kW. 

harmonic colimits specifi

cipants to th

 except P.O.

t.  Affiliation 

kV (3 phases

Ground ther k Offices

Industrial cultural/Stable. . . . . . . . . . .

silicon cify) . . . . . . .

Page | 33  

ontent of ed in the 

he Power 

 Box and 

shall  be 

s)

e . . .

. . . .

Page 34: Inspection and Testing Checklists 2.2 - EWA · IEC 60364‐6 IEC 61010 – laboratory u IEC 61557 – d.c. IEC 61724‐1 IEC 61724‐2 IEC 61724‐3 IEC 61730‐2 IEC 62446‐1 maintenanc

     

    

Power Tracking Participa

Test engiInstaller DesignerInspectorInspectorInspector

Result 

7.3 D

7.3.1 This parTests.  

7.3.2 A positiv 

7.3.3  

Power Documen

Final descase of vTest withPreliminaEWA

Result 

7.4 H

7.4.1 This parnetwork 

7.4.2 A  positiStandard 

r Quality M

g system if any

ants Role

ineer (mandat(mandatory) r (facultative) r (facultative) r (facultative) r (facultative)

t

Document

Description

rt refers to th

Pass/fail cri

ve final resul

Checklist 

r Quality M

nts required Field

sign (or As-buvariations) h Interconnectary Authoriza

t

Harmonic

Description

rt refers to tk. 

Pass/fail cri

ive  final  resds for the Co

Measurem

y

tory)

ts required

 

he documen

iteria 

lt requires th

Measurem

uilt design in

tion report ation from

Tests

 

the harmonic

iteria 

sult  requiresonnection of 

 

ments and

No tra

d

nts required 

hat only Yes o

ments and

Resul Yes N

Yes N Yes N

c tests made

s  that  all  thPV Plants. 

d Tests Ch

acking Sin

Name

Pas

on‐site to pe

or N/A boxes

d Tests Ch

lt / Value No

No No

Pa

e at Point of

he  measured

eck-list

ngle-axis track

ssed N

erform the P

s are checke

eck-list

assed

f Connection

d  values  are

king Two

Independe

Not passed

Power Qualit

d. 

No

Not passe

n of the PV p

e  below  tho

P

o-axes tracking

Affiliation dent licensed e

EWA

d

ty Measurem

otes

ed

plant with th

ose  indicate

Page | 34  

g

engineer

ment and 

he public 

d  in  the 

Page 35: Inspection and Testing Checklists 2.2 - EWA · IEC 60364‐6 IEC 61010 – laboratory u IEC 61557 – d.c. IEC 61724‐1 IEC 61724‐2 IEC 61724‐3 IEC 61730‐2 IEC 62446‐1 maintenanc

     

    

7.4.3  

Power Voltage h

FielTHD 3rd 5th 7th 9th 11th 13th 15th Current THD 3rd 5th 7th 9th 11th 13th 15th

Result 

7.5 P

7.5.1 This part 

7.5.2 The Testgive pos 

7.5.3  

Power Participa

Test engi Installer Designer Inspector

Checklist 

r Quality M

harmonics d F

harmonics

t

Power Qua

Description

t reports the

Pass/fail cri

t with Intercsitive result (

Final result 

r Quality M

ants Role

ineer (mandat

(mandatory)

r (if present)

r (if present)

Measurem

1 (Red)

ality Meas

 

e final outcom

iteria 

connection wPassed). 

page 

Measurem

tory)

 

ments and

F2 (Yellow)

Passed

surements

me of the Po

will be succes

ments and

d Tests Ch

) F3 (B

Not p

s and Tes

ower quality 

ssful (Passed

d Tests Fin

Name

eck-list

Blue) N

passed

sts Final r

Measureme

d) if all the ch

nal result

N (Black)

result

ents and Test

hecklists in th

P

Note

ts. 

he above do

Signatur

Page | 35  

es

ocuments 

re

Page 36: Inspection and Testing Checklists 2.2 - EWA · IEC 60364‐6 IEC 61010 – laboratory u IEC 61557 – d.c. IEC 61724‐1 IEC 61724‐2 IEC 61724‐3 IEC 61730‐2 IEC 62446‐1 maintenanc

     

    

Power Inspector Inspector Notes

Final r 

r Quality M

r (if present)

r (if present)

result

Measurem

 

ments and d Tests Fin

Pas

nal result

ssed NNot passed

P

d

Page | 36