    Inspection report : Groups stacked by Elbak Stacker

    Date : 25.09.2001

    Group combination: A)5 positive + 5 negative + negative enveloping + glassmat (0.85 )

    !late t"pe : #$ %0 (#e&)'uantit" o groups stace*: %0 nos. appro.

    ,) - positive + 8 negative + negative enveloping + glassmat

    !late t"pe : a*ial D/#

    'uantit" o groups stace*: %0 nos. appro.

    Aspects Observations Remarks

    1. $tace* group:

    a) nvelop sealing

    b) Glassmat stacing

    c) !late enveloping

    neven ol*ing observe* (1 to

    % mm) in man" groups. ateral

    sealing oun* o ( c3ece* b"loa* test)

    4e& groups observe* to 3ave

    glassmat on one si*e o t3e

    positive ( 56 groups). !roblem

    *ue to blocing o one

    separator station.

    &o envelops oun* &it3

    *ouble negative plates

    ngineer trie* to a*7ust t3e

    uneven ol*ing but t3e

    problem remains. Due tos3ortage o #$ %0 plates

    c3ange over *one. is

    opinion is b" continuous

    running problem can be

    solve*.

    2. unning o mac3ine 4reuent stops *ue to blocage

    o plate separator station

    Date : 26.09.2001

    Group combination: 10 positive + 11 negative + glassmat (1.% mm)!late t"pe : D/#

    'uantit" o groups stace*: 150 nos. appro.

    Aspects Observations Remarks

    1. $tace* group: ; to % our groups oun* &it3

    *ouble separator stacing at

    initial stage.