Inspection Report For Concreting Client : GAIL (India) Limited Name of the Work : Consultant : MECON LIMITED Report No. Contractor JAIHIND PROJECTS LTD Date DOC. NO. : JPL/KKBMPL/CIVIL/06 1 Reference Drawing No : 2 Type of Structure : Location : 3 Levels From : To : 4 Grade of Concrete 5 Estimated volume of concrete : 6 Quantity of cement required : 7 Inspection Details Checked NA a) Layout b) Complection of underground works c) Cleanliness d) Slopes e) Construction / Expansion Joints f) Any Others 8 Quality of Coarse Aggregate 9 Quality of Fine Aggregate FOR JPL FOR MECON/GAIL Signature Name Date KOCHI-KOTTANAD-BANGLORE-MANGLORE PIPELINE PROJECT (PHASE 1)

Upload: sachein-anand

Post on 05-Jan-2016

6 views

Category:

Documents


1 download

DESCRIPTION

Inspection Report Format.

TRANSCRIPT

Page 1: Inspection Report Format

Inspection Report For Concreting

Client : GAIL (India) Limited Name of the Work :

Consultant : MECON LIMITED Report No.

Contractor :JAIHIND PROJECTS LTD Date

DOC. NO. : JPL/KKBMPL/CIVIL/06

1 Reference Drawing No :

2 Type of Structure : Location :

3 Levels From : To :

4 Grade of Concrete

5 Estimated volume of concrete :

6 Quantity of cement required :

7 Inspection Details Checked NA

a) Layout

b) Complection of underground works

c) Cleanliness

d) Slopes

e) Construction / Expansion Joints

f) Any Others

8 Quality of Coarse Aggregate

9 Quality of Fine Aggregate

FOR JPL FOR MECON/GAILSignatureNameDate

KOCHI-KOTTANAD-BANGLORE-MANGLORE PIPELINE PROJECT(PHASE 1)

Page 2: Inspection Report Format

SIEVE ANALYSIS OF SAND/FINE AGGREGATES

Client : GAIL (India) Limited Name of the Work :

Consultant : MECON LIMITED Report No.

Contractor : JAIHIND PROJECT LTD Date

DOC. NO. :- JPL/KKBMPL/CIVIL/06

Report No. : _____________________ Sampled By : __________________

Date of Testing: ______________ Weight of Sample : ____________

IS SIEVE SIZE

10 mm

4.75mm

2.36 mm

1.18 mm

600 micron

300 micron

150 micron

RESULTS : Conform to grading zone

FOR JPL FOR MECON/GAIL

SIGN

NAME

DATE

KOCHI-KOTTANAD-BANGLORE-MANGLORE PIPELINE PROJECT (PHASE 1)

WEIGHT RETAINED BY SIEVE IN (GMS.)

WEIGHT PASSED BY

SIEVE IN (GMS.)

% PASSES BY WEIGHT

% RETAINED BY WEIGHT

CUMULATIVE % RETAINED

GRADING ZONE, % PASSING AS PER IS

383-1970

GRADATION ZONE

Page 3: Inspection Report Format

Client : GAIL (India) Limited

Consultant : MECON LIMITED Report No.

Contractor : JAIHIND PROJECTS LIMITED Date

DOC. NO. :- JPL/KKBMPL/CIVIL/06

SIEVE ANALYSIS FOR STONE AGGREGATES

SIEVE ANALYSIS 20 MM AGGREGATE Report No.:

Contractor: Sampled by :

Date of Testing: Weight of Sample :

WEIGHT % Passing as per

RETAINED BY SIEVE Mix design or

IS SIEVE (GMS.) IS 383 - 1970

40 mm 100

20mm 85 -100

10mm0 - 20

4.75mm0- 5

RESULTS :

FOR JPL FOR MECON / GAIL

SIGN

NAME

DATE

KOCHI-KOTTANAD-BANGLORE-MANGLORE PIPELINE PROJECT(PHASE 1)

WEIGHT PASSED BY

SIEVE IN (GMS.)

% PASSES BY WEIGHT

% RETAINED BY WEIGHT

CUMULATIVE % RETAINED

Page 4: Inspection Report Format

KOCHI-KOTTANAD-BANGLORE-MANGLORE PIPELINE PROJECT(PHASE 1)

Material Reconciliation Statement - Civil Works

Client : GAIL (India) Limited Name of Work:

Consultant : MECON LIMITED Report No.

Contractor : JAIHIND PROJECTS LTD Date

DOC NO :- JPL/KKBMPL/CIVIL/06

S. No. Material Description Qty Issued upto date Remarks

FOR JPL FOR MECON/GAILSignatureNameDate

Unit of Measurement

Qty Received upto date

Balance Stock as on date