Inspection Report
State Bank of MysoreChikkanayakana Halli, Tumkur Dist.
Ground Floor
Water Ingress from the roof top at Safe Locker Room
Ground Floor
Water Ingress from the Crack formed due to Structural Damage at Safe Locker Room
Ground Floor
Crack on back side of the building due to structural damage
Ground Floor
Crack due to Structural Damage
Ground Floor
Soil Settlement on the rare side of the building causing structural damage
Ground Floor
Soil Settlement near the Column on the rare side of the building
Ground Floor
Damage in Rain Water Pipe
Ground Floor
Cracks on the roof of ground floor building
Ground Floor
Cracks on additional screed done on main slab
Ground Floor
Additional Screeding done on roof of ground Floor
First Floor
Chipping of Screeding on 1st Floor Roof Top
First Floor
Cracks on 1st Floor Columns
First Floor
Carbonation and Scaling of Reinforcement
First Floor
Cracks developed on the 1st Floor Roof Top
First Floor
Damaged Parapet wall on 1st Floor
First Floor
Cracks on Parapet Wall