INSTALLATION GUIDEFilcoten Infra 4 and 5 mm
INSTALLATION1. Drainage outlets
2. Installation
3. Installing the vandal-proof lock (optionnal)
Table 1 : Trench dimensions
Figure 1 : Typical trenches Figure 2 : Positioning the expansion joints
Figure 3 : Tees and elbows (optional)
02.2018
REV
STEP 1DRILLING THE DRAINAGE OUTLETS
DRILLING THE SIDE CONNEXTION WELL OPENING (IF REQUIRED)
AND/OR DRILLING THE VERTICAL CHANNEL OUTLET (IF REQUIRED)
1a. Using a hole saw, drill an opening
in order to install the vertical channel outlet.
1a. Using a concrete drill bit, drill small holes
following the guide which is appropriate
for your installation.
1b. Insert the vertical channel outlet above
the opening and seal.
1b. Using a cold chisel, clear the side con-
nection well opening.
02.2018
REV
STEP 2INSTALLATION
2c. Pour a concrete slab if the clearance be-
tween the base of the channel and the
bottom of the trench exceeds 125 mm
(5 in) and let it harden.
2d. Determinethefinalelevationlevelofthe
top of the corner bracket using a chalk
lineoralaserlevel.Thefinalelevation
level must be 3 mm to 5 mm (1/8 in to
3/16in)lowerthanthefinishedsurface.
2a. Dig the trench in accordance with
Table 1.
2b. Determine the outlet type: lateral for
side connection well, vertical for channel
or horizontal for the end of channel with
end plate with outlet used.
02.2018
REV
Chalk line
Embedment of the base
Paver, block or brick
(optional)
Slab (optional)
Placethefirstdrainagechannelbypushingits
base in the concrete clump, until the angle cor-
ner reaches the desired level.
Method #1:
Place clumps of concrete having a consistent
texture against the channel joints.
Method #2:
Add concrete pavers or bricks against the
channel joints. Embed these leveling blocks
in concrete having a consistent texture.
or
2e. Preparation for levelling: Two suggested methods
2f. Installation and levelling
02.2018
REV
2g. Install the other drainage channels. Let
the concrete embedment harden at the
base of the channels prior to pouring the
finalconcrete.
2i. It is essential that the grates be installed
in the drainage channels and covered
withaplasticfilmorprotectivetape
duringtheconcretepour.Backfillthe
bottom and sides of the trench, in accor-
dance with Figure 1. Take care to spread
the concrete evenly.
2h. Apply a concrete sealer at the joints be-
tween each channel.
2j. Unpack the grates and reinstall them.
Addthefinishcoating,whereapplicable.
02.2018
REV
3a. Insert the vandal-proof lock under the grate.
3c. Insert the grate into the channel.
3e. Using a 5-mm Allen wrench, tighten the screw to expand the lock and thus prevent removal of the grate.
3b. Press on the lock until it fits completely between the clips.
3d. Press the grate until the clips reach the recesses inside the channel.
STEP 3INSTALLING THE VANDAL-PROOF LOCK (OPTIONAL)
02.2018
REV
Load Classes
A 15 kN B 125 kN C 250 kN D 400 kN E 600 kN F 900 kN
Channel width (mm)
100150 200
300 100150 200
300 100150 200
300 100150 200
300 100150 200
300 100150 200
300
Xmin
(mm) 100 150 200 100 150 200 150 200 250 150 200 300 200 250 300 200 250 300
Zmin
(mm) 100 150 200 100 150 200 150 200 250 150 200 300 200 250 300 200 250 300
Ymin
(mm) Total height of the channel
Re-bar Not requiredTreillis of 10 m
200 mm x 200 mm
TABLE 1TABLE TRENCH DIMENSIONS ACCORDING TO THE LOAD CLASSES OF THE INSTALLATION*
02.2018
X
Y
Z
3 to 5 mm(0.12 to 0.2 in)
Y
Z
X
3 to 5 mm(0.12 to 0.2 in)
X
*The load class of the installation is governed by the lowest component. For example, an installation of a Class F channel with a Class C grate will have a global load Class C.
CHANNEL SIDE CONNECTION WELL
REV 02.2018
EDGE / ASPHALT
FIGURE 1TYPICAL FILCOTEN INFRA TRENCHES 4 mm AND 5 mm
CONCRETE / ASPHALT
PAVERS / ASPHALT
Concrete edge
Paver
Granular layer
Sub-foundation
Concrete embedment
Bitumunous coating
Bituminous sealing tape
Finishing layer - asphalt
Upper foundation
Lower foundation
X
Z
3 to 5 mm(0.12 to 0.2 in)
Concrete embedment
Longitudinal expansion joint*
Concrete slab
Sub-foundation
Load-resistant concrete slab
Bituminous sealing tape
Finishing layer - asphalt
Upper foundation
Lower foundation
X
Z
X
Re-bar, see Table 1* Longitudinal expansion joints shall
be provided over the total length of the channel project.
3 to 5 mm(0.12 to 0.2 in)
Note 1 : For the installation of the paver in direct contact with the channel, using a concrete adhesive, make sure to adhere the first row of pavers to the channel and on the width X*, to adhere the horizontal side of the pavers to concrete and the vertical sides of the paving stones one on each other.
See Note 1
Paver
Sub-foundation
Concrete embedment
X
Z
X
Bituminous sealing tape
Finishing layer - asphalt
Upper foundation
Lower foundation
3 to 5 mm(0.12 to 0.2 in)
* If the paver width exceeds the width X, adjust the width X to match the width of the paver.
REV
ON SITE, IT IS POSSIBLE TO MAKE TEES AND ELBOWS, IF REQUIRED. CONTACT YOUR SOLENO REPRESENTATIVE FOR QUESTIONS REGARDING YOUR PROJECT.
FIGURE 3 TEES AND ELBOWS (OPTIONAL)
FIGURE 2POSITIONING THE EXPANSION JOINTS
02.2018
LONGITUDINAL EXPANSION JOINTS SHALL BE PROVIDED OVER THE TOTAL LENGTH OF THE CHANNEL PROJECT.
THE TRANSVERSE JOINTS SHOULD BE INSTALLED EVERY 5 METERS WHEN THE CONCRETE IS IN DIRECT CONTACT WITH THE CHANNELS.
TRANSVERSE EXPANSION JOINTINSTALLED WHEN CONCRETE IS IN CONTACT WITH THE CHANNEL
Note : A transverse expansion joint must be provided every 5 meters at the junction between two channels.
Concrete sealer
Channel (1 m)
Transverse expansion joint
Concrete embedment
5 m(15,5 ft)