installation instru tion sheet - ips corp · installation instru tion sheet dialysis supply and...

2
INSTALLATION INSTRUCTION SHEET Dialysis Supply and Waste Box, One Valve 1. With the frame removed, assemble valve inlet(s) and hose connecon as shown in Diagram “A” using soſt seng “Pipe Dope”, Weld-On® brand “White Seal”, or Weld-On brand “Blue Seal”. Install in box using the pipe clamp “①” and clamp gasket with #10-32 screws (supplied). Ensure 90° fing is below discharge support bracket “②”and can be rotated for removal during flushing. NOTE: Do Not over ghten and Do Not use PTFE thread tape. 2. Install grommets (supplied) in discharge bracket “②” . 3. Install adjustable stainless steel mounng flanges “③” into slots on sides of box and set front of box to be flush with finished wall. Secure with #6-32 screws (supplied). Determine locaon of box and secure to framing. (Adjustable to 3/4” wall thick- ness). 4. Connect supply line(s) to ½” NPT pipe and test. 5. Connect waste line, 2 3/8” O.D. plain end outlet, using mechanical coupling (not supplied). Test for leaks and proper operaon. 6. Determine frame orientaon and aach foam seal “④” (supplied) to lower frame wall as shown in Diagram “A”. Install frame using 4 #10-32 screws (supplied). If locking door is supplied, install by inserng fixed hinge pin in one receiver hole and spring loaded pin in sec- ond receiver hole. 7. Orange drain plug and flushing nipple(s) to remain with box. Orange drain plug is placed in drain opening when removing/installing hose connector and 90° fings to prevent loss. INSTALLATION INSTRUCTIONS: Orange Drain Plug Flushing Nipple (2) Mounng Flanges www.ipscorp.com [email protected] 500 Distribuon Parkway, Collierville, TN 38017 800-888-8312 ▪ FAX: 901-853-5008 IMPORTANT: Ensure that all supply lines are flushed of all foreign materials such as pipe dope, solder, chips and etc. Valve(s) must be drained during freezing temperatures. Always check local hospital & plumbing codes prior to installaon. MAX PSI : 150 MAX TEMP: 140° F DIAGRAM A 1 One Valve Box with frame, less door One Valve Box with frame and door One Valve Box, supply hole top view © 2014 IPS Corporation 01/14_REV A

Upload: others

Post on 31-May-2020

4 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: INSTALLATION INSTRU TION SHEET - IPS Corp · INSTALLATION INSTRU TION SHEET Dialysis Supply and Waste Box, One Valve 1. With the frame removed, assemble valve inlet(s) and hose connection

INSTALLATION INSTRUCTION SHEET

Dialysis Supply and Waste Box, One Valve

1. With the frame removed, assemble valve inlet(s) and hose connection as shown in Diagram “A” using soft setting “Pipe Dope”, Weld-On® brand “White Seal”, or Weld-On brand “Blue Seal”. Install in box using the pipe clamp “①” and clamp gasket with #10-32 screws (supplied). Ensure 90° fitting is below discharge support bracket “②”and can be rotated for removal during flushing. NOTE: Do Not over tighten and Do Not use PTFE thread tape.

2. Install grommets (supplied) in discharge bracket “②” .

3. Install adjustable stainless steel mounting flanges “③” into slots on sides of box and set front of box to be flush with finished wall. Secure with #6-32 screws (supplied). Determine location of box and secure to framing. (Adjustable to 3/4” wall thick-ness).

4. Connect supply line(s) to ½” NPT pipe and test.

5. Connect waste line, 2 3/8” O.D. plain end outlet, using mechanical coupling (not supplied). Test for leaks and proper operation.

6. Determine frame orientation and attach foam seal “④” (supplied) to lower frame wall as shown in Diagram “A”. Install frame using 4 #10-32 screws (supplied). If locking door is supplied, install by inserting fixed hinge pin in one receiver hole and spring loaded pin in sec-ond receiver hole.

7. Orange drain plug and flushing nipple(s) to remain with box. Orange drain plug is placed in drain opening when removing/installing hose connector and 90° fittings to prevent loss.

INSTALLATION INSTRUCTIONS:

Orange Drain Plug Flushing Nipple

(2) Mounting Flanges

www.ipscorp.com [email protected]

500 Distribution Parkway, Collierville, TN 38017 800-888-8312 ▪ FAX: 901-853-5008

IMPORTANT: Ensure that all supply lines are flushed of all foreign materials such as pipe dope, solder, chips and etc. Valve(s) must be

drained during freezing temperatures. Always check local hospital & plumbing codes prior to installation.

MAX PSI : 150 MAX TEMP: 140° F

DIAGRAM A ①

1

② ③ ③

One Valve Box with frame, less door

One Valve Box with frame and door

One Valve Box, supply hole top view

© 2014 IPS Corporation 01/14_REV A

Page 2: INSTALLATION INSTRU TION SHEET - IPS Corp · INSTALLATION INSTRU TION SHEET Dialysis Supply and Waste Box, One Valve 1. With the frame removed, assemble valve inlet(s) and hose connection

INSTALLATION INSTRUCTION SHEET

Dialysis Supply and Waste Box, Two Valves

1. With the frame removed, assemble valve inlet(s) and hose connection as shown in Diagram “A” using soft setting “Pipe Dope”, Weld-On® brand “White Seal”, or Weld-On brand “Blue Seal”. Install in box using the pipe clamp “①” and clamp gasket with #10-32 screws (supplied). Ensure 90° fitting is below discharge support bracket “②”and can be rotated for removal during flushing. NOTE: Do Not over tighten and Do Not use PTFE thread tape.

2. Install grommets (supplied) in discharge bracket “②” .

3. Install adjustable stainless steel mounting flanges “③” into slots on sides of box and set front of box to be flush with finished wall. Secure with #6-32 screws (supplied). Determine location of box and secure to framing. (Adjustable to 3/4” wall thick-ness).

4. Connect supply line(s) to ½” NPT pipe and test.

5. Connect waste line, 2 3/8” O.D. plain end outlet, using mechanical coupling (not supplied). Test for leaks and proper operation.

6. Determine frame orientation and attach foam seal “④” (supplied) to lower frame wall as shown in Diagram “A”. Install frame using 4 #10-32 screws (supplied). If locking door is supplied, install by inserting fixed hinge pin in one receiver hole and spring loaded pin in sec-ond receiver hole.

7. Orange drain plug and flushing nipple(s) to remain with box. Orange drain plug is placed in drain opening when removing/installing hose connector and 90° fittings to prevent loss.

INSTALLATION INSTRUCTIONS:

Orange Drain Plug Flushing Nipple

(2) Mounting Flanges

www.ipscorp.com [email protected]

500 Distribution Parkway, Collierville, TN 38017 800-888-8312 ▪ FAX: 901-853-5008

IMPORTANT: Ensure that all supply lines are flushed of all foreign materials such as pipe dope, solder, chips and etc. Valve(s) must be

drained during freezing temperatures. Always check local hospital & plumbing codes prior to installation.

MAX PSI : 150 MAX TEMP: 140° F

DIAGRAM A

1

1

2

③ ③

Two Valve Box with frame, less door

Two Valve Box with frame and door

Two Valve Box, supply hole top view

© 2014 IPS Corporation 01/14_REV A