Page 1: Installation: the plan. Reality Pressure dome: the problem

Installation: the plan

Page 2: Installation: the plan. Reality Pressure dome: the problem

Reality

Page 3: Installation: the plan. Reality Pressure dome: the problem

Pressure dome: the problem

Page 4: Installation: the plan. Reality Pressure dome: the problem

The Rack, Mark I

Page 5: Installation: the plan. Reality Pressure dome: the problem

Scan Head, in place, finally

Page 6: Installation: the plan. Reality Pressure dome: the problem

Pressure Vessel “Doghouse”

Equipment Racks -

Cable Run 6

144Z AMS Configuration

Page 7: Installation: the plan. Reality Pressure dome: the problem

AMS Mosaic 3/1/13

7

Magna, UTKennecott Smelter

Page 8: Installation: the plan. Reality Pressure dome: the problem

Kennecott Stack 3/1/13

8

Kennecott Stack

Page 9: Installation: the plan. Reality Pressure dome: the problem

West Valley City, UT 3/1/13

DRAFT 9

RSAC

Page 10: Installation: the plan. Reality Pressure dome: the problem

AirCell Issues

Leaver Arm Measurements for Applinix Installed electronics into IPM box Integrate IPM and conduct ground tests Reconfigure AirCell for static IP and reset router Connect IPM to AirCell and AMS Test Ground Processing Software Connection

Page 11: Installation: the plan. Reality Pressure dome: the problem

Wasatch Front 3/29/13

-112.245 42.069 7,5,3 7.6m

Page 12: Installation: the plan. Reality Pressure dome: the problem

Wasatch Front 3/29/13

Page 13: Installation: the plan. Reality Pressure dome: the problem

Utah Lake 3/29/13

• Imagery will be evaluated by USGS for hot spring monitoring project

Page 14: Installation: the plan. Reality Pressure dome: the problem

Questions