instrumentation consultancy services

12
Build On You Can Data MissionOS Tunnel Data Management

Upload: maxwellgeo

Post on 03-Dec-2020

4 views

Category:

Services


0 download

DESCRIPTION

https://www.maxwellgeosystems.com/news-i&m-coordinator-service-on-hs2.php

TRANSCRIPT

Page 1: Instrumentation consultancy services

Build OnYou Can Data

MissionOS Tunnel Data Management

Page 2: Instrumentation consultancy services

TUNNEL DATA MANAGEMENT

Maxwell GeoSystems Limited Tunnel BrochureVersion: 1.0 2Date: 1st January 2018

The portal allows the engineer rapid access to all the information associated with the tunnelling works. Any of the recorded parameters can be graphed for any section of the tunnel

Maxwell GeoSystems is seeing great success with its innovative MissionOS system.Customers are discovering how it enables collaboration on projects. It’s proving to be a real game-changer for the construction industry and ideal for tunnelling applications. The system is beingchosen for major infrastructure development projects as well as ongoing maintenance management. This innovative technology platform is revolutionising how our clients can exploit automation of project data to reduce time & costs, making teams more e�ective.

MissionOS is a bespoke software platform for the display and interpretation of construction data and has a module speci�cally con�gured for tunnelling. The software utilises a robust, expandable, tiered and secure database architecture to process the construction data before displaying it on a fast, ultra-light, con�gurable web interface for rapid interrogation anywhere that has an internet connection.The key features of the system are its con�guarability, the level of engineering tools and timelines available to the user. Hosting on cloud services means that MissionOS can readily deal with the largest projects.

Page 3: Instrumentation consultancy services

The portal allows the engineer rapid access to all the information associated with the tunnelling works. Any of the recorded parameters can be graphed for any section of the tunnel

Maxwell GeoSystems Limited Tunnel BrochureVersion: 1.0 3Date: 1st January 2018

MissionOSGeoSystems Ltd.

MissionOS - Tunnelling

The Tunnel Data Management System(TDMS) is an application of both the MissionOS Designer and Builder streams combined into one integrated platform for the speci�c high risk construction activity of tunnelling. The platform combines several layers of functionality to enable the user to e�ectively link data to the tunnel excavation and lining process to design, investigation and instrument feedback for better tunnel process control. The portal allows the engineer rapid access to all the information associated with the tunnelling works. Any of the recorded parameters can be graphed for any section of the tunnel.

The STEMS Control Room on Singapore’s DTSS2 using MissionOS-TDMS to manage 100km of tunnelling built by 27 collaborating contractors with 86 shafts

The TDMS system has been successfully utilised on numerous projects in Hong Kong (Regional Express Line, Shatin Central Link, Hong Kong West Drainage, Lai Chi Kok and Tsuen Wan West Drainage, LiantangLam Tin and others), Singapore (SPPA cable tunnels), Thailand (MRTBLE) and Malaysia (KVMRT 1&2),United Kingdom (Thames Tideway), U.S. (Los Angeles Metro & Washington NEBT) as well as in Australia (Brisbane Airport Link, Perth Airport Link).

The Proven Solution for the Toughest Jobs

Page 4: Instrumentation consultancy services

GeoSystems Ltd.

Managing Tunnel Risk

Maxwell GeoSystems Limited Tunnel BrochureVersion: 1.0 4Date: 1st January 2018

MissionOS

Obtaining accurate prediction data becomes quick and easy using MissionOS. The system provides a range of analytical tools enabling the user to create instant comparisons and the critical analysis of project data can be achieved dynamically.

With such a high level of built-in con�gurability, any TBM parameter can be immediately compared with predictions and instrument data as sections, plots & contours. The ability to combine key TBM parameters such as face pressure, thrust, cutter wear etc. with geotechnical data provides an important insight into critical parameters as the TBM progresses through the ground.

This allows the Project Engineer to readily undertake forecasts such as volume loss analysis or the impact of water in�ow & tunnel pumping.

A signi�cant capability of the system is the newly introduced automatic 3D model generation feature. This allows for the interrogation of data to be presented in a 3D rendering in real-time.

A critical element of any tunnel project is the e�ective management of risk & hazards.

MissionOS creates an environment in which all relevant tunnel geological plans and pro�les together with pre-tunnel assumptions, including the geology revealed through drill hole data, can be easily loaded.

It is possible to identify hazards and register them within the MissionOS platform through simple digitising and classi�cation. Additional relevant hazards & consequence meta-data such as building damage assessments can also be incorporated.

MissionOS can host all geotechnical and survey instruments installed in a tunnel as well as at the surface. On-going records of ground movement and instrumentation monitoring can then be carried out both in manual mode as well as in real-time.

The system hierarchy can be readily con�gured combining geotechnical, survey and TBM parameters into single & tables in order to assess correlations.

The unique MissionOS user-interface is extremely intuitive and allows for the creation of a bespoke dashboard for key instruments or parameters.

Once con�gured, geological cross-sections and generic canvas screens can automate the reporting process, manage alarms, safety events and processes using collaborative blogs.

Importantly, this frees up valuable engineer’s time to focus on risk management and mitigation.

The portal allows the engineer rapid access to all the information associated with the tunnelling works. Any of the recorded parameters can be graphed for any section of the tunnel

TBM HEAD PLAN VIEW

LONG SECTION VIEW

TBM Section View Gaussian plots & digitised hazards

Page 5: Instrumentation consultancy services

The portal allows the engineer rapid access to all the information associated with the tunnelling works. Any of the recorded parameters can be graphed for any section of the tunnel

GeoSystems Ltd.

Managing Productivity

Maxwell GeoSystems Limited Tunnel BrochureVersion: 1.0 5Date: 1st January 2018

MissionOS

MissionOS optimises all input data to generate a common cycle of statistics allowing for cross-comparison and analysis against the forecast plan.

The system monitors the time records of all site related activities during excavation and throughout thelining of the tunnel. Each record is then identi�able within the critical path activity.

As the tunnel progresses, data can be acquired from the TBM in real-time and automatically converted into structured data & analysed using highly con�gurable graphing & reporting to produce customisable interfaces combining all key TBM machine data with other measured parameters.

Tunnel geology and hydro-geology information can also be incorporated with the MissionOS system.Other construction records including temporary works ( Probing, grouting, mapping, support, installation),QA/QC tests ( Both concrete & steel) plus photographic & CCTV records can all be included.

This provides a platform for more comprehensive collection of data, from probe hole drilling & Pre/Post excavation records to photographic records of jobs and structures.

MissionOS was awarded a “Productivity Improvement Project” award by the Singapore Building Authorityin 2015.

QS Charts are easy to produce from a range of �xed templates

Final output of Shift Reports generated automatically to PDF

Construction progress viewed in real-time

Easy-to-use interface for the creation of shift reports

Page 6: Instrumentation consultancy services

GeoSystems Ltd.

Managing Safety

Maxwell GeoSystems Limited Tunnel BrochureVersion: 1.0 6Date: 1st January 2018

MissionOS

The portal allows the engineer rapid access to all the information associated with the tunnelling works. Any of the recorded parameters can be graphed for any section of the tunnel

MissionOS allows the user to monitor all critical aspects of tunnel activities & safety in real-time.

The system automatically prompts Alerts and Actions to a heirarchy of users for assessment and furtherinterrogation of data. These warning noti�cations can be sent by e-mail & SMS-text automatically, oralternatively, by the engineer responsible after veri�cation. Reports can also be produced in PDF format.

The Blog feature gives user group members the opportunity to add their own comments and feedback to any given topic. Attachments can be included to a Blog comment and easily viewed.

Users can search speci�c topics, check for updates as well initiate their own new threads. The systemautomatically archives all Blog information ensuring that the data history is fully maintained throughoutthe duration of the project and afterwards providing a valuable accesible library resource if required.

MissionOS is a highly con�gurable, structured operation system, which monitors and controls all the various activities a tunnel project generates, reducing risks and managing safety.

System users can easily operate the software through its intuative user-interface.

Page 7: Instrumentation consultancy services

The portal allows the engineer rapid access to all the information associated with the tunnelling works. Any of the recorded parameters can be graphed for any section of the tunnel

GeoSystems Ltd.

Maxwell GeoSystems Limited Tunnel BrochureVersion: 1.0 7Date: 1st January 2018

MissionOS

TBM Process Control

Tunnel process control is the feedback between the observed behaviour of the TBM and supporting plant with data records, predictions and observations. The objective is to tunnelsafely and e�ectively, maximising productivity, whilst minimising any harmful e�ects, such assettlement. This feedback requires numerous streams of data to be connected and comparedin real-time and MissionOS is the most complete and con�gurable system to do this. System users can freely interrogate data and provide enhanced levels of supervision, knowingthat MissionOS is managing the data processing.

Page 8: Instrumentation consultancy services

GeoSystems Ltd.

Maxwell GeoSystems Limited Tunnel BrochureVersion: 1.0 8Date: 1st January 2018

MissionOS

The portal allows the engineer rapid access to all the information associated with the tunnelling works. Any of the recorded parameters can be graphed for any section of the tunnel

TBM Process Control

MissionOS features customisable HUD type dashboard screens for any TBM with each screen focused on particular TBM processes. Screens are available for Open Shield, Double Shield conveyor, EPB, Slurry and multimode.Processes covered include:.

Overview

Guidance

Machine E�ciency

Face Pressure Control

Muck Conditioning

Muck Balance

Slurry Circuit

Slurry Treatment Plant

Muck Gantry

Innovative displays show clearly the real time line and level of the TBM with attitude and relation to actual and interpreted ground conditions

Clear summary dashboard giving access to key tunnelling parameters with ability to customise and save plots as required

Thrust pressures, cutterhead torque and motor parameters recorded and compared in real time to evaluate machine health

Real time face pressure distribution on the tunnel face linked to parameters such as muck conditioning and slurry density

Heads up display of the current and historical face injection of slurry, bentonite and EPB polymers and data on the resulting much density, temperature and cutterhead torque.

Real time control on the excavation volume against prediction with the ability to evaluate ground loss and heave. Compare in real-time with instrumentation through predicted gaussian curves using updateable constants. Perform user de�ned calculations using belt weighers and volume scanners on EPB machines

Clear visual representation of the current and historic �ow of slurry with density characteristics and calculated in/out balance and excavated volume

Connect to STP dataloggers and show current representations for slurry separation for comparison with ground conditions

For EPB link to gantry crane muck extraction records for secondary evaluation of muck volumes

Page 9: Instrumentation consultancy services

GeoSystems Ltd.

Maxwell GeoSystems Limited Version: 1.0 9Date: 1st January 2018 Tunnel Brochure

MissionOS

Tunnel System Performance

The portal allows the engineer rapid access to all the information associated with the tunnelling works. Any of the recorded parameters can be graphed for any section of the tunnel

Complex 3D Interactions can be viewed dynamically in real-time

Progress of Tunnel Sectors and Rings can display full engineering parameters

The Tunnel Data Management System (TDMS) is accessed through a portal interface. Users can create their own bespoke dashboard for key instruments and project parameters.It is possible to set the Ring-theming for any TBM parameter (Min, Max & Average) for instant analysis.The MissionOS TDMS has a suite of generic canvas screens to choose from encompassing 100m Look-ahead, settlement contouring and TBM control options.

Page 10: Instrumentation consultancy services

The portal allows the engineer rapid access to all the information associated with the tunnelling works. Any of the recorded parameters can be graphed for any section of the tunnel

GeoSystems Ltd.

Maxwell GeoSystems Limited Tunnel BrochureVersion: 1.0 10Date: 1st January 2018

MissionOS

Tunnel Key Features

Hazards & Risks

Automated loading, processing, audit, management, analysis, display & reporting

Automated import of any data format for any data source including any TBM

Data checks and pre-processing on import for optimising web accessibility

Transparent calibration and calculation processes

User de�nable GIS, HUD interfaces combine all data in one environment with high interactivity

Automatic alarm issuing including heartbeat function

Combine with instrument and other meta-data to produce calculated results

Manual and real-time data capture with automated Shift reporting using machine data

Audit control for alerts and alarms

Customisable Analysis & Reporting using CSR (Consolidated Summary Reports) & WYSIWYG Canvas

Load tunnel geological plans and pro�les and pre-tunnel assumptions including the geology revealed in the drill holes

Identify hazards and register them to the MissionOS through simple digitising and classi�cation in both 2D and 3D Add relevant hazard and consequence meta-data e.g. building damage assessments

Host geotechnical and survey Instruments installed in tunnel and at the surface with on-going records on ground movement and instrumentation monitoring both manual and in real-time

Combine geotechnical, survey & TBM parameters into single graphs & tables to assess correlationsCreate bespoke dashboard for key instruments or parameters including geological cross sections and generic canvas screens (100m Lookahead, settlement contour, TBM control)

Automate reporting processes to free up engineers to focus on risk management and mitigation

Manage alarms, safety events and processes using collaborative blogs

System capabilities managing risks, hazards, design feedback and instrumentation:

Ring theming of any TBM parameter (min, max & average) for instant analysis and comparison with contours of instrument data

Contouring of TBM parameters such as face pressure, cutter wear etc.

Automatic 3D model generation

Volume loss analysis

Enables forecasting using numerical models for a variety of water in�ow & tunnel pumping records and evaluate time dependent e�ects.

Combine geotechnical and TBM parameters into a single graph to assess correlations

Load prediction data using analytical tools for instant comparison & analysis including:

Page 11: Instrumentation consultancy services

GeoSystems Ltd.

Maxwell GeoSystems Limited Tunnel BrochureVersion: 1.0 11Date: 1st January 2018

MissionOS

Tunnel Key Features

Data Management and Processing

Productivity

Time records of all site activities during excavation and lining of the tunnel with recordsidentifying the critical path activity

Tunnel progress and chainage to tunnel face in real time, with geometrical details of tunnel cross-section before and after excavation

Number and classi�cation of labour and plant engaged in tunnelling

TBM data in real-time (< 2mins) into con�gurable graphing and reporting with customisable HUD like interfaces combining all TBM machine data with other measured parameters

Tunnel geology and hydro geology encountered including soft/mixed ground characteristics and interfaces, rock Joint details and primary support installed

Probe hole drilling and Pre- and Post- excavation grouting records, including grout design/mix, grouting accepting criteria, grouting pressure adopted, grout volume used, rock mass parameters, probe hole in�ow, calibration records of measurement devices/procedures.

Photographic records of jobs (exposed rock face/support installed), instruments(installation records) and structures (condition survey details)

Manage progress of the works including activities & links to meta-data. Summarise data to common cycle statistics for cross comparison and analysis against forecasts. Typical data includes:

The portal allows the engineer rapid access to all the information associated with the tunnelling works. Any of the recorded parameters can be graphed for any section of the tunnel

Data capture of TBM parameter data in real-time Ring file data file size reduced through post-processing to remove idle status data Cutter tool wear prediction Shift reporting Drill and Blast logging Rock mapping/face inspections Grouting details

Dynamic monitoring and capture of data in real-time

Page 12: Instrumentation consultancy services

Website: Demo Portal: Email:www.maxwellgeosystems.com demo.maxwellgeosystems.com [email protected]

Hong KongMaxwell GeoSystems Ltd.Unit A, 20/F Easy Tower, 609 Tai Nan West Street, Cheung Sha Wan,

Tel: +852 2581 2288Hong Kong SAR, China

IndiaMaxwell GeoSystems India Pvt Ltd.Door no 39/2638, 3rd Floor, Modayil Centre Point,M.G Road, Kochi-16, Kerala,IndiaTel: +91 484-4011161

SingaporeMaxwell GeoSystems Pte Ltd.11 Beach Road, #03-01

Tel: +65 62941931Crasco Building, Singapore, 189675

United Kingdom/EuropeMaxwell GeoSystems (UK) Ltd.65a Loxley Road

United KingdomLondon, SW183LL

United StatesMaxwell GeoSystems Ltd.c/o Spectotechnology LLC

Linden, NJ 07036Tel: +1 866-925-7737

1061 E. Elizabeth Ave.

AustraliaMaxwell GeoSystems Pty Ltd.Unit 3 44 Thalassa Ave

Tel: +61 405355931East Corrimal, NSW 2518