instrumentation for process control 09

210
1 Instrumentation Instrumentation for for Process Control Process Control Gregg Cunningham Gregg Cunningham Consultant/Trainer Consultant/Trainer Three Gez Consulting Three Gez Consulting Email:[email protected] Email:[email protected] et et

Upload: greggacunn

Post on 15-Jan-2015

2.087 views

Category:

Business


33 download

DESCRIPTION

 

TRANSCRIPT

Page 1: Instrumentation For Process Control 09

1

InstrumentationInstrumentationforfor

Process ControlProcess Control

Gregg CunninghamGregg CunninghamConsultant/TrainerConsultant/Trainer

Three Gez ConsultingThree Gez ConsultingEmail:[email protected]:[email protected]

Page 2: Instrumentation For Process Control 09

2

Page 3: Instrumentation For Process Control 09

3

OutlineOutline

• Optimizing Process PerformanceOptimizing Process Performance• Lab InstrumentsLab Instruments

• On-line InstrumentsOn-line Instruments

• Know your processKnow your process

• Data analysisData analysis

Page 4: Instrumentation For Process Control 09

4

OutlineOutline• Specific Cost/Energy Savings PointsSpecific Cost/Energy Savings Points

• Source waterSource water

• Flocculation AidsFlocculation Aids

• Filter PerformanceFilter Performance• Filter EffluentFilter Effluent• Filter to WasteFilter to Waste• BackwashBackwash

• Disinfection controlDisinfection control

• DistributionDistribution

Page 5: Instrumentation For Process Control 09

5

OutlineOutline

• Process Instruments Hands-on/DemoProcess Instruments Hands-on/Demo• Effects of changing water chemistry on Effects of changing water chemistry on

process instrumentsprocess instruments

• Summary and ConclusionsSummary and Conclusions

Page 6: Instrumentation For Process Control 09

6

Optimizing Process Optimizing Process PerformancePerformance

Page 7: Instrumentation For Process Control 09

7

Lab InstrumentsLab Instruments

• Generally used for compliance purposesGenerally used for compliance purposes

• Lab must have a QC/QA program in Lab must have a QC/QA program in placeplace

• Lab instruments must be capable of Lab instruments must be capable of running the same methods as the on-line running the same methods as the on-line instrumentsinstruments

Page 8: Instrumentation For Process Control 09

8

Lab InstrumentsLab Instruments

• Grab Sample PointsGrab Sample Points• MUST be representative of the processMUST be representative of the process

• Easily accessibleEasily accessible

• Consistently use the same pointConsistently use the same point

• Correctly locateCorrectly locate• Sample tapSample tap• ““Dip” sample pointDip” sample point

Page 9: Instrumentation For Process Control 09

9

Lab InstrumentsLab Instruments

• Grab SamplesGrab Samples• Flush sample container with sample at least Flush sample container with sample at least

three times (unless a preservative is added)three times (unless a preservative is added)

• If it is a sample tapIf it is a sample tap• Let it run to flush out the lineLet it run to flush out the line

• If a basinIf a basin• Do not scrape side wallDo not scrape side wall• Do not get surface scumDo not get surface scum• Try to get towards the centerTry to get towards the center

Page 10: Instrumentation For Process Control 09

10

The analysis is only as good as The analysis is only as good as the sample!the sample!

Page 11: Instrumentation For Process Control 09

11

Recommended Sample TapsRecommended Sample Taps

XX PoorPoor, may , may draw draw sedimentsediment

XXPoorPoor, avoid ells, , avoid ells, valves, T’s and other valves, T’s and other areas of turbulenceareas of turbulence

BetterBetter

PoorPoor, , may draw may draw airair

BestBest

XXX

Page 12: Instrumentation For Process Control 09

12

Lab InstrumentsLab Instruments

• Calibration and VerificationCalibration and Verification• Follow manufacturers recommendationsFollow manufacturers recommendations

• Follow State or USEPA regulationsFollow State or USEPA regulations

• Always use fresh standards and verify with Always use fresh standards and verify with third party standardsthird party standards

• Have instrument calibrated by qualified Have instrument calibrated by qualified service technician at least once a yearservice technician at least once a year

Page 13: Instrumentation For Process Control 09

13

Lab InstrumentsLab Instruments

• Use the right instrumentUse the right instrument• Do not use a spectrophotometer to do Do not use a spectrophotometer to do

turbidityturbidity• Spec will not do 90Spec will not do 90° detection or forward ° detection or forward

scatterscatter

• Instrument must have the correct resolutionInstrument must have the correct resolution• PCII for Cl/pH only reads to a tenthPCII for Cl/pH only reads to a tenth• Pkt Turb could only read to a tenthPkt Turb could only read to a tenth

Page 14: Instrumentation For Process Control 09

14

Lab InstrumentsLab Instruments

• Use the correct procedureUse the correct procedure• Monochloramine vs total chlorineMonochloramine vs total chlorine

• Correct speciesCorrect species• As P or as POAs P or as PO44??

• DigestionDigestion

• DistillationDistillation

• Correct rangeCorrect range

Page 15: Instrumentation For Process Control 09

15

Lab InstrumentsLab Instruments

• QC/QAQC/QA• Control chartsControl charts

• 10% of all tests run should be QC/QA10% of all tests run should be QC/QA• StandardsStandards• SpikesSpikes• UnknownsUnknowns

• MDL’s must be established for each lab MDL’s must be established for each lab tech for each parameter reportedtech for each parameter reported

Page 16: Instrumentation For Process Control 09

16

LABORATORY VS ON-LINELABORATORY VS ON-LINE

• Monitoring may be carried out by Monitoring may be carried out by collecting grab or composite samples collecting grab or composite samples and then analyzing them in the and then analyzing them in the laboratory.laboratory.

Requires large amounts of time and Requires large amounts of time and laborlabor

Possibility of inconsistent results due to Possibility of inconsistent results due to variations in technique at time of variations in technique at time of sampling and/or analysissampling and/or analysis

Page 17: Instrumentation For Process Control 09

17

LABORATORY VS ON-LINELABORATORY VS ON-LINE

Grab or composite sampling may Grab or composite sampling may not detect a problem (such as not detect a problem (such as underfeed or overfeed of treatment underfeed or overfeed of treatment chemicals) soon enough to prevent chemicals) soon enough to prevent process problems or failure.process problems or failure.

Page 18: Instrumentation For Process Control 09

18

LABORATORY VS ON-LINELABORATORY VS ON-LINE

• Laboratory (grab) samples can be Laboratory (grab) samples can be used to supplement the on-line used to supplement the on-line instrumentationinstrumentation Parameters not needing constant Parameters not needing constant

measurement or controlmeasurement or control Problem solvingProblem solving Checking calibration of on-line instrumentsChecking calibration of on-line instruments

Page 19: Instrumentation For Process Control 09

19

LABORATORY VS ON-LINELABORATORY VS ON-LINE

• What’s better: Lab or Process?What’s better: Lab or Process?• Most lab errors can be tied to the “human Most lab errors can be tied to the “human

factor” or “pilot error” factor” or “pilot error”

• Process instruments are generally self-Process instruments are generally self-diagnosing and will tell you if there is a diagnosing and will tell you if there is a problemproblem

Page 20: Instrumentation For Process Control 09

20

LABORATORY VS ON-LINELABORATORY VS ON-LINE

• Automated Analysis (On-line) is the Automated Analysis (On-line) is the key to solving critical water problems key to solving critical water problems and reducing labor requirements.and reducing labor requirements.

• Fast detection and correction of Fast detection and correction of abnormalities in each unit process abnormalities in each unit process can cut treatment costs and keep a can cut treatment costs and keep a plant process in control.plant process in control.

Page 21: Instrumentation For Process Control 09

21

On-Line Process InstrumentsOn-Line Process Instruments

Page 22: Instrumentation For Process Control 09

22

Page 23: Instrumentation For Process Control 09

23

Process InstrumentsProcess Instruments

Automate analytical tests for on-line, Automate analytical tests for on-line, continuous monitoring and controlcontinuous monitoring and control

Page 24: Instrumentation For Process Control 09

24

ADVANTAGES:ADVANTAGES:

• Detect process problemsDetect process problems

• Save operator timeSave operator time

• Reduce operator errorReduce operator error

• May save reagent costs vs lab May save reagent costs vs lab teststests

• May be used for feed controlMay be used for feed control

Page 25: Instrumentation For Process Control 09

25

CONSIDERATIONS IN CONSIDERATIONS IN SELECTING AN INSTRUMENTSELECTING AN INSTRUMENT

• Does it meet your needsDoes it meet your needs• Example: particle counter vs laser turb vs Example: particle counter vs laser turb vs

LR turbLR turb

• Does it measure the parameter neededDoes it measure the parameter needed• Monochloramine vs total chlorineMonochloramine vs total chlorine

• Is it in the proper rangeIs it in the proper range• HR turb not accurate at low rangeHR turb not accurate at low range

• High or low end 5% of range is ???High or low end 5% of range is ???

Page 26: Instrumentation For Process Control 09

26

CONSIDERATIONS IN CONSIDERATIONS IN SELECTING AN INSTRUMENTSELECTING AN INSTRUMENT

• Is it reliableIs it reliable

• Is it easy to operateIs it easy to operate• User friendly interfaceUser friendly interface

• Is it low maintenanceIs it low maintenance• APA6000APA6000

• What are the featuresWhat are the features• Outputs (compatible with current and future Outputs (compatible with current and future

needs)needs)

• Software/hardware upgradeable (field or factory)Software/hardware upgradeable (field or factory)

Page 27: Instrumentation For Process Control 09

27

CONSIDERATIONS IN CONSIDERATIONS IN SELECTING AN INSTRUMENTSELECTING AN INSTRUMENT

• What is the What is the costcost, not just the , not just the priceprice• Get the sales rep to provide the Cost Get the sales rep to provide the Cost

of Ownershipof Ownership• Initial costInitial cost

• Maintenance cost (including labor)Maintenance cost (including labor)

• Reagent costReagent cost

• Replacement parts costReplacement parts cost

Page 28: Instrumentation For Process Control 09

28

Cost of OwnershipCost of OwnershipWDMP Dascore Panel Builder

Grab Sampling

$12,800.00 $9,750.00 $15,000.00 $2,500.00

$34.00 $0.00 $71.00 $5.00

$34.00 $0.00 $71.00 $5.00

Estimated Mtnc. labor rate per hour $17.00 $17.00 $17.00 $17.00 $17.00

Labor Time in hours per month 0.25 0.25 1.00 0.75

Estimated Laboratory labor rate per hour $20.00 0 0 0 20Labor Time per month in hours - (assumes 1hr Lab Staff time per sampling event for current

30 0 0 0 30

$38.25 $4.25 $88.00 $617.75

$218.00 $600.00 $0.00 $0.00

30 60 0 0

$235.00 $1,234.00 $0.00 $0.00

Number of Sample Events per Month per Site (Sampling frequency every X min.)

1 43200 43200 43200 30

$13,494.00 $11,035.00 $16,056.00 $9,913.00

Amortized Cost Per Site Per Year Over X Years (Amortization Period)

5 $3,254.00 $3,235.00 $4,056.00 $7,913.00

Total Network Cost (# Units Required) 1 $13,494.00 $11,035.00 $16,056.00 $9,913.00

$3,254.00 $3,235.00 $4,056.00 $7,913.00

$0.01 $0.01 $0.01 $21.981

$0.37 $0.37 $0.46 N/A$8.92 $8.86 $11.11 $21.68

Hourly cost for 24/7 monitoring including all labor, parts and instrument cost

Cost of Reagents/month

Total monthly cost of reagents

Cost monthly lab & mtnc. Including reagents and labor

Average Daily Cost

WDMP Water Monitoring Network

Annual cost to change sensor module once per 6 months - Including parts and labor

Labor Time in minutes - Sensor Module (assume 2 people - total minutes)

Incremental Cost per Sampling event (per site)

Total Network Annualized Amortized Cost

Enter appropriate variables in yellow highlighted cells. All other cells calculate automatically.

Cost of Instrument + Installation

Price Sensor Module, changed every six months

Cash Outlay per site (per unit) for Year 1

Page 29: Instrumentation For Process Control 09

29

CONSIDERATIONS IN CONSIDERATIONS IN SELECTING AN INSTRUMENTSELECTING AN INSTRUMENT

• ServiceService• Who can work on the instrument? Who can work on the instrument?

• While under warranteeWhile under warrantee

• After warranteeAfter warrantee

• What is their response time?What is their response time?

• Is there a service plan available?Is there a service plan available?• Can help to control service costsCan help to control service costs

• Best for multiple instrumentsBest for multiple instruments

Page 30: Instrumentation For Process Control 09

30

Installation of On-line Installation of On-line InstrumentsInstruments

Page 31: Instrumentation For Process Control 09

31

Instrument Installation: Key to Proper Instrument Installation: Key to Proper PerformancePerformance

• Select proper location Select proper location • As near to the sample point as practicalAs near to the sample point as practical

• Reduces sampling errorsReduces sampling errors• Reduces lag timeReduces lag time

• Avoid dead ends, valves, bendsAvoid dead ends, valves, bends• Minimize errors due to air bubbles, Minimize errors due to air bubbles,

turbulence, etc.turbulence, etc.• Level, insulated from vibrationLevel, insulated from vibration• Good conditions of heat and humidity - Good conditions of heat and humidity -

avoid direct sunlight.avoid direct sunlight.• Avoid sample pumpsAvoid sample pumps

Page 32: Instrumentation For Process Control 09

32

Turbidimeter PanelTurbidimeter Panel

• Measurement accuracy and response time are Measurement accuracy and response time are sacrificed for convenience and appearance.sacrificed for convenience and appearance.

• Good for public relations, poor for analysisGood for public relations, poor for analysis

Page 33: Instrumentation For Process Control 09

33

Turbidimeters Mounted at Turbidimeters Mounted at Sample PointSample Point

• Instruments Instruments should be installed should be installed as close as as close as possible to the possible to the sample point for sample point for greatest accuracy greatest accuracy and best response and best response time.time.

Power isolation switch

Flow Control

Page 34: Instrumentation For Process Control 09

34

Poor Installation Can Lead To Poor Installation Can Lead To Erroneous ConclusionsErroneous Conclusions

• Particle counts Particle counts real timereal time

• Turbidity Turbidity measurements measurements delayed in time delayed in time approximately approximately 15 minutes due 15 minutes due to installation to installation in a panel in a panel arrangementarrangement

0 . 1

1

1 0

1 0 0

1 0 0 0

0.00

0.25

0.50

0.75

1.00

1.25

1.50

1.75

2.00

2.25

2.50

2.75

3.00

3.25

3.50

3.75

4.00

F i l t e r R u n - H o u r s

Partic

les Pe

r Millili

ter

0

0 . 0 2

0 . 0 4

0 . 0 6

0 . 0 8

0 . 1

0 . 1 2

0 . 1 4

Turbi

dity (

ntu)

T u r b i d i t y

P a r t i c l e C o u n t s

Page 35: Instrumentation For Process Control 09

35

Example of Sampling ErrorExample of Sampling ErrorDo The Math!Do The Math!

• PoorPoor

• Sample pipe 100’ Sample pipe 100’ (3048 cm)(3048 cm)

• ¾” (1.9 cm) pipe¾” (1.9 cm) pipe

• Flow 200 mL/minFlow 200 mL/min

• OptimalOptimal

• Sample line 5’ Sample line 5’ (152 cm)(152 cm)

• ¼” (0.635 cm) line¼” (0.635 cm) line• Flow 200 mL/minFlow 200 mL/min

VSVS

Page 36: Instrumentation For Process Control 09

36

Poor SamplingPoor Sampling

Measurement Units (select

from list)Enter Diameter (d) in

Enter pipe or tubing length (l) in Volume in Volume in

Metric Centimeters Centimeters ccs or mL Liters1.9 3048 8641.70103 8.642

Enter flow rate (Q) in ml/min

200 2592.510 43.209

V = π x (d/2)2 x lTubing/Pipe Volume & Sample Delay

Delay time in seconds

Delay time in minutes

d

l

Q

Page 37: Instrumentation For Process Control 09

37

Optimal SamplingOptimal Sampling

Measurement Units (select

from list)Enter Diameter (d) in

Enter pipe or tubing length (l) in Volume in Volume in

Metric Centimeters Centimeters ccs or mL Liters0.635 152 48.13579083 0.048

Enter flow rate (Q) in ml/min

200 14.441 0.241

V = π x (d/2)2 x lTubing/Pipe Volume & Sample Delay

Delay time in seconds

Delay time in minutes

d

l

Q

Page 38: Instrumentation For Process Control 09

38

Increase flow but stillIncrease flow but stillPoor Sampling!Poor Sampling!

Measurement Units (select

from list)Enter Diameter (d) in

Enter pipe or tubing length (l) in Volume in Volume in

Metric Centimeters Centimeters ccs or mL Liters1.9 3048 8641.70103 8.642

Enter flow rate (Q) in ml/min

500 1037.004 17.283

V = π x (d/2)2 x lTubing/Pipe Volume & Sample Delay

Delay time in seconds

Delay time in minutes

d

l

Q

Page 39: Instrumentation For Process Control 09

39

Crank it up to equal lower lag time?Crank it up to equal lower lag time?Big price to pay!Big price to pay!

Measurement Units (select

from list)Enter Diameter (d) in

Enter pipe or tubing length (l) in Volume in Volume in

Metric Centimeters Centimeters ccs or mL Liters1.9 3048 8641.70103 8.642

Enter flow rate (Q) in ml/min

35800 14.483 0.241

V = π x (d/2)2 x lTubing/Pipe Volume & Sample Delay

Delay time in seconds

Delay time in minutes

d

l

Q

35,800 ml/min = 9.46 gal/min35,800 ml/min = 9.46 gal/min = 13,622 gal/day= 13,622 gal/day

Page 40: Instrumentation For Process Control 09

40

Know Your ProcessKnow Your Process

Page 41: Instrumentation For Process Control 09

41

Know Your ProcessKnow Your Process

• Monitor Source WaterMonitor Source Water• Known variationsKnown variations

• SeasonalSeasonal• DiurnalDiurnal

• Unexpected upsetsUnexpected upsets• Spills/contaminationSpills/contamination• SecuritySecurity

Page 42: Instrumentation For Process Control 09

42

Know Your ProcessKnow Your Process

• Use lab and on-line instruments to Use lab and on-line instruments to understand the variables in chemical understand the variables in chemical additionaddition• pHpH

• PolymerPolymer

• DisinfectantDisinfectant

• FluorideFluoride

Page 43: Instrumentation For Process Control 09

43

Know Your ProcessKnow Your Process

• Jar tests can be invaluable Jar tests can be invaluable • Must simulate Must simulate youryour physical process physical process

• Helps to optimize coagulation which will Helps to optimize coagulation which will optimize the processoptimize the process

• Use lab test procedures for jar tests and Use lab test procedures for jar tests and validate process results with both lab and validate process results with both lab and on-line instrumentson-line instruments

Page 44: Instrumentation For Process Control 09

44

Know Your ProcessKnow Your Process

• Monitor distributionMonitor distribution• Yes, it really is part of the processYes, it really is part of the process

• Helps to maintain the water quality Helps to maintain the water quality throughout the system as good as it was throughout the system as good as it was coming out of the plantcoming out of the plant

• Monitor Corrosion ControlMonitor Corrosion Control

• Identify Potential Nitrification IssuesIdentify Potential Nitrification Issues

Page 45: Instrumentation For Process Control 09

45

Know Your ProcessKnow Your Process

• Baseline data must be establishedBaseline data must be established• The more you know about “normal” The more you know about “normal”

operations, the quicker you will discover operations, the quicker you will discover when it is abnormalwhen it is abnormal

Page 46: Instrumentation For Process Control 09

46

Analyze The DataAnalyze The Data• SCADASCADA

• Min, Max, AverageMin, Max, Average• TrendsTrends

• LIMSLIMS• Min, Max, AverageMin, Max, Average• TrendsTrends

• CombinationCombination• Software packages that can import from Software packages that can import from

both and analyze the databoth and analyze the data

Page 47: Instrumentation For Process Control 09

47

Specific Cost/EnergySpecific Cost/EnergySavings PointsSavings Points

Page 48: Instrumentation For Process Control 09

48

Major Monitoring PointsMajor Monitoring Points

• Source WaterSource Water

• Flocculation AidsFlocculation Aids

• Filter PerformanceFilter Performance• Filter EffluentFilter Effluent

• Filter to WasteFilter to Waste

• BackwashBackwash

• DisinfectionDisinfection

• DistributionDistribution

Page 49: Instrumentation For Process Control 09

49

MIXER

FLOCCULATOR

CLARIFIER

FILTERS

CLEARWELL

DisinfectantsHardnessTurbidity

pH

TurbiditypH

pH

WasteWater

BackwashTurbidity

TurbidityParticle MonitoringChlorine and / or

Permanganate and / orManganeseAluminum

pH

TurbidityDisinfectants

HardnessAlkalinity

pH

DRINKING WATER TREATMENT FLOW DIAGRAM

RawWater Effluent

TurbidityChlorineAlkalinity

Particle Monitoring

Distribution

Solids

Filter Effluent

SCM Recycle

Filter toWaste

Page 50: Instrumentation For Process Control 09

50

Source WaterSource Water

Page 51: Instrumentation For Process Control 09

51

Source WaterSource Water

• You need to know what the water quality You need to know what the water quality is coming into your plant before you can is coming into your plant before you can make any needed adjustments to it.make any needed adjustments to it.

• Baseline data is invaluable.Baseline data is invaluable.

• Many normal variations in water quality Many normal variations in water quality can easily be accommodated.can easily be accommodated.

• Serious changes can be identified and Serious changes can be identified and dealt with.dealt with.

Page 52: Instrumentation For Process Control 09

52

Source Water – Ground WaterSource Water – Ground Water• At the minimum, with on-line instrumentsAt the minimum, with on-line instruments

• pH (with temperature)pH (with temperature)• ORPORP• TurbidityTurbidity

• Additionally, with either lab or on-line Additionally, with either lab or on-line instrumentsinstruments• HardnessHardness• AlkalinityAlkalinity• OrganicsOrganics• NitratesNitrates• IronIron• ManganeseManganese

Page 53: Instrumentation For Process Control 09

53

Source Water – Surface WaterSource Water – Surface Water

• Many more parameters to be concerned Many more parameters to be concerned withwith

• Changes can happen much quicker than Changes can happen much quicker than with ground waterwith ground water

• Need to be able to respond to those Need to be able to respond to those changes rapidly to adjust your processchanges rapidly to adjust your process

Page 54: Instrumentation For Process Control 09

54

Source Water – Surface WaterSource Water – Surface Water

• pHpH• General, overall indicatorGeneral, overall indicator

• Seasonal variationsSeasonal variations• Fall turnoverFall turnover• Summer stratificationSummer stratification• Influence of precipitation eventsInfluence of precipitation events• Indicator of biological activityIndicator of biological activity• Indicator of industrial pollutionIndicator of industrial pollution

Page 55: Instrumentation For Process Control 09

55

Source Water – Surface WaterSource Water – Surface Water

• TurbidityTurbidity• Indicator of physical upset (rain,wind, etc)Indicator of physical upset (rain,wind, etc)

• Many contaminants adhere to particles (e.g. Many contaminants adhere to particles (e.g. phosphorous)phosphorous)

• High turbidity water is harder to treatHigh turbidity water is harder to treat

• Need to be able to respond quickly to Need to be able to respond quickly to changes in turbiditychanges in turbidity

Page 56: Instrumentation For Process Control 09

56

Source Water – Surface WaterSource Water – Surface Water• ConductivityConductivity

• Changes in ionic speciesChanges in ionic species

• ORPORP• Changes in oxidative or reducing speciesChanges in oxidative or reducing species

• OrganicsOrganics• Seasonal changes and contaminationSeasonal changes and contamination

• AmmoniaAmmonia• Biological degradationBiological degradation

Page 57: Instrumentation For Process Control 09

57

Source Water – Surface WaterSource Water – Surface Water

• NitrateNitrate• Level of nutrients and ag runoffLevel of nutrients and ag runoff

• DODO• Seasonal and diurnal changes due to algae Seasonal and diurnal changes due to algae

and other aquatic plantsand other aquatic plants

Page 58: Instrumentation For Process Control 09

58

Source Water Monitoring PanelSource Water Monitoring Panel

Page 59: Instrumentation For Process Control 09

59

Flocculation AidsFlocculation Aids

Page 60: Instrumentation For Process Control 09

60

Flocculation AidsFlocculation Aids

• Proper dosing of flocculation aids Proper dosing of flocculation aids (polymer, alum, ferric chloride, etc) will (polymer, alum, ferric chloride, etc) will optimize your processoptimize your process

• Under-dosing results in poor floc Under-dosing results in poor floc formationformation

• Over-dosing is expensiveOver-dosing is expensive

Page 61: Instrumentation For Process Control 09

61

Flocculation AidsFlocculation Aids

• Laboratory jar Laboratory jar tests are tests are invaluable as invaluable as long as the long as the apparatus is apparatus is representative of representative of your processyour process

Page 62: Instrumentation For Process Control 09

62

Flocculation AidsFlocculation Aids

• Controlling the dose correctly is the keyControlling the dose correctly is the key

• Parameters to monitorParameters to monitor• Turbidity can be used to track dosingTurbidity can be used to track dosing

• pH is also an important parameter to trackpH is also an important parameter to track

• Streaming Current is generally one of the Streaming Current is generally one of the best methods of measuring effectiveness of best methods of measuring effectiveness of dosedose

Page 63: Instrumentation For Process Control 09

63

Streaming CurrentStreaming Current

• On-line measurement of how well charge On-line measurement of how well charge neutralization has occurredneutralization has occurred

• Influenced by salinity, pH and Influenced by salinity, pH and conductivityconductivity

• Sample point must be close to the point Sample point must be close to the point of injection but after it is well mixedof injection but after it is well mixed

Page 64: Instrumentation For Process Control 09

64

Streaming Current MonitorStreaming Current Monitor

Page 65: Instrumentation For Process Control 09

65

Monitoring Filter Monitoring Filter TurbidityTurbidity

Page 66: Instrumentation For Process Control 09

66

Monitoring Filter TurbidityMonitoring Filter Turbidity

• Three points of turbidity monitoring Three points of turbidity monitoring • Filter effluentFilter effluent

• Filter to wasteFilter to waste

• BackwashBackwash

Page 67: Instrumentation For Process Control 09

67

Filter Effluent TurbidityFilter Effluent Turbidity

• Monitors filter performanceMonitors filter performance

• Provides the method of meeting Provides the method of meeting regulatory requirementsregulatory requirements• ““15 Minute Rule”15 Minute Rule”

Page 68: Instrumentation For Process Control 09

68

The “15 Minute Rule”The “15 Minute Rule”

• Must conduct continuous monitoring of Must conduct continuous monitoring of turbidity for each filter using an turbidity for each filter using an approved method.approved method.

• Must calibrate turbs using the procedure Must calibrate turbs using the procedure specified by the manufacturer.specified by the manufacturer.

• Must record the results every 15 Must record the results every 15 minutes while the filter is contributing to minutes while the filter is contributing to the combined filter effluent.the combined filter effluent.

Page 69: Instrumentation For Process Control 09

69

Combined Filter Effluent Combined Filter Effluent TurbidityTurbidity

• Must be monitored at least every 4 Must be monitored at least every 4 hours.hours.

• Must be less than or equal to 0.3 NTU in Must be less than or equal to 0.3 NTU in at least 95% of the measurements taken at least 95% of the measurements taken each month.each month.

• Must not exceed 1 NTU at any time.Must not exceed 1 NTU at any time.

Page 70: Instrumentation For Process Control 09

70

Filter PerformanceFilter PerformanceTurbidity vs. Particle CounterTurbidity vs. Particle Counter

• Like turbidity, particle counting is another Like turbidity, particle counting is another tooltool

• They are complimentary and They are complimentary and notnot competing technologiescompeting technologies

• Each can tell part of the whole pictureEach can tell part of the whole picture

Page 71: Instrumentation For Process Control 09

71

Turbidity Measurement Particle Count Measurement

Measurement of light scattered at an angle. For municipal water/wastewater applications light scattering measurements at 90º to the incident light path.

Particle counting measurements can be light scattering or light blocking. Light scattering technology is appropriate for particle sizes <1µm. Light blocking technology is appropriate for particle sizes > 1µm. For municipal drinking water applications, light blocking > 1µm (typically >2µm) is appropriate.

Not a specific measurement of anything, it is a qualitative measurement

A quantitative measurement of particle size and particle number.

Measurement is independent of volume

Measurement is volume dependent

Measurement is relatively independent of flow rate. Sample can be flowing or static

Sample must be flowing and flowing at a constant rate.

Unit of measurement is nephelometric turbidity units, NTU

Unit of measurement is particle counting must state the number of particles, particle size or range of sizes and unit volume. For example 10 particles per ml > 5µm or 200 particles per ml 2-5µm.

Peak wavelength response for lab, SS7 and 1720 series process is ~560nm, FT660 is 660 nm, for Accu4 ~ 850nm

Wavelength is 790 nm

Theoretical particle size sensitivity 10-8m (0.01µm)

2200 PCX sensitivity is > 2µm

Turbidity Measurement Particle Count Measurement

Size range from approximately 10-8m - 10-3m (large molecules to sand)

For the 2200 PCX: 2-750 µm

Color in water is a negative interference except for the Accu 4

Color does not interfere with particle count measurements

Turbidity interferes. High turbidity is a negative interference. At high turbidity scattered light is blocked or absorbed by the large amount of turbidity and thus does not reach the detector. The turbidity will be false negative. This phenomenon is called ‘going blind.’

Turbidity interferes. High turbidity is a negative interference. Particle counters typically have a range of approximately 17,000 particles/ml > 2µm. The particle counter may be over range at turbidity between 1 and 10 NTU – typically approximately 5 NTU. The particle counts will be false negative.

Light absorbing materials (i.e. activated carbon) are negative interferences.

Light absorbing materials (i.e. carbon) block light well and thus are counted. They do not interfere

Accuracy of measurement is influenced by particle size

Accuracy of measurement is influenced by particle size

Accuracy of measurement is influenced by particle shape

Accuracy of measurement is influenced by particle shape

Accuracy of measurement is influenced by a particle’s refractive index

Accuracy of measurement is influenced by particle’s refractive index

Page 72: Instrumentation For Process Control 09

72

Particle Particle Sizes Sizes

Practical Practical MeasurementMeasurement

Siz

e in

Me

ters

100

10-10

10-6

1 Meter-Boulders

1 AngstromIons

Bacteria/Silt & Clay

Viruses/Colloids

Sand

Multicell Organisms

Visible

Microscope

Electron Microscope

TurbidityParticle Counting

10-3

10-8

Page 73: Instrumentation For Process Control 09

73

Turbidity vs. Particle CounterTurbidity vs. Particle Counter

• What follows are examples of how they What follows are examples of how they compliment each othercompliment each other

Page 74: Instrumentation For Process Control 09

74

1720C and PCX-10 Response to Fluoride and Carbon1720C and PCX-10 Response to Fluoride and Carbon

0.00

500.00

1000.00

1500.00

2000.00

2500.00

3000.00

3500.00

4000.00

1999

/01/

05 0

0:01

1999

/01/

05 0

0:51

1999

/01/

05 0

1:40

1999

/01/

05 0

2:30

1999

/01/

05 0

3:20

1999

/01/

05 0

4:10

1999

/01/

05 0

5:00

1999

/01/

05 0

5:50

1999

/01/

05 0

6:40

1999

/01/

05 0

7:30

1999

/01/

05 0

8:20

1999

/01/

05 0

9:21

1999

/01/

05 1

0:11

1999

/01/

05 1

1:01

1999

/01/

05 1

1:51

1999

/01/

05 1

2:41

1999

/01/

05 1

3:31

1999

/01/

05 1

4:21

1999

/01/

05 1

5:11

1999

/01/

05 1

6:01

1999

/01/

05 1

6:51

1999

/01/

05 1

7:41

1999

/01/

05 1

8:31

1999

/01/

05 1

9:21

1999

/01/

05 2

0:11

1999

/01/

05 2

1:01

1999

/01/

05 2

1:51

1999

/01/

05 2

2:41

1999

/01/

05 2

3:31

Date/Time

Pa

rtic

les/

mL

PC

X-1

0 S

en

sor:

>1

µm

an

d >

m

0.00

0.01

0.02

0.03

0.04

0.05

0.06

0.07

0.08

0.09

0.10

Effluent PCX-10:>1µm Effluent PCX-10:>2 µm Effluent Turbidity, NTU

Tu

rbid

ity, NT

U

1µ PCX-10 Sensor >2µm, left axis

Turbidity, NTU, right axis

1µ PCX-10 Sensor >2µm, left axis

By 17:00 Filters 3 and 6 in service 100 hrs and 72 hrs, respectively.

Filter 4 in service

Page 75: Instrumentation For Process Control 09

75

0.00

500.00

1000.00

1500.00

2000.00

2500.00

3000.00

3500.00

4000.00

1999

/01/

05 0

0:01

1999

/01/

05 0

0:51

1999

/01/

05 0

1:40

1999

/01/

05 0

2:30

1999

/01/

05 0

3:20

1999

/01/

05 0

4:10

1999

/01/

05 0

5:00

1999

/01/

05 0

5:50

1999

/01/

05 0

6:40

1999

/01/

05 0

7:30

1999

/01/

05 0

8:20

1999

/01/

05 0

9:21

1999

/01/

05 1

0:11

1999

/01/

05 1

1:01

1999

/01/

05 1

1:51

1999

/01/

05 1

2:41

1999

/01/

05 1

3:31

1999

/01/

05 1

4:21

1999

/01/

05 1

5:11

1999

/01/

05 1

6:01

1999

/01/

05 1

6:51

1999

/01/

05 1

7:41

1999

/01/

05 1

8:31

1999

/01/

05 1

9:21

1999

/01/

05 2

0:11

1999

/01/

05 2

1:01

1999

/01/

05 2

1:51

1999

/01/

05 2

2:41

1999

/01/

05 2

3:31

Date/Time

Pa

rtic

les/

mL

PC

X-1

0 S

en

sor:

>1

µm

an

d >

m

0.00

0.01

0.02

0.03

0.04

0.05

0.06

0.07

0.08

0.09

0.10

Effluent PCX-10:>1µm Effluent PCX-10:>2 µm Effluent Turbidity, NTU

Tu

rbid

ity, NT

U

1µ PCX-10 Sensor >2µm, left axis

Turbidity, NTU, right axis

1µ PCX-10 Sensor >2µm, left axis

By 17:00 Filters 3 and 6 in service 100 hrs and 72 hrs, respectively.

Filter 4 in service

• About 9:21 AM both PCX and 1720C showed a deviationAbout 9:21 AM both PCX and 1720C showed a deviation

• Turb from 0.04 to 0.06 NTUTurb from 0.04 to 0.06 NTU

• PCX jumped over a decade on both channelsPCX jumped over a decade on both channels

• Delta in turb readings seem insignificant but did respondDelta in turb readings seem insignificant but did respond

• PCX definitely saw somethingPCX definitely saw something

Page 76: Instrumentation For Process Control 09

76

0.00

500.00

1000.00

1500.00

2000.00

2500.00

3000.00

3500.00

4000.00

1999

/01/

05 0

0:01

1999

/01/

05 0

0:51

1999

/01/

05 0

1:40

1999

/01/

05 0

2:30

1999

/01/

05 0

3:20

1999

/01/

05 0

4:10

1999

/01/

05 0

5:00

1999

/01/

05 0

5:50

1999

/01/

05 0

6:40

1999

/01/

05 0

7:30

1999

/01/

05 0

8:20

1999

/01/

05 0

9:21

1999

/01/

05 1

0:11

1999

/01/

05 1

1:01

1999

/01/

05 1

1:51

1999

/01/

05 1

2:41

1999

/01/

05 1

3:31

1999

/01/

05 1

4:21

1999

/01/

05 1

5:11

1999

/01/

05 1

6:01

1999

/01/

05 1

6:51

1999

/01/

05 1

7:41

1999

/01/

05 1

8:31

1999

/01/

05 1

9:21

1999

/01/

05 2

0:11

1999

/01/

05 2

1:01

1999

/01/

05 2

1:51

1999

/01/

05 2

2:41

1999

/01/

05 2

3:31

Date/Time

Pa

rtic

les/

mL

PC

X-1

0 S

en

sor:

>1

µm

an

d >

m

0.00

0.01

0.02

0.03

0.04

0.05

0.06

0.07

0.08

0.09

0.10

Effluent PCX-10:>1µm Effluent PCX-10:>2 µm Effluent Turbidity, NTU

Tu

rbid

ity, NT

U

1µ PCX-10 Sensor >2µm, left axis

Turbidity, NTU, right axis

1µ PCX-10 Sensor >2µm, left axis

By 17:00 Filters 3 and 6 in service 100 hrs and 72 hrs, respectively.

Filter 4 in service

• What happened?What happened?

• Out of spec sodium silicofluoride (large particle size) was also contaminated with Out of spec sodium silicofluoride (large particle size) was also contaminated with activated carbon, hit the system at about 9:20 AMactivated carbon, hit the system at about 9:20 AM

• PC responded strongly to both the fluoride particles and carbon particlesPC responded strongly to both the fluoride particles and carbon particles

• Turb saw the fluoride particles as turbidity, but carbon particles are a negative Turb saw the fluoride particles as turbidity, but carbon particles are a negative interference. That made the response much less in intensity. interference. That made the response much less in intensity. MostMost turbs do not turbs do not have the low range resolution to show a significant response.have the low range resolution to show a significant response.

Page 77: Instrumentation For Process Control 09

77

Particle Counter vs. Laser TurbParticle Counter vs. Laser Turb

• Laser Turb particle size sensitivity down to 0.01 Laser Turb particle size sensitivity down to 0.01 µmµm

• Resolution in mNTU (1.0 mNTU = 0.001 NTU)Resolution in mNTU (1.0 mNTU = 0.001 NTU)

• Particle counter size sensitivity at > 2 µmParticle counter size sensitivity at > 2 µm

Page 78: Instrumentation For Process Control 09

78

Particle Counter vs. Laser TurbParticle Counter vs. Laser Turb

• Both track fairly well togetherBoth track fairly well together

• The FT660 show longer time to ripen after filter run. FT660 is still The FT660 show longer time to ripen after filter run. FT660 is still seeing the particles < 2 µmseeing the particles < 2 µm

• Particle counter does not respond to particles < 2 µmParticle counter does not respond to particles < 2 µm

• FT660 definitely responds to an anomaly that the Particle counter FT660 definitely responds to an anomaly that the Particle counter does not. Again probably because of particle size.does not. Again probably because of particle size.

Page 79: Instrumentation For Process Control 09

79

Particle Counter vs. Laser TurbParticle Counter vs. Laser Turb

• Notice that the change in the FT660 at the event is from about 24 to Notice that the change in the FT660 at the event is from about 24 to 31 (7) mNTU’s. That is a significant number.31 (7) mNTU’s. That is a significant number.

• If it were a 1720E (or C or D) that would be a change of 0.007 NTU. If it were a 1720E (or C or D) that would be a change of 0.007 NTU. You probably would not even see it, let alone think it was significant.You probably would not even see it, let alone think it was significant.

Page 80: Instrumentation For Process Control 09

80

Page 81: Instrumentation For Process Control 09

81

Particle Counter DataParticle Counter Data• A particle counter is an excellent tool to A particle counter is an excellent tool to

judge filter performancejudge filter performance

• BUT, you must be willing to analyze the BUT, you must be willing to analyze the data…and there is a lot of it!data…and there is a lot of it!

• Data Data acquisitionacquisition is inadequate, it must is inadequate, it must become data become data analysisanalysis..

• Data acquired without a plan for, or Data acquired without a plan for, or means of use, is not of much value.means of use, is not of much value.

Page 82: Instrumentation For Process Control 09

82

Monitoring Filter TurbidityMonitoring Filter Turbidity

• Three points of turbidity monitoring Three points of turbidity monitoring • Filter effluentFilter effluent

• Filter to wasteFilter to waste

• BackwashBackwash

Page 83: Instrumentation For Process Control 09

83

Filter To WasteFilter To Waste• After backwash each filter’s water is run to waste After backwash each filter’s water is run to waste

until the filter ripens enough to bring it back on lineuntil the filter ripens enough to bring it back on line• Measuring the FTW turbidity is the best method of Measuring the FTW turbidity is the best method of

controlling when to bring the filter on linecontrolling when to bring the filter on line• If the FTW turbidity is less than the raw water but If the FTW turbidity is less than the raw water but

more than the allowed filter effluent, the water could more than the allowed filter effluent, the water could be recycled until the turbidity is low enough to bring be recycled until the turbidity is low enough to bring the filter on line.the filter on line.

• Difficult to do with grab samplesDifficult to do with grab samples• Must be done with a process turbMust be done with a process turb

Page 84: Instrumentation For Process Control 09

84

Monitoring Filter TurbidityMonitoring Filter Turbidity

• Three points of turbidity monitoring Three points of turbidity monitoring • Filter effluentFilter effluent

• Filter to WasteFilter to Waste

• BackwashBackwash

Page 85: Instrumentation For Process Control 09

85

The Importance of Backwash The Importance of Backwash Monitoring for TurbidityMonitoring for Turbidity

• Backwashing requires a significant Backwashing requires a significant volume of (already treated) water (3 - volume of (already treated) water (3 - 5% or more).5% or more).

• The most common problem is excessive The most common problem is excessive backwash.backwash.

• This can have a dramatic impact on This can have a dramatic impact on • filter performancefilter performance• plant operating costsplant operating costs

Page 86: Instrumentation For Process Control 09

86

The Importance of Backwash The Importance of Backwash Monitoring for TurbidityMonitoring for Turbidity

• Excessive backwash can lead toExcessive backwash can lead to• Loss of filter mediaLoss of filter media

• A negative effect on the ripening phaseA negative effect on the ripening phase

• Shortened filter runsShortened filter runs

• Higher potential for filter break throughsHigher potential for filter break throughs

• Degraded filter performanceDegraded filter performance

Page 87: Instrumentation For Process Control 09

87

The Importance of Backwash The Importance of Backwash Monitoring for TurbidityMonitoring for Turbidity

• To optimize filter performance:To optimize filter performance:

REDUCE BACKWASHING!REDUCE BACKWASHING!

Page 88: Instrumentation For Process Control 09

88

The Importance of Backwash The Importance of Backwash Monitoring for TurbidityMonitoring for Turbidity

• Methods used for determining Methods used for determining termination of the backwash cycle termination of the backwash cycle include:include:• Timed cycleTimed cycle

• Backwash volume Backwash volume

• Operator judgementOperator judgement

• TurbidityTurbidity

Page 89: Instrumentation For Process Control 09

89

Methods for Backwash Methods for Backwash Termination: Timed CycleTermination: Timed Cycle

• Backwash cycle is just timedBackwash cycle is just timed• Not a true indicator of filter cleaningNot a true indicator of filter cleaning

• Does not take into account:Does not take into account:• Solids loadingSolids loading• Changes in the mediaChanges in the media• Variations in flowVariations in flow

• Typically, excess water is used to Typically, excess water is used to ensure the filter is clean.ensure the filter is clean.

Page 90: Instrumentation For Process Control 09

90

Methods for Backwash Methods for Backwash Termination: Backwash VolumeTermination: Backwash Volume• A specific amount of water is used to A specific amount of water is used to

backwash the filterbackwash the filter

• Same problems as with the timed cycleSame problems as with the timed cycle

• Typically, excess water is used to ensure Typically, excess water is used to ensure the filter is clean.the filter is clean.

Page 91: Instrumentation For Process Control 09

91

Methods for Backwash Methods for Backwash Termination:Operator Termination:Operator

JudgementJudgement• Operator “eye-balls” the top of the filter to Operator “eye-balls” the top of the filter to

determine when the backwash is done.determine when the backwash is done.

• The obvious:The obvious:• Un-scientific Un-scientific

• InconsistentInconsistent

• Often results in over-washing the filter.Often results in over-washing the filter.

Page 92: Instrumentation For Process Control 09

92

Page 93: Instrumentation For Process Control 09

93

Methods for Backwash Methods for Backwash Termination: TurbidityTermination: Turbidity

• Turbidimetric measurements are made Turbidimetric measurements are made throughout the cyclethroughout the cycle

• Determination of the end-point is:Determination of the end-point is:• Based on good scienceBased on good science

• RepeatableRepeatable

• Independent of filter loading and variationsIndependent of filter loading and variations

• Un-biasedUn-biased

Page 94: Instrumentation For Process Control 09

94

Methods for Backwash Methods for Backwash Termination:TurbidityTermination:Turbidity

• Studies have shown that the final Studies have shown that the final turbidity at the termination of a turbidity at the termination of a backwash cycle directly correlates backwash cycle directly correlates to subsequent filter performance to subsequent filter performance and run time.and run time.

Page 95: Instrumentation For Process Control 09

95

Methods for Backwash Methods for Backwash Termination: TurbidityTermination: Turbidity

• AWWA recommends backwash be AWWA recommends backwash be terminated when the turbidity is in the terminated when the turbidity is in the range of 10 - 15 NTUrange of 10 - 15 NTU

• When done so, sufficient particulate When done so, sufficient particulate material remains above the filter to material remains above the filter to create the proper environment for an create the proper environment for an effective ripening period, which results effective ripening period, which results in longer and more effective filter runs.in longer and more effective filter runs.

Page 96: Instrumentation For Process Control 09

96

AWWA Recommended Backwash Limit (10 - 15 NTU)

Page 97: Instrumentation For Process Control 09

97

0

5

10

15

20

25

3:0

2

3:0

2

3:0

3

3:0

4

3:0

4

3:0

5

3:0

5

3:0

6

3:0

7

3:0

7

3:0

8

3:0

9

3:0

9

3:1

0

3:1

0

3:1

1

3:1

2

3:1

2

3:1

3

3:1

3

3:1

4

3:1

5

3:1

5

Start

End

A 3:13

B 3:15

Large Filter with aLarge Filter with a17,000 gpm BW Rate17,000 gpm BW Rate

Page 98: Instrumentation For Process Control 09

98

Methods for Backwash Methods for Backwash Termination:TurbidityTermination:Turbidity

• Methods for measuring backwash Methods for measuring backwash turbidityturbidity• Grab sampleGrab sample

• Must be representative sampleMust be representative sample• Time and labor intensiveTime and labor intensive• Requires many samples per filter runRequires many samples per filter run

• On-lineOn-line• Slip-stream (traditional)Slip-stream (traditional)• In situIn situ

Page 99: Instrumentation For Process Control 09

99

In situIn situ Analysis for Backwash Analysis for Backwash TurbidityTurbidity

• Use a probe designUse a probe design• The probe is placed in backwash The probe is placed in backwash

troughtrough• Extremely rapid response to changes Extremely rapid response to changes

in backwash turbidityin backwash turbidity• Measurements are taken at frequent Measurements are taken at frequent

intervalsintervals

Page 100: Instrumentation For Process Control 09

100

Instrumental MonitoringInstrumental Monitoring• AdvantagesAdvantages

• Consistent Consistent operationoperation

• Automated Automated monitoringmonitoring

• All operators “see” All operators “see” the same thingthe same thing

• Better overall Better overall process control to process control to lower costslower costs

• DisadvantagesDisadvantages• Initial instrument Initial instrument

purchasepurchase

• Installation costsInstallation costs

• Operators may feel Operators may feel threatenedthreatened

Page 101: Instrumentation For Process Control 09

101

Instrumental MonitoringInstrumental Monitoring

• Nearly every utility implementing Nearly every utility implementing instrumental backwash monitoring can instrumental backwash monitoring can achieve cost savings equal to the achieve cost savings equal to the installed cost of the instruments in a year installed cost of the instruments in a year or lessor less

Page 102: Instrumentation For Process Control 09

102

Location – Time is Money!Location – Time is Money!• Analysis needs to be taken as close to the Analysis needs to be taken as close to the

backwash as practical – seconds are backwash as practical – seconds are importantimportant

• If possible mount in the BW trough If possible mount in the BW trough

• CAUTION:CAUTION: Poor response and little or no Poor response and little or no savings may result if mounted as follows:savings may result if mounted as follows:• Manifolding multiple filters to a single Manifolding multiple filters to a single

monitoring sensor or point monitoring sensor or point

• Sampling the common drain line of drain galley Sampling the common drain line of drain galley or gulletor gullet

Page 103: Instrumentation For Process Control 09

103

Typical Installation Typical Installation ConfigurationConfiguration

• Many Many controllers controllers accept inputs accept inputs from two from two probesprobesOne Sensor in

Backwash Trough

Page 104: Instrumentation For Process Control 09

104

Page 105: Instrumentation For Process Control 09

105

Monitor Uniformity of BackwashMonitor Uniformity of Backwash

• Use a second Use a second sensor mounted sensor mounted on a pole (1/2-on a pole (1/2-3/4” pipe or rigid 3/4” pipe or rigid conduit) to move conduit) to move around the filter around the filter to check to check uniformity of uniformity of washingwashing

Page 106: Instrumentation For Process Control 09

106

Sensor Mounted in Filter BedSensor Mounted in Filter Bed

• Use pipe-mounted Use pipe-mounted sensor to move sensor to move around filteraround filter

Sensor

Sensor Mounting

Page 107: Instrumentation For Process Control 09

107

Sensor Mounted in TroughSensor Mounted in Trough• Sensor mounted Sensor mounted

in backwash in backwash trough – more trough – more representativerepresentative

• Sensor points Sensor points upstream, into upstream, into the flowthe flow

• Mount near Mount near bottom of troughbottom of trough

Page 108: Instrumentation For Process Control 09

108

Self-cleaning WiperSelf-cleaning Wiper

• Self-cleaning Self-cleaning • Adjustable wiping Adjustable wiping

frequencyfrequency

• Long wiper blade Long wiper blade lifelife

Page 109: Instrumentation For Process Control 09

109

Typical Data From BW Typical Data From BW MonitoringMonitoring

Page 110: Instrumentation For Process Control 09

110

Noisy ResponseNoisy Response

• Some samples may be noisy and require Some samples may be noisy and require sample conditioning with a stilling chambersample conditioning with a stilling chamber

Page 111: Instrumentation For Process Control 09

111

Stilling Chamber to Quiet NoiseStilling Chamber to Quiet Noise

• Black PVC pipeBlack PVC pipe

• 6 feet long, 8 6 feet long, 8 inch diameterinch diameter

• Used to ‘quiet’ Used to ‘quiet’ the samplethe sample

Page 112: Instrumentation For Process Control 09

112

After Installation of Stilling After Installation of Stilling ChamberChamber

Page 113: Instrumentation For Process Control 09

113

Large FiltersLarge FiltersFilter Side A Filter Side B

BW Trough/Launderer BW Trough/Launderer

BW Trough/Launderer BW Trough/Launderer

BW Trough/LaundererBW Trough/Launderer

Flo

w

Common Drain Gullet Mount Permanent Probe here to look into the stream

Use second probe to move around the filter to assess uniformity of backwash

Page 114: Instrumentation For Process Control 09

114

Manifold/Drain Header Mounting Manifold/Drain Header Mounting

• Avoid where possibleAvoid where possible• Unacceptable delayUnacceptable delay

• Non-representative samplingNon-representative sampling

Sensor

Filter 1 Filter 2 Filter 3 Filter 4 Filter 5 Filter 6

Manifold/Drain Header

Page 115: Instrumentation For Process Control 09

115

Summary of Backwash Summary of Backwash MonitoringMonitoring

• Consistent Filter BackwashConsistent Filter Backwash• Filter to FilterFilter to Filter• Operator to OperatorOperator to Operator

• Reduced Power CostReduced Power Cost• Reduced Water ConsumptionReduced Water Consumption• More Saleable WaterMore Saleable Water• Lower Re-treatment CostLower Re-treatment Cost• Lower Filter to Waste Cost and VolumeLower Filter to Waste Cost and Volume• Lower Backwash Recovery CostsLower Backwash Recovery Costs

Page 116: Instrumentation For Process Control 09

116

Case Study: Backwash Profiling Case Study: Backwash Profiling at a Colorado Water Treatment at a Colorado Water Treatment

PlantPlant• 38 MGD38 MGD• 12 Filter beds12 Filter beds• Coagulation, sedimentation and filtrationCoagulation, sedimentation and filtration• Conventional dual-media filter designConventional dual-media filter design• Filter run averages 24 hoursFilter run averages 24 hours• Raw water 10 - 20 NTURaw water 10 - 20 NTU• Settled water 1 - 2 NTUSettled water 1 - 2 NTU• Final effluent rarely exceeds 0.030 NTUFinal effluent rarely exceeds 0.030 NTU

Page 117: Instrumentation For Process Control 09

117

Case Study: Backwash Profiling Case Study: Backwash Profiling at a Colorado Water Treatment at a Colorado Water Treatment

PlantPlant

• The plant is a member of the Partnership The plant is a member of the Partnership for Safe Drinking Water and consistently for Safe Drinking Water and consistently exceeds their membership requirements.exceeds their membership requirements.

Page 118: Instrumentation For Process Control 09

118

Case Study: Backwash Profiling Case Study: Backwash Profiling at a Colorado Water Treatment at a Colorado Water Treatment

PlantPlant• To profile the filters, the probeTo profile the filters, the probe

• was mounted 4 feet below the water linewas mounted 4 feet below the water line

• 18 inches above the filter media18 inches above the filter media

• facing away from the filter wallfacing away from the filter wall

• in a horizontal positionin a horizontal position

Page 119: Instrumentation For Process Control 09

119

Case Study: Backwash Profiling Case Study: Backwash Profiling at a Colorado Water Treatment at a Colorado Water Treatment

PlantPlant

• Data collection at 5 second intervalsData collection at 5 second intervals

• 30 second signal averaging to reduce 30 second signal averaging to reduce noise levels due to turbulence above the noise levels due to turbulence above the filter mediafilter media

Page 120: Instrumentation For Process Control 09

120

Page 121: Instrumentation For Process Control 09

121

Surface Wash On

4,000 gpm

6,000 gpm

Surface Wash Off

Surface Wash On 3,900 gpm

Surface Wash Off 6,000gpm

5,300 gpm

2,000 gpm

Page 122: Instrumentation For Process Control 09

122

Case Study: Backwash Profiling Case Study: Backwash Profiling at a Colorado Water Treatment at a Colorado Water Treatment

PlantPlant• The profile shows two distinct peaksThe profile shows two distinct peaks

• Cycle begins with surface washCycle begins with surface wash

• Max turbidity (55 NTU) at 6000 gpm (1Max turbidity (55 NTU) at 6000 gpm (1OO))

• Within 6 minutes turbidity drops below 5 Within 6 minutes turbidity drops below 5 NTUNTU

• Second SW brings it up to 15 NTU (2Second SW brings it up to 15 NTU (2OO))

• Backwash flow rate is then slowly reducedBackwash flow rate is then slowly reduced

Page 123: Instrumentation For Process Control 09

123

Case Study: Backwash Profiling Case Study: Backwash Profiling at a Colorado Water Treatment at a Colorado Water Treatment

PlantPlant• At nine minutes turbidity is between 1 At nine minutes turbidity is between 1

- 2 NTU- 2 NTU• Same as settled water prior to filtrationSame as settled water prior to filtration

• After almost 14 minutes final turbidity After almost 14 minutes final turbidity is 0.081 NTUis 0.081 NTU

Page 124: Instrumentation For Process Control 09

124

Case Study: Backwash Profiling Case Study: Backwash Profiling at a Colorado Water Treatment at a Colorado Water Treatment

PlantPlant• ConclusionsConclusions

• The filter was over-washed (0.081 vs 10 - 15 The filter was over-washed (0.081 vs 10 - 15 NTU)NTU)

• AWWA would recommend terminating BW during AWWA would recommend terminating BW during second Surface Wash peak (15 NTU at 7 min)second Surface Wash peak (15 NTU at 7 min)

• If longer runs are desired, could terminate BW at If longer runs are desired, could terminate BW at about 9 minutes when turbidity was equal to that about 9 minutes when turbidity was equal to that of settled water.of settled water.

Page 125: Instrumentation For Process Control 09

125

Case Study: Backwash Profiling Case Study: Backwash Profiling at a Colorado Water Treatment at a Colorado Water Treatment

PlantPlant• Conclusions (continued)Conclusions (continued)

• In either case a substantial amount of BW water In either case a substantial amount of BW water could be saved. (30% – 45%) = $$$$$$could be saved. (30% – 45%) = $$$$$$

• Although subsequent filter runs were not Although subsequent filter runs were not documented in this case, other studies have documented in this case, other studies have shown an increase in filter runs and quicker shown an increase in filter runs and quicker ripening of the filter.ripening of the filter.

• Process optimization is the ultimate goalProcess optimization is the ultimate goal

Page 126: Instrumentation For Process Control 09

126

Will I Always Save?Will I Always Save?• WaterWater

• No. Under washing and over washing No. Under washing and over washing are both problems. If under washing has are both problems. If under washing has been a problem for very long, it will take been a problem for very long, it will take a while to clean the filter(s) up. a while to clean the filter(s) up. THEN THEN water savings will start.water savings will start.

• Operation ExpenseOperation Expense• Yes. Savings in power, re-treatment Yes. Savings in power, re-treatment

costs of water, labor, filter media, will costs of water, labor, filter media, will yield net savings.yield net savings.

Page 127: Instrumentation For Process Control 09

127

Sample Calculations of Sample Calculations of SavingsSavings

Page 128: Instrumentation For Process Control 09

128

Calculate BW Costs (Savings)Calculate BW Costs (Savings)• Calculate Cost of Backwash:Calculate Cost of Backwash:

• The Cost of OperationsThe Cost of Operations(A)(A) = =

$ Cost of Operation(A) X 1000 Gallons Saved(B) = $ Saved1000 Gallons Backwash Cycle Backwash Cycle

Total Annual Budget $* = $ Cost of Operation1000 Gallons Produced Annually 1000 Gallons

*All costs – debit service, salaries, benefits, utilities, chemicals, maintenance, depreciation, capital expenses, consulting fees

Page 129: Instrumentation For Process Control 09

129

Calculate BW Costs (Savings)Calculate BW Costs (Savings)

• Example Cost of Operation Example Cost of Operation (A)(A)::

• The Cost of OperationsThe Cost of Operations(A)(A) = =

$ Total annual budget = $ Cost of Operation1000 Gallons annually 1000 gallons

$18,000,000 Annual Budget = $ 3.654,900,000,000 Gallons Produced Annually 1000 gallons

Page 130: Instrumentation For Process Control 09

130

Calculate BW Costs (Savings)Calculate BW Costs (Savings)

• Calculate Dollars saved per Backwash:Calculate Dollars saved per Backwash:

• So,in1000 gallons saved/backwash cycle So,in1000 gallons saved/backwash cycle (B(B)=)=

$ 3.65 (A) X 1000 Gallons saved (B) = $ Saved1000 Gallons Backwash Cycle Backwash Cycle

1000 gallons (max rate) X Minutes Saved Minute Backwash Gallons

Page 131: Instrumentation For Process Control 09

131

Calculate BW Costs (Savings)Calculate BW Costs (Savings)

• Savings per backwash Savings per backwash (B):(B):

• So, assume 4,000 gal/minute rate, 1.5 minutes So, assume 4,000 gal/minute rate, 1.5 minutes saved/backwash cost of water will be:saved/backwash cost of water will be:

$ 3.65 (A) X 1000 Gallons saved (B) = $ Saved 1000 Gallons Backwash Cycle Backwash Cycle

4,000 gallons X 1.5 Minutes Saved X $3.65 (A) = $21.90Minute Wash 1000 Gal Wash

Page 132: Instrumentation For Process Control 09

132

Calculate BW Costs (Savings)Calculate BW Costs (Savings)

• Savings in Wash water Savings in Wash water (B):(B):

• So, assume 4 filters, 60 hr runtimes; 8,760 hours in So, assume 4 filters, 60 hr runtimes; 8,760 hours in a year so each filter will be washed 146 timesa year so each filter will be washed 146 times

$ 3.65 (A) X 6000 Gallons saved (B) = $ 21.901000 Gallons Backwash Cycle Backwash Cycle

$21.90 X 146 washes X 4 filters = $12,789.60 Wash Filter Year

Page 133: Instrumentation For Process Control 09

133

Calculate Savings and Calculate Savings and Revenue in BWRevenue in BW

• Savings from saved water:Savings from saved water:

• Savings from treating or retreating replacement Savings from treating or retreating replacement water – water – Numerically the same as above = $Numerically the same as above = $12,789.60

$21.90 X 146 washes X 4 filters = $12,789.60 Wash Filter Year

Page 134: Instrumentation For Process Control 09

134

Calculate Savings and Calculate Savings and Revenue in BWRevenue in BW

• Savings from saved water per year:Savings from saved water per year:• figured already = $12,789.60figured already = $12,789.60

• Savings from treating or retreating Savings from treating or retreating replacement water – $ 12,789.60 same replacement water – $ 12,789.60 same as aboveas above

• Total savings from saved and Total savings from saved and retreating water = retreating water = $25,579.20$25,579.20

Page 135: Instrumentation For Process Control 09

135

Calculate Savings and Calculate Savings and Revenue in BWRevenue in BW

Revenue Value of Water Saved:Revenue Value of Water Saved:

$Price$Price X 1000 Gallons Saved = $ Revenue X 1000 Gallons Saved = $ Revenue 1000 Gallons1000 Gallons

1.5 mintues x 4000 gal/min = 6, 000 gallons/wash1.5 mintues x 4000 gal/min = 6, 000 gallons/washor or 3,504,000 gallons per year3,504,000 gallons per year (6000x146x4) (6000x146x4)

Water Water raterate = $3.75/1000 = = $3.75/1000 = $13,140 Revenue $13,140 Revenue valuevalue

Page 136: Instrumentation For Process Control 09

136

Calculate Savings in Power for Calculate Savings in Power for Pumps and BlowersPumps and Blowers

• Calculate power use for pump or blower Calculate power use for pump or blower (air wash or air scour)(air wash or air scour)KW* Used X Hours of Pumping X Dollars = Dollars

Backwash KWH* Backwash

*KW = Kilowatt; KWH = Kilowatt Hour. Calculate KW from motor name plate from - KVolts X rated Amps of motor.

Page 137: Instrumentation For Process Control 09

137

Calculate Savings in Power for Calculate Savings in Power for Pumps and BlowersPumps and Blowers

• Calculate power use for pump or blower Calculate power use for pump or blower (air wash or air scour)(air wash or air scour)

• Example of 1.5 minutes/backwash savingsExample of 1.5 minutes/backwash savings• 60 HP PUMP AT 24kw ONLY PUMP USED60 HP PUMP AT 24kw ONLY PUMP USED

• Utility pays $0.07 per KWHUtility pays $0.07 per KWH

• 1.5/60 = hours of pumping1.5/60 = hours of pumping

24 KW X 0.025 Hours of Pumping X $0.07 = $0.042 Backwash KWH Backwash

Page 138: Instrumentation For Process Control 09

138

Calculate Savings in Power for Calculate Savings in Power for Pumps and BlowersPumps and Blowers

• Calculate power use for pump or blower Calculate power use for pump or blower (air wash or air scour)(air wash or air scour)

• Example of $.042 /backwash savingsExample of $.042 /backwash savings• $0.042 x 146 backwashes/filter/year = $6.13 / Filter$0.042 x 146 backwashes/filter/year = $6.13 / Filter

• $6.13 / Filter x 4 = $24.52 per year$6.13 / Filter x 4 = $24.52 per year

24 KW X 0.025 Hours of Pumping X $0.07 = $0.042 Backwash KWH Backwash

Page 139: Instrumentation For Process Control 09

139

Summary of SavingsSummary of Savings• Savings from using less waterSavings from using less water

• Washwater savedWashwater saved $ 12,789.60$ 12,789.60• Retreatment savedRetreatment saved $ 12,789.60 $ 12,789.60

• Savings in Power CostSavings in Power Cost• Backwash pumpBackwash pump $25 $25• Surface wash $10Surface wash $10• Waste return $ 5Waste return $ 5• Other pumpsOther pumps

• Savings in laborSavings in labor• Reduced by the percent reductionReduced by the percent reduction

of pump usage (eg 15 hrs) X labor costof pump usage (eg 15 hrs) X labor cost• TOTAL DIRECT ANNUAL SAVINGSTOTAL DIRECT ANNUAL SAVINGS > >$25,619.20$25,619.20

Page 140: Instrumentation For Process Control 09

140

Summary of SavingsSummary of Savings• Total Direct Annual Savings Total Direct Annual Savings $25,604.20$25,604.20

• Indirect Annual savingsIndirect Annual savings• Revenue from water savedRevenue from water saved $13,140$13,140

• Water saved/yearWater saved/year3,504,0003,504,000 gal gal

Page 141: Instrumentation For Process Control 09

141

1 Calculate cost per thousand gallons Notes:

a Total Annual BudgetInclude salaries, benefits, debt service, capital expenses, maintenance - the bottom line.

Average daily production in gallonsb 1000's of gallons produced annually 0

Cost of Operation per 1000 gallons = #DIV/0!

2 Calculate water savings per backwasha Backwash flow rate in 1000's/min 0 5,500 gal/min = 5.5 K gal/minb Enter minutes saved in backwash 0

1000's of Gallons saved per backwash 0

3 Calculate dollar savings per backwash1000's of gallons saved (line B10 above) 0Cost of Operation per 1000 gallons (line C5 above) #DIV/0!

Dollars saved per backwash #DIV/0!

4 Calculate annual savings in backwashNumber of FiltersAverage Filter run in hoursAverage number of backwashes per year #DIV/0!

Cost savings per year #DIV/0!Water savings per year in gallons #DIV/0!

Calculate annual savings in retreatment/replacement water treatment costs #DIV/0!

Equal to line C22

5 Calculate Pumping Cost for each pump

Backwash PumpKVA (KW) From motor name plateMinutes of pumping saved per backwash 0.00Hours of pumping saved per year #DIV/0!Cost in $ per KWHDollars saved per backwash $0.000Dollars saved per year #DIV/0!

Surface Wash PumpKVA (KW) From motor name plateMinutes of pumping saved per backwashHours of pumping saved per year #DIV/0!Cost in $ per KWH $0.000Dollars saved per backwash $0.000Dollars saved per year #DIV/0!

Backwash Return PumpKVA (KW) From motor name plateMinutes of pumping saved per backwashHours of pumping saved per year #DIV/0!Cost in $ per KWH $0.000Dollars saved per backwash $0.000Dollars saved per year #DIV/0!

Calculate Potential Savings in Backwash All gray-shaded cells are self-calculating and locked to protect them from inadvertent change. Enter the proper values for your treatment plant in the

yellow cells (column B). Enter notes as needed in white notes

Page 142: Instrumentation For Process Control 09

142

Disinfection ControlDisinfection Control

Page 143: Instrumentation For Process Control 09

143

Disinfection ControlDisinfection Control

• OzoneOzone

• Chlorine DioxideChlorine Dioxide

• ChloraminationChloramination

Page 144: Instrumentation For Process Control 09

144

OzoneOzone

• Typically use ozone analyzer or ORP for Typically use ozone analyzer or ORP for feedback controlfeedback control

• Feed forward control usually done by Feed forward control usually done by measuring organic loadingmeasuring organic loading• TOCTOC

• UV-254UV-254

Page 145: Instrumentation For Process Control 09

145

OzoneOzone

• Ozone is aggressive, volatile, and has a Ozone is aggressive, volatile, and has a short half-lifeshort half-life

• Very important to sample properlyVery important to sample properly• Correct sample tubing materialCorrect sample tubing material

• Shortest line possibleShortest line possible

• High velocity with proper volume to High velocity with proper volume to instrument instrument

Page 146: Instrumentation For Process Control 09

146

OzoneOzone

““A short detention time is critical when ozone decay is A short detention time is critical when ozone decay is very rapid (i.e. ozone half-life is short). Sample very rapid (i.e. ozone half-life is short). Sample detention time is considered adequate if total ozone detention time is considered adequate if total ozone decay within the sample line is <10% for the worst-decay within the sample line is <10% for the worst-case condition, which is the most rapid ozone decay case condition, which is the most rapid ozone decay rate.” rate.”

(Rakness, (Rakness, Ozone in Drinking Water Treatment: Ozone in Drinking Water Treatment: Process Design, Operation and Optimization,Process Design, Operation and Optimization, AWWA 2005).AWWA 2005).

Page 147: Instrumentation For Process Control 09

147

Ozone Residual Loss in Sample LineOzone Residual Loss in Sample Line

0

10

20

30

40

50

60

70

80

90

100

0 10 20 30 40 50 60 70 80 90 100 110 120

Detention Time in Sample Line, sec

% o

f A

ctua

l Ozo

ne R

esid

ual

HL = 0.5 min

HL = 1 min

HL = 2 min

HL = 4 min

Ozone Half-Life

0

10

20

30

40

50

60

70

80

90

100

0 10 20 30 40 50 60 70 80 90 100 110 120

Detention Time in Sample Line, sec

% o

f A

ctua

l Ozo

ne R

esid

ual

HL = 0.5 min

HL = 1 min

HL = 2 min

HL = 4 min

Ozone Half-Life

Page 148: Instrumentation For Process Control 09

148

Chlorine DioxideChlorine Dioxide• Requires amperometric titration in lab for Requires amperometric titration in lab for

regulatory purposesregulatory purposes

• CLOCLO22

• ChloriteChlorite

• ChlorateChlorate

• Generator performanceGenerator performance

• On-line instruments provide the On-line instruments provide the monitoring necessary to assure CLOmonitoring necessary to assure CLO22

stays within limitsstays within limits

Page 149: Instrumentation For Process Control 09

149

ChloraminationChloramination

• Must use the correct instrument for the Must use the correct instrument for the jobjob

• If you are making monochloramine then If you are making monochloramine then measure monochloraminemeasure monochloramine

• You cannot use a total chlorine test to You cannot use a total chlorine test to measure monochloraminemeasure monochloramine

• WHY?WHY?

Page 150: Instrumentation For Process Control 09

150

ChloraminationChloramination

• Back to some basicsBack to some basics

• DefinitionsDefinitions• Total Chlorine = Free + CombinedTotal Chlorine = Free + Combined

• Combined Chlorine = (mostly) mono-, di- Combined Chlorine = (mostly) mono-, di- and trichloramineand trichloramine

• Free Chlorine = Hypochlorous acid (HOCL) Free Chlorine = Hypochlorous acid (HOCL) + hypochlorite ion (OCL+ hypochlorite ion (OCL--))

Page 151: Instrumentation For Process Control 09

151

Chloramination CurveChloramination Curve

• Begin adding chlorine to water Begin adding chlorine to water containing ammoniacontaining ammonia• Initial addition of chlorine reacts to exhaust Initial addition of chlorine reacts to exhaust

any chlorine demand present in the waterany chlorine demand present in the water

Page 152: Instrumentation For Process Control 09

152

Chlorination CurveChlorination Curve

Chlorine Added

Chl

orin

e M

easu

red

Page 153: Instrumentation For Process Control 09

153

Chloramination CurveChloramination Curve

• Continue to add chlorine to the waterContinue to add chlorine to the water• After chlorine demand is exhausted, After chlorine demand is exhausted,

chlorine reacts with ammonia to form chlorine reacts with ammonia to form monochloraminemonochloramine

HOCl + NH3 NH2Cl + H2O

Page 154: Instrumentation For Process Control 09

154

Chlorination CurveChlorination Curve

Chlorine Added

Chl

orin

e M

easu

red

ChloraminationChloramination

II

5:1 Cl2:N Ratio

Page 155: Instrumentation For Process Control 09

155

Chloramination CurveChloramination Curve

• Continue to add chlorine to the waterContinue to add chlorine to the water• After complete formation of After complete formation of

monochloramine, monochloramine reacts monochloramine, monochloramine reacts with additional chlorine to form dichloramine with additional chlorine to form dichloramine and nitrogen trichloride.and nitrogen trichloride.

HOCl + NH2Cl NHCl2 + H2O

Page 156: Instrumentation For Process Control 09

156

Chloramination CurveChloramination Curve

• Continue to add chlorine to the waterContinue to add chlorine to the water• As dichloramine and nitrogen trichloride As dichloramine and nitrogen trichloride

form, the addition of chlorine continues to form, the addition of chlorine continues to oxidize these compounds to nitrogen gasoxidize these compounds to nitrogen gas

• The point at which all dichloramine is The point at which all dichloramine is converted to nitrogen gas is the converted to nitrogen gas is the breakpointbreakpoint..

Page 157: Instrumentation For Process Control 09

157

Chlorination CurveChlorination Curve

Chlorine Added

Chl

orin

e M

easu

red

ChloraminationChloramination

II

Breakpoint 9:1 Cl2:N Ratio

IIII

5:1 Cl2:N Ratio

Page 158: Instrumentation For Process Control 09

158

Chloramination CurveChloramination Curve

• Continue to add chlorine to the waterContinue to add chlorine to the water• After the breakpoint, all chlorine added to After the breakpoint, all chlorine added to

the water remains as free chlorinethe water remains as free chlorine

• Breakpoint chlorinationBreakpoint chlorination

Cl2 + H2O HOCl + OCl-

Page 159: Instrumentation For Process Control 09

159

Chlorination CurveChlorination Curve

Chlorine Added

Chl

orin

e M

easu

red

ChloraminationChloramination

II

Breakpoint 9:1 Cl2:N Ratio

IIII

5:1 Cl2:N Ratio

Free ChlorinationFree Chlorination

IIIIII

Page 160: Instrumentation For Process Control 09

160

Chloramination GoalsChloramination Goals

• Complete formation of monochloramine Complete formation of monochloramine (stay in section I)(stay in section I)

• 3-5:1 Cl3-5:1 Cl22:N optimal feed ratio:N optimal feed ratio

• Avoid dichloramine formationAvoid dichloramine formation• Avoid taste and odor problemsAvoid taste and odor problems

• Minimize un-reacted ammoniaMinimize un-reacted ammonia• Control biofilm and nitrificationControl biofilm and nitrification

Page 161: Instrumentation For Process Control 09

161

Chloramination SpeciesChloramination Species

• Curve we have been looking at is total Curve we have been looking at is total chlorinechlorine

• What other species are involved in What other species are involved in chloramination and what happens to chloramination and what happens to their concentrations?their concentrations?

Page 162: Instrumentation For Process Control 09

162

Free AmmoniaFree Ammonia

• Free ammonia reacts with chlorine to Free ammonia reacts with chlorine to form monochloramine until ammonia has form monochloramine until ammonia has been consumedbeen consumed

Page 163: Instrumentation For Process Control 09

163

Chloramination SpeciesChloramination Species

Chlorine Added

Chl

orin

e M

easu

red

ChloraminationChloramination

II IIII

Free ChlorinationFree Chlorination

IIIIII

Total Chlorine

Free Ammonia

Page 164: Instrumentation For Process Control 09

164

MonochloramineMonochloramine

• Monochloramine is equivalent to total Monochloramine is equivalent to total chlorine until Section II where it reacts chlorine until Section II where it reacts with chlorine to form new compounds.with chlorine to form new compounds.

• No monochloramine remains at the No monochloramine remains at the breakpoint.breakpoint.

Page 165: Instrumentation For Process Control 09

165

Chloramination SpeciesChloramination Species

Chlorine Added

Chl

orin

e M

easu

red

ChloraminationChloramination

II IIII

Free ChlorinationFree Chlorination

IIIIII

Total Chlorine

Free Ammonia

Monochloramine

Page 166: Instrumentation For Process Control 09

166

Free ChlorineFree Chlorine

• Free chlorine does not exist until after Free chlorine does not exist until after the breakpoint.the breakpoint.

• After the breakpoint, all chlorine added to After the breakpoint, all chlorine added to the system exists as free chlorine.the system exists as free chlorine.

Page 167: Instrumentation For Process Control 09

167

Chloramination SpeciesChloramination Species

Chlorine Added

Chl

orin

e M

easu

red

ChloraminationChloramination

II IIII

Free ChlorinationFree Chlorination

IIIIII

Total Chlorine

Free Ammonia

Monochloramine

Free Chlorine

Page 168: Instrumentation For Process Control 09

168

ChloraminationChloramination

• So why can’t I use total chlorine to run So why can’t I use total chlorine to run my chloramination process?my chloramination process?

• Let’s look at the results of a total chlorine Let’s look at the results of a total chlorine test on the curve.test on the curve.

Page 169: Instrumentation For Process Control 09

169

Where Am I When Where Am I When Total Chlorine = 3mg/L?Total Chlorine = 3mg/L?

Chlorine Added

Chl

orin

e M

easu

red

ChloraminationChloramination

II IIII

Free ChlorinationFree Chlorination

IIIIII

Page 170: Instrumentation For Process Control 09

170

I Am Here!I Am Here!

Chlorine Added

Chl

orin

e M

easu

red

ChloraminationChloramination

II IIII

Free ChlorinationFree Chlorination

IIIIII

NHNH22Cl = t-DPDCl = t-DPD

f-NHf-NH33N > 0N > 0

NHNH22Cl < t-DPDCl < t-DPD

f-NHf-NH33N = 0N = 0

t-DPD > 0t-DPD > 0

NHNH22Cl = 0Cl = 0

f-NHf-NH33N = 0N = 0

Page 171: Instrumentation For Process Control 09

171

ChloraminationChloramination

• Chose the right instrument for the jobChose the right instrument for the job

• Both lab and on-line instruments are Both lab and on-line instruments are available to measure and/or calculate:available to measure and/or calculate:• MonochloramineMonochloramine

• Total ChlorineTotal Chlorine

• Free ChlorineFree Chlorine

• Total AmmoniaTotal Ammonia

• Free AmmoniaFree Ammonia

Page 172: Instrumentation For Process Control 09

172

ChloraminationChloramination

• Using the right instrument to measure Using the right instrument to measure these parameters will keep your process these parameters will keep your process in controlin control

• Upset conditions can be dealt with in a Upset conditions can be dealt with in a timely manner to minimize any negative timely manner to minimize any negative impactimpact

Page 173: Instrumentation For Process Control 09

173

DistributionDistribution

Page 174: Instrumentation For Process Control 09

174

DistributionDistribution

• Distribution monitoring is critical not only Distribution monitoring is critical not only for security, but also for performance for security, but also for performance reasons.reasons.

• The distribution system is a part of the The distribution system is a part of the process that has been overlooked.process that has been overlooked.

• The water leaving your plant may meet The water leaving your plant may meet all regulated requirements, but can all regulated requirements, but can change dramatically in distribution.change dramatically in distribution.

Page 175: Instrumentation For Process Control 09

175

DistributionDistribution• There are many parameters that can There are many parameters that can

be monitored.be monitored.

• Through many studies, those deemed Through many studies, those deemed most important are:most important are:• pHpH

• ConductivityConductivity

• Chlorine (colorimetric)Chlorine (colorimetric)

• TurbidityTurbidity

• TOCTOC

Page 176: Instrumentation For Process Control 09

176

DistributionDistribution• Several manufactures have developed Several manufactures have developed

“panels” that include these and other “panels” that include these and other parameters.parameters.

• You can build your own with discrete You can build your own with discrete instrumentsinstruments

• EPA suggests that at least 10 sampling points EPA suggests that at least 10 sampling points are needed throughout a system to be are needed throughout a system to be effectiveeffective

• The difficult part is interpreting all the dataThe difficult part is interpreting all the data

Page 177: Instrumentation For Process Control 09

177

Guardian BlueGuardian Blue™™

• Off the shelf “hardware” and Off the shelf “hardware” and communicationscommunications

• Raw data available to SCADA systemRaw data available to SCADA system

• Contains a software algorithm that can Contains a software algorithm that can interpret,interpret, identifyidentify and and namename anomalies anomalies in the systemin the system

Page 178: Instrumentation For Process Control 09

178

Guardian BlueGuardian Blue™™

• Hach Laboratory testing and verification.Hach Laboratory testing and verification.• EPA/Battelle Environmental Testing EPA/Battelle Environmental Testing

Verification (ETV) program testing and Verification (ETV) program testing and certification.certification.

• Army Edgewood Chemical and Biological Army Edgewood Chemical and Biological Command (ECBC) and Army Corps of Command (ECBC) and Army Corps of Engineers Engineer Research and Engineers Engineer Research and Development Center-Construction Engineering Development Center-Construction Engineering Research Laboratory(ERDC-CERL) Testing.Research Laboratory(ERDC-CERL) Testing.

• Real world deployment testing.Real world deployment testing.

Page 179: Instrumentation For Process Control 09

179

All of this Led to DHS Safety Act All of this Led to DHS Safety Act ApprovalApproval

• The SAFETY act is part of the 2002 Homeland The SAFETY act is part of the 2002 Homeland Security Act. Security Act. SSupport upport AAnti-terrorism by nti-terrorism by FFostering ostering EEffective ffective TTechnologies Actechnologies Act

• Provides litigation protection for manufacturers Provides litigation protection for manufacturers and end users of designated anti-terror and end users of designated anti-terror technologies.technologies.

• All testing data was submitted to DHS for All testing data was submitted to DHS for review and approval.review and approval.

This is currently the ONLY DHS Designated and Certified on-line water anti-terror technology protecting you from

system disruption and potential litigation

Page 180: Instrumentation For Process Control 09

180

Dual Use CapabilitiesDual Use Capabilities

• The security aspects of the system The security aspects of the system derive from the event detection software derive from the event detection software and the agent library compiled by Hach.and the agent library compiled by Hach.

• The everyday utility derives from the The everyday utility derives from the event detection software and the plant event detection software and the plant library that is learned on site.library that is learned on site.

Page 181: Instrumentation For Process Control 09

181

Plant LibraryPlant Library

• The learning ability and plant library can The learning ability and plant library can be used to correlate problems to be used to correlate problems to changes in water quality.changes in water quality.

• System can be programmed to alert System can be programmed to alert operators when such changes recur so operators when such changes recur so that corrective action can be taken and that corrective action can be taken and the water supply is not compromised.the water supply is not compromised.

Page 182: Instrumentation For Process Control 09

182

How the Algorithm Works

BaselineEstimator

GainMatrix A

DistanceMeasure

Unit VectorFormation using Y(t)

VectorSearch

X(t)

Five Parameter Signal Vector Baseline

Deviation Y(t)

+-

Resultant Vector

Report Best Match

Vector Libraries( Agent, Plant )

A two-step process is used: Trigger when deviations indicate agentClassify agent in response to Trigger

Is Threshold exceeded?

No

Yes

Trigger Signal

Threshold Level

Trigger

Page 183: Instrumentation For Process Control 09

183

Plant Chlorine Upsets

00.5

11.5

22.5

0 500 1000 1500 2000 2500 3000

Minutes

PP

M C

hlor

ine

Plant Event DefinedPlant Event DefinedName: Pump Shut Off, Type: Name: Pump Shut Off, Type: NORMALNORMAL

Page 184: Instrumentation For Process Control 09

184

Trigger Signal - Caustic Feed Event

0

1

2

3

4

0 2 4 6 8 10

Hours

Trig.

Thres .

The plant uses caustic feed to control water pH and experienced an operational problem that resulted in the feed of excess caustic. That affected the pH and the conductivity of the water, causing the Event Monitor to alarm.The Event Monitor learned this Plant Event and can identify a recurrence of the event.

Page 185: Instrumentation For Process Control 09

185

Road work near a distribution line dislodged biomass and other particulate matter from the lining of the pipe. There was a massive increase in turbidity, which not only showed up on the turbidimeter, but also showed up as an interference in the chlorine measurement ( optical ). As expected, the conductivity and pH also showed minor changes. The increase in biomass in the water was indicated by the TOC analyzer. This event illustrates the ability of the Event Monitor to detect and alarm on unanticipated events. This event also provides a signature for the materials adhering to the walls of the pipes in this location.

Trigger Signal - Road Work Event

0

10

20

30

40

0 10 20 30 40

Time

Trig.

Thres .

Page 186: Instrumentation For Process Control 09

186

Trigger Signal - Pressure Event

0

1

2

3

4

0 5 10 15 20

Hours

Trig.

Thres .

The Event Monitor is located in a building which experiences a daily variation in water pressure. The sample variation is associated with a turbidity increase that causes a Trigger. There is also a small pH decrease at that time, possible because of increased solubility of CO2 in the water, dropping the pH slightly. This pattern is recognized by the Event Monitor as a "Normal" event, rather than an alarm condition.

Page 187: Instrumentation For Process Control 09

187

Effects of Variable DemandEffects of Variable DemandDaily events influencing turbidity, chlorine, pH and possibly conductivity are not completely Daily events influencing turbidity, chlorine, pH and possibly conductivity are not completely

understood but suspected to be caused by water demand fluctuations in the area.understood but suspected to be caused by water demand fluctuations in the area. May indicate need for flushing and chlorine booster. May indicate need for flushing and chlorine booster.

Turbidity, Cl2, pH, TOC, Conductivity, Pressure

0

0.5

1

1.5

2

2.5

3

3/15/20060:00

3/16/20060:00

3/17/20060:00

3/18/20060:00

3/19/20060:00

3/20/20060:00

3/21/20060:00

3/22/20060:00

Time

Tu

rbid

ity

, C

l2, p

H, T

OC

-20

-10

0

10

20

30

40

50

60

70

80

Co

nd

ucti

vit

y, P

SI

Turbidity

Chlorine

pH

Conductivity

PSI

Page 188: Instrumentation For Process Control 09

188

Ammonia Overfeed EventAmmonia Overfeed Event

• On March 26On March 26thth, 2007, maintenance was performed at the , 2007, maintenance was performed at the Plant. After maintenance was completed, the plant was Plant. After maintenance was completed, the plant was restarted and the system that feeds the ammonia overfed the restarted and the system that feeds the ammonia overfed the chemical. The operator noticed an increase in pH and chemical. The operator noticed an increase in pH and contacted operations at 16:25. Operations reported a contacted operations at 16:25. Operations reported a problem with the ammonia feed pumps. The problem was problem with the ammonia feed pumps. The problem was temporarily fixed but a slug of ammonia was sent into the temporarily fixed but a slug of ammonia was sent into the distribution system. Several customers called, complaining distribution system. Several customers called, complaining about an ammonia smell and taste coming from the tap. The about an ammonia smell and taste coming from the tap. The exact amount of ammonia released was unknown, but was exact amount of ammonia released was unknown, but was believed to be less than 10 ppm. The facility continued believed to be less than 10 ppm. The facility continued operation but temporarily utilizing free chlorine as a operation but temporarily utilizing free chlorine as a disinfectant until July 2disinfectant until July 2ndnd..

Page 189: Instrumentation For Process Control 09

189

Ammonia Event

Ammonia Event. Scott Powers noticed the pH spike

and contacted operations at 16:25

0

10

20

30

40

50

60

70

80

3/25/0719:12

3/26/07 0:00 3/26/07 4:48 3/26/07 9:36 3/26/0714:24

3/26/0719:12

3/27/07 0:00 3/27/07 4:48

Time

0

100

200

300

400

500

600

µS

/cm

Trigger

Turbidity

Chlorine

pH

TOC

Temperature

PSI

Conductivity

Page 190: Instrumentation For Process Control 09

190

Possible Chlorine Feed EventPossible Chlorine Feed EventOn April 3, 2007 there was a turbidity and pH increase and a decrease in chlorine and On April 3, 2007 there was a turbidity and pH increase and a decrease in chlorine and conductivity. Operator believes that there might have been a problem with the chlorine conductivity. Operator believes that there might have been a problem with the chlorine

feed at the plant. However, this cannot be confirmed. The plant was using free chlorine feed at the plant. However, this cannot be confirmed. The plant was using free chlorine instead of chloramines at the time which rules out the ammonia feed problem.instead of chloramines at the time which rules out the ammonia feed problem.

0

5

10

15

20

25

4/2/0721:36

4/3/070:00

4/3/072:24

4/3/074:48

4/3/077:12

4/3/079:36

4/3/0712:00

Time

200

210

220

230

240

250

260

270

280

290

300

Co

nd

uc

tiv

ity

TriggerTurbidityChlorinepHTOCTemperaturePSIConductivity

Page 191: Instrumentation For Process Control 09

191

Air Bubble EventAir Bubble Event

• In one Northern Midwest system, every Friday, the sensors In one Northern Midwest system, every Friday, the sensors would behave extremely erratically resulting in multiple would behave extremely erratically resulting in multiple alarm signals being generated. Investigations led to the alarm signals being generated. Investigations led to the discovery of extreme amounts of entrained air bubbles being discovery of extreme amounts of entrained air bubbles being present in the systems water on Friday afternoons and present in the systems water on Friday afternoons and evenings. evenings.

• Further investigation revealed that school buildings that Further investigation revealed that school buildings that were to be vacant over the weekend had a policy of using air were to be vacant over the weekend had a policy of using air to blow out their water lines to prevent freezing so that the to blow out their water lines to prevent freezing so that the heat could be turned off over the weekend. A faulty check heat could be turned off over the weekend. A faulty check valve at one of the schools allowed the air to bleed into the valve at one of the schools allowed the air to bleed into the distribution system. The valve was replaced, thus closing a distribution system. The valve was replaced, thus closing a possible backflow route into the system. After this the possible backflow route into the system. After this the erratic readings ceased.erratic readings ceased.

Page 192: Instrumentation For Process Control 09

192

Main Break #1Main Break #1The break occurred on July 30The break occurred on July 30thth, 2006. The line was a 36” water main located 1.0 , 2006. The line was a 36” water main located 1.0

miles from the WDMP. Conductivity, turbidity, and chlorine spiked. There appears to miles from the WDMP. Conductivity, turbidity, and chlorine spiked. There appears to be two water flow interruptions to the WDMP the night before but it’s unclear if they be two water flow interruptions to the WDMP the night before but it’s unclear if they

are related to the break on the 30are related to the break on the 30thth..

Break

0.00

1.00

2.00

3.00

4.00

5.00

6.00

7.00

8.00

9.00

7/27/0612:00

7/28/060:00

7/28/0612:00

7/29/060:00

7/29/0612:00

7/30/060:00

7/30/0612:00

7/31/060:00

7/31/0612:00

8/1/060:00

8/1/0612:00

Time

Cl2

, p

H,

TO

C,

Tu

rbid

ity

250.00

255.00

260.00

265.00

270.00

275.00

280.00

285.00

290.00

295.00

Co

nd

uc

tiv

ity

(u

S/c

m)

Cl2

pH

TOC

TURB

COND

Page 193: Instrumentation For Process Control 09

193

Main Break #2Main Break #2The break occurred at night on September 20The break occurred at night on September 20thth, 2006. The exact time of the break is , 2006. The exact time of the break is currently unknown, although there appears to be a flow interruption to the WDMP the currently unknown, although there appears to be a flow interruption to the WDMP the

previous morning. The line involved was a 12” water main which is 0.4 miles from previous morning. The line involved was a 12” water main which is 0.4 miles from the WDMP. the WDMP.

September 20th Break, 12" Main, 0.4 Miles From Sensors, Time Unknown

0.00

5.00

10.00

15.00

20.00

25.00

30.00

9/18/06 0:00

9/18/06

12:00

9/19/06 0:00

9/19/06

12:00

9/20/06 0:00

9/20/06

12:00

9/21/06 0:00

9/21/06

12:00

9/22/06 0:00

9/22/06

12:00

9/23/06 0:00

9/23/06

12:00Time

Cl2

, p

H,

TO

C,

Tu

rbid

ity

250.00

255.00

260.00

265.00

270.00

275.00

280.00

285.00

290.00

Co

nd

uc

tiv

ity

(u

S/c

m)

Cl2

pH

TOC

TURB

COND

Page 194: Instrumentation For Process Control 09

194

Main Break Event #3August 17 at 10:30 AM

Pittsburgh, PA

0

2

4

6

8

10

12

14

16

18

18:0

0

17:1

0

16:2

0

15:3

0

14:4

0

13:5

0

13:0

0

12:1

0

11:2

0

10:3

0

9:4

0

8:5

0

8:0

0

7:1

0

Time

0

100

200

300

400

500

600

Trigger Turbidity Chlorine pH Temperature Conductivity TOC PSI

Page 195: Instrumentation For Process Control 09

195

TurbidityTurbidity

0.00

2.00

4.00

6.00

8.00

10.00

12.00

14.00

16.00

18.00

12

:00

AM

1:2

0 A

M

2:4

0 A

M

4:0

0 A

M

5:2

0 A

M

6:4

0 A

M

8:0

0 A

M

9:2

0 A

M

10

:40

AM

12

:00

PM

1:2

0 P

M

2:4

0 P

M

4:0

0 P

M

5:2

0 P

M

6:4

0 P

M

8:0

0 P

M

9:2

0 P

M

10

:40

PM

Turbidity

Page 196: Instrumentation For Process Control 09

196

ChlorineChlorine

0

0.5

1

1.5

2

2.5

0:0

0

1:1

7

2:3

4

3:5

1

5:0

8

6:2

5

7:4

2

8:5

9

10

:16

11

:33

12

:50

14

:07

15

:24

16

:41

17

:58

19

:15

20

:32

21

:49

23

:06

Chlorine

Page 197: Instrumentation For Process Control 09

197

ConductivityConductivity

465

470

475

480

485

490

7:0

0

7:2

0

7:4

0

8:0

0

8:2

0

8:4

0

9:0

0

9:2

0

9:4

0

10

:00

10

:20

10

:40

11

:00

11

:20

11

:40

12

:00

12

:20

12

:40

13

:00

13

:20

13

:40

14

:00

14

:20

14

:40

15

:00

15

:20

15

:40

16

:00

16

:20

16

:40

17

:00

17

:20

17

:40

18

:00

Conductivity

Page 198: Instrumentation For Process Control 09

198

ConductivityConductivity

Conductivity

400420440460480500520540560

8/8/2005 0:00

8/10/2005 0:00

8/12/2005 0:00

8/14/2005 0:00

8/16/2005 0:00

8/18/2005 0:00

8/20/2005 0:00

8/22/2005 0:00

8/24/2005 0:00

8/26/2005 0:00

Main BreakMain Break48 Hours48 Hours

BeforeBefore

Page 199: Instrumentation For Process Control 09

199

36 Inch Main Break

• A geyser caused by a severed 36-inch water line erupts 10:30 a.m., August 17th. One of the largest water main breaks in the city's modern history.

                                                                                                                                                   

Page 200: Instrumentation For Process Control 09

200

A driver who was able to rescue a vehicle follows a man on foot out of a flooded parking garage, following a water main break

                                                                                                                                                                                             

Page 201: Instrumentation For Process Control 09

201

More than 20 million gallons of water poured out and into nearby parking garages and other low-lying areas Downtown.

                                                                                                                                                                                             

Page 202: Instrumentation For Process Control 09

202

Workers move a section of new pipe into position as the broken 36-inch water main can be seen in the background.

                                                                                                                                                   

Page 203: Instrumentation For Process Control 09

203

DistributionDistribution

Distribution monitoring can be an effective Distribution monitoring can be an effective means for protecting your customers means for protecting your customers from not only a security threat, but also from not only a security threat, but also from a plant or distribution system upset.from a plant or distribution system upset.

Page 204: Instrumentation For Process Control 09

204

Questions?Questions?

Page 205: Instrumentation For Process Control 09

205

Process InstrumentsProcess InstrumentsHands-On/DemoHands-On/Demo

• Variety of instruments set up on an Variety of instruments set up on an isolated city water supplyisolated city water supply

• ““Challenge” the instruments withChallenge” the instruments with• CausticCaustic

• AcidAcid

• ChlorineChlorine

• TurbidityTurbidity

Page 206: Instrumentation For Process Control 09

206

Summary and ConclusionsSummary and Conclusions

Page 207: Instrumentation For Process Control 09

207

Summary and ConclusionsSummary and Conclusions

• Representative sample taps are a critical Representative sample taps are a critical component of any testing protocolcomponent of any testing protocol

• Knowledge and understanding of your Knowledge and understanding of your process is key to running it properlyprocess is key to running it properly

• Data collection is only good if you Data collection is only good if you analyze itanalyze it

• From source to tap, on-line analysis is From source to tap, on-line analysis is essential for safe, secure and high essential for safe, secure and high quality waterquality water

Page 208: Instrumentation For Process Control 09

208

Summary and ConclusionsSummary and Conclusions

• Lab instruments are essential for Lab instruments are essential for reporting and verification of process reporting and verification of process instrumentsinstruments

• On-line instrumentation is the most On-line instrumentation is the most effective way to keep your process in effective way to keep your process in controlcontrol

• Significant cost/energy savings can be Significant cost/energy savings can be achieved using on-line instrumentationachieved using on-line instrumentation

Page 209: Instrumentation For Process Control 09

209

Questions?Questions?

Page 210: Instrumentation For Process Control 09

210

AcknowledgementsAcknowledgements

• Terry Engelhardt, Hach CompanyTerry Engelhardt, Hach Company

• Mike Sadar, Hach CompanyMike Sadar, Hach Company

• Chuck Scholpp, Hach CompanyChuck Scholpp, Hach Company

• Carl Byron, ChemtracCarl Byron, Chemtrac

• Trina Picardi, Hach CompanyTrina Picardi, Hach Company