insuring risk in construction projects

25
Insuring Risk In Construction Projects Lecture by: Laina Chan, Barrister Nine Wentworth Chambers, Sydney For: University of Melbourne

Upload: lainachanbarrister-chan

Post on 28-Nov-2014

1.573 views

Category:

Economy & Finance


1 download

DESCRIPTION

 

TRANSCRIPT

Page 1: Insuring Risk in Construction Projects

Insuring Risk

In Construction Projects

Lecture by:Laina Chan, Barrister Nine Wentworth Chambers,

SydneyFor: University of Melbourne

Page 2: Insuring Risk in Construction Projects

Financiers

Developers

Head Contractor

Design Consultant Sub-Contractors

Economic viability

Cash flow can be impacted upon by delays

Claims against the contractor

Insolvency of major parties

Design risk which can be laid off to design sub-consultants

Unforseen site conditions

Construction risk in terms of defects supervision

Responsibility for the work of subcontractors

Specified, defect and warranty obligations

Delay, penalties and liquidated damages claims

Monitor and ensure compliance with insurance requirementsNegligence and defective design

Job delivered late

Job delivered with defects

Increased costs

Risk Diagram

Page 3: Insuring Risk in Construction Projects

Types of Insurance

– Contractors’ All Risk policies;

– Industrial Special Risk policies which take over

insurance of the project once the works are complete;

– Professional Indemnity;

– Public liability insurance;

– Workers’ Compensation;

– Compulsory third party

motor vehicle; and

– Marine cargo or transit.

Page 4: Insuring Risk in Construction Projects

Trident General Insurance Co Ltd v McNiece Bros Pty Ltd (1988) 165 CLR 107

Applicable in the context of public liability insurance and property insurance.

Common law exception to the rules of privity of contract and consideration;

Page 5: Insuring Risk in Construction Projects

Insurance Contracts Act 1984

48(1) Where a person who is not a party to a contract of general insurance is specified or referred to in the contract, whether by name or otherwise, as a person to whom the insurance cover provided by the contract extends, that person has a right to recover the amount of the person’s loss from the insurer in accordance with the contract notwithstanding that the person is not a party to the contract.

16(1) A contract of general insurance is not void by reason only that the insured did not have, at the time when the contract was entered into, an interest in a subject-matter of the contract.

17(1) Where the insured under a contract of general insurance has suffered a pecuniary or economic loss by reason that property the subject-matter of the contract has been damaged or destroyed, the insurer is not relieved of liability under the contract by reason only that, at the time of the loss, the insured did not have an interest at law or in equity in the property.

Page 6: Insuring Risk in Construction Projects

Contract Works Policies

No cover for defective workmanship and design

But what does this mean?

Page 7: Insuring Risk in Construction Projects

Graham Evans & Co (Qld) Pty Limited v Vanguard Insurance Company Limited (1987) 4 ANZ Insurance Cases 60-772 “…all risks of physical loss of or damage to property of every kind and

description (including the whole of the Contract Plant, Equipment, Materials

and Supplies up to but not exceeding the respective sums insured in the

Schedule owned by the Insured or for which the Insured may be responsible

or, prior to any occurrence for which may be made hereunder, assumed

responsibility, used or to be used

in part of or incidental to the

Insured’s Contracting Operations

detailed in the Schedule.”

Page 8: Insuring Risk in Construction Projects

Chalmers Leask Underwriting Agencies v May Nicholas Limited (1983) 155 CLR 279 “…loss or damage directly caused by

defective workmanship, material or design or wear and tear or mechanical breakdown or normal upkeep or normal making good but so that this exclusion shall be limited to the part immediately affected and shall not apply to any other part or parts lost or damage in consequence thereof…”

Vehicles passing over a coffer dam damaged the coffer dam (which was alleged to be defective). Flood waters breaching the coffer dam and caused damage tothe construction works including leaving behind deposits of silt and debris.

Q: Is the cost of rectifying the damage to the construction works (but not the cost of repair of the coffer dam) insured under the policy?

Page 9: Insuring Risk in Construction Projects

Walkers Civil Engineering v Sun Alliance & London Insurance PLC & Ors (1999) 10 ANZ Ins Cases 61-418

• Similar exclusion clause to clause construed in Chalmers Leask

• The insuring clause provided:

“This section, subject to the limitations, exclusions, terms and conditions hereinafter mentioned, is to insure in respect of occurrences happening during the period stated in the Schedule against all risks of physical loss of or damage to property of every kind and description (including the whole of the contract plant, equipment, materials and supplies up to but not exceeding the respective sums Insured in the Schedule) owned by the insured or for which the Insured may be responsible or, prior to any occurrence for which claim may be made hereunder, have assumed responsibility, use or to be used in part of or incidental to the “Insured’s Contracting Operations” detailed in the Schedule wherever the said property may be located in Australia or whilst in transit within and between any place or places therein.”

Page 10: Insuring Risk in Construction Projects

Exclusion 2(c) provided:

Walkers Civil Engineering v Sun Alliance & London Insurance PLC & Ors (1999) 10 ANZ Ins Cases 61-418

“This insurance does not cover loss or damage directly caused by

defective workmanship, construction or design or wear and tear or

mechanical breakdown or normal upkeep or normal making good

but this exclusion shall be limited to the part which is defective and

shall not apply to any other part or parts lost or damaged in

consequence thereof.”

Page 11: Insuring Risk in Construction Projects

• Three sewerage treatment plants

• Cement poured onto fibreglass sewerage tanks to counter hydrostatic ground pressure

• Fibreglass tanks defective

• Rectification works included the removal of the concrete

Q: Is the insured entitled to indemnity for the cost of the removal of the concrete?

Walkers Civil Engineering v Sun Alliance & London Insurance PLC & Ors (1999) 10 ANZ Ins Cases 61-418

Page 12: Insuring Risk in Construction Projects

Cementation Piling & Foundations Limited v Aegon Insurance Co Limited and Commercial Union Insurance Co PLC [1995] 1 Lloyd’s Rep 97

(1) Rectification of the gaps and/or voids in the walls;

(2) Removal of the sand fill from the dock bed; and

(3) Grouting and filling behind the walls of the voids from which the sand fill had escaped.

The losses suffered by Cementation fell into three distinct areas:

Page 13: Insuring Risk in Construction Projects

“… (2) the cost of replacing or rectifying defects in design, materials or

workmanship unless the property insured suffers actual loss,

destruction or damage as a result of such defects.

Cementation Piling & Foundations Limited v Aegon Insurance Co Limited and Commercial Union Insurance Co PLC [1995] 1 Lloyd’s Rep 97 The policy excludes:

However, initial costs of introducing

improvements, betterments or

corrections in the rectification of the

design, material or workmanship

causing such loss or damage shall

always be excluded.”

Page 14: Insuring Risk in Construction Projects

In deciding whether the costs of rectifying the gaps and voids in the wall (category 1) were covered by the policy, the court looked at the exclusion clauses in the policy:

Cementation Piling & Foundations Limited v Aegon Insurance Co Limited and Commercial Union Insurance Co PLC [1995] 1 Lloyd’s Rep 97

“It is common ground that an exception clause cannot extend the cover from which the exception is made. It is also, however, common ground that the terms of an exception clause may provide material from which the Court can discern that the first possible meaning of the indemnity clause is to be preferred to another or second possible meaning.”

Page 15: Insuring Risk in Construction Projects

Cross Liability Clauses

• What do they mean?

• What is the defence of circuity?

Page 16: Insuring Risk in Construction Projects

Transfield Pty Limited v National Vulcan Engineering Ins Group Ltd & Ors;

Connell Wagner Pty Ltd National Vulcan Engineering Ins Group Ltd & Ors

(2003) 12 ANZ Insurance Cases 61-547 The policy had three sections:

Section C set out various terms and conditions.

Section B covered legal liability under the terms of any contract maintenance or defects liability clauses for loss and/or damage in identified circumstances

Section A provided insurance for loss or damage to property owned by the insured or for which the insured may have been responsible.

Page 17: Insuring Risk in Construction Projects

Transfield Pty Limited v National Vulcan Engineering Ins Group Ltd & Ors;

Connell Wagner Pty Ltd National Vulcan Engineering Ins Group Ltd & Ors

(2003) 12 ANZ Insurance Cases 61-547

W&D Elliot Earthmoving Pty

Ltd (Elliot)

DN Pearce & Maintenance Pty

Ltd (Pearce)

Connell Wagner Coffey

Transfield (Head Contractor)

Transfield Bouygues JV

Transfield Holdings Pty Ltd

JV to construct a section of railway

Subcontracted with

Page 18: Insuring Risk in Construction Projects

(a) Pay on behalf of the Insured all sums which the Insured shall become legally obligated to pay as compensation for:

(2) loss of and/or damage to and/or destruction of property and/or the Loss of Use thereof; in respect of and/or arising out of Occurrences happening anywhere in the Geographical Limits during the Period of Insurance in connection with the Construction Operation and/or Other Business Operations and/or Products Liability/Completed Operations and/or Property Insured detailed in the Schedule.”

The Insuring Clause provided relevantly:

“The Insurers hereby agree, subject to the limitations, terms and conditions hereafter mentioned, that they will:

Transfield Pty Limited v National Vulcan Engineering Ins Group Ltd & Ors;

Connell Wagner Pty Ltd National Vulcan Engineering Ins Group Ltd & Ors

(2003) 12 ANZ Insurance Cases 61-547

Page 19: Insuring Risk in Construction Projects

“Exclusions applicable to Section C

This section shall not apply to liability:

for damage to property owned by the insured”

Transfield Pty Limited v National Vulcan Engineering Ins Group Ltd & Ors;

Connell Wagner Pty Ltd National Vulcan Engineering Ins Group Ltd & Ors

(2003) 12 ANZ Insurance Cases 61-547

Page 20: Insuring Risk in Construction Projects

The cross liability clause provided:

• “Each of the persons comprising the Insured shall for the purposes of this policy be considered a separate and distinct unit and the words “the Insured” shall be considered as applying to each of such persons in the same manner as if a separate policy had been issued to each of them in his name alone and the Insurers waive all rights of subrogation or action which they may have or acquire against any of such persons. Provided that nothing in this clause shall be deemed to increase the limit of the Insurers’ liability under this policy in respect of any one occurrence.

Transfield Pty Limited v National Vulcan Engineering Ins Group Ltd & Ors;

Connell Wagner Pty Ltd National Vulcan Engineering Ins Group Ltd & Ors

(2003) 12 ANZ Insurance Cases 61-547

Page 21: Insuring Risk in Construction Projects

Waiver of Subrogation

How wide is too ?

Does a waiver of subrogation clause only apply to claims covered by the policy?

Page 22: Insuring Risk in Construction Projects

GPS Power Pty Ltd v Gardiner Willis Associates Pty Ltd [2000] QSC 075

• The insurers agreed that “in the event of the insurers indemnifying or making a payment to any insured(s), the insurers shall not exercise any rights of subrogation against any other insured(s) hereunder.”

• The insurers also agreed “to waive any rights and remedies or relief to which they may become entitled by subrogation against … [a]ny insured named or described by this policy.”

Page 23: Insuring Risk in Construction Projects

Larson-Juhl Australia LLC v Jaywest International Pty Ltd (2000) 11 ANZ Ins Cases 61-472 and 61-500

The New South Wales Court of appeal affirmed the decision of Master

MacReady who construed the following clause literally and held that there was

nothing in the clause to confine the generality of the phrase “shall waive any

rights and remedies or relief” :

1. Any co-insured (including its directors, officers and employees);

2. Any corporation or entity (including its directors, officers and

employees) owned or controlled by any insured or against any

co-owner of the property insured.”

“14.8.1 The insurer shall waive any rights and remedies or relief to which it is

or may become entitled by subrogation against:

Page 24: Insuring Risk in Construction Projects

Thiess Contractors Pty Ltd v Norcon Pty Ltd (2001) 11 ANZ Ins cases 61-509

Should a plaintiff who had suffered loss as a result of a defendant’s negligence,

but is the beneficiary of an insurance policy covering that loss,

have the sum that it has received from the insurer taken into account to reduce the damages recoverable from the

defendant?

Page 25: Insuring Risk in Construction Projects

“5. Further or alternatively, if the second third party [the respondent] breached clause 8.04 of the Norcon Subcontract as alleged or at all, which is not admitted, then:-

(a) at all material times the first third party [the appellant] had taken out its own public liability policy of insurance (‘the Policy’), the further particulars of which the second third party is not presently aware;

(b) the first third party has made a claim, or is entitled to make a claim, pursuant to the Policy with respect to any liability that it has in these proceedings;

(c) further or alternatively to subparagraph (b) above, the first third party has been granted indemnity pursuant to, or is entitled to be granted indemnity pursuant to, the Policy;

(d) by reason of the matters pleaded above, there is no loss or liability in respect of which the first third party is entitled to claim indemnity pursuant to any other policy of insurance;

(e) the insurer or insurers on the Policy are not entitled to exercise a right of subrogation so as to claim pursuant to another policy of insurance on behalf of the first third party;

(f) the first third party has suffered no loss by reason of any breach by the second third party of clause 8.04 of the Norcon Subcontract.”

In its defence, Norcon denied that it was a joint tortfeasor with Thiess Contractors. It also pleaded the following paragraph:

Thiess Contractors Pty Ltd v Norcon Pty Ltd (2001) 11 ANZ Ins cases 61-509