integrated environmental site characterization and analysis: equis in…

11
1 Integrated Environmental Site Characterization and Analysis: EQuIS in the Military S. D. WEAVER EarthSoft, Inc., 10820 South 800 East, Paradise, Utah, 84328, USA email: [email protected] Abstract Four sites on military installations or managed by military agencies illustrate how EQuIS has been implemented as a core component of a more comprehensive environmental program to provide information to the decision-maker. With quick and easy access to discrete sampling information, analytical and conceptual models, and GIS, these systems constitute a valuable resource management tool for both proactive and reactive decision making. INTRODUCTION The seamless integration of subsurface environmental geology and analytical chemistry data with the latest tools and technology for data management and analysis make site characterization and investigation more efficient than ever before. EarthSoft’s Environmental Quality Information System—EQuIS—has been chosen by many military agencies and organizations for the management of analytical chemistry and geology data. The extensive integration with industry-standard applications for visualization and analysis make EQuIS a popular foundation for what is often an extensive environmental program or plan. The implementation of EQuIS at Robins Air Force Base, on the Central & South Florida project by the Army Corps of Engineers, on South Weymouth Naval Air Station, and Minnesota’s Camp Ripley is investigated. ROBINS AIR FORCE BASE Robins Air Force Base, located in Warner Robins, Georgia, is home to the Warner Robins Air Logistics Center as well as more than 60 other units that comprise a critical interest in the United States’ Air Force fighting operations. Robins AFB employs nearly 20,000 civilian, contractor, and military personnel and is the largest industrial complex in Georgia. Covering 8,722 acres, the base contains over 14 million square feet of maintenance, administrative, and storage facilities, and the longest runway in Georgia at 12,000 feet long, with an estimated total replacement value of almost $5 billion. One of three USAF air logistics centers, Warner Robins Air Logistics Center is responsible for the maintenance, repair, and modification of several aircraft worldwide. These aircraft include the F-15 Eagle, C-130 Hercules, C-141 Starlifter, C-5 Galaxy, and all helicopters as well as special operations aircraft and weapons systems. Environmental responsibility and liability at Robins AFB is handled by the Environmental Management Directorate, which “establishes, implements and manages environmental programs, systems and procedures to ensure compliance with federal, state and local laws and regulations”. The Environmental Management Directorate is organized into three branches: the Pollution Prevention Division, the Compliance and Restoration Division, and the Environmental Resources Division. The Pollution Prevention Division engineers and implements programs to reduce air, water, and land pollution by 1) managing solid and hazardous wastes, 2) environment-friendly practices such as recycling, and 3) promoting the purchase of post-consumer content products in all operations. The Compliance and Restoration Division serves to protect human health and the environment by ensuring that base operations are in compliance with state and federal regulations. This division also conducts investigation and remediation of contaminated sites and manages the Installation Restoration Program and

Upload: earthsoft

Post on 05-Dec-2014

1.810 views

Category:

Technology


2 download

DESCRIPTION

Four sites on military installations or managed by military agencies illustrate how EQuIS has been implemented as a core component of a more comprehensive environmental program to provide information to the decision-maker. With quick and easy access to discrete sampling information, analytical and conceptual models, and GIS, these systems constitute a valuable resource management tool for both proactive and reactive decision making.

TRANSCRIPT

Page 1: Integrated Environmental Site Characterization and Analysis: EQuIS in…

1

Integrated Environmental Site Characterization andAnalysis: EQuIS in the Military

S. D. WEAVEREarthSoft, Inc., 10820 South 800 East, Paradise, Utah, 84328, USAemail: [email protected]

Abstract Four sites on military installations or managed by military agencies illustratehow EQuIS has been implemented as a core component of a more comprehensiveenvironmental program to provide information to the decision-maker. With quick andeasy access to discrete sampling information, analytical and conceptual models, and GIS,these systems constitute a valuable resource management tool for both proactive andreactive decision making.

INTRODUCTION

The seamless integration of subsurface environmental geology and analytical chemistry data with the latesttools and technology for data management and analysis make site characterization and investigation moreefficient than ever before. EarthSoft’s Environmental Quality Information System—EQuIS—has beenchosen by many military agencies and organizations for the management of analytical chemistry andgeology data. The extensive integration with industry-standard applications for visualization and analysismake EQuIS a popular foundation for what is often an extensive environmental program or plan. Theimplementation of EQuIS at Robins Air Force Base, on the Central & South Florida project by the ArmyCorps of Engineers, on South Weymouth Naval Air Station, and Minnesota’s Camp Ripley is investigated.

ROBINS AIR FORCE BASE

Robins Air Force Base, located in Warner Robins, Georgia, is home to the Warner Robins Air LogisticsCenter as well as more than 60 other units that comprise a critical interest in the United States’ Air Forcefighting operations. Robins AFB employs nearly 20,000 civilian, contractor, and military personnel and isthe largest industrial complex in Georgia. Covering 8,722 acres, the base contains over 14 million squarefeet of maintenance, administrative, and storage facilities, and the longest runway in Georgia at 12,000 feetlong, with an estimated total replacement value of almost $5 billion. One of three USAF air logisticscenters, Warner Robins Air Logistics Center is responsible for the maintenance, repair, and modification ofseveral aircraft worldwide. These aircraft include the F-15 Eagle, C-130 Hercules, C-141 Starlifter, C-5Galaxy, and all helicopters as well as special operations aircraft and weapons systems.

Environmental responsibility and liability at Robins AFB is handled by the Environmental ManagementDirectorate, which “establishes, implements and manages environmental programs, systems and proceduresto ensure compliance with federal, state and local laws and regulations”. The Environmental ManagementDirectorate is organized into three branches: the Pollution Prevention Division, the Compliance andRestoration Division, and the Environmental Resources Division.

The Pollution Prevention Division engineers and implements programs to reduce air, water, and landpollution by 1) managing solid and hazardous wastes, 2) environment-friendly practices such as recycling,and 3) promoting the purchase of post-consumer content products in all operations.

The Compliance and Restoration Division serves to protect human health and the environment by ensuringthat base operations are in compliance with state and federal regulations. This division also conductsinvestigation and remediation of contaminated sites and manages the Installation Restoration Program and

Page 2: Integrated Environmental Site Characterization and Analysis: EQuIS in…

2

Resource and Conservation Recovery Act (RCRA) Corrective Action Program which remediates soil,groundwater, and surface water contaminated by past practices.

The Environmental Resources Division is the focal point for all environmental programs; itsresponsibilities include the administration of finances, personnel, equipment, and supplies for the base.The Environmental Compliance Assessment Management Program (ECAMP) and the EnvironmentalImpact Analysis Process Program (EIAP), as well as the management of the cultural and natural resourcesprogram are all handled by the Environmental Resources Division. In 1994, the EnvironmentalManagement Directorate received the Department of Defense (DoD) award for Best Overall EnvironmentalQuality Program, and in 1995, 1997, and 1998 the DoD Pollution Prevention Award, Industrial Category.

In the mid 1990s, the Compliance and Restoration Division acquired EQuIS to support their objectives inthe management of analytical data from contaminated areas within the base and to help ensure compliancewith environmental regulations. The comprehensive EQuIS data structure is being used as a back-end datarepository. Currently, 2,730 sampling locations and over 800,000 result records are maintained in EQuIS.Data are now associated with ArcCatalog layers, and within the next year it is intended that theenvironmental data contained within EQuIS as well as facility features and map layers will be madeavailable via the web through ArcIMS.

The Compliance and Restoration Division of the Environmental Management Directorate at Robins AFB isusing EQuIS to provide an interface for project managers to store and retrieve analytical data aboutgroundwater, soil, surface water, and sediment sampling locations throughout the base. The continuingobjective is that managers are able to easily access, view, and interpret data to efficiently assess the successof their remediation programs.

CENTRAL & SOUTHERN FLORIDA PROJECT

The Central & Southern Florida Project (C&SF) dates back to 1850 when the United States Congresspassed the “Swamp and Overflowed Lands Act”. While water problems surely existed in Florida for manycenturies prior to 1850, this Act declared ownership of swamp and overflowed lands to the state. Sale oflands to private interests was to fund the work of reclamation. However, due to poor transportation, debt,politics, and the ravages of the Civil War, little was accomplished for the next 30 years.

In 1881, the first contract was signed to drain overflowed lands and over the next several decadesreclamation progressed as previously inundated lands were used for farming and settlement; by 1921, anestimated 2,000 people inhabited the lake region. However, hurricanes in 1926 and 1928 swept through theregion killing nearly 3,000 people and destroying vast areas of development. These disasters pressured thegovernment to action and saw the beginning of involvement in water control by the U.S. Army Corps ofEngineers.

In 1947, following one of the worst droughts in Florida history, 100 inches of rain fell in southern Florida,filling lakes and canals. Not long thereafter, two hurricanes and more rainfall devastated the area, resultingin 90% of southeastern Florida being underwater and an estimated $59,000,000 damage. Following theprompting of several local agencies, the Corps of Engineers’ Jacksonville District conducted hearingsthoughout the state to determine the best course of action. The consensus was that the problems were toowidespread and complex to be handled by state and/or local agencies alone. In December of 1947, theCorps presented a report to the U.S. Government recommending a comprehensive plan for “flood control,drainage and related purposes.”

The C&SF project, authorized by the Flood Control Act of June 30, 1948, was intended to improve floodcontrol, water level control, water conservation, prevention of salt water intrusion, and the preservation offish and wildlife. Construction began in 1950, and in the last half century nearly 2,000 miles of levees andcanals, 30 pumping stations, and many diversion structures, navigation locks, and bridges have been built.

Page 3: Integrated Environmental Site Characterization and Analysis: EQuIS in…

3

The C&SF project was a success. It allowed development, farming, and settlement on otherwiseuninhabitable lands. Fifty years later, attitudes are different. There is a general consciousness that naturalresources, including the Everglades, are not inexhaustible. The C&SF project, while accomplishing itsintent, also caused significant disruption at a tremendous ecological cost to the Everglades. Compared tothe pre-development era, approximately 70% less water flows through the ecosystem today, and the qualityof that water is questionable at best. Many fish, wildlife, and plant species are threatened and some havevanished completely.

Now, there is a new project on the horizon. The Comprehensive Everglades Restoration Project (CERP),initiated by the Water Resources Development Acts of 1992 and 1996, is an effort to “undo” much of thedamage done to the Everglades during the 20th century. Over the next 20 years, the implementation cost ofCERP is anticipated to be $8 billion, shared by the U.S. government and the state of Florida. While thefinancial aspects are nontrivial and the duration significant, the project is expected to maintain floodprotection while enhancing water supply, improving water quality, eliminate damaging fresh water releasesto estuaries, and improve the general health of 2.4 million acres of the southern Florida ecosystem.

From an engineering perspective, immense quantities of data have been collected during the past severaldecades of the C&SF project. In addition to all types of hydrologic data, the construction of dams, bridges,levees, and canals has produced extensive geotechnical data. However, due to the nature of data collectedin the field, much of it consists of hardcopy logs, drawings, maps, charts, and graphs. Certainly, at thebeginning of the C&SF project in the 1950s data were only recorded on paper because there were no otheroptions. Much of the data from this era is in jeopardy simply due to aging. The paper is brittle andcracking; the ink is fading. Even newer data, collected in recent decades, that are legible are, in manycases, not usable. A huge component of the data management problem is simply accessibility. Far toooften, data painstakingly obtained from field investigation, particularly geologic data, cannot be located oreasily used. When data are hardcopy instead of electronic, and may even be stored off-site in a nearlyforgotten repository it is often times not feasible or possible to locate the needed records. In manyinstances, the effort required to find and obtain data from a previous study is comparable to collecting thedata in the first place.

gINT

CADD

WebBrowser

GMS

FutureApps

DatabaseMirror

Relational Database(SQL/ODBCcompliant)

Firewall

Shell for:TranslatorsSecurityLockout

GIS (Arc)

Figure 1. USACE Jacksonville District Geotechnical Data Management Implementation

Page 4: Integrated Environmental Site Characterization and Analysis: EQuIS in…

4

The Jacksonville District needed an electronic data management system to make data readily available andeasy to review, report, and utilize for model construction and analysis. Specifically, as depicted in Figure1, the Jacksonville District was looking for a central relational database, SQL and ODBC compliant, tohouse and manage subsurface geologic field and sample data. The application had to have adequatesecurity to enforce and promote data integrity, as well as integration and support of

• gINT, the gEOTECHNICAL INTegrator by Geotechnical Computer Applications• CADD• GMS, the Department of Defense Groundwater Modeling System• ESRI’s Arc family of GIS software

Customizability and extensibility was necessary to support future integration with additional reporting andmodeling applications. Finally, it was desired to make the data accessible outside of a firewall via a webbrowser.

At the recommendation of the U.S. Army Corps of Engineers Waterways Experiment Station (WES) inVicksburg, MS, the Jacksonville District chose EQuIS Geology as the data management system to meettheir needs in managing and using C&FS data. The model preferred for populating the EQuIS system isimporting data directly from gINT files. While alternative methods may be used for loading the reams ofhistorical hardcopy data, the District requires all new data submitted to be in the gINT format.

As with the restoration of the Everglades, the effort to migrate data from paper records in boxes, filingcabinets and warehouses into EQuIS so that it is accessible and usable for use in CERP is just beginning.To this point, a pilot project has been populated with borehole, well, and lithology data. A considerableamount of work is required to establish references, valid values, and protocols which will continue to makeEQuIS a successful part of the overall restoration of the Everglades.

SOUTH WEYMOUTH NAVAL AIR STATION

The South Weymouth Naval Air Station (NAS South Weymouth, or NAS SOWEY) is located in easternMassachusetts, 15 miles south of Boston and six miles from the Atlantic coast. During its operation, NASSouth Weymouth was utilized for airfield operations, safety and clearance zones, and aircraft support. Thesite was placed on the National Priorities List (NPL) in May 1994 with a Hazard Ranking System (HRS)score of 50.00 due to known or potential groundwater contamination. A Phase I Environmental BaselineSurvey (EBS) was completed in 1996, and the Air Station was closed on September 30, 1997, inaccordance with the Department of Defence Base Realignment and Closure (BRAC) Commission's 1995Base Closure List. Within its 1,400+ acres, twelve sites have been identified for potential cleanup, four ofwhich are closed or are currently undergoing remediation.

The Phase II EBS Work Plan was initiated based on the results of a Phase I EBS investigation conductedduring October and November of 1995. The final Phase I report identified 94 potential Phase II EBSReview Items as potential environmental concerns. After further review, the BRAC Cleanup Teamrecommended 53 Review Item Areas for further investigation under the Phase II EBS. The primary goal ofthe Phase II EBS field investigation is to obtain analytical data at the 53 proposed Review Item Areas sothat the environmental conditions of these areas can be evaluated and appropriate action can be taken. Asecond goal is the characterization of the water quality of aquifers located under NAS SOWEY.

Several types of environmental data collected from the South Weymouth Naval Air Station, including soil(both surface and subsurface), groundwater, surface water and sediment chemistry as well as geologicinformation were loaded into EQuIS Chemistry and EQuIS Geology. Unvalidated laboratory electronicdata deliverables (EDDs), consisting of over 100,000 data records, were received by EA Engineering’sData Management team and evaluated for completion and accuracy. The verified EDDs were thenmanipulated into an EQuIS import format and sent to the data validator for data reduction and EPA Region

Page 5: Integrated Environmental Site Characterization and Analysis: EQuIS in…

5

I - Level II data validation. These EDDs were also imported into an unvalidated EQuIS Chemistrydatabase. The validated EDDs were then returned to EA Engineering to be incorporated into the finalvalidated database. Location, water level, well, and piezometer type data were received electronically asExcel spreadsheets and entered into EQuIS Geology.

Once the databases were complete, data reporting and visualization software tools were used to support theproject. The chemistry database was queried by Review Item Area to create summary tables as well astables of analyte detentions compared to criteria. Well construction diagrams are created throughpredefined exports from EQuIS Geology to Rockware’s LogPlot. An ArcView GIS project was alsoinitiated for spatial presentation and analysis of site data. The ArcView GIS project was used to create aseries of views and layouts showing the locations of each Review Item Area for a client presentation.

Figure 2. Naval Air Station South Weymouth ArcIMS Web Site

For greater access and availability, ArcIMS has been used to post and present data relative to the NASSouth Weymouth on the Web. The site, http://weymouthnas.eaest.com, summarizes visually the results ofthe ongoing investigation and remedial planning.

CAMP RIPLEY

Camp Ripley is a state-of-the-art military training facility in central Minnesota, about 100 miles northwestof the Minneapolis/St. Paul metroplitan area. Funded by the National Guard Bureau (NGB) andadministered by the Minnesota Department of Military Affairs (DMA), Camp Ripley trains domestic

Page 6: Integrated Environmental Site Characterization and Analysis: EQuIS in…

6

military units from both active and reserve forces as well as foreign units from Canada, Great Britain,Norway, and the Netherlands. Situated on 53,000 acres west of the Mississippi river, Camp Ripley isdesignated the National Guard Primary Winter Training Site in the continental United States.

As with any other large military facility, the camp’s training and maintenance facilities carry with them anenvironmental responsibility. One of the missions of Camp Ripley is to partner with local communities tofoster cooperation and facilitate economic growth. This objective necessitates the protection andpreservation of natural resources, including water resources. The Integrated Natural Resource ManagementPlan (INRMP) includes programs for conservation, ecosystem, forest, land use, wildlife, and pests;however, a more robust, comprehensive strategy was needed for subsurface environmental concerns andproactive water resource management.

The DMA contracted with the University of Minnesota Duluth, Geological Sciences Department to comeup with a management plan for geologic and associated analytical data as well as water chemistryinformation. The plan required a core database for managing data, a user interface for accessing andviewing data, the capability to integrate with modeling and analysis tools, and a GIS component forpresentation of the data. Since 1999, Benjamin Bertsch, Senior Scientist at the UMD Geological SciencesDepartment, and his team have been developing the foundation for water resource management tools to beused at Camp Ripley. This set of tools, founded on EQuIS, and the processes that drive them, are referredto as the Comprehensive Water Management Plan (CWMP). Like the other components of Ripley’sINRMP, the CWMP assures maximum use for the military while minimizing ecological costs. Unlike theother components, however, the CWMP developed by Bertsch focuses on making data and scienceaccessible to managers for integration into their daily tasks.

Typical of many site characterization/investigation projects, a three-phase implementation has beenproposed. Phase I involves the assimiliation and conversion (where necessary) of historical data into aconsistent and usable format. Using data collected and managed in EQuIS, a characterization of theconceptual hydrologic flow systems is made and used to construct basic groundwater flow models. Phase Iestablishes the framework for building the CWMP. Phase II evaluates information previously collected andrecommends additional data collection where necessary, ultimately to enhance and improve the accuracy offlow models. Phase III integrates the data, scientific processes, and computer models and tools to deliver ausable product to resource managers. Specifically, proposed deliverables include

• EQuIS (EarthSoft’s Environmental Quality Information System)• ArcView User Interface Applications• Groundwater and Surface Water Sensitivity/Vulnerability Models• Semi-automation of report and permit applications• Electronic data submission and communication with the Minnesota Pollution Control Agency

(PCA) and other regulatory agencies• Water Quality Sampling Plans

Present Status

Currently, Phase I of the Camp Ripley CWMP is nearing completion. Over 60 reports have been read andcatalogued, with relevant information extracted and entered into EQuIS. More than 250 environmentalborelogs and well construction reports have also been loaded into EQuIS, in addition to 275 well logs forthe area immediately surrounding Camp Ripley. Over 3,000 analytical results have been entered as well.Managing this data in EQuIS has made it readily available for modeling and GIS analysis.

Page 7: Integrated Environmental Site Characterization and Analysis: EQuIS in…

7

ArcView GISDisplaying

Geologic Data

GEOLOGICDATABASE

Figure 3. Camp Ripley Geologic Data in EQuIS and Displayed Spatially In ArcView GIS

Figure 3 shows an example of how data may be managed in EQuIS and how it is accessible through GIS.The photo shows the boundaries and spatial extent of Camp Ripley. Once properly loaded, the EQuISArcView Interface facilitates automatic display of borehole and well locations. In addition to being able toeasily identify the properties or attributes of each well, the Interface includes capabilities to view thelithology at any borehole location, to create a report-quality borehole log in either LogPlot or gINT, twocreate 2D cross-sections in RockWorks, and to view the site in three dimensions in either ESRI’s 3DAnalyst, GMS, or CTech’s EVS.

In Figure 4, hydrostratigraphic data, or the aquifer-aquitard relationship, for each borehole location wasexported to GMS through the EQuIS ArcView Interface. The appropriate locations were selected inArcView, and then the data were queried out of the EQuIS database and written to GMS borehole files.GMS was launched and the borehole files loaded. Subsequent interpolation defined this sand/till model. InFigure 4, the red-colored material represents sand or highly sandy layers. Clay and sand mixtures arecolored green, and clay-rich tills are not shown.

Page 8: Integrated Environmental Site Characterization and Analysis: EQuIS in…

8

Figure 4. Camp Ripley Hydrostratigraphy model in GMS

In addition to the geologic modeling, analytical results stored in EQuIS were used for reporting andanalysis. Figure 5 shows observed analytical results for chloride from 1993 to 2000 in monitoring wells atthe Demolition Debris Landfill.

Figure 5. Chloride trend in Demolition Debris Landfill Monitoring Wells

Page 9: Integrated Environmental Site Characterization and Analysis: EQuIS in…

9

Application: Landfill Spread Site

An application of the geologic and analytical data stored in EQuIS as part of the CWMP for Camp Ripleyis the siting of monitoring wells at the Landfarm Spread Site. In conjunction with Liesch and Associates,the UMD Geological Sciences Department used existing data to propose locations for both upgradient anddowngradient monitoring wells at the site to characterize water quality prior to and during operation. Toaccurately and correctly place the new wells, at least three factors needed to be considered: groundwaterflow, geology, and estimated depth to water.

North

ProposedLandfarmExpansionUp Gradient

Down Gradient

Figure 6. Groundwater Flow at the Proposed Landfarm Expansion Site

Water level elevations observed during the construction and sampling of nine monitoring wells surroundingthe proposed site were stored in EQuIS Geology. Using the direct interface to Surfer, a mapped elevationcontour was produced showing the potentiometric surface. Illustrated in Figure 6 (existing monitoringwells displayed as red dots), the groundwater flow was determined to flow from the northwest towards theMississippi River in a southeasterly direction.

Page 10: Integrated Environmental Site Characterization and Analysis: EQuIS in…

10

Figure 7. Proposed Well Placement

Based on the results of the groundwater flow analysis, the proposed wells were sited as shown in Figure 7.Well #1 shown to the left is west and upgradient of the expansion to capture background water quality data,prior to contact with the Landfarm. Wells #2 and #3, capturing water quality within the site, are towardsthe center of the expanded area. Well #4, shown in the bottom right, is downgradient with the purpose ofcharacterizing the quality of water leaving the site. In addition to determining the proper location spatially,the proper depth of well and screened interval needed to be determined. Using borehole data logged duringthe drilling of the existing wells stored in EQuIS Geology, a local model similar to Figure 4 was developed.This three-dimensional hydrostratigraphic model provided insight as to the depth and distribution of waterbearing units. Surficial sand-rich deposists were estimated to extend to a depth of about 80 feet, where theytransitioned to a clayey confining unit. The upper unit was assumed to be a localized, shallow aquifer,while a regional aquifer existed below the confining unit. Wells 1, 2, and 4 are to be screened in theshallow aquifer, while Well 3 will be screened in the deeper regional aquifer.

What has been demonstrated with the example of monitoring well placement for the proposed Landfarmexpansion at Camp Ripley is fairly typical of a groundwater investigation. However, the primary benefit ofthe CWMP is that it is a proactive, rather than a reactive, solution. This can result in a significant savingsin time and, potentially, millions of dollars.

A brief comparison is made with the Massachusetts Military Reservation (MMR). The MMR is a 21,000acre military training facility on the upper west area of Cape Cod. Established in 1911, the base has beenused for military training since 1935. From 1955 to 1972, Air Force operations included the use andgeneration of hazardous products such as motor oils, fuels, and cleaning solvents. Typical of the practiceof the day, these materials were disposed of in landfills, drywells, sumps, and the sewage treatment plant.The MMR sits atop the Sagamore Lens, a 300-foot thick aquifer with permeable sandy soils. Currently,there are 15 known contaminant plumes originating from MMR. To date, over $400 million of anestimated $850 million has been spent on the cleanup project.

When contamination was first discovered at MMR, it is likely that no proactive water management planwas in place. Essentially, a Phase I and Phase II process, including characterization of the hydrologicsystem, modeling, remediation, and monitoring had to be conducted in a short time span and at greatexpense. There was little integration of geologic and analytical data. The conceptual and dynamicmodeling process had to start from the beginning; remediation activities were eventually based upon thesemodels.

Lessons have been learned, and the CWMP developed by the UMD Geological Sciences Department isexpected to facilitate much more expedient and cost-effective investigation, should the need arise, at CampRipley. Existing data is already compiled and accessible. A baseline hydrologic model has beenconstructed, and could be refined locally with only a few properly sited boreholes. A dynamic flow modelis available. Using the tools and data made available as part of the CWMP ensures that decision-makershave the most accurate information easily accessible when reactive management issues need to beaddressed.

CONCLUSION

EQuIS has been implemented or is currently being utilized in many different environmental remediationand restoration projects at military installations and other facilities around the world. The projectshighlighted in this paper serve as examples of the benefits of implementing a database system such asEQuIS. With the storage of data in one centralized repository and the ability to export this data to manydifferent evaluation tools, site characterization and analysis becomes quicker and more effective. Decisionscan be made based on the data with much more confidence and reliability. The ease of data query andexport to evaluation tools afforded by EQuIS allows project managers to test the sensitivity of differentapplications to the data.

Page 11: Integrated Environmental Site Characterization and Analysis: EQuIS in…

11

Environmental Data Management—site remediation, water quality analysis, chemical contaminantassessments, and more—is a complex process which may involve several organizations participating indata collection, assessment, and evaluation of the information. Engineering consultants and militaryenvironmental commands; Army Corps of Engineers and water management districts; even cutting-edgeeducation institutions….all of these entities can work cooperatively to standardize and implement asuccessful data management system which ultimately facilitates better decision making.

ACKNOWLEDGEMENTS

Many thanks to the following individuals who provided information, assistance, and proved an invaluableresource in the writing of this paper:

John J. Hyde, WR-ALC/EMXAnthony Dipiero, USACE, Jacksonville DistrictKaren Pitchford, USACE, Jacksonville DistrictBen Bertsch, University of Minnesota at DuluthAndrew League, EA Engineering, Science, and Technology, Inc.

The following web sites also provided valuable information:

http://www.evergladesplan.orghttp://www.dma.state.mn.us/cpripleyhttp://www.mmr.org/irphttp://5yrplan.nfesc.navy.mil/