integrated esia greece annex 3.4 - technical drawings ... · spp ria rab size:a4 trans adriatic...

6
Integrated ESIA Greece Annex 3.4 - Technical Drawings, Construction Activities

Upload: lemien

Post on 06-Apr-2019

243 views

Category:

Documents


0 download

TRANSCRIPT

Integrated ESIA GreeceAnnex 3.4 - Technical Drawings, Construction Activities

Pipe Bending

Pipe Welding

Pipe Stringing

Motor Driven Welding Machine

CHECK TRANS ADRIATIC PIPELINE CLIENT:

DATE

REV

Integrated ESIA Greece Annex 3.4 - Technical Drawings - Construction Activities

Pipe Stringing, Bending and Welding

PROJECT:

ISSUE, SCOPE OF REVISION PREP. APR.

TITLE:

SCALE PROJECT DRAWING NO: SHEET OF

No scale Figure 4-13 2/5

SPP RIA RAB

Size:A4

Trans Adriatic Pipeline (TAP)

Integrated ESIA Greece

0C 06/06/2013 Issued for Information

SOURCE: ERM SpA (December 2011)

SOURCE: ERM SpA (December 2011) SOURCE: ERM SpA (December 2011)

Source: Timberpro.com 2012 (retrieved November 2012)

CHECK TRANS ADRIATIC PIPELINE CLIENT:

DATE

REV

PROJECT:

Onshore Pipeline Construction Typical Trench for 48” Pipeline

ISSUE, SCOPE OF REVISION PREP. APR.

Integrated ESIA Greece Annex 3.4 - Technical Drawings - Construction Activities

TITLE:

SCALE PROJECT DRAWING NO: SHEET OF

No scale Figure 4-14 3/5

SPP RIA RAB

Size:A4

Trans Adriatic Pipeline (TAP)

Integrated ESIA Greece

Typical Trench for 48” Pipeline

SOURCE: CPL00-ENT-100-F-DFT-0008_0B

00 06/06/2013 Issued for Information

NOTES: A: ANGLE OF REPOSE OF SLOPE OF PIPE TRENCH DEPENDING ON SOIL CONDITIONS 80° IN ROCKS. 60° IN LEAST STIFFNESS COHESIVE SOIL LAYER 45° IN NON COHESIVE OR SOFT COHESIVE LAYER B: HAS TO BE ADVISED BY CONSTRUCTION SUPERVISOR.

Example of Ripper attached to back of Bulldozer

Examples of Trenchers

Examples of Hydraulic Breakers

Examples of Excavators

CHECK TRANS ADRIATIC PIPELINE CLIENT:

DATE

REV

Trenching Equipment

PROJECT:

ISSUE, SCOPE OF REVISION PREP. APR.

TITLE:

SCALE PROJECT DRAWING NO: SHEET OF

No scale Figure 4-15 4/5

SPP RIA RAB

Size:A4

Trans Adriatic Pipeline (TAP)

Integrated ESIA Greece

Wheel Trencher

Chain Trencher

Integrated ESIA Greece Annex 3.4 - Technical Drawings - Construction Activities

SOURCE (All images):: ILF (2012) Generic Description of Excavation Methods – 2012-02-10 – Ref. CPL00-ILF-100-F-TRS-0001_0D

00 06/06/2013 Issued for Information

Pipe Trench Backfilling Pipe Lowering

Motor Driven Welding Machine (Pay-welder)

CHECK TRANS ADRIATIC PIPELINE CLIENT:

DATE

REV

PROJECT:

Pipe Lowering, Trench Backfilling and Restoration

ISSUE, SCOPE OF REVISION PREP. APR.

Integrated ESIA Greece Annex 3.4 - Technical Drawings - Construction Activities

TITLE:

SCALE PROJECT DRAWING NO: SHEET OF

No scale Figure 4-16 5/5

SPP RIA RAB

Size:A4

Trans Adriatic Pipeline (TAP)

Integrated ESIA Greece

Pipeline Re-instatement and Restoration

SOURCE: All photos ERM SpA (December 2011)

00 06/06/2013 Issued for Information

Date 06/2013

Copyright Reserved: This document may not be copied, shown to or placThe latest version of the document is registered in the TAP Project's Data

Trans Adriatic Pipeline AG – Greece (Branch Office)21st Floor, Athens Tower, 2-4 Messogion Ave., 11527

Athens GreeceAthens, GreecePhone.: + 30 210 7454613

Fax: + 30 210 7454300

[email protected]

ced at the disposal of third parties without prior consent of TAP AG.abase.