integrated river-basin management model for a target river basin (selenga river)
DESCRIPTION
First Draft. Integrated River-Basin Management Model for a Target River Basin (Selenga River) KOREA ENVIRONMENT INSTITUTE. Background. √ Jeju NISD Meeting (2005, Korea) - Build Institute Network for Sustainable Development - Organize Four Thematic Groups - PowerPoint PPT PresentationTRANSCRIPT
Integrated River-Basin Management Model for a Target River Basin
(Selenga River)
KOREA ENVIRONMENT INSTITUTE
First Draft
Background Background
√ Jeju NISD Meeting (2005, Korea) - Build Institute Network for Sustainable Development
- Organize Four Thematic Groups
(Water, Transportation, National Park, Trade)
√ Delft NISD Meeting(2005, Netherlands) - Reconfirm the dedications of NISD Network
- Discussion on the Organizing Thematic Groups
• Proposal: Development of Integrated River-Basin Management Model for a Target River Basin• Support UNEP/DTIE/ETB’s Efforts for Design & Implementation of Integrated Sustainable Development Policies
STUDY SITE (Tentative)STUDY SITE (Tentative)
√ trans-boundary Issues √ Water Quality & Water Development Issues
√ Capacity Building Requirement
√ Cooperative Networks
WORK FLOWWORK FLOW
START
Ad Hoc WorkingGroup Meeting (3M)
Year IMOU betweenParticipatingInstitutes(2M)
Selection ofDemo Site(6~7M)
Compile IWMExperiences
Networking & Preparation
Refine Derailed Work Plan (2M)
Basic Survey of Water Issues & Socio-Economic Condition(6M)
Test Applicability of IWM Approaches (4M)
Year II
Year III
Evaluate Applicability of Korean Schemes to PH
Development IWM Model
Capacity Building –Integrated Thematic Group Meeting (4M)
Local Assessment
Formulate IWM Model (8M)
TASKS & EXPECTED OUTPUTSTASKS & EXPECTED OUTPUTS
Task 2: Assessment of IWM -Regulatory-Market-based-Define Successful Components
Task 1: Research Network
-Share information-Share Experience-Capacity Building Activities
Task 4 : Model Formulation-Test Applicability-Suggest IWM Framework-Capacity Building
Task 3: Gap Analysis-Water Resource Development-Water Quality Management-Water Supply
-IWM Model Framework-Policy Recommendation Report-Capacity Building
-Cooperative Network-Capacity Building Ad Hoc Meeting
-Technical Tools -Regulatory Tools -Market-Based Tools of IWM
-IWM Guiding Principles-Review Report of IWM
Main Objectives Expected Results &Output
COOPERATIVE FRAMEWORK (Tentative)COOPERATIVE FRAMEWORK (Tentative)
UNEP(Supports & Coordination)
Institute of Geoecology Mongolian Academy of Science
(watershed issues)
Other Institutes in Developing Countries (Capacity Building)
Institute for Sustainable Futures(water development issues)
Korea Environment Institute(water quality issues)
All-Russian Research Institute For Nature Protection
(watershed issues)
Other Thematic Groups (Capacity Building)
Thank you !
Discussion