integrated urban water reclamation and reuse system

80
INTEGRATED URBAN WATER RECLAMATION AND REUSE SYSTEM OS DESAFIOS DA IMPLEMENTAÇAO DE PROJECTOS DE REUTILIZAÇÄO DE AGUAS RESIDUALES EM PORTUGAL: Casos de sucesso de reutilizaçäo de águas residuais Región de Murcia Miguel Ángel Ródenas Cañada, President of the Segura RBA (Spain) Evora, Portugal 9 de outubro 2012

Upload: others

Post on 03-Feb-2022

7 views

Category:

Documents


0 download

TRANSCRIPT

INTEGRATED URBAN WATER

RECLAMATION AND REUSE SYSTEM

OS DESAFIOS DA IMPLEMENTAÇAO DE PROJECTOS DE

REUTILIZAÇÄO DE AGUAS RESIDUALES EM PORTUGAL: Casos de sucesso de reutilizaçäo de águas residuais

Región de Murcia

Miguel Ángel Ródenas Cañada, President of the Segura RBA (Spain)

Evora, Portugal 9 de outubro 2012

Aportaciones : 110.000 Hm3/año

Aportaciones : 110.000 Hm3/año

Abastecimiento: 5.000 Hm3/año

Aportaciones: 110.000 Hm3/año

Abastecimiento: 5.000 Hm3/año

Retornos abastec: 4.000 Hm3/año

Aportaciones: 110.000 Hm3/año

Abastecimiento: 5.000 Hm3/año

Retornos abastec: 4.000 Hm3/año

Reuso potencial: 3.300 Hm3/año

1984

1984 TRASPASO COMPETENCIAS AUTONOMÍAS

1991 DIRECTIVA 91/271/CEE

1995 PLAN NACIONAL SANEAMIENTO DEPURACIÓN(2005)

2000 DIRECTIVA MARCO UE 2000/60

2007 RD1620/2007 REGULACIÓN REUTILIZACIÓN

• PLAN NACIONAL CALIDAD AGUAS

OTROS PLANES Y LEGISLACIÓN NACIONAL ( PLANES HIDROLÓGICOS, LODOS, LEY

AGUAS, LEY COSTAS)

Segura River Basin District

RAINFALL

300 mm

IRRIGATION TRANSFER TAJO-SEGURA: 150.000 Ha

IRRIGATION TRANSFER ‘TAJO-SEGURA’

‘CAMPO DE CARTAGENA’ 33.000 Ha. DISTRIBUTION NETWORKS 900 Km. LARGE PRESSURE PIPELINES

EXPORTACIÓN FRUTAS Y HORTALIZAS

POBLACIÓN

Cuenca del Segura

4’3 % 30 %

ESPAÑA ESPAÑA

3 millones Tm / año 2.550 millones euros No subvencionada (PAC)

Cuenca del Segura

UE: 500 million people

AGUA PARA TODOS AGUA PARA LA VIDA “Informe sobre el desarrollo de los recursos hídricos en el mundo” (III FORO MUNDIAL KYOTO 2003)

Disponibilidad hídrica < 1.000 m3/hab y año: Catastróficamente baja

NO SOSTENIBLE

REUTILIZACIÓN

DESALINIZACIÓN

TRASVASE TAJO-SEGURA

AGUAS PROPIAS CUENCA

300 m3/h año

DÉFICIT

500 m3/h año

600 m3/h año

650 m3/h año

1000 m3/h año

2 MILLONES HAB.

RECURSOS HÍDRICOS CUENCA ‘RÍO SEGURA’

RIVER SEGURA – ‘CONTRAPARADA’ Control

0

5

10

15

20

25

m³/s 19

75

1980

1985

1990

1995

2000

2005

2010

EQUIVALENT CONTINUOUS FLOW (m³/seg)

Segura River Contraparada control station

RIVER SEGURA ‘CONTRAPARADA’

0

5

10

15

20

25

m³/s 19

75

1980

1985

1990

1995

2000

2005

2010

0

50

100

150

200

250

DBO5 mg/L EQUIVALENT CONTINUOUS FLOW (m³/seg)

BOD5 (mg/L) O2

Segura River 80´s

Segura River

MURCIA CITY

MASTER PLAN FOR URBAN

WASTEWATER RECLAMATION 2001-2010

MORE WATER (FOR AGRICULTURAL USE)

RECOVERY SEGURA RIVER (AND NATURE)

OBJECTIVES

ENSURING WASTEWATER TREATMENT (EU DIRECTIVE 91/ 271/CEE)

MASTER PLAN FOR URBAN WASTEWATER RECLAMATION 2001-2010

BUILDING INFRASTRUCTURES

WASTEWATER MANAGEMENT SYSTEM

INDUSTRIAL WASTEWATER • SEWER DISCHARGES CONTROL • AT SOURCE TREATMENT

BASIC POLICIES

MASTER PLAN FOR URBAN WASTEWATER RECLAMATION 2001-2010

INFRASTRUCTURE

MASTER PLAN FOR URBAN WASTEWATER RECLAMATION 2001-2010

‘WHOLE’ COLLECTING SYSTEMS : 99% URBAN POPULATION CONNECTED TO TREATMENT

DESIGN CRITERIA FOR WW TREATMENT PLANTS

Title 22 STATE CALIFORNIA WATER CODE Total coliform <2.2 ufc/100 mL Turbidity < 2 NTU

TERTIARY TREATMENT

MASTER PLAN FOR URBAN WASTEWATER RECLAMATION 2001-2010

WASTEWATER TREATMENT PLANTS

46 LARGE WASTEWATER TREATMENT PLANTS Treatment capacity: 525.000 m3/d Population capacity : 5 million 70 % Tertiary treatment capacity

51 SMALL WASTEWATER TREATMENT PLANTS

MASTER PLAN FOR URBAN WASTEWATER RECLAMATION 2001-2010

PROJECT COST

CO-FINANCED PROJECT BY EUROPEAN UNION

COHESION FUND / ERDF

645 MILLION EUROS

• AGRICULTURE AND WATER REGIONAL DEPARTMENT

• MINISTRY OF AGRICULTURE, FOOD AND ENVIRONMENT (Segura River Basin Authority)

• CITY COUNCILS

INTEGRATED URBAN WATER RECLAMATION AND REUSE SYSTEM

WASTEWATER MANAGEMENT SYSTEM

WASTEWATER RECLAMATION LEVY ‘You contaminate, you pay’ REGIONAL AGENCY ‘ESAMUR’

MASTER PLAN FOR URBAN WASTEWATER RECLAMATION 2001-2010

RESULTS OVERALL CONTAMINATION LOAD IN TREATMENT PLANTS

SOURCE: ESAMUR

SOURCE: ESAMUR

98%

INTEGRATED URBAN WATER RECLAMATION AND REUSE SYSTEM

COSTES DEPURACIÓN INTEGRATED URBAN WATER RECLAMATION AND REUSE SYSTEM

• COSTE MEDIO FUNCIONAMIENTO 0’30 (4-0’16) Eur/m3

• COSTE FUNC. TERCIARIO 0’06-0’08 Eur/m3 (20-30%)

• TARIFA: 0’44 Eur/m3

• TARIFA URBANA: 32 Euros/año+ 0’27 e/m3

• (Consumo 150 m3/año 0’48 e/m3) (Consumo 100 m3/año 0’59 e/m3)

Saved Water 0 KWh/m3

Reclaimed Water 0,6 KWh/m3

Tajo-Segura Transfer 1 KWh/m3

Seawater Desalination 5 KWh/m3

ENERGY CONSUMPTION

INTEGRATED URBAN WATER RECLAMATION AND REUSE SYSTEM

Saved Water 0 euros/m3

Reclaimed Water 0,4 euros/m3

Tajo-Segura Transfer 0’12 euros/m3

Seawater Desalination 1 euro/m3

INTEGRATED URBAN WATER RECLAMATION AND REUSE SYSTEM

INTEGRATED URBAN WATER RECLAMATION AND REUSE SYSTEM

2010

TRATED WASTEWATER 111 Million m3

REUSED WATER (Directly o indirectly) 100 Million m3

REUSED / TRATED 90%

MBR WASTEWATER TREATMENT PLANTS ‘SAN PEDRO PINATAR’ MBR 20,000 m3/day

GENERAL PLAN WASTEWATER RECLAMATION 2001-2010

MBR WASTEWATER TREATMENT PLANTS

‘SAN PEDRO PINATAR’ MBR 20,000 m3/day

SEGURA RIVER WATER QUALITY ALONG THE LONGITUDINAL PROFILE

Source: Segura River Basin Authority

A fishing day in Murcia City ..…

And the old bridge sees amazed how they enjoy in the river..…

Source: Ministry of Environmental, Rural and Marine

SURFACE WATER QUALITY BY SPANISH RIVER BASINS

WETLANDS RECOVERY

INTEGRATED URBAN WATER RECLAMATION AND REUSE SYSTEM

Birds migration corridor

New tertiary wastewater treatment plant

Old lagooning wastewater treatment plant . 30 has

MOLINA-CAMPOTEJAR

MOLINA-CAMPOTEJAR

WETLANDS RECOVERY

Two wetlands in the Region of Murcia with reclaimed wastewater have been included in the RAMSAR CONVENTION LIST OF WETLANDS OF

INTERNATIONAL IMPORTANCE ( January 4th, 2011)

INTEGRATED URBAN WATER RECLAMATION AND REUSE SYSTEM

ACHIEVED OBJECTIVES

INTEGRATED URBAN WATER RECLAMATION AND REUSE SYSTEM

• MORE WATER : 100 Million m3

• SEGURA RIVER RECOVERY

• WETLANDS RICOVERY (TWO ‘RAMSAR LIST’)

• EU WASTEWATER TREATMENT DIRECTIVE (100% Agreed)

INTEGRATED URBAN WATER RECLAMATION AND REUSE SYSTEM

The ‘General System for Wastewater Reclamation and Reuse. Region of Murcia’ has been awarded

‘ Acueducto de Segovia Prize in Civil Works and

Environmental Projects’ Fifth Edition, 2011

Spanish Society of Civil Engineers

“The River Segura: Reclaimed Water, Recovered River” Accepted for publication in the “IWA JOURNAL OF WATER REUSE AND DESALINATION”

THANKS FOR YOUR ATTENTION

Miguel A. Ródenas, [email protected] President of the Segura River Basin Authority