Integration of Power-to-Gas Conversion into Dutch Electricity Ancillary Services Markets
ENERDAY 2018 – Technische Universität Dresden – April 27th, 2018 12th International Conference on Energy Economics and Technology Market and Sector Integration – National and European Perspective
VÍCTOR GARCÍA SUÁREZ
JOSÉ L. RUEDA TORRES
BART W. TUINEMA
ARCADIO PERILLA GUERRA
MART VAN DER MEIJDEN
THE POTENTIAL OF POWER-TO-GAS FOR THE NETHERLANDS
POWER-TO-GAS CONVERSION: PEM ELECTROLYSERS
DUTCH ANCILLARY SERVICES MARKETS
CASE STUDY: GRONINGEN-DRENTHE-OVERIJSEEL AREA (2030)
2 | 17
AGENDA
NORTH SEAOFFSHORE WIND FARMS
SOLAR FARMS
GREEN POWER FROM GERMANY
FROM 2019: COBRAcable FOR SURPLUS OF
DANISH WIND ENERGY
INDUSTRY
TRANSPORTATION
HOUSEHOLDS
H2
H2
H2
CH4
UNDERGROUND GAS STORAGE
FUEL CELLS
ELECTROLYSER
NATURAL GASELECTRICITY
Adapted from: http://tso2020.eu/ 3 | 17
USAGE OF NATURAL GAS IN EUROPE
• 1st in gas installed capacity (54%) • 1st in electricity produced with gas (45%)• 1st in gas consumption per capita (1180 m3)• World leading chemical industry cluster
• Generation mix dominated by nuclear power• Marginal use of gas for electricity production
• 2nd in gas installed capacity (35%)• 2nd in electricity produced with gas (42%)• 3rd in in total gas consumption (64,500 Mm3)
• 3rd in gas installed capacity (32%) • 3rd in electricity produced with gas (40%)• 2nd in total gas consumption (76,700 Mm3)
• 1st in total gas consumption (80,500 Mm3)• Generation mix based on coal and renewables
• Low usage of gas power plants (15%)• Last overall in total gas consumption
4 | 17- Top-6 EU Countries with Highest GDP in 2017 -
PEM = Polymer Electrolyte Membrane
POWER-TO-GAS CONVERSION: PEM ELECTROLYSERS
• Size of individual stack ≤ 3 MW• System efficiency of 75 – 85 %• Power setpoint change within 1 second• Startup and shutdown within minutes
SPECIFICATIONS
• TSO 2020 – 1 MW pilot station (NL)• Shell / ITM – 10 MW refinery (DE)• McPhy – 13 MW methanation (AT)• Gasunie – 20 MW station (NL)
ONGOING / PLANNED PROJECTS
CAPITAL COST (CAPEX)
• 1000 €/kW at 1 MW scale in 2018 • 500 €/kW at 10 MW scale by mid 2020s
POTENTIAL USES FOR POWER SYSTEMS
• Frequency regulation• Renewables curtailment reduction• Congestion management• Voltage control
• ≈ 80,000 hours for the stack• 20 – 30 years for the rest of the plant
LIFETIME
5 | 17- Reference data taken from different manufacturers - Electrolyzer sample image retrieved from Nel Hydrogen -
PREQUALIFICATION, MARKET MECHANISMS AND FUTURE FRAMEWORK OF:
» BALANCING MARKETS (FCR and aFRR)
» VOLTAGE CONTROL
» CONGESTION MANAGEMENT
ASSESSMENT OF THE TECHNICAL ADEQUACY OF PEM ELECTROLYSERS
BUSINESS MODEL OF ELECTROLYSERS AS ANCILLARY SERVICES PROVIDER
6 | 17
DUTCH ANCILLARY SERVICES MARKETS
[1] Online trading platform at regelleistung.net / 30% Dutch exclusive and 70% auctioned together with the following TSOs:
Generators
PARTICIPANTS:
Loads
» Symmetric bid» Bid ≥ 1 MW» Bid ≤ Prequalified MW
BIDDING RULES:
Organized capacity market
» ± 110 MW [1]
» Weekly auction
MARKET TYPE: SETTLEMENT RULE:
Pay-as-bid
PRODUCT RESOLUTION:
Weekly
FREQUENCY CONTAINMENT RESERVE (FCR)
» Complete bid activation within 30 sec.» Provision for 30 min. for a ± 200 mHz deviation» Linear frequency-power characteristic
PREQUALIFICATION:
7 | 17
» Symmetric bids» Bid ≥ 1 MW» Bid ≤ 999 MW
BIDDING RULES:
Single-buyer bilateral market
» ± 350 MW» Mandatory daily bids
MARKET TYPE: SETTLEMENT RULE:
Pay-as-bid
PRODUCT RESOLUTION:
Monthly / Weekly
Marginal price
15-Minute (PTU)
Daily bid ladder
» Activation by merit order» Energy remuneration
» Voluntary capacity bids» Asymmetric bids allowed
AUTOMATIC FREQUENCY RESTORATION RESERVE (aFRR)
» Complete bid activation within 15 min.» Minimum ramping of 7% of the bid per min.» Control by Load Frequency Control (LFC)
PREQUALIFICATION:
Generators
PARTICIPANTS:
Loads
8 | 17
» Daily auction frequency
» Product resolution of 4 hours
» Marginal pricing settlement rule
» Introduction of asymmetric bids
FCR:
Involved TSOs:
» Full activation time of 5 or 7.5 minutes
» Gate closure times closest to real-time
» Increased imbalance netting through IGCC [1]
» Unified European market model
» Energy activation by a common merit order list
» Cross-border marginal pricing settlement rule
aFRR:
[1] International Grid Control Cooperation
BALANCING MARKETS: THE ROAD TO 2025
9 | 17
VOLTAGE CONTROL & CONGESTION MANAGEMENT
Generators
PARTICIPANTS:
Loads
Single-buyer bilateral market
» At TenneT’s request
CONGESTION MANAGEMENT: SETTLEMENT RULE:
Fixed fee
PRODUCT RESOLUTION:
No details
» The reinforcement of the grid is the preferred action plan in to avoid future congestions
» Mandatory provision for generators > 5 MW (Contracted service)
Generators
PARTICIPANTS:
Loads
FACTS
Single-buyer bilateral market
» Based on local needs» Yearly tender
REACTIVE POWER MARKET: SETTLEMENT RULE:
Pay-as-bid
PRODUCT RESOLUTION:
Yearly
» Activation in 15 min.
PREQUALIFICATION:
10 | 17
TECHNICAL ADEQUACY OF PEM ELECTROLYSERS
• 1 MW active power steps by LFC• Power setpoint change within 1 second
FREQUENCY RESTORATION RESERVE (aFRR)
• Curtailable industrial load• Interruptible load• Fast ramping in both directions
CONGESTION MANAGEMENT
FREQUENCY CONTAINMENT RESERVE (FCR)
VOLTAGE CONTROL
• Purely DC load• Reduction of active power demand• Use of converter at partial loading
Poutput [MW]
f [Hz]
PnomPref0
50.0
50.2
49.8
Pbid
Pbid
Inverse droop control:
• Power setpoint change within 1 second
11 | 17- Electrolyzer sample image retrieved from Nel Hydrogen -
» The sale of H2 (production with cheap electricity) and syngas is the main financial revenue source.
» The provision of ancillary services adds extra revenue to the power-to-gas business model.
» Most interest in short product horizons and capacity payments.
» In the new framework, prioritization of FCR and voluntary bidding for upward regulation aFRR.
11131517192123
1 4 7 10 13 16 19 22 25 28 31 34 37 40 43 46 49 52
Pri
ce [
€/M
W/h
]
Week
FCR marginal priceFCR average pay-as-bid priceFCR minimum pay-as-bid price
Source: regelleistung.netFCR price in the Dutch auction in 2017 Energy price duration curve for upward regulation aFRR in 2017
Source:
0
200
400
600
800
1000
0 3000 6000 9000 12000 15000 18000
Pri
ce [
€/M
Wh
]Number of PTUs with Imbalance
12 | 17
BUSINESS MODEL AS ANCILLARY SERVICES PROVIDER
ISSUES TO BE INVESTIGATED:
» PRELIMINARY ASSESMENT ON VOLTAGE CONTROL AND LIKELIHOOD OF CONGESTIONS
» TECHNICAL IMPACT OF THE PARTICIPATION OF ELECTROLYSERS IN FCR
» COMBINED OPERATION OF RENEWABLES AND POWER-TO-GAS
GRID TOPOLOGY ACCORDING TO TENNET’S DEVELOPMENT PLAN FOR 2030
HIGH CROSS-BORDER POWER IMPORT AND LOW CONVENTIONAL GENERATION
13 | 17
CASE STUDY: GRONINGEN-DRENTHE-OVERIJSEEL AREA
VIERVERLATEN
to GERMANY
to ZWOLLE
EEMSHAVEN
NorNed COBRAcable
380 kV 220 kV 110 kV
MEEDEN
WEIWERD
14 | 17
49.80
49.82
49.84
49.86
49.88
49.90
49.92
49.94
10 12 14 16 18 20 22 24 26 28 30
Nad
ir F
req
ue
ncy
[H
z]
Total FCR Capacity [MW]
Only P2G
10 MW CCGT + P2G
Only CCGT
Frequency nadir for different allocations of FCR capacity
49.88
49.90
49.92
49.94
49.96
49.98
50.00
0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15
Freq
uen
cy [
Hz]
Time [s]
30 MW P2G20 MW P2G + 10 MW CCGT15 MW CCGT + 15 MW P2G20 MW CCGT + 10 MW P2G30 MW CCGT
Frequency response for different allocations of FCR capacity
EVENT: Loss of generation due to disconnection of wind turbines or sudden decrease of COBRAcable power import
15 | 17
FCR PROVISION: EFFECTS ON FREQUENCY RESPONSE
0
100
200
300
400
500
600
0:00 2:00 4:00 6:00 8:00 10:00 12:00 14:00 16:00 18:00 20:00 22:00 0:00
Po
wer
[M
W]
Time [hrs]
Wind PowerP2G ConsumptionP2G CapacityGrid Injection
Example of the coordinated operation between the wind park and the large-scale power-to-gas facility
16 | 17
INTERACTION WITH WIND ENERGY GENERATION
Maximum consumption during cheap electricity hours No grid injection for
low wind power output
Shutdown during the most expensive electricity hours
Operation at partial load output
TECHNICALLY, ELECTROLYSERS COULD PARTICIPATE IN FREQUENCY BALANCING MARKETS, VOLTAGE CONTROL AND CONGESTION MANAGEMENT
ECONOMICALLY, FCR IS THE MOST ATTRACTIVE SERVICE DUE TO THE CAPACITY PAYMENTS AND SHORT PRODUCT RESOLUTION (FROM 2021)
THE FAST DYNAMICS OF ELECTROLYSERS IMPROVE THE FREQUENCY RESPONSE OF THE POWER SYSTEM
LARGE-SCALE POWER-TO-GAS CAN BECOME ONE OF THE POTENTIAL SOLUTIONS TO MITIGATE RENEWABLE ENERGY VARIABILITY
17 | 17
CONCLUSIONS
Integration of Power-to-Gas Conversion into Dutch Electricity Ancillary Services Markets
ENERDAY 2018 – Technische Universität Dresden – April 27th, 2018 12th International Conference on Energy Economics and Technology Market and Sector Integration – National and European Perspective
VÍCTOR GARCÍA SUÁREZ
JOSÉ L. RUEDA TORRES
BART W. TUINEMA
ARCADIO PERILLA GUERRA
MART VAN DER MEIJDEN