integration risk assessment...integration issues 45% of acquisition programs have integration issues...

24
13 th Annual NDIA SE Conf Oct 2010 Page-1 DISTRIBUTION STATEMENT A -- Cleared for public release by OSR on 08 October 2010 -- SR case number #11-S-0046 applies. Integration Risk Assessment - Assessing Integration Risk Throughout the Lifecycle - Mr. Jim Thompson Director, Major Program Support, ODDR&E/Systems Engineering Mr. Lawrence Gresko, Mr. Larry Schluderberg, and Mr. Ray Lowe Decisive Analytics Corporation and Mr. Pete Nolte, ODDR&E/Systems Engineering 13 th Annual NDIA Systems Engineering Conference San Diego, CA | October 28, 2010

Upload: others

Post on 06-Jun-2020

5 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Integration Risk Assessment...Integration Issues 45% of Acquisition Programs have Integration Issues • Integration issues are an underlying cause of many of the shortfalls to DoD

13th Annual NDIA SE Conf

Oct 2010 Page-1DISTRIBUTION STATEMENT A -- Cleared for public release by OSR on 08 October 2010 -- SR case number #11-S-0046 applies.

Integration Risk Assessment- Assessing Integration Risk Throughout the Lifecycle -

Mr. Jim Thompson

Director, Major Program Support, ODDR&E/Systems Engineering

Mr. Lawrence Gresko, Mr. Larry Schluderberg, and Mr. Ray Lowe

Decisive Analytics Corporation

and Mr. Pete Nolte, ODDR&E/Systems Engineering

13th Annual NDIA Systems Engineering Conference

San Diego, CA | October 28, 2010

Page 2: Integration Risk Assessment...Integration Issues 45% of Acquisition Programs have Integration Issues • Integration issues are an underlying cause of many of the shortfalls to DoD

DISTRIBUTION STATEMENT A -- Cleared for public release by OSR on 08 October 2010 -- SR case number #11-S-0046 applies.13th Annual NDIA SE Conf

Oct 2010 Page-2

Integration Risk Overview

• Weapon Systems

Acquisition Reform

Act (PL 111-23)

WSARA – Technology

Integration Risk

• SE – Integration

Readiness Level

• Increased awareness

• Integration Risk

Assessment

Questions

• Program Notable

Efforts

• Department-wide

initiatives

• Annual Report topic

• Formal SE guidance

• Integration metrics

• Tracking/Trending

• Dashboard

• Annual Reporting

Growing consciousness within the Department

of Integration risk and mitigation

FY09 FY10 FY11

Page 3: Integration Risk Assessment...Integration Issues 45% of Acquisition Programs have Integration Issues • Integration issues are an underlying cause of many of the shortfalls to DoD

DISTRIBUTION STATEMENT A -- Cleared for public release by OSR on 08 October 2010 -- SR case number #11-S-0046 applies.13th Annual NDIA SE Conf

Oct 2010 Page-33

System / Integration Risk

• Integration is an aggregation of all of the processes and activities that

are applied to assure that a weapon system is designed and developed

so that all system elements (hardware, software, people, facilities,

procedures, etc.) work together in a way that satisfies the intended

purpose of the weapon system (meets the technical, functional and

performance requirements)

• Systems Engineering is an interdisciplinary approach … Systems

Engineering integrates all the disciplines and specialty groups into a

team effort forming a structured development process that proceeds

from concept to production to operation. Systems Engineering

considers both the business and the technical needs of all customers

with the goal of providing a quality product that meets the user needs.

(INCOSE)

Background

The successful integration of DoD weapons systems relies upon the applicationof good systems engineering throughout the acquisition life cycle

Page 4: Integration Risk Assessment...Integration Issues 45% of Acquisition Programs have Integration Issues • Integration issues are an underlying cause of many of the shortfalls to DoD

DISTRIBUTION STATEMENT A -- Cleared for public release by OSR on 08 October 2010 -- SR case number #11-S-0046 applies.13th Annual NDIA SE Conf

Oct 2010 Page-4

Integration Issues

45% of Acquisition Programs have Integration Issues

• Integration issues are an underlying cause of many

of the shortfalls to DoD acquisition programs…

Overall Systemic analysis reveals

integration issues in ~45% of Program

Support Reviews (PSRs)

but trend is improving…

This past year, of 43 programs examined in depth,

only ~25% exhibited integration issues

Page 5: Integration Risk Assessment...Integration Issues 45% of Acquisition Programs have Integration Issues • Integration issues are an underlying cause of many of the shortfalls to DoD

DISTRIBUTION STATEMENT A -- Cleared for public release by OSR on 08 October 2010 -- SR case number #11-S-0046 applies.13th Annual NDIA SE Conf

Oct 2010 Page-5

DoD Systems Engineering Shortfalls*

* Findings from Program Support Reviews and DoD-directed Studies/Reviews 2004-2010

Integration

Issues

Major contributors to poor program performance

• Common failures on acquisition programs include:– Inadequate understanding of requirements

– Lack of systems engineering discipline, authority, and resources

– Lack of technical planning and oversight

– Stovepipe developments with late integration

– Lack of subject matter expertise at the integration level

– Availability of systems integration facilities

– Incomplete, obsolete, or inflexible architectures

– Low visibility of software risk

– Technology maturity over estimated

Major contributors to poor program performance stem from integration issues

Page 6: Integration Risk Assessment...Integration Issues 45% of Acquisition Programs have Integration Issues • Integration issues are an underlying cause of many of the shortfalls to DoD

DISTRIBUTION STATEMENT A -- Cleared for public release by OSR on 08 October 2010 -- SR case number #11-S-0046 applies.13th Annual NDIA SE Conf

Oct 2010 Page-6

SRR

SFR

PDR

CDR

TRR

PRRInterpret User

Needs

Dev. Functional Specs

Dev. Performance Spec.

Dev. Build to Documentation

Fabricate, Assemble, Code

Individual CI Verification

Integrated DT&E, Verify Performance

System DT&E, Verify System

Combined DT&E Verify Needs Met

SRR

SFR

PDR

CDR

TRR

PRRInterpret User

Needs

Dev. Functional Specs

Dev. Performance Spec.

Dev. Build to Documentation

Fabricate, Assemble, Code

Individual CI Verification

Integrated DT&E, Verify Performance

System DT&E, Verify System

Combined DT&E Verify Needs Met

Verification Integration

Development

Integration Evaluation

Integration

Process

Layers

Systems Engineering Layers

Lines of Integration

Page 7: Integration Risk Assessment...Integration Issues 45% of Acquisition Programs have Integration Issues • Integration issues are an underlying cause of many of the shortfalls to DoD

DISTRIBUTION STATEMENT A -- Cleared for public release by OSR on 08 October 2010 -- SR case number #11-S-0046 applies.13th Annual NDIA SE Conf

Oct 2010 Page-7

within & across layers

Management & Contracting, etc…

Logistics & Sustainability

Specialty Disciplines

Manufacturing

Technical

Program success depends oncoordination of the various layers

Systems Engineering provides disciplined and coordinated communicationand integration across and within the layers of development

Systems Engineering Layers

Lines of Integration

Process

Layers

Page 8: Integration Risk Assessment...Integration Issues 45% of Acquisition Programs have Integration Issues • Integration issues are an underlying cause of many of the shortfalls to DoD

DISTRIBUTION STATEMENT A -- Cleared for public release by OSR on 08 October 2010 -- SR case number #11-S-0046 applies.13th Annual NDIA SE Conf

Oct 2010 Page-8

FY01 FY02 FY03 FY04 FY05 FY06 FY07 FY08 FY09 FY10

TRL – Technology Readiness Levels

EMRL– Engineering & Manufacturing Readiness Levels

SWRL Software Readiness Levels

MRL – Manufacturing Readiness Levels

RRL – Reliability Readiness Levels

Etc…

Addressing The Problem FY09-10

• Original thinking was to address Integration risk similar

to the “Readiness Level” concepts of Manufacturing,

Reliability, SW, Technology…

• Integration is the connections between the other

specialties – Initial result: a series of questions to the

assess “readiness” to couple the “layers”

Lines of Integration

within and across layers

Management & Contracting, etc...

Specialty Disciplines

Logistics & Sustainability

Manufacturing

Technical

SRR

SFR

PDR

CDR

TRR

PRR

Interpret User Needs

Dev. Functional

Specs

Dev. Performance Spec.

Dev. Build to Documentation

Fabricate, Assemble, Code

Individual CI Verification

Integrated DT&E, Verify Performance

System DT&E, Verify System

Combined DT&E Verify Needs Met

SRR

SFR

PDR

CDR

TRR

PRR

Interpret User Needs

Dev. Functional

Specs

Dev. Performance Spec.

Dev. Build to Documentation

Fabricate, Assemble, Code

Individual CI Verification

Integrated DT&E, Verify Performance

System DT&E, Verify System

Combined DT&E Verify Needs Met

SRR

SFR

PDR

CDR

TRR

PRR

Interpret User Needs

Dev. Functional

Specs

Dev. Performance Spec.

Dev. Build to Documentation

Fabricate, Assemble, Code

Individual CI Verification

Integrated DT&E, Verify Performance

System DT&E, Verify System

Combined DT&E Verify Needs Met

SRR

SFR

PDR

CDR

TRR

PRR

Interpret User Needs

Dev. Functional

Specs

Dev. Performance Spec.

Dev. Build to Documentation

Fabricate, Assemble, Code

Individual CI Verification

Integrated DT&E, Verify Performance

System DT&E, Verify System

Combined DT&E Verify Needs Met

SRR

SFR

PDR

CDR

TRR

PRR

Interpret User Needs

Dev. Functional

Specs

Dev. Performance Spec.

Dev. Build to Documentation

Fabricate, Assemble, Code

Individual CI Verification

Integrated DT&E, Verify Performance

System DT&E, Verify System

Combined DT&E Verify Needs Met

Integration Risk

Specialty

Engineering

Disciplines

Page 9: Integration Risk Assessment...Integration Issues 45% of Acquisition Programs have Integration Issues • Integration issues are an underlying cause of many of the shortfalls to DoD

DISTRIBUTION STATEMENT A -- Cleared for public release by OSR on 08 October 2010 -- SR case number #11-S-0046 applies.13th Annual NDIA SE Conf

Oct 2010 Page-9

FY09-10 Integration RiskProgram Support Review Questions

Integration

Questions

Have all necessary Specialty Engineering

disciplines been addressed in the

requirements, specifications, and interface

control documents (HSI, Manufacturing, RMA,

Logistics, Environmental, Disposal, etc)? ○

How were the technical standards in the Technical

View (TV) products identified, and how are

they to interoperate with the GIG Enterprise

services identified for the system’s net-centric

roles? ○

Is the system aligned with Net-Centric Operations

and Warfare functional concept?

Are all Interface Control Documents (ICD),

Software Interface Design Description (SIDD),

Interface Requirements Specification, etc.,

complete and under configuration

management (CM) control? ○

Have interface requirements been established for

all interfaces? ○

• Internal: hardware-hardware,

software-software, hardware-software,

subsystem-subsystem, component-

component, etc

• External: system-weapons system; C2

(e.g. GCCS); data collection

/dissemination; training systems;

maintenance/sustainment systems

Has the traceability of the interface design to the

allocated requirements been verified by audit?

Do the test plans reflect a high level of

understanding in the interfaces? ○

How are the interoperability

capabilities/requirements documented, and

how are they addressed in the overall system

design and development process of the

program? ○

What is the program’s approach to facilitate

interoperability?

Program Support Review

Integration Risk

Assessment

Integration Risk Questions

(Multi-Sourced Document)

• DoDI 5000.02, Operation of the

Defense Acquisition System

• Interim Defense Acquisition

Guidebook (DAG)

• Defense Acquisition Program

Support (DAPS) Methodology

• NAVAIR System Engineering

Technical Review (SETR)

Resource Kit

• Air Force’s Risk RI3 Guidebook

Ma

turi

ng

Ca

pa

bilit

y

Current Capability

Ready forImplementation

In Development

Future Tools

Page 10: Integration Risk Assessment...Integration Issues 45% of Acquisition Programs have Integration Issues • Integration issues are an underlying cause of many of the shortfalls to DoD

DISTRIBUTION STATEMENT A -- Cleared for public release by OSR on 08 October 2010 -- SR case number #11-S-0046 applies.13th Annual NDIA SE Conf

Oct 2010 Page-10

TRA

PDR

TechnologyDevelopment

Production &

DeploymentLow-Rate Initial

Production

FRP DecisionReview

Post CDR Assessment

Materiel Development Decision

Post PDR Assessment

Activities Systems Acquisition

TRA

ITR ASR SRR SFR PCA

OTRR

SVR

OTRRTechnical

Reviews

IBR IBR PRRCDR TRR

Pre-Systems Acquisition Sustainment

Assessment ofOperationalTest Readiness

Pre-IOC Post-IOCAssessments

Engineering and

Manufacturing Dev.B CIntegrated Sys

DesignSys Capability & Mfg

Demonstration

ISR

Phases

Assessments

MaterielSolutionAnalysis

AOperations & Support

Life Cycle Sustainment

IOC FOC

Integration Risk Criteria MatrixSpiral 1.0

Integration Risk Layers And Threads Are Then Cross Referenced Across The Lifecycle, Establishing Phased Criteria

Program Support

Review

Integration Risk

Assessment

• Processes /

Planning

• Design

• Resources

• SoS

• Parameters

• Facilities Eqmt

• Test Planning

• M&S

• Eval Results

• Certifications

• SoS

• Log Planning

• Training

• Facilities

• Packaging

• Log Analysis

• SoS

• Manufacturing

• Reliability

• Software

• Safety

• Human Factors

• AoA

• Ops

Capabilities

• Architecture

• CONOPS

• SoS

• Plans &

Scheds

• Manpower

• PESHE

• Solicitation

• Contract

• SoS

• Budget Mgmt

• POM Dev /

Cycle

• Funds Mgmt

• Cost

Estimation

• SoS

Management & Contracting

Capabilities Cost

Technical Specialty Disciplines

Test & Evaluation

Logistics &Sustainability

Page 11: Integration Risk Assessment...Integration Issues 45% of Acquisition Programs have Integration Issues • Integration issues are an underlying cause of many of the shortfalls to DoD

DISTRIBUTION STATEMENT A -- Cleared for public release by OSR on 08 October 2010 -- SR case number #11-S-0046 applies.13th Annual NDIA SE Conf

Oct 2010 Page-11

TRA

PDR

TechnologyDevelopment

Production &

DeploymentLow-Rate Initial

Production

FRP DecisionReview

Post CDR Assessment

Materiel Development Decision

Post PDR Assessment

Activities Systems Acquisition

TRA

ITR ASR SRR SFR PCA

OTRR

SVR

OTRRTechnical

Reviews

IBR IBR PRRCDR TRR

Pre-Systems Acquisition Sustainment

Assessment ofOperationalTest Readiness

Pre-IOC Post-IOCAssessments

Engineering and

Manufacturing Dev.B CIntegrated Sys

DesignSys Capability & Mfg

Demonstration

ISR

Phases

Assessments

MaterielSolutionAnalysis

AOperations & Support

Life Cycle Sustainment

IOC FOC

Integration Risk Criteria MatrixSpiral 1.0

Specialty Disciplines

Test & Evaluation

Logistics &Sustainability

Cost

Management & Contracting

Capabilities

Technical

Integration Risk Assessment Criteria Matrix by Phase

Page 12: Integration Risk Assessment...Integration Issues 45% of Acquisition Programs have Integration Issues • Integration issues are an underlying cause of many of the shortfalls to DoD

DISTRIBUTION STATEMENT A -- Cleared for public release by OSR on 08 October 2010 -- SR case number #11-S-0046 applies.13th Annual NDIA SE Conf

Oct 2010 Page-12

Awareness and Lessons Learned

FY09-10 development provided valuable insight for next spiral

TRA

PDR

TechnologyDevelopment

Production &

DeploymentLow-Rate Initial

Production

FRP DecisionReview

Post CDR Assessment

Materiel Development Decision

Post PDR Assessment

Activities Systems Acquisition

TRA

ITR ASR SRR SFR PCA

OTRR

SVR

OTRRTechnical

ReviewsIBR IBR PRRCDR TRR

Pre-Systems Acquisition Sustainment

Assessment ofOperationalTest Readiness

Pre-IOC Post-IOCAssessments

Engineering and

Manufacturing Dev.B CIntegrated Sys

DesignSys Capability & Mfg

Demonstration

ISR

Phases

Assessments

MaterielSolutionAnalysis

AOperations & Support

Life Cycle Sustainment

IOC FOC

TRA

PDR

TechnologyDevelopment

Production &

DeploymentLow-Rate Initial

Production

FRP DecisionReview

Post CDR Assessment

Materiel Development Decision

Post PDR Assessment

Activities Systems Acquisition

TRA

ITR ASR SRR SFR PCA

OTRR

SVR

OTRRTechnical

ReviewsIBR IBR PRRCDR TRR

Pre-Systems Acquisition Sustainment

Assessment ofOperationalTest Readiness

Pre-IOC Post-IOCAssessments

Engineering and

Manufacturing Dev.B CIntegrated Sys

DesignSys Capability & Mfg

Demonstration

ISR

Phases

Assessments

MaterielSolutionAnalysis

AOperations & Support

Life Cycle Sustainment

IOC FOC

Specialty Specialty DisciplinesDisciplines

Test & Test & EvaluationEvaluation

Logistics &Logistics &SustainabilitySustainability

CostCost

Management Management & Contracting& Contracting

CapabilitiesCapabilities

TechnicalTechnical

Lines of

Integrationwithin and

across layers

Management & Contracting

Logistics

Specialty Engineering

Manufacturing

Technical

Current Capability

Ready forImplementation

In Development

Future Tools

Current Capability

Ready forImplementation

In Development

Future Tools

Lessons Learned

• Readiness Level approach

aggregates issues losing insight

• Multi-dimensional approach good,

but “layer” categories not crisp

• Technology integration (WSARA

focus) is not THE driver of

integration issues

DoD-wide Awareness

• Increased focus throughout the

Department on Integration risk

• Assessment Criteria serve better as

“Good Practice” type guidance

adopted by programs (Notable

examples)

Page 13: Integration Risk Assessment...Integration Issues 45% of Acquisition Programs have Integration Issues • Integration issues are an underlying cause of many of the shortfalls to DoD

DISTRIBUTION STATEMENT A -- Cleared for public release by OSR on 08 October 2010 -- SR case number #11-S-0046 applies.13th Annual NDIA SE Conf

Oct 2010 Page-1313

FY10 Notable Efforts

Notable Program Efforts• Air and Missile Defense Radar (AMDR) – Open

Architecture with Integration IPR prior to MS-B

• Ground Combat Vehicle (GCV) –Subsystem

prototypes integrated on surrogate vehicles

• Ohio Replacement Program (ORP) – Mature

integration processes & integration facilities

• Cooperative Engagement Capability (CEC) - Navy

Open Architecture Computing Environment

(OACE) compliant

• JLENS – Dedicated System Integration Cross

Product Team (CPT) working integration

• AIAMD –Working Group coordinating Interface

Control Documents across team

• P-8A –Integration Readiness Reviews; >20,000 SIL

Hours, 6,000 test problem reports

• JMS (JSPOC) – Conducting technical interchanges

and integration risk reduction activities.

• SDBII –Joint Interface Control Working Group to

facilitate weapon system integration

• >20 Programs implementing SOAs

Integration Challanges• Pgm A – Disconnect between Mission and

Functional decomposition

• Pgm B – Performance across all connectivity paths

not adequately planned or executed.

• Pgm C – Sensors and Platform developed

separately without schedule/funding/and

contractual linkages

• Pgm D – Lack Architectural views of system

• Pgm E – Methodical build up of integrated system

not accomplished

• Pgm F – Integration across system nodes not

adequately planned

• Pgm G – DoD programs not available in time frame

needed to integrate with system

Integration Awareness Increasing… Performed 43 Integration Evaluations: 20 Positive, 12 Negative, and 11 Neutral

Page 14: Integration Risk Assessment...Integration Issues 45% of Acquisition Programs have Integration Issues • Integration issues are an underlying cause of many of the shortfalls to DoD

DISTRIBUTION STATEMENT A -- Cleared for public release by OSR on 08 October 2010 -- SR case number #11-S-0046 applies.13th Annual NDIA SE Conf

Oct 2010 Page-14

Open System Architecture Initiatives

• Programs implementing Service Oriented Architectures (SOA)– ISPAN

– AOC WS

– CANES

– BCTM

– NCES

– AOC-WS

– BTA program

– KMI

– PKI

• Overall SOA Integration benefits

– Reusable functionality and interfaces

– Loosely-coupled functions that are not required to be installed onto platforms

– Standards-based design – greater degree of rigor to interface specifications

– Multi-Service SOA Consortium – DoD programs implementing SOA

environments meet and share experiences and best-practices

– MCSC M&JIC

– SSWG

– GV-ES

– TEDS JCTD

– JITC-G

– GCSS-AF

– ECSS

– EHR

– NGEN

Software Engineering Institute, Carnegie Mellon

Page 15: Integration Risk Assessment...Integration Issues 45% of Acquisition Programs have Integration Issues • Integration issues are an underlying cause of many of the shortfalls to DoD

DISTRIBUTION STATEMENT A -- Cleared for public release by OSR on 08 October 2010 -- SR case number #11-S-0046 applies.13th Annual NDIA SE Conf

Oct 2010 Page-15

within & across layers

Management & Contracting, etc…

Logistics & Sustainability

Specialty Disciplines

Manufacturing

Technical

Refined the SE layer categories from “specialties” to better align with integration

activities and types

(Based on key drivers of integration issues and

matching integration tasks)

Systems Engineering provides disciplined and coordinated communicationand integration across and within the layers of development

Refined / Aligned Multi-Dimensional Layer Definitions

Lines of Integration

Functional

Physical

Management

Disciplines

System ofSystems

Page 16: Integration Risk Assessment...Integration Issues 45% of Acquisition Programs have Integration Issues • Integration issues are an underlying cause of many of the shortfalls to DoD

DISTRIBUTION STATEMENT A -- Cleared for public release by OSR on 08 October 2010 -- SR case number #11-S-0046 applies.13th Annual NDIA SE Conf

Oct 2010 Page-16

Metrics Development Evolution

Systemic

integration

issues from

PSR

Database

Vision:

• Measures that change over time

• Streamline multi-dimensional layers

• Focus on documented integration issues

DAPSGAO Report

USN SETR

AFRI3

5000.2

TRA

PDR

TechnologyDevelopment

Production &

DeploymentLow-Rate Initial

Production

FRP DecisionReview

Post CDR Assessment

Materiel Development Decision

Post PDR Assessment

Activities Systems Acquisition

TRA

ITR ASR SRR SFR PCA

OTRR

SVR

OTRRTechnical

ReviewsIBR IBR PRRCDR TRR

Pre-Systems Acquisition Sustainment

Assessment ofOperationalTest Readiness

Pre-IOC Post-IOCAssessments

Engineering and

Manufacturing Dev.B CIntegrated Sys

DesignSys Capability & Mfg

Demonstration

ISR

Phases

Assessments

MaterielSolutionAnalysis

AOperations & Support

Life Cycle Sustainment

IOC FOC

TRA

PDR

TechnologyDevelopment

Production &

DeploymentLow-Rate Initial

Production

FRP DecisionReview

Post CDR Assessment

Materiel Development Decision

Post PDR Assessment

Activities Systems Acquisition

TRA

ITR ASR SRR SFR PCA

OTRR

SVR

OTRRTechnical

ReviewsIBR IBR PRRCDR TRR

Pre-Systems Acquisition Sustainment

Assessment ofOperationalTest Readiness

Pre-IOC Post-IOCAssessments

Engineering and

Manufacturing Dev.B CIntegrated Sys

DesignSys Capability & Mfg

Demonstration

ISR

Phases

Assessments

MaterielSolutionAnalysis

AOperations & Support

Life Cycle Sustainment

IOC FOC

Specialty Specialty DisciplinesDisciplines

Test & Test & EvaluationEvaluation

Logistics &Logistics &SustainabilitySustainability

CostCost

Management Management & Contracting& Contracting

CapabilitiesCapabilities

TechnicalTechnical

Top down

Bottoms Up

• Lessons Learned

• Notable Practices

• Integration Focus

• Functional

• Physical

• Management

• Disciplines

• SoS

% High Risk Interfaces % Integration Tasks Late% Mission Threads

Validated

Physical

Integration TDSfor TD

IMSfor TD

AS for EMD

IMS for EMD

(Allocated Baseline)

IMS for EMD

(Product Baseline)

AS for LRIP (Verified

Prod. Baseline)

IMS for FRP (Final

Prod. Baseline)

IMS for LRIP

(Verified Prod.

Baseline

AS for FRP (Final Prod.

Baseline)

IMS for FRP (Final

Prod. Baseline)

Sub-System LabSystem Lab

Host Platform

SoS Lab

•Quantitative Tracking

•Qualitative Checklists• Functional• Physical• Management• Disciplines• SoS

Consolidated Integration

Risk Metrics

Realignment

Page 17: Integration Risk Assessment...Integration Issues 45% of Acquisition Programs have Integration Issues • Integration issues are an underlying cause of many of the shortfalls to DoD

DISTRIBUTION STATEMENT A -- Cleared for public release by OSR on 08 October 2010 -- SR case number #11-S-0046 applies.13th Annual NDIA SE Conf

Oct 2010 Page-17

SoS

Coupling

Complexity

% High Risk

SoS

Interfaces

Internal

Coupling

Complexity

% Function

Threads

Validated

Qualitative and Quantitative Integration Metrics

PhysicalIntegration TDS

for TDIMS

for TDAS

for EMDIMS for EMD (Allocated Baseline)

IMS for EMD (Product Baseline)

AS for LRIP (Verified Prod.

Baseline)

IMS for FRP (Final Prod. Baseline)

IMS for LRIP (Verified Prod.

Baseline

AS for FRP (Final Prod. Baseline)

IMS for FRP (Final Prod. Baseline)

Sub-System Lab

System Lab

Host Platform

FunctionalIntegration Final

ICDDraftCDD

InitialISP

FinalCDD

Perform. Spec

Functional Spec

Verified Product Baseline

InitialCPD

Final Product Baseline

Initial Product Baseline

Final Product

ISP

Initial Product

ISP

OV-1

OV-3

SV-4

OV-2

SV-1

SV-6

ICD

IRS

IDD

TDSfor TD

IMSfor TD

AS for EMD

IMS for EMD (Allocated Baseline)

IMS for EMD (Product Baseline)

AS for LRIP (Verified Prod.

Baseline)

IMS for FRP (Final Prod. Baseline)

IIMS for LRIP (Verified Prod.

Baseline

AS for FRP (Final Prod. Baseline)

IMS for FRP (Final Prod. Baseline)

Manpower

Facilities (Labs)

Integration Articles

Org. Responsibilities

Funding

Management

Integration

Discipline

Integration TDSfor TD

IMSfor TD

AS for EMD

IMS for EMD (Allocated Baseline)

IMS for EMD (Product Baseline)

AS for LRIP (Verified Prod.

Baseline)

IMS for FRP (Final Prod. Baseline)

IMS for LRIP (Verified Prod.

Baseline

AS for FRP (Final Prod. Baseline)

IMS for FRP (Final Prod. Baseline)

HW

HSI

Mission Threads

SW

High Risk I/F

SoS Lab Integration

Active ICWG for Key Interfaces

SoS Field Integration

TDSfor TD

IMSfor TD

AS for EMD

IMS for EMD (Allocated Baseline)

IMS for EMD (Product Baseline)

AS for LRIP (Verified Prod.

Baseline)

IMS for FRP (Final Prod. Baseline)

IMS for LRIP (Verified Prod.

Baseline

AS for FRP (Final Prod. Baseline)

IMS for FRP (Final Prod. Baseline)

SoS

Integration

% Integration Tasks Late

% Discrepancy Closure during

Integration

% High Risk Internal

Interfaces

Functional

Disciplines

Physical

Management

System Of Systems

Qualitative Checklist Metrics

Quantitative Tracking Metrics

Qualitative and Quantitative Metrics Development

Current Capability

Ready forImplementation

In Development

Future Tools

Current Capability

Ready forImplementation

In Development

Future Tools

Lines of Integrationwithin and

across layers

Functional

Disciplines

Physical

Management

System Of Systems

Page 18: Integration Risk Assessment...Integration Issues 45% of Acquisition Programs have Integration Issues • Integration issues are an underlying cause of many of the shortfalls to DoD

DISTRIBUTION STATEMENT A -- Cleared for public release by OSR on 08 October 2010 -- SR case number #11-S-0046 applies.13th Annual NDIA SE Conf

Oct 2010 Page-18

Qualitative Integration Metrics

Notional Example of Qualitative Checklist Metrics Development

TDSfor TD

IMSfor TD

AS for EMD

IMS for EMD (Allocated Baseline)

IMS for EMD (Product Baseline)

AS for LRIP (Verified Prod.

Baseline)

IMS for FRP (Final Prod. Baseline)

IIMS for LRIP (Verified Prod.

Baseline

AS for FRP (Final Prod. Baseline)

IMS for FRP (Final Prod. Baseline)

Manpower

Facilities (Labs)

Integration Articles

Org. Responsibilities

Funding

Management

Integration

Page 19: Integration Risk Assessment...Integration Issues 45% of Acquisition Programs have Integration Issues • Integration issues are an underlying cause of many of the shortfalls to DoD

DISTRIBUTION STATEMENT A -- Cleared for public release by OSR on 08 October 2010 -- SR case number #11-S-0046 applies.13th Annual NDIA SE Conf

Oct 2010 Page-19

Quantitative Integration Metrics

Notional Example of Quantitative Tracking Metrics Development

Internal

Coupling

Complexity%

Integration

Tasks Late %# Integration Tasks Late to Start or Finish > 1 month

# Total Integration Tasks

% Function

Threads

Validated%

# Function Threads Demonstrated

# Total Function Threads along Nodes/Interfaces

% Discrepancy

Closure during

Integration %# Open Discrepancy Reports during Integration Tasks

# Total Discrepancy Reports

% High Risk

Internal

Interfaces%

# Interfaces rated High Risk

# Total Interfaces (Internal)

% High Risk

SoS

Interfaces%

# Interfaces rated High Risk

# Total Interfaces (External)

# Interfaces (Internal)

# Total Nodes

SoS

Coupling

Complexity

# Interfaces (External)

# Total Nodes

Page 20: Integration Risk Assessment...Integration Issues 45% of Acquisition Programs have Integration Issues • Integration issues are an underlying cause of many of the shortfalls to DoD

DISTRIBUTION STATEMENT A -- Cleared for public release by OSR on 08 October 2010 -- SR case number #11-S-0046 applies.13th Annual NDIA SE Conf

Oct 2010 Page-20

Key Characteristics of Addressing Integration Risk

Time-sensitive Qualitative and Quantitative Integration Metrics

• Sensitive to phases of acquisition Life-Cycle development

• Measures and Threshold expectations on a:

• DAES (3 mo cycle)

• Annual Report cycle

• Milestone cycle

• Planning and execution of integration tasks

• Multi-Dimensional contribution of functions, disciplines, etc.

• Provides Governance

• Indicates rate of change

• Coupling complexity (not all integration is equal)

Page 21: Integration Risk Assessment...Integration Issues 45% of Acquisition Programs have Integration Issues • Integration issues are an underlying cause of many of the shortfalls to DoD

DISTRIBUTION STATEMENT A -- Cleared for public release by OSR on 08 October 2010 -- SR case number #11-S-0046 applies.13th Annual NDIA SE Conf

Oct 2010 Page-21

Path Forward

Institutionalizing Integration Risk Assessment

• Implementing Systems Engineering guidance:

• Socialize “Good” practices to prevent integration issues

• Update Defense Acquisition Program Support (DAPS) methodology

• Emphasize Integration processes and tasks

• Implementing Risk Assessment and Metrics:

• Pilot Program

• Full Scale

• Engage with industry and academia

• Implementing AT&L Affordability Initiatives:

• Early SE

• Execution via Touch points

• Integration as part of RFP’s and Contracts

Page 22: Integration Risk Assessment...Integration Issues 45% of Acquisition Programs have Integration Issues • Integration issues are an underlying cause of many of the shortfalls to DoD

DISTRIBUTION STATEMENT A -- Cleared for public release by OSR on 08 October 2010 -- SR case number #11-S-0046 applies.13th Annual NDIA SE Conf

Oct 2010 Page-22

• Weapon Systems

Acquisition Reform

Act (PL 111-23)

WSARA – Technology

Integration Risk

• SE – Integration

Readiness Level

Integration Risk Overview

• Increased awareness

• Integration Risk

Assessment

Questions

• Program Notable

Efforts

• Department-wide

initiatives

• Annual Report topic

• Formal SE guidance

• Integration metrics

• Tracking/Trending

• Dashboard

• Annual Reporting

FY09 FY10 FY11

Growing consciousness within the Department

of Integration risk and mitigation

Page 23: Integration Risk Assessment...Integration Issues 45% of Acquisition Programs have Integration Issues • Integration issues are an underlying cause of many of the shortfalls to DoD

DISTRIBUTION STATEMENT A -- Cleared for public release by OSR on 08 October 2010 -- SR case number #11-S-0046 applies.13th Annual NDIA SE Conf

Oct 2010 Page-23

For Additional Information

Jim Thompson and Pete Nolte

DDRE/Systems Engineering

Lawrence Gresko,

Larry Schluderberg, and Ray Lowe

Decisive Analytics Corporation703-602-0851 x116

[email protected] | [email protected]

[email protected] | [email protected]

[email protected] | [email protected]

Page 24: Integration Risk Assessment...Integration Issues 45% of Acquisition Programs have Integration Issues • Integration issues are an underlying cause of many of the shortfalls to DoD

DISTRIBUTION STATEMENT A -- Cleared for public release by OSR on 08 October 2010 -- SR case number #11-S-0046 applies.13th Annual NDIA SE Conf

Oct 2010 Page-24

Systems Engineering:Critical to Program Success

Innovation, Speed, and Agilityhttp://www.acq.osd.mil/se