intellitraffic group 7 - progress review
DESCRIPTION
IntelliTraffic Group 7 - Progress Review. Project supervisor: Dr. Chatura De Silva . Group members: Dharmawardana K.A.T.S Rathnayake A.D.S.E. Rodrigo S.A.K.C. Sandeepani L.A.A. Outline. Feasibility study Literature survey Requirement gathering Technologies Risk analysis - PowerPoint PPT PresentationTRANSCRIPT
IntelliTrafficGroup 7 - Progress Review
Project supervisor:
Dr. Chatura De Silva
Group members:
Dharmawardana K.A.T.SRathnayake A.D.S.E. Rodrigo S.A.K.C.Sandeepani L.A.A.
2
OutlineFeasibility studyLiterature surveyRequirement gatheringTechnologiesRisk analysisHow we are going to continue…
3
Feasibility Study
When we came up with the idea…Highly enthusiasticHad a hesitation, weather it would be feasibleMotivations and uncertainties
Feasibility was discussed with relevant experts in the field
We were encouragedSystem will be beneficial to the public
4
Literature SurveyExisting system, UNIROAD 1, was studied
Microcontroller chip has to be replaced to change the signal timing/patterns.
System being developed, UNIROAD 2, was studiedStill at prototype levelConfigurability and flexibility is high
5
Literature SurveyOther existing systems in the world
Autoscope [http://www.autoscope.com]http://www.novosoft-us.comIntelligent Traffic Control System – Ontario,
CanadaMany more…
6
Literature SurveyTheories on traffic control were studied
Presentation slides by Prof. Saman BandaraResearch papers
http://www.geog.buffalo.edu/~jcthill/UGSection12.pdf
http://www.trafficlab.utah.edu Having no IEEE registration was an issue
7
Similar Systems
8
9
10
11
Requirement GatheringSources of requirements
Discussions with Dr. Chatura De. SilvaDiscussions with Mr. Shantha FernandoAppointment with Prof. Saman BandaraStudies done on existing systems
Analysed and summarised those ideas
12
TechnologiesImage processingComputer visionMatlab
Ideal for developing prototypesCost of change is low
C++More powerful and fast
13
Risk AnalysisProject has a fairly large scopeChallenges
To develop a computer vision based system that will function properly under any weather condition
Ambiguities about theories Difficult to clarify all the ambiguities Implementation must be started based on
assumptions
14
How We Are Going to Continue…Identified two main phases in the project
Identification and classification of traffic flowAnalysis of parameters and scheduling signal lights to
optimize traffic flowTwo of us will work on each phase independently
15
Thank you!