INTERCHANGING OF RAILS
A.Gunashekar ADEN .BPQ NAGPUR Division
CENTRAL RAILWAY
1
Cause of Lateral wear
2
• HOW TO INTERCHANGE IN STRAIGHT
3
We can not bodily lift the rail one by one and Shift from Left to Right
• HOW TO INTERCHANGE IN STRAIGHT
4
We can not bodily lift the rail one by one and Shift from Left to Right
200 m
Equal length of 200 m is cut squarely opposite
5
One panel is slewed to the centre of track from LH side to RH
It has slightly shifted to the right side IN THE DIRECTION OF WORK
6
How the panel is moving in the direction of Interchange (Straight)
7
500m
500m
When shifting from LH to RH,
How to Interchange (Straight)
8
500m
500m
How to Interchange (Straight)
9
500m
500m
Length required to form reverse curve is pulled in the direction of work
How to Interchange (Straight)
10
500m
500m
How to Interchange (Straight)
11
500m
500m
How to Interchange (Straight)
12
500m
500m
And the panel has crept to Right side
One panel is slewed to the centre of track from LH side to RH
It has slightly shifted to the right side IN THE DIRECTION OF WORK
13
Snakinglength
Other side panel is slewed over the first to otherside
It has moved ‘s’ distance to the right side
s
14
15
16
17
‘s’ distance is carried to the right side
18
ss
After interchanging the panel has moved in the direction of work ‘s’ distance
19
Sameway the other panel has also moved to the right
Two extra rails are to be replacedFour extra cuts are to be provided
s
20
Snaking length s =60mm
21
500 m
Equal length of 500 m is cut out of square by 60mm opposite
60mm 60mm
22
One panel is slewed to the centre of track from RH side to LH
It has slightly shifted to the left side IN THE DIRECTION OF WORK
23
Other side panel is slewed over the first to otherside
It has moved ‘s’ distance to the right side
24
25
26
‘s’ distance is carried to the right side
27
‘s’ distance is carried to the right side
28
ss
After interchanging the panel has moved in the direction of work ‘s’ distance
No extra rail replacement & no extra cut is involved
29
200 m
200 m
LG/R
Interchanging of panels in curve
Para.424 IRPWM Outer length of Railis longer than inner Rail by LG/R
30
LG/R increasing against the direction of progress
32
33
How to start interchange in CURVE
We can not bodily lift the rail one by one and Shift from Left to RightLike in this animation
34
How to start interchange in CURVE
200 m
200 m
35
Outside panel is slewed to CENTRE OF TRACK . from LH to RH
LG/R gap is left at LH and LG/R extended at RH
200 m
200 m
36
Inside panel is slewed outside from LH to RH
200 m
200 m
37
200 m
200 m
LG/R
38
200 m
200 m
39
LG/R
200 m
200 m
40
200 m
200 m
41
LG/R
200 m
200 m
42
200 m
200 m
43
200 m
200 m
Sameway the other panel has also moved to the right
Four extra rails are to be replacedFour extra cuts are to be provided
44
LG/R
LG/R + La T - S
L T - S
45
Marking of cut locations at starting
46
200 m
200 m
LG/R
Equal length of 200 m is cut out of square by LG/R.To your surprise Far end cuts will become square.
47
200 m
200 m
48
Outside panel is slewed to CENTRE OF TRACK . from LH to RH
200 m
200 m
49
Inside panel is slewed Outside from LH to RH
200 m
200 m
50
200 m
200 m
No extra rail replacement & no extra cut is involved
51
Criteria for Interchanging• On Curve when lateral wear exceeds 8mm• On Straight when cyclic wear exceeds 6mm• On Straight when half service life of rail has passed• Corrosion prone area where rail flange corrosion under liner’s seat is predominant
on inside. Conversion of SWR in to LWR (also in Tunnels). Conversion of 3 rail panel into 20 rail panel in Ghat (Under trial to avoid excessive creep)
52
Clueless Interchanging andBursting of Block
53
Clueless Interchanging andBursting of Block
• Without PLANNING ,if the Interchanging is carried out by deploying labours at both ends,
the rail will buckle as it reaches the centre of panel, as shown in figure.
First keep the Outer rail at middle of track,then the Inner rail to outside of curve.
54
Snaking length s =21.6mm
55
Different Locations
• 1. On Curves (In SWR)• a) With Square Joints • b) With Mid Staggered (Sharp Curves)
• 2. On Straight (LWR)• 3. On Curve (LWR)
56
FACTORS AFFECTING THE LENGTH
• 1. LG/R increasing against the direction of progress
• 2. Snaking effect in the direction of progress
• 3.L T against the direction of progress• 4. Welding Gap
57
d =La T
Rail Length Coeff.of expansion
Temp Variation
Change in Length
52Kg 100m 1.152X10-5 100 C 11.5mm 60Kg 100m 1.152X10-5 100 C 11.5mm
60
D =Lat
Consider 1 Km track with reverse curves of 300 m long each and 400m straight
• 1. The 300m of I st curve got to be Inter changed due to excessive side wear in LH rail
• 2. The 300m of II nd curve got to be Inter changed due to excessive side wear in RH rail
• 3.In the second Interchanging the 300m of I st curve got to be Inter changed due to excessive side wear in LH rail, for which I st or II nd class rails shall be arranged.
• 4.The released panel of the above shall be dollied to II nd curve and the second Interchanging shall be done
• 5. The released panel of the above shall be dollied to straight portion of the track and replaced .And the released rail can be kept reserved for future Interchanging.
61
Advantages
• Safety• 1.Rail profile can be controlled and monitored• 2. GFC defects are avoided from propagation.• Economy• 3. Number of welded joints are reduced• 4.Optimum use of rail
62
300 m
280 m
LG/R
63
At the mid of curve make two cuts on inner and outer rails in perfect square with each other
Measure equal distance ,up to where the rail is worn and got to be Interchanged on both rails and make cuts on both rails.
300 m
280 m
Keep the outer rail at the centre of track starting from LH end
Take the inner rail to the outer side over the rail at centre of track from LH end
Shift rail at the centre of track to the inner side from LH end
Same way the RH side of curve is Interchanged from RH end
NO CALCULATION AND NO THEORY
Follow the steps below to Interchange any curve without closure rails
64