Interface and Configuration Management Outline. CF Engineering Group and IMT Roles Design Changes since last FAC RFI’s and Submittals Status On-Going and Upcoming Activities Issues and Concerns Summary. CF Engineering Group. RFI’s. UTR. Installation. IMT. Interfaces. Submittals. - PowerPoint PPT Presentation

TRANSCRIPT

Page 1: Interface and Configuration Management  Outline

Javier A. Sevilla

Interface & Configuration Mgmt [email protected]

FAC Review April 16, 20071

Interface and Configuration Management Outline

CF Engineering Group and IMT Roles

Design Changes since last FAC

RFI’s and Submittals Status

On-Going and Upcoming Activities

Issues and Concerns

Summary

Page 2: Interface and Configuration Management  Outline

Javier A. Sevilla

Interface & Configuration Mgmt [email protected]

FAC Review April 16, 20072

CF Engineering Group

UTR

IMT

Design

RFI’s

Installation

Inspections

InterfacesSubmittals

Page 3: Interface and Configuration Management  Outline

Javier A. Sevilla

Interface & Configuration Mgmt [email protected]

FAC Review April 16, 20073

Organization CF Engineering Group

Engineers-TBD

D. Saenz-CF System Manager

D. McDonald-Deputy

See J. Albino presentation for complete Chart

J. Cranston

J. Gong

J. Albino-Associate Director Civil Construction

A. Comelo

M. ZyrubaProject Engineer

UTR

Electrical

Lori Shewchuk

Structural

Ken Yang

Group Leader

Javier A. Sevilla

Electrical/CEF

Karen Chan-Hui

AE’s (MTH)

Page 4: Interface and Configuration Management  Outline

Javier A. Sevilla

Interface & Configuration Mgmt [email protected]

FAC Review April 16, 20074

Roles and Responsibilities

CF LCLS Engineering GroupCoordination of design with A/E firms (JE, MTH,etc)

Primary interface with Physics requirements for CF changes

Interface with Jacobs Title III Support

Interface with Turner Co. for RFI’s, Submittals, etc.

Design of small engineering projects for Tech. Systems

Coordination with Integration Management Team (IMT) members

Interface and coordination of Engineering issues with SLAC Departments (Fire Marshal, CEF, ES&H, Building Inspection Office (BIO), etc)

Page 5: Interface and Configuration Management  Outline

Javier A. Sevilla

Interface & Configuration Mgmt [email protected]

FAC Review April 16, 20075

Design Changes since last FAC

Design Change Requests (DCR) Approved (scope and funding)Service Buildings Power: IMT-DCR-1006-01 (Controls-CF)Offset Mirror support pad relocation: IMT-DCR-1006-02 (XTOD/XES-CF)Electron Beam dump: IMT-DCR-1106-01 (Linac-CF)NEH Concrete Wall Penetrations: IMT-DCR-020701 (XTOD/XES-CF)BTH West Room Data Sheets (RDS) (CF-all)

DCRs in process FEE Electrical Alcove: IMT-DCR-0307-01 (XTOD/XES-CF) NEH Floor Plan Re-design (XTOD/XES-CF) LCW for LTU (PM/Linac-CF)

OthersCLOC De-scopingIssues being worked

PPS requirements for CF (lighting controls, AC power, HVAC/ventilation controls, etc)Concrete floor anchor installations

See R. M. Boyce Talk for Details

Page 6: Interface and Configuration Management  Outline

Javier A. Sevilla

Interface & Configuration Mgmt [email protected]

FAC Review April 16, 20076

CF Configuration Management

Interface Control Documents (ICD’s), ESD

JE Construction Bulletins:

CB#1 and CB#2- VE’s

CB# 3-Mirror Foundation, Fire Hazard Analysis Updates

CB# 4-Electrical duct bank across EBD area

CB# 5-Electron Beam Dump Mods and FEE wall

Approvals (WAF, ESH, etc) for all design documents by AE consultants (JE, MTH, etc.)

Release of APPROVED drawings and specifications by LCLS QA

All documentation (drawings and Specs) on LCLS Share point Web Server

Submittals and shop drawings review (Approvals, JE, CF LCLS, ESH, CEF, etc.)

Integration Management Team (IMT) Process for DCR’s

Page 7: Interface and Configuration Management  Outline

Javier A. Sevilla

Interface & Configuration Mgmt [email protected]

FAC Review April 16, 20077

RFI’s and Submittal Process

All RFI documentation via Turner Talk (access CF LCLS, JE and Subcontractors)Daily Coordination with JE Title III on-site liaison and Project Engineers from Turner ConstructionWeekly meetings (Turner, JE and LCLS) to review and set priorities on RFI’sInternal Coordination with CF LCLS and other SLAC Department to respond to RFI’sSubmittals (electronic and hard copies)Quick Review of Submittals prior sending them to JE

Page 8: Interface and Configuration Management  Outline

Javier A. Sevilla

Interface & Configuration Mgmt [email protected]

FAC Review April 16, 20078

RFI’s and Submittals Status

RFI’sBidding: 181,Re-opened: 49

Construction: 300, Re-opened: 59 (as April 16-07)

Submittals:177

Page 9: Interface and Configuration Management  Outline

Javier A. Sevilla

Interface & Configuration Mgmt [email protected]

FAC Review April 16, 20079

CF Design and Coordination Activities

Being Implemented:

Linac Electrical Upgrades (S21-S30)

Electrical Feeder to BTH

CUP/FEH substation 12.47kV

RFI responses FCO

Coordination 2007 SLAC shutdown

Temporary Power (12.4kV, 480 volts)

Steel Plates (EBD, FEE)

S20-MEP designs-100%

Upcoming:

BTH West and Service Buildings Design

Gas Piping to CUP

Power feeders to racks

Cold Baffle CF Infrastructure

PCW in FEE

CF activities in Installation schedule

Data/Phone cable backbone installation

Power to PPS

Page 10: Interface and Configuration Management  Outline

Javier A. Sevilla

Interface & Configuration Mgmt [email protected]

FAC Review April 16, 200710

Commissioning of LCLS Infrastructure

Commissioning of SystemsDevelop SOW for prospective bidders

Implement JE Commissioning Plan

Establish Commissioning TeamCommissioning Authority (CA)

Turner MEP Coordinator, Art Pimentel

Subcontractors ( Mechanical, HVAC Controls, Electrical, Fire Alarm, Fire Protection, etc)

SLAC Conventional and Experimental Facilities (CEF)

Transfer ALL systems to CEF after BO

Page 11: Interface and Configuration Management  Outline

Javier A. Sevilla

Interface & Configuration Mgmt [email protected]

FAC Review April 16, 200711

Issues and Concerns

A lot of activities and limited resourcesChanges from Technical SystemsRFI’S and Change Requests from SubcontractorsMulti-tasking (engineering, coordination, UTR support, IMT, SLAC Depts.) Small changes take time and resources!

Quality of engineering support to the construction activities and changes (due time and resources)

Page 12: Interface and Configuration Management  Outline

Javier A. Sevilla

Interface & Configuration Mgmt [email protected]

FAC Review April 16, 200712

Interface and Configuration Management SUMMARY

Engineering TEAM is in place, coordinating designs, and

providing support to Construction Activities and Technical

Systems.

Engineering Group in the primary interface between ALL

technical systems, A/E consultants, Turner, SLAC

Departments: ESH, CEF, etc.

Questions? THANKS

Page 13: Interface and Configuration Management  Outline

Javier A. Sevilla

Interface & Configuration Mgmt [email protected]

FAC Review April 16, 200713

END

Page 14: Interface and Configuration Management  Outline

Javier A. Sevilla

Interface & Configuration Mgmt [email protected]

FAC Review April 16, 200714

Reference Slides

Following are some slides being provided for Quick Reference

Page 15: Interface and Configuration Management  Outline

Javier A. Sevilla

Interface & Configuration Mgmt [email protected]

FAC Review April 16, 200715

Integration Management Team (IMT)

PMD 1.1-028

D.Saenz

J.Turner

H.Tompkins

J.Sevilla

R.M Boyce

D.Marsh

IMT is in place

and working! R.PopeR. Fuller

Page 16: Interface and Configuration Management  Outline

Javier A. Sevilla

Interface & Configuration Mgmt [email protected]

FAC Review April 16, 200716

CF Configuration Management

Documentation is available to ALL LCLS Collaborators

Drawings and Specs

in PDF

Page 17: Interface and Configuration Management  Outline

Javier A. Sevilla

Interface & Configuration Mgmt [email protected]

FAC Review April 16, 200717

Web Based Storage and Communication Tool

Documentation from Turner

https://sharepoint.slac.stanford.edu/sites/

LCLS%20Document%20Storage/01%20-%20LCLS%20Systems/ConvFac%20External/Turner/default.aspx

Page 18: Interface and Configuration Management  Outline

Javier A. Sevilla

Interface & Configuration Mgmt [email protected]

FAC Review April 16, 200718

Web Based Storage and Communication Tool

Documentation from Jacobs

https://sharepoint.slac.stanford.edu/sites/

LCLS%20Document%20Storage/01%20-%20LCLS%20Systems/ConvFac%20External/Jacobs/default.aspx