© The INTERPLAN Consortium
EU H2020 Programme GA No. 773708
INTERPLAN - INTEgrated opeRation PLANning
tool towards the pan-European network
IRED 2018 - Side Event Workshop: “Grid control for inverter dominated
power systems”
Vienna, Austria, 17th October 2018
INTERPLAN Project Coordinator Dr. Giorgio Graditi &
Dr. Maria Valenti / ENEA
17/10/2018 1
© The INTERPLAN Consortium
EU H2020 Programme GA No. 773708
SUMMARY
2 17/10/2018 IRED 2018
Background
The INTERPLAN Idea
INTERPLAN in a nutshell
General information
The INTERPLAN Advisory Board
Technical objectives
Methodology
Pert Chart
Mindmap
Project Timeline
Impacts
© The INTERPLAN Consortium
EU H2020 Programme GA No. 773708
BACKGROUND
The operation of the internal electricity
markets is becoming ever more
connected with neighboring ones.
Stability, security and efficiency must
be ensured at a higher hierarchical level
than at national one, managing the local
grid as part of a wider interconnected
network.
3 17/10/2018 IRED 2018
Moving towards a pan-European electricity network
introduces new challenges for the networks.
© The INTERPLAN Consortium
EU H2020 Programme GA No. 773708
Novel solutions are required to support
the network operation in order to ensure
the security of supply.
New rules and management/control
systems are necessary to interface the
many European TSOs and DSOs.
Best practices become necessary to
integrate emerging technologies (e.g.
renewables) to support the EU in reaching
the expected low-carbon targets while
maintaining network security and
reliability.
4 17/10/2018 IRED 2018
Moving towards a pan-European electricity network
introduces new challenges for the networks.
BACKGROUND
© The INTERPLAN Consortium
EU H2020 Programme GA No. 773708
TSOs will have to evolve progressively
from a “business as usual approach” to a
“proactive approach”.
DSOs will need to actively manage and
operate a smarter grid through
appropriate system control logics, by
using the grid’s and consumers’ flexibility
potential.
A closer cooperation between TSOs
and DSOs is needed to address several
operational challenges such as congestion
of transmission-distribution interface.
5 17/10/2018 IRED 2018
Moving towards a pan-European electricity network
introduces new challenges for the networks.
BACKGROUND
© The INTERPLAN Consortium
EU H2020 Programme GA No. 773708
THE INTERPLAN IDEA
6 17/10/2018 IRED 2018
The increasing complexity of the grids requires control and
operation planning tools even more advanced and homogenous
among European nations
With these beliefs, the idea was born
© The INTERPLAN Consortium
EU H2020 Programme GA No. 773708 7 17/10/2018 IRED 2018
The increasing complexity of the grids requires control and
operation planning tools even more advanced and homogenous
among European nations
THE INTERPLAN IDEA
© The INTERPLAN Consortium
EU H2020 Programme GA No. 773708 8 17/10/2018 IRED 2018
The increasing complexity of the grids requires control and
operation planning tools even more advanced and homogenous
among European nations
THE INTERPLAN IDEA
© The INTERPLAN Consortium
EU H2020 Programme GA No. 773708 9 17/10/2018 IRED 2018
The increasing complexity of the grids requires control and
operation planning tools even more advanced and homogenous
among European nations
THE INTERPLAN IDEA
© The INTERPLAN Consortium
EU H2020 Programme GA No. 773708 10
Innovative grid operation planning tool for the novel pan-European grid
17/10/2018 IRED 2018
INTERPLAN IN A NUTSHELL
© The INTERPLAN Consortium
EU H2020 Programme GA No. 773708 11
Innovative grid operation planning tool for the novel pan-European grid
A tool for all network control levels from transmission to distribution with a focus on TSO-DSO interfaces
17/10/2018 IRED 2018
INTERPLAN IN A NUTSHELL
© The INTERPLAN Consortium
EU H2020 Programme GA No. 773708 17/10/2018 IRED 2018 12
Innovative grid operation planning tool for the novel pan-European grid
A tool for all network control levels from transmission to distribution with a focus on TSO-DSO interfaces
Innovative approach for the future low-carbon electricity grid
INTERPLAN IN A NUTSHELL
© The INTERPLAN Consortium
EU H2020 Programme GA No. 773708 13
Innovative grid operation planning tool for the novel pan-European grid
A tool for all network control levels from transmission to distribution with a focus on TSO-DSO interfaces
Innovative approach for the future low-carbon electricity grid
Technical and regulatory assessment of the European electricity grid
17/10/2018 IRED 2018
INTERPLAN IN A NUTSHELL
© The INTERPLAN Consortium
EU H2020 Programme GA No. 773708
GENERAL INFORMATION
Call: H2020 – LCE – 05 -2017
Type of Action: RIA
Number: 773708
Duration: 36 months
Starting date: 1 November 2017
Total Budget: € 2,964,362.50
Partners: 6 from 5 European
countries: Austria, Cyprus, Germany,
Italy and Poland
14 17/10/2018 IRED 2018
Targeted Area: Novel European grid and end-to-end energy system planning
tools, including foreseeable features such as storage, aggregation, demand-
response and integrating cost aspects;
© The INTERPLAN Consortium
EU H2020 Programme GA No. 773708
Call: H2020 – LCE – 05 -2017
Type of Action: RIA
Number: 773708
Duration: 36 months
Starting date: 1 November 2017
Total Budget: € 2,964,362.50
Partners: 6 from 5 European
countries: Austria, Cyprus, Germany,
Italy and Poland
15 17/10/2018 IRED 2018
GENERAL INFORMATION
© The INTERPLAN Consortium
EU H2020 Programme GA No. 773708
Call: H2020 – LCE – 05 -2017
Type of Action: RIA
Number: 773708
Duration: 36 months
Starting date: 1 November 2017
Total Budget: € 2,964,362.50
Partners: 6 from 5 European
countries: Austria, Cyprus, Germany,
Italy and Poland
16 17/10/2018 IRED 2018
A MULTI-DISCIPLINARY, MULTI-
OBJECTIVE CONSORTIUM,
REPRESENTATIVE OF THE CROSS-
CUTTING SECTORS ON THE ELECTRICITY
AND SMART GRID VALUE CHAIN.
ALL MEMBERS OF THE EUROPEAN
ENERGY RESEARCH ALLIANCE –
JOINT PROGRAMME ON SMART
GRIDS
GENERAL INFORMATION
© The INTERPLAN Consortium
EU H2020 Programme GA No. 773708 17
The AB provides a space
for external members to
participate in the
INTERPLAN project
17/10/2018 IRED 2018
ADVISORY BOARD & STAKEHOLDERS
© The INTERPLAN Consortium
EU H2020 Programme GA No. 773708 18
The AB provides a space
for external members to
participate in the
INTERPLAN project
17/10/2018 IRED 2018
Would you like to contribute to enhancing Europe's future grid
operation?
Then contact us!
INTERPLAN exercises the novel approach of actively involving external
stakeholders in a series of targeted workshops in order to validate and
complement project recommendations on regulations and grid rules. This
strategy is the key to actual adoption and further exploitation in the market.
ADVISORY BOARD & STAKEHOLDERS
© The INTERPLAN Consortium
EU H2020 Programme GA No. 773708 19
The AB provides a space
for external members to
participate in the
INTERPLAN project
17/10/2018 IRED 2018
INTERPLAN exercises the novel approach of actively involving external
stakeholders in a series of targeted workshops in order to validate and
complement project recommendations on regulations and grid rules. This
strategy is the key to actual adoption and further exploitation in the market.
ADVISORY BOARD & STAKEHOLDERS
DSO
INDUSTRY
DSO/
INDUSTRY
PUBLIC
RESEARCH
ALLIANCE
UNIVERSITY
& RESEARCH
GROUP
© The INTERPLAN Consortium
EU H2020 Programme GA No. 773708
Provide a methodology for proper representation of a
“clustered” model of the pan-European network
Generate grid equivalents as a growing library able to
cover all relevant system connectivity possibilities
occurring in the real grid
Address operation planning issues at all network
levels (transmission, distribution and TSO-DSO
interfaces)
Investigate novel control strategies and operation
planning approaches in order to ensure the security
of supply and flexibility of the interconnected EU
electricity grids, based on a close cooperation
between TSOs and DSOs
25
TECHNICAL OBJECTIVES
EQU
IVA
LENT
MO
DELS
CO
NTR
OL TO
OLS
CLUSTERING
GRID EQUIVALENTING
USE CASES
SIMULATING
TESTING
VALIDATING
17/10/2018 IRED 2018
© The INTERPLAN Consortium
EU H2020 Programme GA No. 773708
I
Scenarios describe the future
situation of the European electric
network, typically including grid
topology, generation mix, loads
and diffusion of EV, RES and
storages.
26
METHODOLOGY
17/10/2018 IRED 2018
Surveying the
future Energy
scenarios
Identification of
scenarios fitting
the concept of
the project
© The INTERPLAN Consortium
EU H2020 Programme GA No. 773708
I
INTERPLAN SCENARIOS:
1) Big market
2) Small & Local
3) Large scale RES
4) 100% RES
27
METHODOLOGY
17/10/2018 IRED 2018
Surveying the
future Energy
scenarios
Identification of
scenarios fitting
the concept of
the project
© The INTERPLAN Consortium
EU H2020 Programme GA No. 773708 29
USE CASE
Specification of a set of actions
performed by a system, which yields
an observable result that is, typically,
of value for one or more actors or
other stakeholders of the system.
[ISO/IEC 19505-2:2012].
PLANNING CRITERIA Examples:
1) minimizing losses
2) minimizing costs
3) maximize DG/DRES contribution
to ancillary services
4) minimizing energy interruptions
METHODOLOGY
17/10/2018 IRED 2018
Surveying the
future Energy
scenarios
Identification of
scenarios fitting
the concept of
the project
Identification
of use cases
Identification of
requirements
Identification of
planning criteria
© The INTERPLAN Consortium
EU H2020 Programme GA No. 773708 30
METHODOLOGY
17/10/2018 IRED 2018
Surveying the
future Energy
scenarios
Identification of
scenarios fitting
the concept of
the project
Identification
of use cases
Identification of
requirements
Identification of
planning criteria
© The INTERPLAN Consortium
EU H2020 Programme GA No. 773708 31
Showcase is the presentation of
use case(s) in the frame of chosen
scenario. Different showcases will
be established based on operation
planning criteria and varying
behavior of power system objects
subject to planning.
METHODOLOGY
17/10/2018 IRED 2018
Surveying the
future Energy
scenarios
Identification of
scenarios fitting
the concept of
the project
Identification
of use cases
Identification of
requirements
Identification of
planning criteria
Definition of show cases
© The INTERPLAN Consortium
EU H2020 Programme GA No. 773708 32
Semi-dynamic simulations of grid
equivalents will be performed for
each identified showcase to detect
operation challenges.
METHODOLOGY
17/10/2018 IRED 2018
Surveying the
future Energy
scenarios
Identification of
scenarios fitting
the concept of
the project
Identification
of use cases
Identification of
requirements
Identification of
planning criteria
Definition of show cases
Identification of operation
challenges
© The INTERPLAN Consortium
EU H2020 Programme GA No. 773708 33
Semi-dynamic simulations of grid
equivalents will be performed for
each identified showcase to detect
operation challenges.
METHODOLOGY
17/10/2018 IRED 2018
Surveying the
future Energy
scenarios
Identification of
scenarios fitting
the concept of
the project
Identification
of use cases
Identification of
requirements
Identification of
planning criteria
Definition of show cases
Identification of operation
challenges
© The INTERPLAN Consortium
EU H2020 Programme GA No. 773708 34
A controller will be developed to
solve each operation challenge in
the specific show case, applying
adequate intervention measures
through cluster controllers and/or
interface controllers.
METHODOLOGY
17/10/2018 IRED 2018
Surveying the
future Energy
scenarios
Identification of
scenarios fitting
the concept of
the project
Identification
of use cases
Identification of
requirements
Identification of
planning criteria
Definition of show cases
Identification of operation
challenges
Controllers development
© The INTERPLAN Consortium
EU H2020 Programme GA No. 773708 35
METHODOLOGY
17/10/2018 IRED 2018
Surveying the
future Energy
scenarios
Identification of
scenarios fitting
the concept of
the project
Identification
of use cases
Identification of
requirements
Identification of
planning criteria
Definition of show cases
Identification of operation
challenges
Controllers development
© The INTERPLAN Consortium
EU H2020 Programme GA No. 773708 36
METHODOLOGY
17/10/2018 IRED 2018
Surveying the
future Energy
scenarios
Identification of
scenarios fitting
the concept of
the project
Identification
of use cases
Identification of
requirements
Identification of
planning criteria
Definition of show cases
Identification of operation
challenges
Controllers development
DEVELOPMENT, SIMULATION & TESTING
VALIDATION
© The INTERPLAN Consortium
EU H2020 Programme GA No. 773708 37
Grid equivalenting is the process to
generate a grid equivalent model
encompassing a large part of
network substituted by a smaller
counterpart having the same
relevant properties.
A Grid Equivalent approximately
behaves like an associated complex
physical network or a group of
physical networks. The grid
equivalent thus is a representation of
the physical network(s), which is
typically used for a simulation
experiment.
Cluster is a part of a grid OR a
group of grids which are represented
by a specific grid equivalent.
GRID EQUIVALENTING
17/10/2018 IRED 2018
© The INTERPLAN Consortium
EU H2020 Programme GA No. 773708
Taking into account all voltage levels in an integrated top-
down approach.
Building a bridge between static, long-term planning, and
the operation planning.
Focusing the attention on specific issues occurring at TSO-
DSO interfaces.
Developing control system logics which suit the complexity
of the integrated grid through cluster and/or interface
controllers.
Managing all relevant flexibility resources as “local active
elements” involving DSOs in the balancing process.
38 17/10/2018 IRED 2018
GRID EQUIVALENTING
© The INTERPLAN Consortium
EU H2020 Programme GA No. 773708 39
INTERPLAN works in integrated way at different voltage levels.
17/10/2018 IRED 2018
GRID EQUIVALENTING
© The INTERPLAN Consortium
EU H2020 Programme GA No. 773708 40
Strong interrelation among Tasks and WPs
In some cases, results come back to previous WPs to improve and correct the tool
components development
PERT CHART
17/10/2018 IRED 2018
© The INTERPLAN Consortium
EU H2020 Programme GA No. 773708
MINDMAP
41
WP2 WP4
WP3
WP5
WP6
17/10/2018 IRED 2018
© The INTERPLAN Consortium
EU H2020 Programme GA No. 773708
PROJECT TIMELINE
42 17/10/2018 IRED 2018
© The INTERPLAN Consortium
EU H2020 Programme GA No. 773708
Handling efficiently and effectively intermittent RES, and
emerging technologies (Storage, Demand Response, EVs).
Planning, development and operation from a technology neutral
view, allowing active contributions throughout the network hence in
support of the ongoing policy developments.
Via effective cluster and interfacing controllers INTERPLAN
contributes to the objectives for building one single energy
network within the interconnected Europe allowing the
contributing benefits of complementary energy networks to the
electricity network
Planning and operation of an integrated grid from the European
perspective without losing the myriad benefits of distributed
resources.
IMPACTS
43 17/10/2018 IRED 2018
© The INTERPLAN Consortium
EU H2020 Programme GA No. 773708 44
Dr. Maria Valenti, Ph.D Researcher @ ENEA Research Centre, Italy [email protected]
17/10/2018 IRED 2018
© The INTERPLAN Consortium
EU H2020 Programme GA No. 773708 45
Dr. Maria Valenti, Ph.D Researcher @ ENEA Research Centre, Italy [email protected]
17/10/2018 IRED 2018
SEE YOU AT