The New York City Green
Infrastructure Program
Intro, Challenges, and Solutions
Lower Hudson Coalition of Conservation Districts
Southeast New York Stormwater Conference
October 18, 2017
Adriana Kocovic, New York City Department of Environmental Protection
Erin Cuddihy, New York City Department of Transportation
![Page 2: Intro, Challenges, and Solutions · Adriana Kocovic New York City Department of Environmental Protection Accountable Manager, Green Infrastructure Program akocovic@dep.nyc.gov Erin](https://reader036.vdocuments.net/reader036/viewer/2022062303/5fce34347a08771d4124e2e6/html5/thumbnails/2.jpg)
2
NYC Sewer System Overview
• 7,400 total miles of sewers
• 3,337 miles of combined sewer
• 14 Wastewater Treatment Plants
• Over 400 combined sewer outfalls
![Page 3: Intro, Challenges, and Solutions · Adriana Kocovic New York City Department of Environmental Protection Accountable Manager, Green Infrastructure Program akocovic@dep.nyc.gov Erin](https://reader036.vdocuments.net/reader036/viewer/2022062303/5fce34347a08771d4124e2e6/html5/thumbnails/3.jpg)
3
Consent Order to Reduce CSOs
In 2012, DEP and NYS Department of Environmental Conservation (DEC)
signed an Amended Consent Order.
Commitment to spend $1.5 billion to manage 1” of stormwater runoff from
10% of impervious surfaces in combined sewer areas by 2030.
![Page 4: Intro, Challenges, and Solutions · Adriana Kocovic New York City Department of Environmental Protection Accountable Manager, Green Infrastructure Program akocovic@dep.nyc.gov Erin](https://reader036.vdocuments.net/reader036/viewer/2022062303/5fce34347a08771d4124e2e6/html5/thumbnails/4.jpg)
4
Priority Areas and Area-wide Approach
The area-wide approach allows DEP to:
• Focus resources on selected CSO tributary
areas (Priority Areas)
• Saturate these CSO tributary areas with as
much GI as practical
• Achieve efficiencies through standard
designs, specifications and procedures
![Page 5: Intro, Challenges, and Solutions · Adriana Kocovic New York City Department of Environmental Protection Accountable Manager, Green Infrastructure Program akocovic@dep.nyc.gov Erin](https://reader036.vdocuments.net/reader036/viewer/2022062303/5fce34347a08771d4124e2e6/html5/thumbnails/5.jpg)
5
Interagency Collaboration
Bi-weekly meetings and constant communication between agencies
Agency GI Responsibilities
DEP Stormwater capture effectiveness
Citywide GI program management
Area-wide contract management
Maintenance
DOT Maintaining street and sidewalk use
Roadway safety
DPR Planting and transplanting trees
Plant health
Area-wide contract management
DDC Contracting
Construction Management
Area-wide contract management
EDC Area-wide contract management
![Page 6: Intro, Challenges, and Solutions · Adriana Kocovic New York City Department of Environmental Protection Accountable Manager, Green Infrastructure Program akocovic@dep.nyc.gov Erin](https://reader036.vdocuments.net/reader036/viewer/2022062303/5fce34347a08771d4124e2e6/html5/thumbnails/6.jpg)
6
ROW Green Infrastructure
Stormwater is captured in green infrastructure installations before reaching catch basins,
reducing stormwater in the combined sewers and combined sewer overflows.
ROW Rain Garden (ROWRG)
Fully within sidewalkStormwater Green Street (SGS)
Bumped out into street
Original Designs
![Page 7: Intro, Challenges, and Solutions · Adriana Kocovic New York City Department of Environmental Protection Accountable Manager, Green Infrastructure Program akocovic@dep.nyc.gov Erin](https://reader036.vdocuments.net/reader036/viewer/2022062303/5fce34347a08771d4124e2e6/html5/thumbnails/7.jpg)
7
Challenges
Numerous inter-agency and intra-agency challenges
in GI implementation
Space constraints
Review Durations
Maintenance
GI in Other Agencies’ Projects
Guidelines from Multiple Agencies
Public Acceptance
Site Identification
![Page 8: Intro, Challenges, and Solutions · Adriana Kocovic New York City Department of Environmental Protection Accountable Manager, Green Infrastructure Program akocovic@dep.nyc.gov Erin](https://reader036.vdocuments.net/reader036/viewer/2022062303/5fce34347a08771d4124e2e6/html5/thumbnails/8.jpg)
8
Space ConstraintsP
rob
lem
Solu
tion New design: “Infiltration Basins” Can site closer to furnishings and in
clear pathGrass-top
Concrete-top Rain gardens with trees are still the first choice
Fits in existing context
Pedestrian clear path requirements Gates
ADA Signs
Doorways Benches
Street furnishings in sidewalk Trees and tree canopies
Driveways Etc…
![Page 9: Intro, Challenges, and Solutions · Adriana Kocovic New York City Department of Environmental Protection Accountable Manager, Green Infrastructure Program akocovic@dep.nyc.gov Erin](https://reader036.vdocuments.net/reader036/viewer/2022062303/5fce34347a08771d4124e2e6/html5/thumbnails/9.jpg)
9
New Designs: “Infiltration Basin”
Space Constraints: Solution
![Page 10: Intro, Challenges, and Solutions · Adriana Kocovic New York City Department of Environmental Protection Accountable Manager, Green Infrastructure Program akocovic@dep.nyc.gov Erin](https://reader036.vdocuments.net/reader036/viewer/2022062303/5fce34347a08771d4124e2e6/html5/thumbnails/10.jpg)
10
Site IdentificationP
roble
mS
olu
tion “Self-certification” for DOT and DPR Checklists and photo logs
Consultants perform walkthroughson agencies’ behalf
Up to 5 walkthroughs/day
All agencies attending walkthroughs was slow
Limited siting to a few walkthroughs/week
![Page 11: Intro, Challenges, and Solutions · Adriana Kocovic New York City Department of Environmental Protection Accountable Manager, Green Infrastructure Program akocovic@dep.nyc.gov Erin](https://reader036.vdocuments.net/reader036/viewer/2022062303/5fce34347a08771d4124e2e6/html5/thumbnails/11.jpg)
11
Site Identification: Solution
![Page 12: Intro, Challenges, and Solutions · Adriana Kocovic New York City Department of Environmental Protection Accountable Manager, Green Infrastructure Program akocovic@dep.nyc.gov Erin](https://reader036.vdocuments.net/reader036/viewer/2022062303/5fce34347a08771d4124e2e6/html5/thumbnails/12.jpg)
12
Review Durations
DOT and DPR internal reviews taking too long
Pro
ble
mS
olu
tion DOT Borough Engineering training
for DOT GI staff DPR GI employees trained and dedicated to providing GI reviews on DPR’s behalf
Identify signs that can be relocated
![Page 13: Intro, Challenges, and Solutions · Adriana Kocovic New York City Department of Environmental Protection Accountable Manager, Green Infrastructure Program akocovic@dep.nyc.gov Erin](https://reader036.vdocuments.net/reader036/viewer/2022062303/5fce34347a08771d4124e2e6/html5/thumbnails/13.jpg)
13
Review Durations: Solution
Determination: Signs cannot be moved
Determination: OK to site in “No Standing Anytime” zone
![Page 14: Intro, Challenges, and Solutions · Adriana Kocovic New York City Department of Environmental Protection Accountable Manager, Green Infrastructure Program akocovic@dep.nyc.gov Erin](https://reader036.vdocuments.net/reader036/viewer/2022062303/5fce34347a08771d4124e2e6/html5/thumbnails/14.jpg)
14
Public AcceptanceP
roble
mS
olu
tion Updated standard designs to include
GI assets with flush surfaceIncreased emphasis on public outreach: CB meetings, letters, phone calls, door hangers
Opt-out being developed
Mobility challenges
Preference for the status quo
![Page 15: Intro, Challenges, and Solutions · Adriana Kocovic New York City Department of Environmental Protection Accountable Manager, Green Infrastructure Program akocovic@dep.nyc.gov Erin](https://reader036.vdocuments.net/reader036/viewer/2022062303/5fce34347a08771d4124e2e6/html5/thumbnails/15.jpg)
15
Public Acceptance: Solution
Opt-out program
![Page 16: Intro, Challenges, and Solutions · Adriana Kocovic New York City Department of Environmental Protection Accountable Manager, Green Infrastructure Program akocovic@dep.nyc.gov Erin](https://reader036.vdocuments.net/reader036/viewer/2022062303/5fce34347a08771d4124e2e6/html5/thumbnails/16.jpg)
16
Guidelines from Multiple Agencies
Multi-agency combined siting guidelines for GI consultants
Pro
ble
mS
olu
tion
Consultants must consider DEP, DOT, DPR siting requirements
![Page 17: Intro, Challenges, and Solutions · Adriana Kocovic New York City Department of Environmental Protection Accountable Manager, Green Infrastructure Program akocovic@dep.nyc.gov Erin](https://reader036.vdocuments.net/reader036/viewer/2022062303/5fce34347a08771d4124e2e6/html5/thumbnails/17.jpg)
17
Combined Guidelines
Guidelines from Multiple Agencies: Solution
![Page 18: Intro, Challenges, and Solutions · Adriana Kocovic New York City Department of Environmental Protection Accountable Manager, Green Infrastructure Program akocovic@dep.nyc.gov Erin](https://reader036.vdocuments.net/reader036/viewer/2022062303/5fce34347a08771d4124e2e6/html5/thumbnails/18.jpg)
18
GI in Other Agencies’ ProjectsP
roble
mS
olu
tion
To reach CSO goal, other agencies must also include GI
Streamline addition of GI to DOT Capital projects
DEP On-Site projects with NYCHA, Dept. of Ed.
DPR + DEP “Parks Without Borders”
![Page 19: Intro, Challenges, and Solutions · Adriana Kocovic New York City Department of Environmental Protection Accountable Manager, Green Infrastructure Program akocovic@dep.nyc.gov Erin](https://reader036.vdocuments.net/reader036/viewer/2022062303/5fce34347a08771d4124e2e6/html5/thumbnails/19.jpg)
19
Before After
JHS 185Q Edward Bleeker
Flushing, Queens
GI in Other Agencies’ Projects: Solution
Adding GI to other agencies’ projects
![Page 20: Intro, Challenges, and Solutions · Adriana Kocovic New York City Department of Environmental Protection Accountable Manager, Green Infrastructure Program akocovic@dep.nyc.gov Erin](https://reader036.vdocuments.net/reader036/viewer/2022062303/5fce34347a08771d4124e2e6/html5/thumbnails/20.jpg)
20
MaintenanceP
roble
mS
olu
tion
Contractor maintenance of constructed sites
Update contract language to be more specific
Update tree guard design
DEP provide supplemental maintenance between guarantee period cleanings
![Page 21: Intro, Challenges, and Solutions · Adriana Kocovic New York City Department of Environmental Protection Accountable Manager, Green Infrastructure Program akocovic@dep.nyc.gov Erin](https://reader036.vdocuments.net/reader036/viewer/2022062303/5fce34347a08771d4124e2e6/html5/thumbnails/21.jpg)
21
Maintenance: Solution
![Page 22: Intro, Challenges, and Solutions · Adriana Kocovic New York City Department of Environmental Protection Accountable Manager, Green Infrastructure Program akocovic@dep.nyc.gov Erin](https://reader036.vdocuments.net/reader036/viewer/2022062303/5fce34347a08771d4124e2e6/html5/thumbnails/22.jpg)
22
Current Challenges: UnresolvedP
roble
mS
olu
tion
Protection during street resurfacing Working with new consultant teams
Rolling out GI program fast enough to meet CSO goal milestones
Empty constructed assets awaiting planting season
![Page 23: Intro, Challenges, and Solutions · Adriana Kocovic New York City Department of Environmental Protection Accountable Manager, Green Infrastructure Program akocovic@dep.nyc.gov Erin](https://reader036.vdocuments.net/reader036/viewer/2022062303/5fce34347a08771d4124e2e6/html5/thumbnails/23.jpg)
23
Contact Information
Adriana Kocovic
New York City Department of Environmental Protection
Accountable Manager, Green Infrastructure Program
Erin Cuddihy
New York City Department of Transportation
Director of Green Infrastructure
Thank you!