  • CGE665

    Facilities Engineering

    Lecturer: Lecturer: NikNik KhairulKhairul IrfanIrfan Bin Bin NikNik AbAb LahLah

    UNIVERSITI TEKNOLOGI MARAUNIVERSITI TEKNOLOGI MARA

  • Nik Khairul Irfan profile

    Office- Lecturer Room level 11

    Office No- 0355436347

    Email- [email protected]

    Education Background

    BSc in Mechanical Eng. (UTP)

    UNIVERSITY TEKNOLOGI MARA

    BSc in Mechanical Eng. (UTP)

    Msc in Petroleum Eng. (UTP)

    Working experience

    UTP (Graduate Assistant)

    Shin Nippon Machinery Sdn Bhd (Sales Engineer)

    UiTM (Lecturer)

  • Course Information

    Subject Name Facilities Engineering

    Code CGE665

    Credit hour /contact hour 3 (3 hour Lecture & 1 hour

    Tutorial per week)

    Level BachelorLevel Bachelor

    Prerequisite (if any) Nil

    Assessment

    Test/ Assignment/ Project 40%

    Final Exam 60%

    Semester Taught 6

    UNIVERSITY TEKNOLOGI MARA

  • Learning OutcomeUpon completion of this course, student should be

    able to:

    To describe and identify suitable equipment and processing techniques for petroleum production

    and export facilities.

    To integrate the first stage design and optimization technique in the selection of major process

    equipment on oil & gas facilities.

    To identify and describe the equipment used in subsea developments.

    UNIVERSITY TEKNOLOGI MARA

  • Rules & Regulation

    UNIVERSITY TEKNOLOGI MARA

  • Rules & Regulation

    UNIVERSITY TEKNOLOGI MARA

  • OVERVIEW OF CGE665OVERVIEW OF CGE665

    This course is designed to introduce the

    students with the surface equipment

    related to Exploration and Production

    (E&P) processes and the conception of the

    UNIVERSITY TEKNOLOGI MARA

    (E&P) processes and the conception of the

    overall facilities setup as well as designing

    of some of the critical equipments.

  • Outline - Chapter1

    Overview of the oil & gas industry

    E & P business

    1.1) Phases of E&P Activities

    1.2) Details of Project Dev. Phase

    11

    UNIVERSITY TEKNOLOGI MARA

    1.2) Details of Project Dev. Phase

    PSC Production Sharing Contract (Malaysia)33

    44 Project Life Cycle Concept

    E & P Project Costs 22

  • 1.1a. E&P Business- Acquisition of Rights

    Phases of Activities in Petroleum Industry

    Acquisition of Rights To obtain permission from government

    or relevant agency before drilling of

    Exploration wells.

    These can be done through

    A) Concessions Agreement : E&P activities are determinedA) Concessions Agreement : E&P activities are determined

    by the Contractors. The host

    country only interested in the

    profits (profit sharing and taxes)

    B) Production Sharing

    Contracts Agreement: E&P activities are performed by the

    (PSC) Contractors and approved by the host

    country / agency. Costs are recoverable

    through some mechanisms and profits

    are shared. Taxes imposed.

    UNIVERSITY TEKNOLOGI MARA

  • 1.1a. E&P BusinessAcquisition of Rights

    Phases of Activities in Petroleum Industry

    Acquisition of Rights To obtain permission from government

    or relevant agency before drilling of

    Exploration wells.

    These can be done through (contd).

    C) Joint Venture Agreement : E&P activities are jointly performedC) Joint Venture Agreement : E&P activities are jointly performed

    by the Contractors and the host country.

    Costs and profits are shared based on

    the agreed equities. Taxes are imposed.

    D) Service Contract Agreement : E&P activities are performed by the

    host country representative but some

    agreed scope of work are contracted

    out to a Contractor. Costs are borne by

    the host country. Contractor only

    benefits from the scope of work they

    have provided. Taxes may be imposed.

    UNIVERSITY TEKNOLOGI MARA

  • 1.1b. E&P Business - Exploration

    Phases of Activities in Petroleum Industry

    Acquisition of Rights

    EXPLORATION

    To obtain permission from government

    or relevant agency before drilling of

    Exploration wells.

    To search for oil and gas fields

    This is a high risk activities may constitute :This is a high risk activities may constitute :

    a) Gravity and Magnetic Surveys :

    Mapping of gravity and/or magnetic anomalies due to the

    variations of the earths geological structures and magnetic

    properties of rocks.

    b) Seismic Survey : Seismic lines producing Coarse 2-dimensional

    seismic grid reflecting the geophysical nature of the rocks etc.

    c) Wildcat Exploration well drilling,

    UNIVERSITY TEKNOLOGI MARA

  • Facilities Engineering - Introduction

    1.1c. E&P Business Appraisal Phase

    Phases of Activities in Petroleum Industry

    Acquisition of Rights

    EXPLORATION

    To obtain permission from government

    or relevant agency before drilling of

    Exploration wells.

    To search for oil and gas fields

    To determine the commercial significance of

    3/10/2015 APDrRazaliHamzah 12

    APPRAISALTo determine the commercial significance of

    the discovery and to shape the initial development

    plan for the field.

    UNIVERSITY TEKNOLOGI MARA

  • 1.1c. E&P Business Appraisal Phase

    EXPLORATION

    EXPLORATION DRILLING

    APPRAISAL

    RESULTSDry

    DISCOVERY

    3/10/2015 APDrRazaliHamzah 13

    QUIT

    APPRAISAL

    Appraisal drilling to define the extent of discovery

    Data gathering to aid in the development studies

    Development feasibility studies

    DEVELOPMENT

    RESULTSInconclusive

    UNIVERSITY TEKNOLOGI MARA

  • 1.2d. E&P Business Development Phase

    Phases of Activities in Petroleum Industry

    Acquisition of Rights

    EXPLORATION

    To obtain permission from government

    or relevant agency before drilling of

    Exploration wells.

    To search for oil and gas fields

    To determine the commercial significance ofAPPRAISAL

    DEVELOPMENT

    To determine the commercial significance of

    the discovery and to shape the initial development

    plan for the field.

    To formulate the Field Development Plan, install

    platforms / facilities, drill and complete the

    development wells.

    UNIVERSITY TEKNOLOGI MARA

  • 1.1d. E&P Business Development Phase

    This is the DEVELOPMENT of Production Concept and IMPLEMENTATION activities.

    The objectives:

    To meet the maximum recovery with minimum cost.

    Consideration in the Development plan are:Consideration in the Development plan are:

    i) Drilling requirements. (Number of wells, well spacing and drainage pattern, drilling program, completion strategy, etc. )

    ii) Production techniques and policy anticipated. (Artificial lift needs, pressure maintenance, etc.)

    iii) Facilities required Drilling and Production)

    iv) Development time and cost expected.

    UNIVERSITY TEKNOLOGI MARA

  • 1.1e. E&P Business Production Phase

    Phases of Activities in Petroleum Industry

    Acquisition of Rights

    EXPLORATION

    To obtain permission from government

    or relevant agency before drilling of

    Exploration wells.

    To search for oil and gas fields

    To determine the commercial significance ofAPPRAISAL

    DEVELOPMENT

    PRODUCTION

    To determine the commercial significance of

    the discovery and to shape the initial development

    plan for the field.

    To formulate the Field Development Plan, install

    platforms / facilities, drill and complete the

    development wells.

    To bring oil/gas from sub-surface to surface and

    to separate gas/oil/water before oil is stored and

    gas is processed.

    UNIVERSITY TEKNOLOGI MARA

  • 1.1e. E&P Business Production PhaseDRILLING OF PRODUCTION WELLS

    i.i. Production wells are drilled by a Drilling Contractor for Production wells are drilled by a Drilling Contractor for

    the whole drilling campaign to completely produced the whole drilling campaign to completely produced

    the prospects.the prospects.

    ii.ii. The specified drill rig is mobilized and the drilling will The specified drill rig is mobilized and the drilling will

    start.start.start.start.

    iii.iii. The First Oil/Gas is the first Production starting at the The First Oil/Gas is the first Production starting at the

    platform when the first well is completed and producedplatform when the first well is completed and produced

    iv.iv. The drilling campaign will drill all the planned The drilling campaign will drill all the planned

    production wells on the platform before the drill rig is production wells on the platform before the drill rig is

    demobilized.demobilized.

    UNIVERSITY TEKNOLOGI MARA

  • 1 E&P Business - Summary

    Phases of Activities in Petroleum Industry

    Acquisition of Rights

    EXPLORATION

    APPRAISAL

    To obtain permission from government

    or relevant agency before drilling of

    Exploration wells.

    To search for oil and gas fields

    To determine the commercial significance of

    the discovery and to shape the initial developmentAPPRAISAL

    DEVELOPMENT

    PRODUCTION

    Processing / Export

    the discovery and to shape the initial development

    plan for the field.

    To formulate the Field Development Plan, install

    platforms / facilities, drill and complete the

    development wells.

    To bring oil/gas from sub-surface to surface and

    to separate gas/oil/water before oil is stored and

    gas is processed.

    To condition the gas / oil and sell to customers.

    UNIVERSITY TEKNOLOGI MARA

  • 1.1g. E&P Business Facilities, Transportation, Storage and

    Export

    Acquisition of Rights

    EXPLORATION

    APPRAISAL

    3/10/2015 APDrRazaliHamzah 19

    APPRAISAL

    DEVELOPMENT

    PRODUCTION

    Processing / Export

    Facilities Engineering, Transportation

    Storage and Metering (for Export)

    falls under these phases of the E&P

    business

    UNIVERSITY TEKNOLOGI MARA

  • 1.2 E&P Business Development Phase

    Field Development Evaluation.

    Geologist

    OOIP

    Fluid Contacts

    Rock Quality

    Facilities Eng.

    Types of Platforms

    Pipelines and

    Support Fac.

    Drilling Eng.

    Max. Reach

    Min. Time

    Reservoir. Eng.

    EUR

    No. of Plat.

    No. Of Wells

    Production Plan

    FIELD

    LEVEL

    Facilities Eng

    Facilities Selection

    Investment Cost

    Operating Cost

    Reservoir Eng.

    EUR

    Production

    Plan

    Production

    Forecast

    Drilling Eng

    Drilling Cost.

    Geologist

    OOIP

    Economic Evaluation

    Platform

    LEVEL

    UNIVERSITY TEKNOLOGI MARA

  • 1.2a1. E&P Business Details of Project

    Development & Implementation Activities

    Oil and Gas Development Activities:

    a. FEASIBILITIES STUDIES

    b. CONCEPTUAL DESIGNb. CONCEPTUAL DESIGN

    c. FABRICATION / CONSTRUCTION

    d. INSTALLATION

    e. HOOK-UP AND COMMISSIONING

    f. DEVELOPMENT DRILLING

    UNIVERSITY TEKNOLOGI MARA

  • 1.2a2. E&P BusinessProjects Development & Implementation

    Oil & Gas Projects Milestones.

    Year 1Year 1 Year 2 Year 2 Year 3Year 3 Year 4Year 4

    Feasibility Study

    Conceptual Design

    Detail Design

    3/10/2015 APDrRazaliHamzah 22

    Project DevelopmentProject Development Project ImplementationProject Implementation

    Procurement / Long Lead Items

    Contracting

    Fabrication

    Hook-up & Commissioning

    Installation

    Drilling & Production

    First Oil/Gas

    Production

    UNIVERSITY TEKNOLOGI MARA

  • Facilities Engineering - Introduction

    1.2b. E&P BusinessProject Development

    Oil & Gas Projects Milestones.

    FEASIBILITY STUDY

    i.i. General Concept DefinitionGeneral Concept Definition

    ii.ii. Preliminary Cost EstimatesPreliminary Cost Estimates

    Economic EvaluationEconomic Evaluationiii.iii. Economic EvaluationEconomic Evaluation

    iv.iv. Feasibility Screening StudiesFeasibility Screening Studies

    v.v. Field Development PlanField Development Plan

    vi.vi. Work Program and BudgetWork Program and Budget

    NB. Done by an InNB. Done by an In--house Project Teamhouse Project Team

    UNIVERSITY TEKNOLOGI MARA

  • 1.2c. E&P BusinessProject Development

    Oil & Gas Projects Milestones.

    CONCEPTUAL DESIGN (Front End Engineering)

    i.i. More Detail Concept DefinitionMore Detail Concept Definition

    ii.ii. Facilities OptimizationFacilities Optimization

    iii.iii. Environmental / Site SurveysEnvironmental / Site Surveysiii.iii. Environmental / Site SurveysEnvironmental / Site Surveys

    iv.iv. Design SpecificationsDesign Specifications

    v.v. Contracting Strategies / DocumentsContracting Strategies / Documents

    vi.vi. Design Basis Memorandum or ConceptualDesign Basis Memorandum or Conceptual

    vii.vii. DBM Report.DBM Report.

    NB. Usually done inNB. Usually done in--house/contractorhouse/contractor

    UNIVERSITY TEKNOLOGI MARA

  • 1.2d. E&P BusinessProject Implementation

    Oil & Gas Projects Milestones.

    DETAIL DESIGN

    i.i. Develop specifications for each equipment.Develop specifications for each equipment.

    ii.ii. Approved for Bid (AFB) DrawingsApproved for Bid (AFB) Drawings

    iii.iii. Approved for Construction (AFC) DrawingsApproved for Construction (AFC) Drawingsiii.iii. Approved for Construction (AFC) DrawingsApproved for Construction (AFC) Drawings

    iv.iv. Detail Design ReportDetail Design Report

    v.v. Materials Procurement for long lead items.Materials Procurement for long lead items.

    NB. Specifications, AFB/AFC are either done inNB. Specifications, AFB/AFC are either done in--house or house or

    by Design Consultants.by Design Consultants.

    Procurement are done by Purchasing unit.Procurement are done by Purchasing unit.

    UNIVERSITY TEKNOLOGI MARA

  • 1.2e. E&P BusinessProject Implementation

    Oil & Gas Projects Milestones.

    PROCUREMENT & FABRICATION

    i.i. Fabrication works are done at Fabrication Fabrication works are done at Fabrication

    Yards Yards chosen through competitive bidding.chosen through competitive bidding.

    ii.ii. Procurement of Materials e.g. tubular, sheet Procurement of Materials e.g. tubular, sheet

    metals, valves, welding equipment, metals, valves, welding equipment, metals, valves, welding equipment, metals, valves, welding equipment,

    construction equipment such as cranes are construction equipment such as cranes are

    responsibilities of the fabrication contractors..responsibilities of the fabrication contractors..

    iii.iii. PrePre--commissioning of individual systems e.g. commissioning of individual systems e.g.

    pumping unit, heat exchanger and fire deluge.pumping unit, heat exchanger and fire deluge.

    iv.iv. LoadLoad--out and transportationout and transportation

    UNIVERSITY TEKNOLOGI MARA

  • 1.2f. E&P BusinessProject Implementation

    Oil & Gas Projects Milestones.

    INSTALLATION

    i.i. Installation is performed by Installation Contractors Installation is performed by Installation Contractors

    obtained through competitive bidding.obtained through competitive bidding.

    ii.ii. Used Installation Spread consisting of Installation / Used Installation Spread consisting of Installation /

    Crane Barge , Tug Boats, Supply Vessels, Divers @ Crane Barge , Tug Boats, Supply Vessels, Divers @ Crane Barge , Tug Boats, Supply Vessels, Divers @ Crane Barge , Tug Boats, Supply Vessels, Divers @

    Diving Equipment, Construction Crew, Steam Diving Equipment, Construction Crew, Steam

    Hammers, Welders and Riggers and onboard Hammers, Welders and Riggers and onboard

    accommodation and catering.accommodation and catering.

    iii.iii. HookHook--up and Commissioning can be part of the up and Commissioning can be part of the

    installation scope of works.installation scope of works.

    iv.iv. System Testing and StartSystem Testing and Start--up.up.

    UNIVERSITY TEKNOLOGI MARA

  • 1.2g.E&P BusinessProject Implementation

    Oil & Gas Projects Milestones.

    PIPELINE INSTALLATION

    i.i. Pipeline installation is performed separately by a Pipeline installation is performed separately by a

    Pipeline Installation Contractors obtained through Pipeline Installation Contractors obtained through

    competitive bidding.competitive bidding.

    ii.ii. Used Installation Spread consisting of Pipe Laying Used Installation Spread consisting of Pipe Laying ii.ii. Used Installation Spread consisting of Pipe Laying Used Installation Spread consisting of Pipe Laying

    Barge , Anchor Handling Boats, Supply Vessels, ROV/ Barge , Anchor Handling Boats, Supply Vessels, ROV/

    Equipment, Construction Crew, Welders and Riggers Equipment, Construction Crew, Welders and Riggers

    and onboard accommodation and catering.and onboard accommodation and catering.

    iii.iii. Pressure Testing and Commissioning are part of the Pressure Testing and Commissioning are part of the

    installation scope of works.installation scope of works.

    iv.iv. System Testing and StartSystem Testing and Start--up.up.

    UNIVERSITY TEKNOLOGI MARA

  • 1.2h. E&P BusinessProject Implementation

    Oil & Gas Projects Milestones.

    DRILLING and PRODUCTION

    i.i. Production wells are drilled by a Drilling Contractor for Production wells are drilled by a Drilling Contractor for

    the whole drilling campaign to completely produced the whole drilling campaign to completely produced

    the prospects.the prospects.

    ii.ii. The specified drill rig is mobilized and the drilling will The specified drill rig is mobilized and the drilling will

    start.start.start.start.

    iii.iii. The First Oil/Gas is the first Production starting at the The First Oil/Gas is the first Production starting at the

    platform when the first well is completed and producedplatform when the first well is completed and produced

    iv.iv. The drilling campaign will drill all the planned The drilling campaign will drill all the planned

    production wells on the platform before the drill rig is production wells on the platform before the drill rig is

    demobilized.demobilized.

    UNIVERSITY TEKNOLOGI MARA

  • 2. E&P Project Costs.

    a. CAPEX Costs.

    Exploration Seismic Survey

    - Exploration wells

    Appraisal wells

    Platforms / Jackets

    Development Wells

    Production Facilities

    Pipelines inter-platforms & to shore

    Terminals & Export facilitiesTerminals & Export facilities

    b. Operating & Maintenance Costs.

    c. Abandonment Costs.

    Facilities Mothballing & Removal,

    Wells plugging & Facilities Removal

    UNIVERSITY TEKNOLOGI MARA

  • 2a. E&P Project Costs.Development Wells

    Depend on - Total Reserves

    - Reserves per well

    - Off-take rate

    Include - Drilling

    - Casing/Cementing

    - Completion equipment

    - Well Heads

    Type - Production Wells

    - Injection Wells- Injection Wells

    Statistics - USD 2 million / well (shallow wells:

    4,000 ft.)

    - USD 4 million / well (deep wells :

    8,000 ft.)

    Reserves - 1.5 to 4 million bbls/well

    (average 2.5 million bbls/well).

    Capacity - 1000 2000 bopd/well

    UNIVERSITY TEKNOLOGI MARA

  • 2b. E&P Project Costs.Platforms / Jacket

    Depend on - Field Size (Area Extend )

    - Water Depth

    - Number of Slots for Drilling of wells

    Include - Structure

    - Piles (depends on depth of penetration) /

    Foundation.

    - Conductors (for wells)- Conductors (for wells)

    Type - Central Production & Processing (CPP)

    - Satellite Production (SP)

    - Manned / Unmanned

    Statistics - CPP = USD 65 million

    - SP = USD 25 million

    Reserves - CPP = 60 Million Bbls.

    - SP = 30 Million Bbls.

    Water depth up to

    70 meters

    UNIVERSITY TEKNOLOGI MARA

  • 2c. E&P Project Costs.Production Facilities

    Depend on - Throughput Volume

    - Requirement for Gas and/or

    Water Injection

    - Requirement for Gas Lift Requirement

    Include - Processing Facilities Include - Processing Facilities

    - Injection Facilities.

    - Pumping Facilities

    - Power Generation

    Statistics - 70% of Wells Costs (Approximation).

    UNIVERSITY TEKNOLOGI MARA

  • 2d.E&P Project Costs.Pipelines

    Depend on - Throughput Volume

    (Diameter & Wall-thickness)

    - Distance/Length

    - Materials Specifications

    Include - Facilities (Pumps & Compressors) Include - Facilities (Pumps & Compressors)

    - Storage Capacities

    - Loading or Pumping Rates

    Type - Oil Pipelines

    - Gas Pipelines

    Statistics - 15 to 20 for oil CS X 52

    (USD/in./m) - 20 to 30 for gas CS X 65

    UNIVERSITY TEKNOLOGI MARA

  • 2e.E&P Project Costs.Terminal / Tanker

    Depend on - Throughput Volume (Storage Capacity)

    - Infra - Structure

    Include - Facilities

    - Storage Capacities

    - Loading or Pumping Rates- Loading or Pumping Rates

    Type - Terminal (Oil)

    - Tanker (FPSO/FSO)

    Statistics - USD 400k/1000 bbls. capacity

    - USD 100k-200k/1000 bbls. capacity.

    UNIVERSITY TEKNOLOGI MARA

  • 2f.E&P Project Costs.Operating & Production

    Depend on - Type of Operations

    (Onshore/Offshore)

    - Gas Injection

    - Water Injection

    Include - Facilities Operating/Maintenance

    - Overhead and management

    - Wells workovers- Wells workovers

    Statistics - Based On Cumulative CAPEX

    - 9% for Compressors

    - 1% for Structures / Jackets

    - 1% for Pipelines

    - 10 % for wells tangibles

    - 10% for on-shore Terminals

    - USD 0.5 million USD 2 millions / well

    UNIVERSITY TEKNOLOGI MARA

  • 2g.E&P Project Costs.Abandonment

    Depend on - Type of Facilities Size & Complexity

    - Location (Offshore/Onshore)

    - Scope of Work ( Total/ Partial).

    Include - Platform/Jacket Removal

    - Super-Structure

    - Production Facilities

    - Pipelines- Pipelines

    - Wells plugging

    Experience - Based on the Crane Barge Rates &

    Transportation Barge Rates

    (Study shows that the cost of Platform removal

    may be similar to that of installation costs)

    - Drilling Rigs Rates and Number of wells

    UNIVERSITY TEKNOLOGI MARA

  • 3. PSC-Malaysian Model.

    COMPARISON of the 1976, 1985 AND DEEPWATER PSC TERMS

    MAIN FEATURES 1976 TERMS 1985 TERMS DEEPWATER TERMS

    1. ROYALTY

    2. Cost Recovery

    a. Oil

    b. Gas

    3. Profit Split

    (in favor of PETRONAS)

    a. Oil

    10%

    20%

    25%

    70:30

    10%

    50%

    60%

    First 10,000 bopd 50:50

    Next 10,000 bopd 60:40

    10%

    75%

    75%

    (In favor of Contractors)

    First 50,000 bopd 14:86

    Next 50,000 bopd 18:82a. Oil

    b. Gas

    4. Contract Period (Yr.)

    5. a. Signature Bonus

    b. Discovery Bonus

    c. Production Bonus

    6. Research Cess

    7. Carigalis Participation

    70:30

    3+2 Expl.

    4 Dev.

    15 (oil) Prod.

    Nil

    RM2.5 million

    RM5.0 million

    0.5%

    Nil

    Next 10,000 bopd 60:40

    Above 20,000bopd 70:30

    (for first 50 millions bbls)

    First 2 trillion scf 50:50

    Excess 2 trillion scf 70:30

    5-Exploration

    4-Development

    15-Oil Production

    20-Gas Production

    Waived

    Waived

    Waived

    0.5%

    Minimum 15%

    Next 50,000 bopd 18:82

    Above 100,000 bopd 37:63

    After cumulative production

    Of 300 mmbbls 50:50

    To be negotiated

    7-Exploration

    6-Development

    25-Oil Production

    Waived

    Waived

    Waived

    0.5%

    Minimum 15%

    UNIVERSITY TEKNOLOGI MARA

  • 4. Projects Lifecycle

    PrePre--DevDev BuildBuild--UpUp PlateauPlateau DeclineDecline AbandonAbandon

    PRODUCTION

    ENVELOP

    TimePOTENTIAL PROJECTS : Funding Requirements

    NEW PROJECTS : High Capital Spending

    YOUNG PROJECTS : Cash Generating

    AGEING PROJECTS : Self Financing

    ABANDONMENT:

    Cash SinkMAINTENANCEOPERATIONS &ACQUISITION