Irrigation Australia Conference 2014 MID2030 Modernisation Project’s OUTLET RATIONALISATION PROGRAM Ashley Oldham. Introduction. Southern Rural Water – Macalister Irrigation District Outlet Rationalisation Program Summary Why a Rationalisation Program - Benefits How the program works - PowerPoint PPT PresentationTRANSCRIPT
1
Irrigation Australia Conference 2014
MID2030 Modernisation Project’s
OUTLET RATIONALISATION PROGRAM
Ashley Oldham
2
Introduction
• Southern Rural Water – Macalister Irrigation District
• Outlet Rationalisation Program Summary
• Why a Rationalisation Program - Benefits
• How the program works
• Case Studies
• On-farm changes post rationalisation
• Program Outcomes
3
Southern Rural Water – Macalister Irrigation District
4
Southern Rural Water – Macalister Irrigation District
• Service approximately 10,000 customers – 1,100 in MID
• Secure water supplies
• Good rainfall (600mm/yr)
• Productive soils
• Strong dairy and beef industry
• Developing vegetable and cropping industries
• Economic contribution of $500+ million per annum to Victoria’s economy
5
Summary of Rationalisation Program
Program funded by customers that provides them the opportunity to modernise their outlets
• Customers eliminate low use outlets• Elimination of other water delivery assets• Calculate savings through Whole of Life cost analysis
• Positive Whole of Life cost– New modernised outlet(s) constructed at no cost to customer– Connection works conducted with excess savings
• Negative Whole of Life cost– Customer funds difference of outlet works– no connection works
6
Why a Rationalisation Program
• In response to customer demand
• To reduce liabilities by reducing assets
7
How the program works - process• Customers submit application form
• The application is discussed with customer
• Whole of Life cost calculation
• Upon agreement Security Deposit paid
• Farm Consultant assesses rationalisation and produces report
• Approval is sought through a review panel
• Once approved - works are scheduled
8
How the program works – Whole of Life Cost calculation
Total Savings $100,000
Outlet Construction -$40,000
On-farm Connection Works -$25,000
SRW Asset Works -$15,000
NET SAVINGS $20,000
9
How the program works - program features
• Customer participation is voluntary
• Assessment equity
• Program and assessment rules are clear
• Assessment includes independent farm irrigation advice:• Support good practice irrigation• Identifies on-farm works required and links to long term farm plans
• Funded asset abandonments, rationalisations and reconfigurations are compatible with proposed system upgrades
10
What are the benefits of a Rationalisation Program?SRW Benefits• Reduces future modernisation and maintenance costs• Improved measurement accuracy• Increases delivery efficiencies• Encourages on-farm investment• Facilitates regional economic growth
11
What are the benefits of a Rationalisation Program?Customer Benefits• Access to modernised meters now - a meter replacement program years away• Increase production - higher and more consistent flow rates • Improved lifestyle – flexibility of automated start and finish times
12
Difference from Murray Darling Basin modernisation/rationalisation schemes• Not in Murray Darling Basin – government funding not a priority
• Customers have had to largely fund program
• Not trying to reduce the size of the district
• Eliminate spur channels
• Not necessarily to the backbone
13
Case Study 1 – Before Map
14
Case Study 1 – After Map
15
Case Study 2 – Before Map
16
Case Study 2 – After Map
17
On-farm changes post rationalisation
18
On-farm changes post rationalisation
19
Program outcomes
• Customer Consultation• Face to face communication works best
• High Rationalisation Rate• 14 Modernise - 18 Eliminated• 2013 rationalisation rate of 56%• 2014 rationalisation rate of 75%
• Farm Consultant• Customers felt put at ease
• Further Customer Investment• ~80% invested further on-farm• Personally & funding application
• Positive Customer Survey Responses• All would recommend the program to other customers
20