introduction - intellisys · pdf fileintroduction • a vision for corporate responsibility...
TRANSCRIPT
INTRODUCTION • A vision for Corporate Responsibility • Today every company faces a global challenge – we want everyone to satisfy their basic needs and enjoy a
better quality of life but to do so without compromising the quality of life for future generations. • For our society that means limiting climate change and protecting natural resources but also stimulating
cohesive and healthy local communities, promoting fairness and justice in the workplace and building a strong, stable business.
• Everybody has obligations to act responsibly in order to achieve these goals whether as individuals, groups, or business in general. By adopting socially and environmentally responsible behaviour businesses can make a significant contribution to boosting wealth creation and employment, fostering social justice and protecting the environment.
• Essentially, this means companies taking account of the economic, social and environmental impacts that arise from the way in which they operate – maximising the benefits and minimising the negatives. At Intellisys Power and Controls , we see Corporate Responsibility (or Corporate Social Responsibility) as the voluntary actions that business can take, over and above compliance with minimum legal requirements, to address both its own competitive interests and the interests of wider society
OUR CAPABILITIES Intellisys Power Controls Corporation or IPCC stands unsurpassed when it comes to the serious business of
power and control. Throughout the years we have earned a reputation for unwavering quality, attention to detail, and being the most reliable in product and service. When an emergency arises,
It is essential that Standby and Emergency Power Plants are able to meet the demand and be up & running at peak efficiency immediately. Hospitals and medical centers throughout the Philippines have come to rely on IPCC for emergency back-up power controls. When lives are on the line, you can't afford to take a chance on anything but the switchgear with the maximum reliability and efficiency.
At IPCC, our engineering approach is based solely upon our customers individual needs, and specific
requirements...not the other way around. More than 95% of our systems are custom designed and built to accommodate and reflect the unique and varying uses necessitated by workplace conditions and geographic extremes.
IPCC‘s generator expertise in the small utility and standby power field is second to none. We are regarded as the
industry experts when the job requires , Loadsharing, Demand Start, Automatic Synchronizing, and Microprocessor Based Systems, retrofitting works.
OUR MISSION AND VISION TO OUR CUSTOMERS - To provide quality engineered products and services with on-time delivery, defect-free, in a professional manner, at a competitive price. All this to ensure our customers success in their marketing or use of a product we produce that meets or exceeds their expectations.
TO OUR COMPANY - To operate as a team of professionals with respect for each others' talents and skills; to be creative and innovative; to maintain a clean, safe and pleasant working environment; to provide for profit, long term growth and leadership in our industry. TO OUR EMPLOYEES - To provide a workplace for individuals to create and contribute to the objectives of the Company while encouraging development of personal and career opportunities; to offer long term security, health and welfare for the individuals and their families. TO OUR COMMUNITY - To be good members of the business community; to protect the environment around
us; and to be actively involved in promoting the common good for all members of our society. • Our vision is to develop annually, the Company and its employees as the BEST and most demanded
service provider and supplier of Electrical Switchgear and its allied products. OWNERSHIP AND MANAGEMENT Intellisys Power Controls Corp., is a duly organized, 100 percent Filipino Owned Corporation founded in 2011. As of September 2, 2011 the principal officer of IPCC are as follows: LOWEH JOE M. TOMAS - Chairman of the Board ROMEO O. DE LEON JR. - President ROLAND NOLAN O. ENRIQUEZ - Managing Director MARINA M. TOMAS II - Chief Finance Officer RODELLO M. ROMERO - Engineering Manager ADDRESS & TEL. NOS. – Main office Intellisys Power Controls Corp., is conveniently located at Phase-1 Blk-4, Lot-5, Cavite Lights Industrial Park,
Brgy. Maguyam, Silang, Cavite 4118 with Telephone numbers; 579-5382 and Fax No.: 868-9983 PLANT ADDRESS Phase-1 Blk-4, Lot-5, Cavite Lights Industrial Park, Brgy. Maguyam, Silang, Cavite City with Telephone numbers;
579-5382
ORGANIZATIONAL CHART ADMINISTRATION DEPARTMENT : GLENDA C. NISTA FINANCE / ADMIN ANTHONY S. ONTE SALES COORDINATOR CHERILYN C. BERTUMEN BILLING & COLLECTION ROSINE S. SANTOS III I.T DEXTER M. MEDALLADA DRIVER / MESSENGER MYKIE SALALILA PURCHASING ASSISTANT SALES AND MARKETING : ROMEO O. DE LEON JR. PRESIDENT MARKWILL G. DE LEON SALES MANAGER ALDRIN T. PAAYONG-AYONG JR. ACCOUNT MANAGER JOBELLE O. DE GUZMAN MARKETING OFFICER MICAH L. SULIT MARKETING OFFICER ENGINEERING DEPARTMENT : RODELLO M. ROMERO ENGINEERING MANAGER MARK ANTHONY M. ABDON PROJECT ENGINEER RICHARD R. CUNANAN TECHNICAL SUPPORT SUPERVISOR RACQUEL ROQUETTA C. BADARAN SERVICE OPERATION SUPERVISOR RAYMUND M. BALDON TECHNICAL SUPPORT ENGR. GILBERT A. BADEO TECHNICAL SUPPORT ENGR. BERNIE B. OSINSAO TECHNICIAN RONUALDO R. NERAL CAD OPERATOR JIMBOY B. MANALO TECHNICIAN LEONEL R. LLENARESAS TECHNICIAN LAYLANIE B. ESTALANI ENGINEERING STAFF RUEBEN JAMES CLANZA TECHNICIAN ARVIN ADONA TECHNICIAN JONATHAN ORTIZ TECHNICIAN
LEGAL DOCUMENTS CERTIFICATE OF INCORPORATION
LEGAL DOCUMENTS CERTIFICATE OF REGISTRATION ( BIR )
LEGAL DOCUMENTS CERTIFICATE OF REGISTRATION ( DOLE )
LEGAL DOCUMENTS SSS
LEGAL DOCUMENTS MAYORS PERMIT
OUR PRODUCTS AND SERVICES
• Onsite Generation Controls Synchronization Switchgear and Switchboard
• Low and medium voltage synchronizing Panels — custom designed and built in accordance American and European standards. Emergency Standby Base Load Peak Shaving Prime Power Co-generation Closed and Open Transition Transfering
Molded Case, Air circuit breaker ,Solenoid and Changeover type , up to .480 KV applications
• Medium Voltage Switchgear up to 36KV
• Marine Switchboard Controls
Built to ABS and LR specifications for cruise ships, casino boats, workboats, tankers, tugs, barges, dredges, riverboats, ferries, pleasure craft and military vessels.
• Custom Busbar Fabrication and Retrofitting Works
Generator circuit breaker retrofitting ,Supply and Installation of Busduct
• Design , Commissioning and Start-up assistance
Preventive Maintenance , Installation of Generator circuit breaker
OUR TOP CLIENTS
Generator Supplier
• Monark Equipment
• Cummins Philippines
• Philman Corporate Distribution
Corporation
• MHI Engine System Phils., Inc.
• International Elevator and Equipment Inc.
• Advatech Industries Inc.
• Propmech Corporation
• Power Diesel Philippines
• Energetix Power Technologies
Contractor
• AC Technical Services, Inc.
• Advance Polyelectric System Inc.
• APSI
• C.Dizon Construction & Development
• Covenant Construction
• DC Garcia Construction
• E3 Electrical Services
• Kempal United Corporation
• LJ Industrial Fabrication
• Power Partners and General Services, Inc.
• SC – Megaworld
• Thermopower Incorporated
• Tomelekt Power System,Incorporated
• Voltage Electrical Contractor Corp.
Marine industries
• Subic Dry Dock Corporation
• Magsaysay Institute of Shipping
• Harbour Center
• Trans Pacific Journey Fishing Corp.
• Safehull Marine Tech., Inc.
Hotels
• Limketkai Hotel
• Two Season Hotel
• Midas & Casino Hotel
• Pagcor Hyatt Hotel
Banks
• BDO
• BPI
Manufacturer
• Philippines Spring Water Resources Inc.
• Anglo Watson Glass Inc.
• Remec Broadband Wireless International
• Myler Agribusiness Inc.
• Amkor Philippines
Developer
• Alphaland Dev.
• Iglesia ni Cristo
• Manuela Corporation
• Ortigas Corporation
• Peregrine Development International
FINISHED SYNCHRONIZING PANEL PROJECTS
AMKOR P1 / P2
Auto Paralleling of 6 x 2000Kw CAT D.G
Alphaland Place
Auto Paralleling of 5 x 2000kw CAT D.G
Alphaland Tower
Auto Paralleling of 4 x 2000kw CAT D.G
Anglo Watsons Calamba Laguna
Auto Paralleling of 1 x 2000kw CAT D.G & Mains
Araneta Gateway Expansion
Auto Paralleling of 4 x 2000kw CAT D.G
Ayala 6750
Upgrading of Sync Panel 3 X 1000Kw CAT
Banko Sentral ng Pilipinas
Auto Paralleling of 2 x 2000kw CAT D.G.
BDO Greenhills
Auto Paralleling of 1x 600 kw CAT & 1 X500KW FG WILSON
BDO South Tower
Auto Paralleling of 2 x 1250kw CAT D.G.
Beaufort
Auto Paralleling of 2 x 800kw MITSUBISHI D.G.
Christ Commission Fellowship
Auto Paralleling of 3 x 2000kw CAT D.G & Mains
Iglesia Ni Cristo
Auto Paralleling of 3 x 750 kva cummins gen set
Limketkai Hotel
Auto Paralleling of 4 x 1250Kw CAT D.G
FINISHED SYNCHRONIZING PANEL PROJECTS
Philippine Arena
Auto Paralleling of 8 x 2Mw CAT D.G.
Marriot Grand Ballroom
Auto Paralleling of 4 x 2Mw CAT D.G.
Maxim
Auto Paralleling of 3 x 750 kva cummins gen set
Metro Alabang
Auto Paralleling of 2 x 800kw CAT D.G.
NAC Tower
Auto Paralleling of 2 x 2000Kw MTU D.G
One Pavilion Cebu Auto Paralleling of 2 x 1000kw CAT D.G.
UP NSTP Building M & K
Auto Paralleling of 3 x 500Kw Cummins D.G
Viskase
Auto Paralleling of MAINS & MITSUBISHI D.G.
Alabang Town Center
Upgrading of Synchronizing Panels
PROFRIENDS Subdivision Imus Cavite
Auto Paralleling of 1 x 400kw Diesel Generator
Christ Commission Fellowship
Auto Paralleling of 3 x 2000kw CAT D.G & Mains
Discovery Primea
Auto Paralleling of 4 x 1500kw CAT D.G.
FINISHED ATS PROJECTS
Burgundy
ATS 1250, 3P, 230V MCCB Type ABB
July Development Corp.
ATS 3000A, 3P, 240V ACB Type ABB
Kudos
ATS 800A, 3P, 230V Change Over Type ABB
MAERSK
ATS 175A, 3P, 400V MCCB Type Square-D
U.S Embassy
ATS 2000A, 3P, 230V ACB Type Square-D
Widus
ATS 1600A, 3P, 230V MCCB Type ABB
Ospital ng Lipa
ATS 1600A, 3P, 230V MCCB Type Square-D
Amkor Philippines
Close Transition ATS
FINISHED PANEL BOARDS PROJECTS
•Bangko Sentral ng Pilipinas
•Eastwest Bank
•Philippine National Bank
•China Bank
•China Trust Bank
ON GOING SYNCHRONIZING PANEL PROJECTS
•BDO
•Security Bank
•May Bank
•UCPB
•BPI
•Maynilad Arroceros
•Asset Builders (KFC)
•Grand Hyatt
•Starmall BPO 3
SAMPLE OF SALES INVOICE
SAMPLE OF ORIGINAL RECIEPT
BANK REFFERENCE
Name of Bank Branch Account No.
RCBC Alabang 1-168-52762-0
BDO Ayala – Alabang 000650287649
`
EQUIPMENT AND MACHINES
• Busbar and Hydraulic Cuter w/ Punching and Notching
• Mechanical Press 1.35 Tons
• Hydraulic Bender 2.56 Tons
• Hydraulic Punching Machine / Cutting Machine 60 Tons
• Tomita Hydraulic Cutter 3.5 Tons
• SHDY Hydraulic Cutter – 6mm x 3100mm cutting capacity
• Leathe Machine
• VIBROU Shear Machine
• Spot Welding
• Welding Machines
• Drilling Machines
• Ingersoil Rand Air Compressor
• HIS Air Compressor
• Portable Type Air Compressor
• Computer Numeric Control Punching Machine
`
LOCATION MAP
Intellisys Power Controls Corporation is conveniently located just about 1.5 hours
south of Manila. Coming from Makati, take the South Luzon Expressway and exit at
Carmona. Turn right & after passing Southwoods, turn left at the first corner Shell Station.
Then just follow the Maguyam road. IPCC is at the third technopark , Cavite Light Industrial
Park (CLIP) on the left.
Alternatively coming from Makati, exit at Alabang and follow the Zapote-Bacoor route all
the way to SM Dasma/Palapala and turn left (going to GMA & Carmona). Turn right at the
corner Shell Station after crossing the GMA bridge & follow the Maguyam road going to
Cavite Light Industrial Park (CLIP). It’s just after Sterling & Meridian Technoparks.