introduction to pactify - a web based cooperation platform
TRANSCRIPT
An introduction
AGENDA
-2- © 2013 Pactify Software. All rights reserved.
• Positioning
• On progressively increasing autonomy and co-operation
• Our “immediate, goal based feedback system” – PACT-ify / Pact Value
• Screenshots
-3- © 2013 Pactify Software. All rights reserved.
Pactify is a methodology to support cross-company
transformation initiatives
• 1 dedicated platform for the program
– Simple to use (to max adoption& involvement)
– Transparent (trough all the layers …)
• Guiding teams in developing their
– Objective
– Approach
• … and planning and tracking “the essence of what
ties them together”:
– Milestones
– Actions
– Target impact
• … even with the different entities each having
own, different, “vertical” tracking approaches and
methods
Initiatives can be flexibly structured and structure itself can
be expanded on the go
-4- © 2013 Pactify Software. All rights reserved.
Sub-program / taskforce 1
Program 1
Sub-program / taskforce 2
Projects/ initiatives
TO
DA
Y
Do J De I
Projects/ initiatives
“ “ Sub-program / taskforce 3
Projects/ initiatives
Program 2 …
All initiatives go trough planning and execution tracking of
gates, milestones, actions and impacts
-5- © 2013 Pactify Software. All rights reserved.
TO
DA
Y
Do J De Im
KPI impacts
4 stages:
• Documented
• Justified
• Decided
• Implemented
1
2
3
4
The 4 components of an initiative/ project:
Actions/ decisions (to achieve the stages and milestones)
Specific milestones (deliverables, required interim results)
To go from idea to a project Updated forecast date (along the way)
1
2
For each item has:
A status
• On track
• Delayed
• Off track
• Done/ Achieved
3
For impacts : re-forecast impact
(per month)
Name, owner, target date (“stick in
the ground”)
4
The actual execution of a project
time
Pilot successful Pilot prepared
AGENDA
-6- © 2013 Pactify Software. All rights reserved.
• Positioning
• On progressively increasing autonomy and co-operation
• Our “immediate, goal based feedback system” – PACT-ify / Pact Value
• Screenshots
-7- © 2013 Pactify Software. All rights reserved.
Autonomy and co-operation are critical success factors for
implementing cross-company transformation initiatives
• Addressing complex, strategic issues
– Today’s strategic issues require great idea’s,
effective implementation, delivered faster and faster
Characteristics of these initiatives
• Autonomy of participants
– Enables mindset to cope with complexity and
better adopt required skills
– If forced, people don’t produce the required
solutions
Key requirements for success
• Across multiple org entities, where team work is
not “a given”
– Strategy always involves more than 1 entity (by def)
– Teams not familiar with each other, no direct
incentive, different styles, methods, hierarchy, …
• Make the co-operation really work
– Motivated by the team and common goal itself
– All become 1, helping each other
We distinguish 4 gradual steps for individuals to take up autonomy
-8- © 2013 Pactify Software. All rights reserved.
“Confident partner
to sponsor”
• Anticipate sponsors’ feedback
• Make and defend recommendations
• Impact the steering decisions
• Open up for personal development
(coached by your sponsor)
• Define milestones first, then required actions
• Align the milestones plan with the sponsors
“Goal-oriented”
• Always one step ahead of the sponsor
• Fully inside/ immersed in the progress/
problem – 100% focus
“Self-steering
as individual”
1
0
3
2
4
Level of autonomy of the individuals on the team
“On boarding”
• Understand and accept the mission
• From day 1, work themselves on the platform (document/
plan/ report/ present) – not the PMO or others
“I need to do this for my boss and it comes on top of everything else ”
“I find it valuable, WANT to achieve it and will be proud!”
We distinguish 4 gradual steps for teams to increase co-operation
-9- © 2013 Pactify Software. All rights reserved.
“Generate
traction to
deliver”
• From stop&go to a continuous flow of
activity
‒ Balance skill vs complexity (flow)
‒ Performant cycle : individual work vs
team work vs reporting to steerco
• Grow into 1
‒ Find team as interesting as yourself
(skills, motivation)
‒ Provide help beyond own resp.
‒ “Irrelevant” differences flattened out
• Develop specific milestone plan together
• “Accept and propose” ownership of required
milestones and actions
• The combination makes sense to all
“Engage in the
planning”
• Only focused on delivering on target
• No individuals / 1 group
• No steering needed “Self-steering
as a group”
1
0
3
2
4
Level of co-operation within the team
“On boarding”
• Come together in 1 place / 1 platform
• Get to know each other
• Describe and align a joint team objective and approach
“My boss sent me in here, I’ll defend our department’s interests first”
“Our objective is crucial for the company and our team acts as 1”
How autonomy and steering go hand in hand : sponsors and
team “meet” in the formulation of the milestones
10 © 2013 Pactify Software. All rights reserved.
Milestone Action The plan/
The progress
The sponsor
Team autonomy Team autonomy
The team
Our approach to move individuals and teams in the autonomy and
co-operation matrix
• Provide a web based tracking tool
– Easy to use platform (for max adoption and
interaction)
– Transparent to all participants
– Participants work themselves (no PMO)
– To plan and track all co-operation milestones,
actions and impacts
• Use a voluntary, goal-based feedback system
within the team (PACT-ify – Pact Value)
• Provide coaching and support to guide teams
and individuals
– Focus on “making them want it”
– Versus “having them do it”
– Or (worse) “doing it for them”
-11- © 2013 Pactify Software. All rights reserved.
Autonomy
1 2 3 4
2
1
3
4
Co
-op
era
tio
n
?
AGENDA
-12- © 2013 Pactify Software. All rights reserved.
• Positioning
• On progressively increasing autonomy and co-operation
• Our “immediate, goal based feedback system” – PACT-ify / Pact Value
• Screenshots
What is our feedback system ?
-13- © 2013 Pactify Software. All rights reserved.
• The Pledge
– To “PACT-ify” your project
• The goal-based feedback system
– The “Pact Value”
A voluntary, explicit signal from the team that they …
• Value and like the project
• Believe in their plan & want to deliver
• Want to take over autonomy in execution
• Will co-operate and help each other
… and want to form a Pact to make this concrete
Points based system measuring the (cumulative) team
activity and performance vs plan
• All planned actions and milestones by everyone on the
team contribute
– More for a milestone than for an action
– The more ahead of plan, the higher (and vice versa)
• 1 value for the whole team, every team member has an
impact on this value
• “Actual”, “forecast” compared to “target pact value”
1) The Team
2) The challenge
• Objective
• Milestone plan
• Progress
3) The goal-based feedback
Our definition of a Pact
-14- © 2013 Pactify Software. All rights reserved.
Feelings inside the Pact:
curiosity, purposefulness, concentration,
proudness, self-confidence, relatedness, fun, ….
Feelings outside of a Pact:
frustration, boredom, fear, tiredness
(wasted energy) …
A PACT is a bond or commitment to you help yourself and the others to:
2) keep all distractions and potential
blockers outside of the PACT :
This way, the team will develop intrinsic motivation, the only mindset that really allows to
outperform on complex challenges
+ all the other work to be done …
+ other handbrakes, umbrella’s, politics
+ ….
1) develop and maintain a genuine liking of the
team and challenge, and an appetite to deliver
The goal-based feedback system – “The Pact Value”
15 © 2013 Pactify Software. All rights reserved.
TODAY
= Our current cumulative
performance vs plan
= What we
promised
= Our remaining
intention
How does our feedback system helps fostering autonomy?
• Autonomy is a personal thing, we don’t expect nor push for autonomy, we gently ask
the question, so teams can signal it: “Do you want to Pactify?”
• In pure autonomy, there cannot be a boss anywhere near anymore, but teams still
need guidance towards their goals, so a feedback systems is needed
• All small steps of progress immediately visible : a key motivator
• Maximizing your Pact Value drives all the “good” behaviors:
– Realistic but solid plans – with all required milestones aligned
– Maximum amount of required tasks to achieve milestones (traction)
– Deliver vs what you promise : the quicker, the more Pact Value
• Incl. helping others to deliver on their action/ milestone for the Pact
• We make them feel autonomy, instead of telling them “they should be autonomous”
– Trough immediate, activity-based feedback, you start feeling it
– Feeling it sticks much longer than having to hear you should …
-16-
© 2013 Pactify Software. All rights reserved.
How does our feedback system helps making co-operation work ?
• We measure it, to understand it and stimulate/ incentivise it
– All co-operation activity/ results contribute directly to the measurement
• Including helping the others to deliver their action/ milestone for the Pact
– In an objective way, independent of politics, perceptions, hierarchy, …
– Contrary to traditional KPI measurements (financial, operational, …), Pact Value is a “human
activity” measurement, which is a direct driver for impacting performance
• You make them feel co-operation, instead of telling them “they should co-operate”
– Trough immediate, activity-based feedback, you start feeling it
– Feeling it sticks much longer than having to hear you should …
-17- © 2013 Pactify Software. All rights reserved.
AGENDA
-18- © 2013 Pactify Software. All rights reserved.
• Positioning
• On progressively increasing autonomy and co-operation
• Our “immediate, goal based feedback system” – PACT-ify / Pact Value
• Screenshots
Screenshot – subprogram overview
-19- © 2013 Pactify Software. All rights reserved.
Screenshots – Milestone heat map
-20- © 2013 Pactify Software. All rights reserved.
Screenshots – initiative tabs
-21- © 2013 Pactify Software. All rights reserved.
Screenshot – project progress timeline with actions and
milestones
-22- © 2013 Pactify Software. All rights reserved.
Screenshots – Pact Value Creation across the entire program
-23- © 2013 Pactify Software. All rights reserved.
Pact Value charts – immediate goal-based feedback system
-24- © 2013 Pactify Software. All rights reserved.