August 7, 2007 August 7, 2007 1 The Study on City Master Plan and Urban Development Program of Ulaanbaatar City (UBMPS) Intensive Learning Session on Urban Planning under Market Economy Introduction To Traffic Introduction To Traffic Management Management August 7, 2007 August 7, 2007 JICA Study Team JICA Study Team

Upload: bayar-tsend

Post on 22-May-2015

386 views

Category:

Documents


1 download

TRANSCRIPT

Page 1: Introduction to traffic managemen(modif)t

August 7, 2007August 7, 2007 11

The Study on City Master Plan and Urban Development Program of Ulaanbaatar City (UBMPS)Intensive Learning Session on Urban Planning under Market Economy

Introduction To Traffic ManagementIntroduction To Traffic Management

August 7, 2007August 7, 2007

JICA Study TeamJICA Study Team

Page 2: Introduction to traffic managemen(modif)t

22August 7, 2007August 7, 2007

The Study on City Master Plan and Urban Development Program of Ulaanbaatar City (UBMPS)Intensive Learning Session on Urban Planning under Market Economy

ContentsContents

1.1. Overview of traffic managementOverview of traffic management2.2. Data collection and identification of problemsData collection and identification of problems3.3. Data AnalysisData Analysis4.4. Formulation of solutionsFormulation of solutions5.5. Implementation of improvement measuresImplementation of improvement measures6.6. Operation and evaluationOperation and evaluation7.7. Traffic problems in UlaanbaatarTraffic problems in Ulaanbaatar8.8. Improvement directionImprovement direction

Page 3: Introduction to traffic managemen(modif)t

33August 7, 2007August 7, 2007

The Study on City Master Plan and Urban Development Program of Ulaanbaatar City (UBMPS)Intensive Learning Session on Urban Planning under Market Economy

1. Overview of Traffic Management1. Overview of Traffic Management

What is traffic management?What is traffic management?

Rational for traffic management.Rational for traffic management.

Traffic management process.Traffic management process.

Page 4: Introduction to traffic managemen(modif)t

44August 7, 2007August 7, 2007

The Study on City Master Plan and Urban Development Program of Ulaanbaatar City (UBMPS)Intensive Learning Session on Urban Planning under Market Economy

What is Traffic Management?What is Traffic Management?

A set of traffic A set of traffic EEngineering, ngineering, EEnforcement nforcement and and EEducational measures to make traffic ducational measures to make traffic more efficient and safer.more efficient and safer.

No acquisition of additional land.No acquisition of additional land.

Far less costly as compared with road Far less costly as compared with road construction or road widening.construction or road widening.

Can be implemented in a short time.Can be implemented in a short time.

Physical and operational measures.Physical and operational measures.

Page 5: Introduction to traffic managemen(modif)t

55August 7, 2007August 7, 2007

The Study on City Master Plan and Urban Development Program of Ulaanbaatar City (UBMPS)Intensive Learning Session on Urban Planning under Market Economy

Objectives of Traffic ManagementObjectives of Traffic Management

General objectives:General objectives: Make traffic more efficient.Make traffic more efficient. Enhance traffic safetyEnhance traffic safety Reduce pollutant emissionReduce pollutant emission

Specific objectives:Specific objectives: Promote public transport usePromote public transport use Promote non-motorized transport (NMT)Promote non-motorized transport (NMT) Restrict use of private cars (traffic demand Restrict use of private cars (traffic demand

management)management)

Page 6: Introduction to traffic managemen(modif)t

66August 7, 2007August 7, 2007

The Study on City Master Plan and Urban Development Program of Ulaanbaatar City (UBMPS)Intensive Learning Session on Urban Planning under Market Economy

Rationale for Traffic ManagementRationale for Traffic Management

Not enough roads to accommodate Not enough roads to accommodate growing traffic demand.growing traffic demand.

Cannot keep constructing new roads even Cannot keep constructing new roads even if fund is available.if fund is available.

New approach that relies on:New approach that relies on: Improvement of public transport;Improvement of public transport; Intensive management of travel demand; andIntensive management of travel demand; and Traffic management techniques to increase Traffic management techniques to increase

effective capacity of available road space.effective capacity of available road space.

Page 7: Introduction to traffic managemen(modif)t

77August 7, 2007August 7, 2007

The Study on City Master Plan and Urban Development Program of Ulaanbaatar City (UBMPS)Intensive Learning Session on Urban Planning under Market Economy

Traffic Management ProcessTraffic Management ProcessIdentify traffic

problems

Collect data

Analyze data & formulate solution

Estimate cost of improvements

Implement measures

Monitor & fine-tune or adjust measures

Consult stakeholders

Secure efficient and safe flow of people and goods through the road network

Conduct information drive

Secure fund

Page 8: Introduction to traffic managemen(modif)t

88August 7, 2007August 7, 2007

The Study on City Master Plan and Urban Development Program of Ulaanbaatar City (UBMPS)Intensive Learning Session on Urban Planning under Market Economy

2. Data Collection & Problem Identifications2. Data Collection & Problem Identifications

Identification of problem (traffic congestion) Identification of problem (traffic congestion) and its location.and its location.

Traffic survey.Traffic survey. Various traffic surveys were conducted in this Various traffic surveys were conducted in this

study.study.

Opinion and behavior survey.Opinion and behavior survey.

Page 9: Introduction to traffic managemen(modif)t

99August 7, 2007August 7, 2007

The Study on City Master Plan and Urban Development Program of Ulaanbaatar City (UBMPS)Intensive Learning Session on Urban Planning under Market Economy

Traffic CongestionTraffic Congestion

Traffic congestion occurs when:Traffic congestion occurs when:

Demand>CapacityDemand>Capacity

Even small excess demand can cause heavy Even small excess demand can cause heavy congestion.congestion.

Heavy congestion in Bangkok, Thailand

Page 10: Introduction to traffic managemen(modif)t

1010August 7, 2007August 7, 2007

The Study on City Master Plan and Urban Development Program of Ulaanbaatar City (UBMPS)Intensive Learning Session on Urban Planning under Market Economy

Bottleneck PointsBottleneck Points

A location where physical or effective A location where physical or effective capacity decreases and congestion starts.capacity decreases and congestion starts. Intersection / roundaboutIntersection / roundabout Narrowed road sectionNarrowed road section Roadside parkingRoadside parking Bus stopBus stop High side frictionHigh side friction

Page 11: Introduction to traffic managemen(modif)t

1111August 7, 2007August 7, 2007

The Study on City Master Plan and Urban Development Program of Ulaanbaatar City (UBMPS)Intensive Learning Session on Urban Planning under Market Economy

Traffic SurveyTraffic Survey

Objectives: Obtain quantitative data that is Objectives: Obtain quantitative data that is required to identify traffic problem and required to identify traffic problem and formulate solutions.formulate solutions.

Type of survey:Type of survey: Intersection turning movement countIntersection turning movement count Intersection inventory surveyIntersection inventory survey Traffic signal operation surveyTraffic signal operation survey Traffic accident surveyTraffic accident survey Travel time surveyTravel time survey

Page 12: Introduction to traffic managemen(modif)t

1212August 7, 2007August 7, 2007

The Study on City Master Plan and Urban Development Program of Ulaanbaatar City (UBMPS)Intensive Learning Session on Urban Planning under Market Economy

Intersection Turning Movement CountIntersection Turning Movement Count

Essential for intersection capacity analysis.Essential for intersection capacity analysis.

Counted in vehicle and converted to PCU Counted in vehicle and converted to PCU (Passenger Car Unit) for peak hour.(Passenger Car Unit) for peak hour.

Total Out

Total In

RT1 TH1

Total Out

RT2

TH2

Tota

l In

Total Out LT3 TH3

Total In

LT1

RT3

LT2RT4

TH4

Total In

RT4

Total Out

Page 13: Introduction to traffic managemen(modif)t

1313August 7, 2007August 7, 2007

The Study on City Master Plan and Urban Development Program of Ulaanbaatar City (UBMPS)Intensive Learning Session on Urban Planning under Market Economy

Travel Time SurveyTravel Time Survey

To identify bottleneck and low speed section To identify bottleneck and low speed section along the survey route. along the survey route.

Test vehicle runs several times along survey Test vehicle runs several times along survey route and records time at waypoints.route and records time at waypoints.

Travel Time Survey

0

140

370

640

940

1140

0

50

100

150

200

250

300

Distance (m)

Tim

e (s

ec)

Travel Time Survey (Speed)

0

140

370

640

940

1140

0.0

5.0

10.0

15.0

20.0

Distance (m)

Sp

eed

(km

/h)

Time-Distance Chart Travel Speed Chart

Page 14: Introduction to traffic managemen(modif)t

1414August 7, 2007August 7, 2007

The Study on City Master Plan and Urban Development Program of Ulaanbaatar City (UBMPS)Intensive Learning Session on Urban Planning under Market Economy

3. Data Analysis3. Data Analysis

Intersection capacity analysis.Intersection capacity analysis.

Traffic flow simulation.Traffic flow simulation.

Traffic analysis software for PC.Traffic analysis software for PC.

Page 15: Introduction to traffic managemen(modif)t

1515August 7, 2007August 7, 2007

The Study on City Master Plan and Urban Development Program of Ulaanbaatar City (UBMPS)Intensive Learning Session on Urban Planning under Market Economy

Intersection Capacity AnalysisIntersection Capacity Analysis

A procedure to analyze traffic operation at A procedure to analyze traffic operation at intersection.intersection.

Helpful to examine critical movements and Helpful to examine critical movements and overall intersection performance.overall intersection performance.

Applicable for both signalized and non-Applicable for both signalized and non-signalized intersection.signalized intersection.

Page 16: Introduction to traffic managemen(modif)t

1616August 7, 2007August 7, 2007

The Study on City Master Plan and Urban Development Program of Ulaanbaatar City (UBMPS)Intensive Learning Session on Urban Planning under Market Economy

Intersection Capacity AnalysisIntersection Capacity Analysis

Input data:Input data: Directional traffic volumeDirectional traffic volume Lane width and movement assignmentLane width and movement assignment Signal timing (for operational analysis of Signal timing (for operational analysis of

signalized intersection only)signalized intersection only)

Analysis output:Analysis output: [Volume] / [Saturation Rate] for each movement [Volume] / [Saturation Rate] for each movement

and overall intersectionand overall intersection A set of critical movementsA set of critical movements

Page 17: Introduction to traffic managemen(modif)t

1717August 7, 2007August 7, 2007

The Study on City Master Plan and Urban Development Program of Ulaanbaatar City (UBMPS)Intensive Learning Session on Urban Planning under Market Economy

Example of Intersection Capacity AnalysisExample of Intersection Capacity Analysis

1520

1985

124 1861

1730

31

747

1067

2198 0 1489

1536

0

47

2890

1683

1731

48

871

AMAM PMPM

Max N-S V/SMax N-S V/S 0.320.32 0.330.33

Max E-W V/SMax E-W V/S 0.400.40 0.490.49

Y ValueY Value 0.720.72 0.830.83

PM peak hour traffic volume Lane width & assignment

3.30m 6.60m

6.60m 3.30m

3.30m

5.00m

5.00m

3.30m

Page 18: Introduction to traffic managemen(modif)t

1818August 7, 2007August 7, 2007

The Study on City Master Plan and Urban Development Program of Ulaanbaatar City (UBMPS)Intensive Learning Session on Urban Planning under Market Economy

Traffic Flow Simulation SoftwareTraffic Flow Simulation Software

A set of computer programs that constructs A set of computer programs that constructs virtual road network and simulates virtual road network and simulates movements of individual vehicle on it.movements of individual vehicle on it.

Performance of network under various road Performance of network under various road conditions and traffic demands can be conditions and traffic demands can be tested.tested.

Page 19: Introduction to traffic managemen(modif)t

1919August 7, 2007August 7, 2007

The Study on City Master Plan and Urban Development Program of Ulaanbaatar City (UBMPS)Intensive Learning Session on Urban Planning under Market Economy

Input Data RequiredInput Data Required

Link, node and network configuration:Link, node and network configuration: Length, grade, lane assignment, connection, Length, grade, lane assignment, connection,

turn pocketturn pocket

Traffic control at intersection:Traffic control at intersection: Signalized and unsignalized, vehicle detectorSignalized and unsignalized, vehicle detector

Traffic volume and vehicle properties:Traffic volume and vehicle properties: Input volume, turning movement at intersection, Input volume, turning movement at intersection,

vehicle performance by type, etc.vehicle performance by type, etc.

Page 20: Introduction to traffic managemen(modif)t

2020August 7, 2007August 7, 2007

The Study on City Master Plan and Urban Development Program of Ulaanbaatar City (UBMPS)Intensive Learning Session on Urban Planning under Market Economy

Simulation OutputSimulation Output

Traffic data:Traffic data: Number of trips, traffic volume, delayNumber of trips, traffic volume, delay Congestion data (max and average queue)Congestion data (max and average queue)

Person data:Person data: Person-km, person-trips, delay/personPerson-km, person-trips, delay/person

Vehicle data:Vehicle data: Moving time, delay time, queue timeMoving time, delay time, queue time

Energy and environment:Energy and environment: Fuel consumption, pollutant emissionFuel consumption, pollutant emission

Page 21: Introduction to traffic managemen(modif)t

2121August 7, 2007August 7, 2007

The Study on City Master Plan and Urban Development Program of Ulaanbaatar City (UBMPS)Intensive Learning Session on Urban Planning under Market Economy

Traffic Flow AnimationTraffic Flow Animation

Page 22: Introduction to traffic managemen(modif)t

2222August 7, 2007August 7, 2007

The Study on City Master Plan and Urban Development Program of Ulaanbaatar City (UBMPS)Intensive Learning Session on Urban Planning under Market Economy

Application of Traffic Flow SimulationApplication of Traffic Flow Simulation

Can be used for comparison and evaluation Can be used for comparison and evaluation of various traffic improvement measures of various traffic improvement measures including:including: Intersection geometric improvementIntersection geometric improvement Signalization / Signal improvementSignalization / Signal improvement Fly-overFly-over Traffic regulation (lane control, turn prohibition, Traffic regulation (lane control, turn prohibition,

parking control, one-way, etc.)parking control, one-way, etc.) Public transport improvementPublic transport improvement HOV (high occupancy vehicle) laneHOV (high occupancy vehicle) lane

Page 23: Introduction to traffic managemen(modif)t

2323August 7, 2007August 7, 2007

The Study on City Master Plan and Urban Development Program of Ulaanbaatar City (UBMPS)Intensive Learning Session on Urban Planning under Market Economy

Advantage of Using Simulation SoftwareAdvantage of Using Simulation Software

Several traffic management measures can Several traffic management measures can be tested and compared with minimal time be tested and compared with minimal time and cost.and cost.

Various measures of effectiveness (MoE) Various measures of effectiveness (MoE) can be obtained.can be obtained.

Visual presentation of road network and Visual presentation of road network and traffic operation available.traffic operation available.

Page 24: Introduction to traffic managemen(modif)t

2424August 7, 2007August 7, 2007

The Study on City Master Plan and Urban Development Program of Ulaanbaatar City (UBMPS)Intensive Learning Session on Urban Planning under Market Economy

Traffic Analysis Software for PCTraffic Analysis Software for PC

Intersection / arterial streets / network Intersection / arterial streets / network operation analysis software.operation analysis software.

Many package software are available:Many package software are available:

Highway capacity softwareHighway capacity softwarePasser II/III/IVPasser II/III/IVSYNCHROSYNCHROSIMTRAFFICSIMTRAFFICaaSIDRAaaSIDRA

SIG/CINEMASIG/CINEMATRANSYT-TRANSYT-7F7FTSISTSIS

Page 25: Introduction to traffic managemen(modif)t

2525August 7, 2007August 7, 2007

The Study on City Master Plan and Urban Development Program of Ulaanbaatar City (UBMPS)Intensive Learning Session on Urban Planning under Market Economy

4. Formulation of Solutions4. Formulation of Solutions

Traffic management instruments:Traffic management instruments: Intersection geometric improvementIntersection geometric improvement Traffic signalTraffic signal Transit signal priorityTransit signal priority Traffic sign & road markingTraffic sign & road marking Traffic demand managementTraffic demand management Parking managementParking management

Page 26: Introduction to traffic managemen(modif)t

2626August 7, 2007August 7, 2007

The Study on City Master Plan and Urban Development Program of Ulaanbaatar City (UBMPS)Intensive Learning Session on Urban Planning under Market Economy

Traffic Management InstrumentsTraffic Management Instruments

Various technique is available and Various technique is available and applicable to regulate vehicle and applicable to regulate vehicle and pedestrian flows.pedestrian flows.Basic rules are:Basic rules are: Simplify traffic flow (reduce no. of movements)Simplify traffic flow (reduce no. of movements) Segregate road users in space and timeSegregate road users in space and time Increase capacity in order to accommodate Increase capacity in order to accommodate

more vehicles (supply side measure)more vehicles (supply side measure) Restrain traffic in order to reduce traffic volume Restrain traffic in order to reduce traffic volume

(demand side measure)(demand side measure)

Page 27: Introduction to traffic managemen(modif)t

2727August 7, 2007August 7, 2007

The Study on City Master Plan and Urban Development Program of Ulaanbaatar City (UBMPS)Intensive Learning Session on Urban Planning under Market Economy

Traffic Engineering SolutionTraffic Engineering Solution

What is “traffic engineering?”What is “traffic engineering?” Traffic Engineering applies engineering Traffic Engineering applies engineering

principles to help solve transportation problems, principles to help solve transportation problems, and brings into play knowledge of psychology and brings into play knowledge of psychology and habits of users of the transportation and habits of users of the transportation systems, aside from technical foundations.systems, aside from technical foundations.

Page 28: Introduction to traffic managemen(modif)t

2828August 7, 2007August 7, 2007

The Study on City Master Plan and Urban Development Program of Ulaanbaatar City (UBMPS)Intensive Learning Session on Urban Planning under Market Economy

Traffic Engineering MeasuresTraffic Engineering Measures

Traffic Engineering Measures

Advanced signal control

Signal timing review

Traffic sign / road marking

Road section

Intersection Geometry improvement

Turn restriction

Reversible lane

Traffic information system

Wide area Area traffic control system

Truck ban

One-way

Traffic sign / road marking

Page 29: Introduction to traffic managemen(modif)t

2929August 7, 2007August 7, 2007

The Study on City Master Plan and Urban Development Program of Ulaanbaatar City (UBMPS)Intensive Learning Session on Urban Planning under Market Economy

Intersection Geometric ImprovementIntersection Geometric Improvement

Regulate vehicle and pedestrian Regulate vehicle and pedestrian movements at intersection by modifying movements at intersection by modifying intersection geometry.intersection geometry.

Basic rulesBasic rules Make intersection size as small as possibleMake intersection size as small as possible Keep number of approaches four or lessKeep number of approaches four or less Make approach angle close to 90 degreeMake approach angle close to 90 degree Provide left turn lane if necessaryProvide left turn lane if necessary Provide refugee space for pedestrianProvide refugee space for pedestrian

Page 30: Introduction to traffic managemen(modif)t

3030August 7, 2007August 7, 2007

The Study on City Master Plan and Urban Development Program of Ulaanbaatar City (UBMPS)Intensive Learning Session on Urban Planning under Market Economy

Example of Intersection Geometric ImprovementExample of Intersection Geometric Improvement

Before After

Page 31: Introduction to traffic managemen(modif)t

3131August 7, 2007August 7, 2007

The Study on City Master Plan and Urban Development Program of Ulaanbaatar City (UBMPS)Intensive Learning Session on Urban Planning under Market Economy

Traffic Signal – Signal WarrantTraffic Signal – Signal Warrant

Signal warrant determines whether a traffic Signal warrant determines whether a traffic signal is required at a particular intersection signal is required at a particular intersection or not.or not.

Factors to be considered:Factors to be considered:Traffic volume

Left turn volume

Pedestrian volume

V/C ratio

Nearby facility

Traffic accident

Page 32: Introduction to traffic managemen(modif)t

3232August 7, 2007August 7, 2007

The Study on City Master Plan and Urban Development Program of Ulaanbaatar City (UBMPS)Intensive Learning Session on Urban Planning under Market Economy

Traffic Signal – Basic ParameterTraffic Signal – Basic Parameter

Cycle (duration of 1 cycle, second)Cycle (duration of 1 cycle, second)

Split (ratio of green time against cycle, %)Split (ratio of green time against cycle, %)

Offset (time difference between 2 signals with Offset (time difference between 2 signals with same cycle, second or %)same cycle, second or %)

Green(split)

Red

Cycle

Offset

Intersection 2

Intersection 1

Distance

TimeVehicle movement

Page 33: Introduction to traffic managemen(modif)t

3333August 7, 2007August 7, 2007

The Study on City Master Plan and Urban Development Program of Ulaanbaatar City (UBMPS)Intensive Learning Session on Urban Planning under Market Economy

Traffic Signal – Control ModeTraffic Signal – Control Mode

CategoryCategory ModeMode TechnologyTechnology CostCost O/MO/M

IsolatedIsolated Fixed timeFixed time SimpleSimple LowLow EasyEasy

Time-of-dayTime-of-day

ActuatedActuated

ArterialArterial CoordinatedCoordinated

Area Area ResponsiveResponsive

AdaptiveAdaptive SophisticatedSophisticated HighHigh DifficultDifficult

O/M: Operation and maintenance

Page 34: Introduction to traffic managemen(modif)t

3434August 7, 2007August 7, 2007

The Study on City Master Plan and Urban Development Program of Ulaanbaatar City (UBMPS)Intensive Learning Session on Urban Planning under Market Economy

Traffic Signal - CoordinationTraffic Signal - Coordination

Signals along arterial street are coordinated to Signals along arterial street are coordinated to maximize throughput and minimize delaymaximize throughput and minimize delay

Distance

Tim

e

Shorter Travel Time

Tim

e

Uncoordinated Signals Coordinated Signals

Distance

Sig

nal

Page 35: Introduction to traffic managemen(modif)t

3535August 7, 2007August 7, 2007

The Study on City Master Plan and Urban Development Program of Ulaanbaatar City (UBMPS)Intensive Learning Session on Urban Planning under Market Economy

Traffic Signal – Control ModeTraffic Signal – Control Mode

Signal

Clock Vehicle Detector

Fixed Time Time-of-day (TOD) Actuation

Coordinated Area Traffic Control

Traffic responsive/adaptive

Connection

Traffic Control Center

Page 36: Introduction to traffic managemen(modif)t

3636August 7, 2007August 7, 2007

The Study on City Master Plan and Urban Development Program of Ulaanbaatar City (UBMPS)Intensive Learning Session on Urban Planning under Market Economy

Traffic Signal – Manual ControlTraffic Signal – Manual Control

Why manual control is not efficient?Why manual control is not efficient? Control based on wrong perceptionControl based on wrong perception

– Minimizing stops instead of total throughputMinimizing stops instead of total throughput Effective only for light trafficEffective only for light traffic

– Not effective for near- or over-saturated trafficNot effective for near- or over-saturated traffic Local optimization at bestLocal optimization at best

– Coordination not considered, not network-wide Coordination not considered, not network-wide optimizationoptimization

Fatigue and loss of attentionFatigue and loss of attention– Human natureHuman nature

Page 37: Introduction to traffic managemen(modif)t

3737August 7, 2007August 7, 2007

The Study on City Master Plan and Urban Development Program of Ulaanbaatar City (UBMPS)Intensive Learning Session on Urban Planning under Market Economy

Traffic Signal – Long Cycle TimeTraffic Signal – Long Cycle Time

If cycle time is doubled, average delay is If cycle time is doubled, average delay is also doubled with same traffic volumealso doubled with same traffic volume

RED RED

GREEN GREEN

SIGNAL

ARRIVALTIME

SHORT CYCLE TIME

RED

GREEN

SIGNAL

ARRIVALTIME

LONG CYCLE TIME

Page 38: Introduction to traffic managemen(modif)t

3838August 7, 2007August 7, 2007

The Study on City Master Plan and Urban Development Program of Ulaanbaatar City (UBMPS)Intensive Learning Session on Urban Planning under Market Economy

Platoon – Group of VehiclesPlatoon – Group of Vehicles

In manual control, operator tends to wait for In manual control, operator tends to wait for approaching vehicle - wrong practice!approaching vehicle - wrong practice!

(a) Start of Green (b) Begining of Green (c) End of Green

Page 39: Introduction to traffic managemen(modif)t

3939August 7, 2007August 7, 2007

The Study on City Master Plan and Urban Development Program of Ulaanbaatar City (UBMPS)Intensive Learning Session on Urban Planning under Market Economy

Platoon ProfilePlatoon Profile

Green time is wasted as it is not fully utilizedGreen time is wasted as it is not fully utilized

Efficiency decreases with longer cycleEfficiency decreases with longer cycle

Platoon Pattern

Green Time

Veh

icle

s/U

nit

Gre

en

Saturation flow level

Wasted Green Time

Cycle Length and Efficiency

100 120 140 160 180 200

Cycle Length (sec)

Veh

icle

s/U

nit

Gre

en

Page 40: Introduction to traffic managemen(modif)t

4040August 7, 2007August 7, 2007

The Study on City Master Plan and Urban Development Program of Ulaanbaatar City (UBMPS)Intensive Learning Session on Urban Planning under Market Economy

Transit Signal PriorityTransit Signal Priority

Red signal is shortened or green signal is Red signal is shortened or green signal is lengthened to minimized delay of buslengthened to minimized delay of bus

Time

Distance

(a) Early Green (b) Green Extension

Red

BusMovement

BusMovement

Green

BUS DET

BUS DET

Page 41: Introduction to traffic managemen(modif)t

4141August 7, 2007August 7, 2007

The Study on City Master Plan and Urban Development Program of Ulaanbaatar City (UBMPS)Intensive Learning Session on Urban Planning under Market Economy

Traffic Signs and Road MarkingsTraffic Signs and Road Markings

Effective tool to regulate trafficEffective tool to regulate traffic

Mongolian standards establishedMongolian standards established

Page 42: Introduction to traffic managemen(modif)t

4242August 7, 2007August 7, 2007

The Study on City Master Plan and Urban Development Program of Ulaanbaatar City (UBMPS)Intensive Learning Session on Urban Planning under Market Economy

Traffic Demand ManagementTraffic Demand Management

Traffic Demand Management

Demand suppression

Road pricing

Restriction by plate number

Tele-working

Parking control/parking fee

Modal shift Use of public transport

Park & ride

Demand dispersal

Traffic information system

Staggered office / school hour

Flex time

Efficient use of car

HOV lane

Car sharing

Efficient cargo distribution

Page 43: Introduction to traffic managemen(modif)t

4343August 7, 2007August 7, 2007

The Study on City Master Plan and Urban Development Program of Ulaanbaatar City (UBMPS)Intensive Learning Session on Urban Planning under Market Economy

TDM ApplicationTDM Application

Area license (Electronic Road Pricing)Area license (Electronic Road Pricing) - - Singapore, LondonSingapore, London

High Occupancy Vehicle (3-in-1) – JakartaHigh Occupancy Vehicle (3-in-1) – Jakarta

HOV laneHOV lane

Color coding (License plate) – Soul, Manila Color coding (License plate) – Soul, Manila (Monday (1,2), Tuesday (3,4),…)(Monday (1,2), Tuesday (3,4),…)

Pedestrian / transit mall (Istaklal)Pedestrian / transit mall (Istaklal)

Page 44: Introduction to traffic managemen(modif)t

4444August 7, 2007August 7, 2007

The Study on City Master Plan and Urban Development Program of Ulaanbaatar City (UBMPS)Intensive Learning Session on Urban Planning under Market Economy

ERP, Busway, 3-in-1ERP, Busway, 3-in-1

Page 45: Introduction to traffic managemen(modif)t

4545August 7, 2007August 7, 2007

The Study on City Master Plan and Urban Development Program of Ulaanbaatar City (UBMPS)Intensive Learning Session on Urban Planning under Market Economy

Parking ManagementParking Management

Vehicle needs space to park.Vehicle needs space to park.

Reasonable amount of parking space must Reasonable amount of parking space must be provided.be provided. Otherwise, rampant illegal parkingOtherwise, rampant illegal parking

Affluent supply of parking space will induce Affluent supply of parking space will induce and encourage private car use.and encourage private car use.

Balance between demand and supplyBalance between demand and supply

Page 46: Introduction to traffic managemen(modif)t

4646August 7, 2007August 7, 2007

The Study on City Master Plan and Urban Development Program of Ulaanbaatar City (UBMPS)Intensive Learning Session on Urban Planning under Market Economy

Parking Management InstrumentsParking Management Instruments

Supply Management

Provision of off-street parking

On-street parking provision/restrictionParking Management

Demand Management

Goods transport improvement

Enforcement of no parking

Alternative mode of transport

Parking requirement for building

By public sector

By private sector

On-street area for loading/unloading of goods

User’s behavior Education / campaign

Traffic demand management

Efficient use of parking

Parking information provisionParking fee structure & level

Accessibility improvement

Page 47: Introduction to traffic managemen(modif)t

4747August 7, 2007August 7, 2007

The Study on City Master Plan and Urban Development Program of Ulaanbaatar City (UBMPS)Intensive Learning Session on Urban Planning under Market Economy

5. Implementation of Improvement Measures 5. Implementation of Improvement Measures

Cost estimate and fundingCost estimate and funding

Consultation with stakeholdersConsultation with stakeholders

Legislation and regulationLegislation and regulation

Public relationsPublic relations

Page 48: Introduction to traffic managemen(modif)t

4848August 7, 2007August 7, 2007

The Study on City Master Plan and Urban Development Program of Ulaanbaatar City (UBMPS)Intensive Learning Session on Urban Planning under Market Economy

Cost Estimate and FundingCost Estimate and Funding

Realistic cost must be estimated using Realistic cost must be estimated using prevailing price of materials, cost of similar prevailing price of materials, cost of similar works and inquiry to potential suppliers / works and inquiry to potential suppliers / contractors.contractors.

Fund must be secured from annual budget, Fund must be secured from annual budget, special budget, or other sources.special budget, or other sources.

Long lead time must be considered for Long lead time must be considered for timely implementation. timely implementation.

Page 49: Introduction to traffic managemen(modif)t

4949August 7, 2007August 7, 2007

The Study on City Master Plan and Urban Development Program of Ulaanbaatar City (UBMPS)Intensive Learning Session on Urban Planning under Market Economy

Consultation with StakeholderConsultation with Stakeholder

Share knowledge and experience and Share knowledge and experience and collaborate in formulating workable solutioncollaborate in formulating workable solution

Stakeholder Meeting in Jakarta, Indonesia

Participants: Driver Participants: Driver (public, private), (public, private), passenger, pedestrian, passenger, pedestrian, resident, shop owner, resident, shop owner, other government other government agencies (national and agencies (national and local)local)

Page 50: Introduction to traffic managemen(modif)t

5050August 7, 2007August 7, 2007

The Study on City Master Plan and Urban Development Program of Ulaanbaatar City (UBMPS)Intensive Learning Session on Urban Planning under Market Economy

Information & Education CampaignInformation & Education Campaign

Disseminate information to foster road Disseminate information to foster road user’s cooperationuser’s cooperation

Traffic rule campaign Traffic rule campaign in Hanoi, Vietnamin Hanoi, Vietnam

Page 51: Introduction to traffic managemen(modif)t

5151August 7, 2007August 7, 2007

The Study on City Master Plan and Urban Development Program of Ulaanbaatar City (UBMPS)Intensive Learning Session on Urban Planning under Market Economy

6. Operation and Evaluation6. Operation and Evaluation

Guidance and enforcement.Guidance and enforcement.

Review and evaluation.Review and evaluation.

Page 52: Introduction to traffic managemen(modif)t

5252August 7, 2007August 7, 2007

The Study on City Master Plan and Urban Development Program of Ulaanbaatar City (UBMPS)Intensive Learning Session on Urban Planning under Market Economy

Roles of Traffic EnforcerRoles of Traffic Enforcer

Get drivers and pedestrians to obey traffic rules Get drivers and pedestrians to obey traffic rules and regulations – main taskand regulations – main task

Human signal controller – secondary taskHuman signal controller – secondary task

Impromptu new traffic scheme not effectiveImpromptu new traffic scheme not effective

Traffic police at work

Page 53: Introduction to traffic managemen(modif)t

5353August 7, 2007August 7, 2007

The Study on City Master Plan and Urban Development Program of Ulaanbaatar City (UBMPS)Intensive Learning Session on Urban Planning under Market Economy

Monitoring and EvaluationMonitoring and Evaluation

Essential for sustainability.Essential for sustainability.

IndicatorsIndicators Comparison of “before” and “after” data (traffic Comparison of “before” and “after” data (traffic

volume, travel time, delay, etc.)volume, travel time, delay, etc.) Number and severity of accidentsNumber and severity of accidents Pedestrian (space, waiting time and path to Pedestrian (space, waiting time and path to

cross intersection)cross intersection) ComplaintsComplaints

Page 54: Introduction to traffic managemen(modif)t

5454August 7, 2007August 7, 2007

The Study on City Master Plan and Urban Development Program of Ulaanbaatar City (UBMPS)Intensive Learning Session on Urban Planning under Market Economy

SummarySummary

Effectiveness and limitations of traffic Effectiveness and limitations of traffic management measures must be properly management measures must be properly understood (no almighty solution).understood (no almighty solution).

Scientific approach must be taken (think Scientific approach must be taken (think before you tinker). before you tinker).

Concerted and sustained efforts by all Concerted and sustained efforts by all parties concerned is required (never ending parties concerned is required (never ending task but do your best).task but do your best).

Page 55: Introduction to traffic managemen(modif)t

5555August 7, 2007August 7, 2007

The Study on City Master Plan and Urban Development Program of Ulaanbaatar City (UBMPS)Intensive Learning Session on Urban Planning under Market Economy

7. Traffic Management Problem in Ulaanbaatar7. Traffic Management Problem in Ulaanbaatar

Weak road networkWeak road network

Traffic congestionTraffic congestion

Traffic accidentTraffic accident

ParkingParking

Traffic control facilitiesTraffic control facilities

Public transportPublic transport

Page 56: Introduction to traffic managemen(modif)t

5656August 7, 2007August 7, 2007

The Study on City Master Plan and Urban Development Program of Ulaanbaatar City (UBMPS)Intensive Learning Session on Urban Planning under Market Economy

Weak Road NetworkWeak Road Network

Few collector and local roads.Few collector and local roads.

Aerial photo of Ulaanbaatar

Page 57: Introduction to traffic managemen(modif)t

5757August 7, 2007August 7, 2007

The Study on City Master Plan and Urban Development Program of Ulaanbaatar City (UBMPS)Intensive Learning Session on Urban Planning under Market Economy

Traffic CongestionTraffic Congestion

Growing but still at manageable level.Growing but still at manageable level.

Vehicle type Route Direction Travel Speed (km/h)

      1998 2007

Car Peace Ave East 41.4 25.4

    West 42.4 25.7

  Khuvsgalchid - Ikh Toiruu East 30.3 21.3

    West 29.0 20.9

  Ikh Toiruu South 40.9 19.1

    North 42.5 20.3

  Narny Zam East 42.3 31.7

    West 41.2 19.7

Bus UBIS - Yarmag East 35.7 21.4

    West 31.9 20.1

  UBIS - Chingeltei East 24.1 16.8

    West 24.1 18.0

Page 58: Introduction to traffic managemen(modif)t

5858August 7, 2007August 7, 2007

The Study on City Master Plan and Urban Development Program of Ulaanbaatar City (UBMPS)Intensive Learning Session on Urban Planning under Market Economy

Traffic AccidentTraffic Accident

High accident rate compared with number of High accident rate compared with number of vehicles.vehicles.High rate of pedestrian accidents.High rate of pedestrian accidents.Accident prone locations:Accident prone locations: Intersection, roundabout, high traffic volumeIntersection, roundabout, high traffic volume

Accident prone locations

Page 59: Introduction to traffic managemen(modif)t

5959August 7, 2007August 7, 2007

The Study on City Master Plan and Urban Development Program of Ulaanbaatar City (UBMPS)Intensive Learning Session on Urban Planning under Market Economy

Parking ProblemParking Problem

One of the causes of traffic congestion.One of the causes of traffic congestion.

No parking management policy exists.No parking management policy exists.

Insufficient parking supply.Insufficient parking supply.

Double parking along

Page 60: Introduction to traffic managemen(modif)t

6060August 7, 2007August 7, 2007

The Study on City Master Plan and Urban Development Program of Ulaanbaatar City (UBMPS)Intensive Learning Session on Urban Planning under Market Economy

Traffic Control FacilitiesTraffic Control Facilities

New and functional signal and obsolete signals New and functional signal and obsolete signals are mixed.are mixed.

Insufficient number of traffic sign.Insufficient number of traffic sign.

Road marking almost non-existing.Road marking almost non-existing.

Obsolete signal controller

Page 61: Introduction to traffic managemen(modif)t

6161August 7, 2007August 7, 2007

The Study on City Master Plan and Urban Development Program of Ulaanbaatar City (UBMPS)Intensive Learning Session on Urban Planning under Market Economy

Poor Public TransportPoor Public Transport

Proliferation of mini-bus.Proliferation of mini-bus. 337 units (1998) 2,016 units (2004) 337 units (1998) 2,016 units (2004) Lowest evaluation among modes (HIS)Lowest evaluation among modes (HIS)

Deteriorating trolley bus service.Deteriorating trolley bus service. 134 buses (1998) 53 buses (2004)134 buses (1998) 53 buses (2004)

Existing bus lane not enforced.Existing bus lane not enforced.

Page 62: Introduction to traffic managemen(modif)t

6262August 7, 2007August 7, 2007

The Study on City Master Plan and Urban Development Program of Ulaanbaatar City (UBMPS)Intensive Learning Session on Urban Planning under Market Economy

8. Improvement Direction8. Improvement Direction

Traffic Management Improvement ProjectTraffic Management Improvement Project Package of traffic engineering measuresPackage of traffic engineering measures

Establishment of Transportation Research Establishment of Transportation Research CenterCenter Transportation database, modeling & planningTransportation database, modeling & planning Traffic engineering study & designTraffic engineering study & design Human resource developmentHuman resource development

Public transport improvementPublic transport improvementParking management policy and measuresParking management policy and measures

Page 63: Introduction to traffic managemen(modif)t

6363August 7, 2007August 7, 2007

The Study on City Master Plan and Urban Development Program of Ulaanbaatar City (UBMPS)Intensive Learning Session on Urban Planning under Market Economy

…….END.END