Page 1: Introduction UNECE WP.6 SIEEE IECEx-Scheme Conclusion and Discussion

1. Introduction2. UNECE WP.6 SIEEE3. IECEx-Scheme4. Conclusion and Discussion

UNECE WP.6 SIEEEA global regulation approach

WP.6 SIEEE

Frank LieneschPhysikalisch-Technische Bundesanstalt

Page 2: Introduction UNECE WP.6 SIEEE IECEx-Scheme Conclusion and Discussion

Interest of the Industry using Ex-Products

Users in the chemical and petroleum industry act more and more globally with a single engineering approach for their plants

to earn savings of engineering, installation and maintenance costs to buy the equipment in a larger number and to get a better price per piece to have benefit from the global competition under manufacturers

Barriers against this tendency are domestic rules and regulations which require special engineering for the plants from country to country.

1. Introduction

Page 3: Introduction UNECE WP.6 SIEEE IECEx-Scheme Conclusion and Discussion

Interest of the Industry manufacturing Ex-Products

Manufacturers want to sell and manufacture their products

without additional national differences for the product and delays to the market in accordance to one global standard (IEC / ISO) without double-testing of their product without formal restrictions to place it on the market

Barriers against this tendency are domestic rules and regulations which require special differences for the product from country to country.

1. Introduction

Page 4: Introduction UNECE WP.6 SIEEE IECEx-Scheme Conclusion and Discussion

History/StructureNational InternationalEuropean

Up to the seventies

Regulation

Standardi-zation

“Old” “New”Approach

Common RegulatoryObjectives (CRO)?

DIN DKE CEN Cenelec ISO IEC

Product+

Production

Certification Product+

Production

ProductProduct

Some basics of Ex-EquipmentVery High risk

Zone 0Normal risk

Zone 2High riskZone 1

Levels

Certificationby

Third Party

Yes Yes Yes/No

1. Introduction

Page 5: Introduction UNECE WP.6 SIEEE IECEx-Scheme Conclusion and Discussion

2. UNECE WP.6 SIEEE

Page 6: Introduction UNECE WP.6 SIEEE IECEx-Scheme Conclusion and Discussion

Diagramm WP.6

2. UNECE WP.6 SIEEE

Sector Initiatives

Legal Metro-

logy

Page 7: Introduction UNECE WP.6 SIEEE IECEx-Scheme Conclusion and Discussion

2. UNECE WP.6 SIEEE

Page 8: Introduction UNECE WP.6 SIEEE IECEx-Scheme Conclusion and Discussion

Kick off meeting 2007 in Geneva Presentations of the various systems, Questionnaire

2008 ParisDiscussions of the answers of the Questionnaire

2008 GenevaPreparation of the Terms of Reference

2009 StockholmDiscussions about the approach of the CRO

2009 MelbournePreparation of the CRO (proposal)

2009 Geneva Presentation of the Common Regulatory Objectives

2010 BerlinPresentation of the Workshop-Concept

2011 SplitPresentation of various Regulation Systems and Market Surveillance Aspects

Sector Initiative on Equipment for Explosive Environments (SIEEE) Status Report:

2. UNECE WP.6 SIEEE

Page 9: Introduction UNECE WP.6 SIEEE IECEx-Scheme Conclusion and Discussion

Intention of the Common Regulatory Objectives (CRO) to cover comprehensively all relevant issues in order to achieve an globally accepted safety level to provide a global „Best Practice“ model as a template for national regulation Focus to the main objectives

Easy to understand Open for national modifications

Specify the distributed roles and related responsibilities of the involved parties:

Regulator Market Surveillance Certification Body Manufacturer End user

Open for ongoing maintenance and modification

2. UNECE WP.6 SIEEE

Page 10: Introduction UNECE WP.6 SIEEE IECEx-Scheme Conclusion and Discussion

Intention of the Common Regulatory Objectives (CRO)

Ex- Equipment

Installation

Inspection andMaintenance

Repair

Life cycle approach

Market Surveillance

Regulators JurisdictionOperator

Manufacturer Placing on themarket

IEC 60079-0ISO/IEC 80079-0

IEC 60079-10IEC 60079-14IEC 60079-17

IEC 60079-19

2. UNECE WP.6 SIEEE

Page 11: Introduction UNECE WP.6 SIEEE IECEx-Scheme Conclusion and Discussion

CRO Part 1: Requirement for the equipmentPlacing on the market

» Elimination of possible ignition sources in accordance to intended use of the equipment, typical ignition sources are:

» Hot surfaces» Electrical sparks» Mechanical sparks» Electrostatic

» Validated protection concepts (“Types of Protection”) have to be applied

» Instructions (manual) about the intended use, installation and repair

» Conformity assessment procedure in accordance to an international certification scheme such as IECEx (IECEx procedure can be seen as a reference)

EN 1127-113 Ignition sources

IEC/ISO 60079-”X” / 80079-”X”

2. UNECE WP.6 SIEEE

Page 12: Introduction UNECE WP.6 SIEEE IECEx-Scheme Conclusion and Discussion

CRO Part 2: Safe use of the equipment

» Classification of the substances in accordance to:» Ignition Temperature» Explosions Groups (Ignition Energy)

» IEC-Zone Classification Concept (Zones for Gas and Dust) with the applicable Equipment Protection Levels

» The equipment and its installation need to be inspected and maintained

» Requirements for the competency of persons (selection, installation, use of the equipment)

» Requirements for service facilities (e.g. repair workshops)

» The Explosion risk assessment of an individual plant needs to be documented in the “Explosion Protection Document”

Ex d e IIC T3 Gb

IEC 60079 -10

IEC 60079 -14, -17,-19

2. UNECE WP.6 SIEEE

Page 13: Introduction UNECE WP.6 SIEEE IECEx-Scheme Conclusion and Discussion

IECISO

IECExCertification

Testing

PersonsCompetency

ISO Guide 65 / 67[ISO/IEC 17065]IECEx 02

ISO/IEC 17025IECEx 02

Service

IECEx 03

ISO/IEC 17024IECEx 05

Production

ISO/IEC 17021

CRO Part 1 and 2:

2. UNECE WP.6 SIEEE

Page 14: Introduction UNECE WP.6 SIEEE IECEx-Scheme Conclusion and Discussion

CRO Part 3: Standards reference list

» Accepted Standards (ISO/IEC) are listed in an annex to the regulation

» The standards has to be accepted by a Standard Acceptance Group

» After the acceptance the Standards can be applied by manufacturers and end users to show compliance with the regulation

» All countries which have implemented the Regulation enjoy the advantages like barrier free trade of explosion protected equipment and equal conditions for operating a plant bearing explosion risks

2. UNECE WP.6 SIEEE

Page 15: Introduction UNECE WP.6 SIEEE IECEx-Scheme Conclusion and Discussion

CRO Part 4: Conformity assessment bodies

» The accreditation body has to be a member of ILAC/IAF

» The accreditation of » Conformity Assessment Bodies» Test Laboratorieshas to follow the applicable ISO/IEC-Standards

» One member of the assessor team needs competence in the field of explosion protection (see e.g. the list of approved IECEx assessors).

» Procedures and Rules of the IEC Conformity Assessment System IECEx is to take as a reference for conformity assessment

2. UNECE WP.6 SIEEE

Page 16: Introduction UNECE WP.6 SIEEE IECEx-Scheme Conclusion and Discussion

CRO Part 5: Steering Committee

» An Explosion Protection Steering Committee is to formed and operated under the umbrella of UNECE WP.6 (ExSC) to monitor the application experiences

» All member having implemented the CROs can participate in the Explosion Steering Committee (ExSC)

» ExSC notifies the members of the Standard Acceptance Group

» Observers like» Standardization Organization (IEC/ISO)» Market Surveillance » IECExare also invited to attend the meetings

2. UNECE WP.6 SIEEE

Page 17: Introduction UNECE WP.6 SIEEE IECEx-Scheme Conclusion and Discussion

CRO Part 6: Market surveillance

» A Market Surveillance network specialized in Ex-Equipment is to be formed and operated (UNECE-ExMars)

» For critical non-conformance of Ex-Equipment an Alert-System is necessary

Ex - Market Surveillance Concept based on the general conceptof the „MARS“ Group

Strategy: • Developing a general procedure for market surveillance (GMSP)• Increasing cooperation with stakeholders and sharing the work of Market Surveillance internationally• Increasing the visibility of Market Surveillance to the outside world

2. UNECE WP.6 SIEEE

Page 18: Introduction UNECE WP.6 SIEEE IECEx-Scheme Conclusion and Discussion

W

W

W

W

W

The workshop idea: Regulators Dialogue Group

Dubai 2012

Rio 2013

Singapur 2012

Outputs:• Comprehensive description of the methodology of the system• Guidance documents for the various stakeholders (Regulators, Market Surveillance, Manufacturer, Operator, Inspection bodies)

2. UNECE WP.6 SIEEE

W

Page 19: Introduction UNECE WP.6 SIEEE IECEx-Scheme Conclusion and Discussion

Interaction/Relationship within the SIEEE-System

1. Definition/Jurisdictiona) Market Surveillanceb) Certification Bodiesc) Manufacturerd) Operator

2. Interactiona. Cert. B. ↔ Manu.b. Manu. ↔ Oper.c. MS ↔ Oper.d. MS ↔ Manu.e. MS ↔ Insp. B.f. Cert. ↔ Insp. B.

RegulatorRegulation

Market-surveillance

Certif. Bodies“Test Labs”

Operator“User”

Manufacturer

2. UNECE WP.6 SIEEE

Page 20: Introduction UNECE WP.6 SIEEE IECEx-Scheme Conclusion and Discussion

IEC Structure

IEC COUNCIL National Committees

COUNCIL BOARD

EXECUTIVE COMMITTEE

(IEC Officers) ManagementAdvisory

Committees

Central Office

(The Executive)

MARKET STRATEGY

BOARD

Industry Sector Boards

Tech. Advisory Cttees

Technical Committees

STANDARDIZATION MGMT BOARD

Management of International Consensus Standards Work

SWG Tech Watch

SWG SLCA

SWG EEE IECEE

CONFORMITY ASSESSMENTBOARD

Management of CA policy and Systems

IECEx

IECQ

Current Systems

3. IECEx

OIML-IEC-MoU

Page 21: Introduction UNECE WP.6 SIEEE IECEx-Scheme Conclusion and Discussion

What is IECEx?The single International IEC System with Schemes covering Certification to Standards that relate to Equipment and Services in areas relating to Explosive Atmospheres, to provide an Internationally accepted means of demonstrating claimed compliance with International StandardsIECEx is a “Conformity Assessment Tool” providing confidence that Products, Services and Personnel covered by an IECEx Certificate meet specified requirements, (International Standards)

“IECEx is the International Standard way of doing Ex Certification”

3. IECEx

Page 22: Introduction UNECE WP.6 SIEEE IECEx-Scheme Conclusion and Discussion

Outline of IECEx History - Timeline

1996

1997-99

1999

2000

2002

2003

2007

2009

2010

1992 Concept of IEC International Scheme for Ex Considered by IEC TC 31 + Agreed

1st Meeting of the New Management Committee (Comprising TC 31 Experts)

Develop Initial Structure + CB/ExTL qualification requirements

Commence Initial Phase (Transitional Arrangements)

Exchange of Ex Test Reports Commence (no IEC Certificate)

Decision to move to next stage (issue IECEx Certificates)

1st IECEx Certificate issued via “On-Line” System

New Ex Scheme for Services/Repairs Commenced + IECEx Mark Of Conformity Introduced

UN Formal Endorsement of IECEx, via UNECE

New Ex Certified Persons Scheme Launched

2011 > 15’000 Reports and Certificates issued

3. IECEx

Page 23: Introduction UNECE WP.6 SIEEE IECEx-Scheme Conclusion and Discussion

IEC TC 31

IEC TC 31 PTs,

MTs, SCs

IECEx Management and Governance Structure

CB Committee - Ensure common approach to Certification, eg Standard Test Report Forms, ExTRs, Decision Sheets

IECEx ExTAGall ExCBs and

ExTLsrepresented

Coordination Role for day to day Management, finance approves Rules,, CBs, TLs Comprise Industry experts

IEC ExMCManagement Committee

Member Countries

IECEx MarksCommittee

Oversee operation of Mark License system Comprise industry experts

Set Policy and Oversees Systems

CONFORMITY

ASSESSMENTBOARD (CAB)

STANDARDSMANAGEMEN

TBOARD (SMB)

Standards Work Conformity Assessment work

Page 24: Introduction UNECE WP.6 SIEEE IECEx-Scheme Conclusion and Discussion

24

To view on-line certificates

3. IECEx

Page 25: Introduction UNECE WP.6 SIEEE IECEx-Scheme Conclusion and Discussion

25

Ex Equipment, Components +

Systems

Ex Equipment Unit

Verification

Ex Equipment Mark License

Ex Competent Person

Ex Services, eg Repair to IEC 60079-19 +

Installation coming

IECEx - Certificates3. IECEx

Type 5

Page 26: Introduction UNECE WP.6 SIEEE IECEx-Scheme Conclusion and Discussion

Key elements: Accreditation of Conformity Assessment Bodies :

ILAC/IAF, Competent Assessor

Certification of Product and Production: Type 5 (17067), Intercomparisons Accepted and Listed Standards (Procedures)

Market Surveillance: Alert-System for non-conformance, Communication platform

Regulation: Steering Committee + Observers

4. Conclusion and Discussion

Problems:• National Variation, National Acceptance, Peer Assessment …

=> Sector Initiative Legal Metrology of UNECE WP.6?