introductory presentation of consultancy
TRANSCRIPT
![Page 1: Introductory Presentation of Consultancy](https://reader030.vdocuments.net/reader030/viewer/2022021213/577d27691a28ab4e1ea3dbcb/html5/thumbnails/1.jpg)
8/6/2019 Introductory Presentation of Consultancy
http://slidepdf.com/reader/full/introductory-presentation-of-consultancy 1/15
Introductory Presentation
of
Consulting Services provided by,
Mr. Nisarg Sutaria
M.S. Manufacturing Engineering
Mobile : +91-9924248850
Email : [email protected]
![Page 2: Introductory Presentation of Consultancy](https://reader030.vdocuments.net/reader030/viewer/2022021213/577d27691a28ab4e1ea3dbcb/html5/thumbnails/2.jpg)
8/6/2019 Introductory Presentation of Consultancy
http://slidepdf.com/reader/full/introductory-presentation-of-consultancy 2/15
Offerings
� Strategy
± Game Theory, SWOT Analysis, Porters 5 ForcesModel
� Supply Chain Management
± SCM Audit
± SCM Streamlining
�Lean Manufacturing ± Implementation of TPS Techniques
� Lean Six Sigma - Implementation
![Page 3: Introductory Presentation of Consultancy](https://reader030.vdocuments.net/reader030/viewer/2022021213/577d27691a28ab4e1ea3dbcb/html5/thumbnails/3.jpg)
8/6/2019 Introductory Presentation of Consultancy
http://slidepdf.com/reader/full/introductory-presentation-of-consultancy 3/15
Strategic Development through
Game TheoryArea Description
Scope One-to-one mentoring support on generic levels. In
particular, listening to challenges one faces in his/her job
and systematically organizing the improvement needs as
well as recommendations for Strategy Implementation via Game
Theory.
Method Discussion
Outcome You will be able to find out your niche.
You will find out your present status in the industry.
Leadership skills and Teamwork will be implemented.
Differences in reality and what is perceived will remain into focus
and will get visualized.
Tools and Software's will be suggested to implement Strategy more
viably.
Timeline 1 Day
Team Top Management and Department Heads
Impact Risk Management and On Launching of New Projects
![Page 4: Introductory Presentation of Consultancy](https://reader030.vdocuments.net/reader030/viewer/2022021213/577d27691a28ab4e1ea3dbcb/html5/thumbnails/4.jpg)
8/6/2019 Introductory Presentation of Consultancy
http://slidepdf.com/reader/full/introductory-presentation-of-consultancy 4/15
Strategic Development through
SWOT Analysis & Porters 5 Forces ModelArea Description
Scope Discussion on Strength, Weakness, Opportunity and Threats in SWOT
Analysis and Bargaining Power of Suppliers and Buyers, Potential
Entrants, Substitutes and Rivalry Among Existing Firms in Porters5
Forces Model
Method Discussion
Outcome Differences in reality and what is perceived will remain into focus
and will get visualized.
Leadership skills and Teamwork will be implemented.
Timeline 1 Day
Team Top Management and Department Heads
Impact Help in New Project Implementations
![Page 5: Introductory Presentation of Consultancy](https://reader030.vdocuments.net/reader030/viewer/2022021213/577d27691a28ab4e1ea3dbcb/html5/thumbnails/5.jpg)
8/6/2019 Introductory Presentation of Consultancy
http://slidepdf.com/reader/full/introductory-presentation-of-consultancy 5/15
Blue Ocean Strategy
Area Description
Scope Discussion of most famous book by Kim and Mauborgne. A classic
Strategic Management work. Basically creating uncontested
marketplace.
Method DiscussionOutcome Creating uncontested market place.
Timeline 1 Day
Team Top Management and Department Heads
Impact Help in New Project Implementations
![Page 6: Introductory Presentation of Consultancy](https://reader030.vdocuments.net/reader030/viewer/2022021213/577d27691a28ab4e1ea3dbcb/html5/thumbnails/6.jpg)
8/6/2019 Introductory Presentation of Consultancy
http://slidepdf.com/reader/full/introductory-presentation-of-consultancy 6/15
Supply Chain Management AUDIT
Area Description
Scope Streamlining all the Departments in the Company
Method AUDIT
Outcome You will visualize present status of all of your departments.
Reports created will provide information regarding how to upgradeSCM in your company.
Tools and Software's will be suggested to implement SCM more
viably.
Timeline 15/30 Days
Team Staff at all LevelsImpact Company will be able to find its niche Departments and laggard
Departments.
![Page 7: Introductory Presentation of Consultancy](https://reader030.vdocuments.net/reader030/viewer/2022021213/577d27691a28ab4e1ea3dbcb/html5/thumbnails/7.jpg)
8/6/2019 Introductory Presentation of Consultancy
http://slidepdf.com/reader/full/introductory-presentation-of-consultancy 7/15
Introduction of Materials Management
Area Description
Scope Introduction of Materials Management
Method Classroom Teaching
Outcome Knowhow of Supply Chain Management will be gained.
Timeline 5 days
Team Heads and Staffs of all Departments.
Impact Knowhow of SCM Basics will be discussed and taught.
![Page 8: Introductory Presentation of Consultancy](https://reader030.vdocuments.net/reader030/viewer/2022021213/577d27691a28ab4e1ea3dbcb/html5/thumbnails/8.jpg)
8/6/2019 Introductory Presentation of Consultancy
http://slidepdf.com/reader/full/introductory-presentation-of-consultancy 8/15
Kaizen
Area Description
Scope Implementation of Kaizen - Continuous Improvement with JIT, Kanban -
Parts withdrawal Kanban & Production instruction Kanban, Jidoka -
Automation with a human touch, Poka-Yoke - Mistake-proofing, Andon
Lamps, Total Preventive Maintenance, Total Productive Maintenance,
Quality Circles
Method Class Room Teaching as well as Plant Visit
Outcome Continuous Improvement Implementation
Timeline 5 Days
Team Top Management, Heads of the Departments and Staff Impact Improvement and Streamlining in Production and other Departments
![Page 9: Introductory Presentation of Consultancy](https://reader030.vdocuments.net/reader030/viewer/2022021213/577d27691a28ab4e1ea3dbcb/html5/thumbnails/9.jpg)
8/6/2019 Introductory Presentation of Consultancy
http://slidepdf.com/reader/full/introductory-presentation-of-consultancy 9/15
5S
Area Description
Scope Standardizing Workplace Practices with Seiri Sorting Out, Seiton
Place for everything, Everything in its place, Seiso Cleaning is
Inspection, Seiketsu- Standardization, Shitsuke Self-discipline and
training
Method Class Room Teaching as well as Plant Visit
Outcome Better Plant
Timeline 1 Day
Team Heads and Staff of all Departments.
Impact Smooth Workplace
![Page 10: Introductory Presentation of Consultancy](https://reader030.vdocuments.net/reader030/viewer/2022021213/577d27691a28ab4e1ea3dbcb/html5/thumbnails/10.jpg)
8/6/2019 Introductory Presentation of Consultancy
http://slidepdf.com/reader/full/introductory-presentation-of-consultancy 10/15
8 Wastes
Area Description
Scope Finding Wasters from Motion, Overproduction, Correction, Waiting,
Underutilized people, Extra processing, Transportation, Inventory
Method Class Room Teaching as well as Plant Visit
Outcome Removal of Wastes from the Plant
Timeline 5 Days
Team Heads and Staff of all Departments.
Impact Smooth Work Flow
![Page 11: Introductory Presentation of Consultancy](https://reader030.vdocuments.net/reader030/viewer/2022021213/577d27691a28ab4e1ea3dbcb/html5/thumbnails/11.jpg)
8/6/2019 Introductory Presentation of Consultancy
http://slidepdf.com/reader/full/introductory-presentation-of-consultancy 11/15
Value Stream Mapping
Area Description
Scope Finding VA and NVA.
Method Class Room Teaching as well as Plant Visit
Outcome Next Slide
Timeline 2 Days
Team Heads and Staff of all Departments.
Impact Smooth Work Flow
![Page 12: Introductory Presentation of Consultancy](https://reader030.vdocuments.net/reader030/viewer/2022021213/577d27691a28ab4e1ea3dbcb/html5/thumbnails/12.jpg)
8/6/2019 Introductory Presentation of Consultancy
http://slidepdf.com/reader/full/introductory-presentation-of-consultancy 12/15
Outcomes from
Lean Manufacturing ImplementationSr.
No.
Outcome
1. Have we reduced our total cycle time (order to shipment) by at least 50% over
the past three years?
2. Have total inventories decreased by at least 50% over the past three years?3. Do 98% or more of our orders reach customers on time?
4. Has our supplier base been reduced by 2/3 over the past five years?
5. Have our supplier lead times been reduced by 50% or more over the past three
years?
6. Have we reduced scrap, rework and warranty costs by at least 50% over thepast three years?
7. Has our cost to produce decreased by 20% or more over the past three years?
![Page 13: Introductory Presentation of Consultancy](https://reader030.vdocuments.net/reader030/viewer/2022021213/577d27691a28ab4e1ea3dbcb/html5/thumbnails/13.jpg)
8/6/2019 Introductory Presentation of Consultancy
http://slidepdf.com/reader/full/introductory-presentation-of-consultancy 13/15
Outcomes from
Lean Manufacturing ImplementationSr.
No.
Outcome
8. Have we reduced our cost of quality by at least 50% over the past three years?
9. Have we reduced direct material costs by at least 10% over the past three
years?10. Have we reduced our product development cycle time by at least 50% the past
three years?
![Page 14: Introductory Presentation of Consultancy](https://reader030.vdocuments.net/reader030/viewer/2022021213/577d27691a28ab4e1ea3dbcb/html5/thumbnails/14.jpg)
8/6/2019 Introductory Presentation of Consultancy
http://slidepdf.com/reader/full/introductory-presentation-of-consultancy 14/15
Lean Six Sigma
Sr. No. Description of Topics Duration
1. 5 Whys Half Day
2. DMAIC - Define the problem, Measure, Analyze, Design,
Verify
Half Day
3. FMEA - Failure mode and effects analysis Half Day
4. SIPOC analysis (Suppliers, Inputs, Process, Outputs,
Customers)
Half Day
5. X bar and R Chart One Day
Outcome You will start your journey to Six Sigma accuracy in
your Company. You will eliminate wastes and streamline your Supply
Chain.
Team Staff at all Levels.
![Page 15: Introductory Presentation of Consultancy](https://reader030.vdocuments.net/reader030/viewer/2022021213/577d27691a28ab4e1ea3dbcb/html5/thumbnails/15.jpg)
8/6/2019 Introductory Presentation of Consultancy
http://slidepdf.com/reader/full/introductory-presentation-of-consultancy 15/15
Questions? Duration 10 minutes
Ask queries and solve doubts.