SOUTH KAZAKHSTAN OBLAST

логотип

ABOUT THE REGION

100,0% 99,2%

48,0% 46,1%

22,9% 16,8% 16,7% 24,9%

15,0%

Share of SKO in total output of Kazakhstan

Area 117,249 km2

Population 2,642,700 people.

Urban population 40%

The capital city Shymkent

GDP per capita $ 3,700

Average salary $ 488

Economically active population 1 158.8 thousand

Higher education institutions 12

Students 77.7 million

логотип

MAIN INDICATORS

№ Data Measure 2006 2007 2008 2009 2010 2011

1 Consumer Price

Index by SKO

%, end of period, in

December last year 108, 8 123, 6 109, 1 106, 0 108,0 106,1

2 Average salary tenge 27 586 36 707 41 679 48 610 57 545 64 399

3 Investments in to

main capital mln.tenge 84 542 127 175 203 213 319 043 262 595 171 270

-of which foreign

investment mln.tenge 12 278 31 242 67 228 161 504 60 983 31 482

логотип

LIGHT INDUSTRY

The region is a center of implementing the cotton and textile cluster:

More than 50 cotton-processing, textile and garment enterprises

The volume of production of textile products in SKO - 9 300.00 mln.

The share of SKO in the volume of textile products and garments produced in Republic of Kazakhstan - 51.8%

The share of textiles in the industrial structure of SKO- 3.4%

The number of workers in the industry - 5,886 people

The level of labor productivity - $ 25.6 million

Investments in fixed capital industry - 972.84 mln

An increase in output by 1 tenge investments - 1.10 tenge

The large enterprises of cotton and textile industry:

• JSC "Utex"JSC "Melange“

• LLP «SOUTH TEXTILINE KZ»

• LLP "ginneries"LLP «Oxi Textile»

• LLP "Garment factory" Gauhar “

• LLP "Hlopkoprom-cellulose"

логотип

MINING INDUSTRY

The volume of production of mining in SKO - 10 070.50 mln

The share of the mining industry in the industrial structure SKR - 24.1%

The number of workers in the industry - 6,669 people.

The major minerals SKO:

• Uranus

• Lead

• Zinc

• gas fields

• Gold-objects

• commonly occurring minerals

• Fresh and thermal water

Large mining companies of SKO:

• LLP “JV" Betpak Dala “

• LLP “JV" Katko”

• LLP “Taukentskoe GHP”

• LLP “Stepnoe-RU”

• LLP “Mining Company”

• LLP “JV" Inkay”

• LLP "Ferrum-Ftor"

логотип

PHARMACEUTICAL INDUSTRY

Dynamically developing industry at the regional level:

21 companies Pharmaceutical manufacturers in SKO

106 86,6 million tenge Production volume of pharmaceutical products in SKO

49,3% The share of SKO in the volume of pharmaceutical production in Kazakhstan

3,5% The share of pharmaceuticals in the industrial structure of SKO

1300 people The number of workers in the industry

$36,6 thousand The level of labor

405,52 million tenge Investments in basic capital industry

2,10 tenge An increase in output by 1 tenge investments

Large companies in the pharmaceutical industry:

• JSC «Khimpharm»

• «Zerde-phito» LLP

• «Rauan» LLP

логотип

MECHANICAL ENGINEERING

Dynamically developing industry at the regional level:

35 companies Manufacturers of the machinery sector in SKO

21 563,20 million tenge The volume of production of the engineering industry in SKO

4,2% The share of SKO in the volume of engineering industry in Kazakhstan

8,90% The share of mechanical engineering in the industrial structure of SKO

3 500 people The number of workers in the industry

$ 12,4 thousand The level of labor

1 268,1 million tenge Investments in basic capital industry

2,09 tenge An increase in output by 1 tenge investments

Large companies in the engineering industry :

• JSC «Kentau transformer plant»

• «Ak Beren» LLP

• ТОО «Завод Электроаппарат»

• JSC «UKMZ»

• JSC «Excavator»

логотип

AGRICULTURAL SECTOR

Agriculture - one of the key sectors of the economy of SKO:

2,5 thousand Agricultural enterprises

69,5 thousand Farms

246,2 billion tenge The volume of production of the agricultural industry in SKO

8,4% (1place) The share of SKO in the volume of agriculture in Kazakhstan

99 387,8 million tenge The share of livestock in the industry

112 574,1 million tenge The share of crop production in the industry

логотип

RENEWABLE ENERGY SOURCES

Baidibek and Tulkibas rayon (district) SKO

Planned to install:

60 wind generators by 1MW each one

Further it is planned to increase till:

150 wind generators by 1MW each one

Solar potential of Suzak rayon (district:

2200-3000 Hours of sunshine annually

1000-1200 W/m2 of solar radiation energy density

7,6 часов Payback period

Geothermal energy :

24 hours 365 days per year Ability to use

2 years Payback period

логотип

3 main reasons to

invest in South Kazakhstan

1. The favorable investment climate

• Political and social stability

• Government support and investment guarantees (Kazakhstan signed agreements on mutual protection of investments)

2. Resources

• Ground resources

• Large reserve of mineral resources (№ 1 uranium producer in the world)

3. Market

• The location between 3 countries of BRICS (Russia, China and India)

• The growth of markets due to entry into the Customs Union of Kazakhstan, with the potential sale of 170 million people.

• Completion of construction of the international road corridor "Western Europe - Western China"

• The average annual population growth of SKO is 9%

логотип

Investment projects

Name of the project Required investments

Construction of small hydropower plants

USD 224 mln.

Construction of Solar Power Plant

T 7,5 bln.

Construction of Wind Power Plant

USD 86 mln.

Construction of metallurgical plant T 15 000,0 mln.

Plant for production of base oils T 139 950 mln.

Tourist recreation center “Kaskasu”

USD 229,9 mln.

Manufacturing of 110-220 kV voltage power transformers USD 30,0 mln.

Special Economic Zone «Ontustyk»

No restrictions

логотип

The purpose and idea of the project: The use of renewable energy sources

and reducing capacity deficit

Applicant: LLP «Discover», LLP «Aksu-Energo», LLP «KazBelt»,

LLP «Kelesgidrostroi», LLP «Munay Investment Group»

The period of implementation: 2013-2019 years

Place of implementation: South Kazakhstan Oblast

The total cost of the project: 224 million dollars

The financing scheme: Equity - 0% - 30% and necessary investments – 70%

- 100%

Required investments: 156,8 million dollars

The expected result: The production of electricity from renewable energy

sources, employment, tax revenues

Current state: There is a feasibility study, design estimates, available state

act on land

Payback period 7-10 years

Availability of documentation: feasibility study, design estimates,

state act on land

Productivity: 44,73 MW

Advantages: The use of renewable energy sources

Infrastructure and Resources: There is

Sales market: domestic market – 100%

Creating jobs: 691

Construction of small hydropower plants

логотип

The purpose and idea of the project: The use of renewable energy

sources and reducing capacity deficit

Applicant: ТОО «Promondis Kazakhstan»

The period of implementation: 2013-2014 years

Place of implementation: South Kazakhstan Oblast

The total cost of the project: 7,5 Billion dollars

The financing scheme: Equity - 0% - 30% and necessary investments –

70% - 100%

Required investments: 5,25 Billion dollars

The expected result: The production of electricity from renewable

energy sources, employment, tax revenues

Current status: There is a feasibility study, design estimates, available

state act on land

Payback period 7-10 years

Availability of documentation: feasibility study, design estimates, state

act on land

Productivity: 20 MW

Advantages: The use of renewable energy sources

Infrastructure and Resources: There is

Sales market: domestic market – 100%

Creating jobs: 10

Construction of Solar Power Plant

логотип

The purpose and idea of the project: The use of renewable energy

sources and reducing capacity deficit

Applicant: LLP «Ontustyk Zharyk Tranzit»

The period of implementation: 2015 year

Place of implementation: South Kazakhstan Oblast

The total cost of the project: 86 million dollars

The financing scheme: Equity - 0% - 30% and necessary investments –

70% - 100%

Required investments: 60,2 million dollars

The expected result: The production of electricity from renewable

energy sources, employment, tax revenues

Current state: There is a feasibility study, design estimates, available

state act on land

Payback period: 9-15 years

Availability of documentation: feasibility study, design

estimates, state act on land

Productivity: 40 MW

Advantages: The use of renewable energy sources

Infrastructure and Resources: There is

Sales market: domestic market – 100%

Creating jobs: 10

Construction of Wind Power Plant

логотип

Advantages: virtually no competitors (there is only one company in the

Republic implementing full production cycle from mining of iron ore to

the production of metal products)

Infrastructure and Resources: Located in the industrial zone

"Ontustik"

Market: Domestic market - 60%, export - 40%

Job creation: 2000 permanent jobs, 1,000 people during construction

Construction of metallurgical plant

Aim of project: Construction of a metallurgical plant

Applicant: LLP «Ferrum-Vtor»

Period: 2011г. – 2015

Project location: South Kazakhstan oblast, Shymkent

Total cost of the project: 15000,0 million tenge

The financing scheme : Borrowings – 12 000 mln.tenge

Funding scheme: 3 000,0 million tenge. equity

Investments required: 12000 mln. Тенге

Expected result : Production of high quality metal products

Current status: The business plan is prepared, negotiations

with potential suppliers of equipment, carried out the selection

of experts, held talks with investors and banks for raising funds.

Payback period: 3 years

Production capacity: 250,000 tons of metal

Availability of documentation: Business plan is already

prepared

логотип

Advantages: absence of a plant producing base oils

Infrastructure and resources: all the basic utilities are available next to

the selected land area

Market: Domestic market - 50%, export - 50%.

Creating jobs: 2,000 permanent jobs, 1,200 people during the

construction

Plant for production of base oils

The purpose and the idea of the project: Investment project

for the production of base oils

Applicant: LLP «HILL»

Period: 2013– 2016

Project location: South Kazakhstan oblast, Shymkent city

Total project cost: 139,950 million tenge

Funding scheme: Borrowings - 110,840 tenge

equity - 29,110 million tenge

Investments required: 110,840 million tenge

Expected result: Employment, payment of taxes, import

substitution, increasing the proportion of local content in

the production of motor and transmission oils

Current Status: Work is underway on the preparation of

project documentation and approvals, the land issues are

removed

Payback period: 6 years

Production capacity: 750,050 tonnes a year of base oils

Availability of documentation: business plan is being

developed; preliminary negotiations have been conducted with

potential suppliers of equipment, selection of specialists is being

carried out, negotiations with investors and banks are taking

place on the matter of raising funds.

логотип

Tourist recreation center “Kaskasu”

Title of organization: Department of Tourism and physical culture and sport

of South Kazakhstan region

Address: Shymkent city, Madeli kozha 1

Head: Kyrykbayev Polat Nauryzbayevich

Title of the project: Creation of mountain skiing in Kaskasu gorge

The project location place: South Kazakhstan region, Tolebi

Date of project start: 2013-2017

Cost: 229,9 mln $ USA

Payback period: 10 years

Short description:

Tourist recreation center “Kaskasu”

Land plot area-900 hectares

Location of skiing pistes-from 1880 to 3155 m/(Shymbulak-from 2 260 to

3163 m.)

Average bias-from 16 to 38% (Shymbulak –from 12 to 28%)

Direction of skiing pistes- northern and northern-western

Net area of skiing pistes-130 hectares

логотип

Advantage: The absence of a plant for the production of transformers of

this power in Kazakhstan

Infrastructure: No

Market: Domestic market - 50%, export – 50%(CIS)

Job Creation: 800

Manufacturing of 110-220 kV voltage power transformers

Aim of the project: Manufacturing of 110-220 kV voltage

power transformers

Applicant: LLP «Azia Trafo» (LLP «Alageum Group»

(Kazakhstan) and JSHP Transformer (China))

Period: 2013г. – 2015гг.

Project: South Kazakhstan oblast, Sayram area (rayon)

Total project cost: $ 60 million

Financing scheme: LLP «Alageum Group» - 50%

and JSHP Transformer - 50%

Required investments: $ 30 million

Expected outcome: Employment, payment of taxes,

import substitution

Current status: Feasibility study, the land issues solved

Payback period: 7-8 years

Productivity: 2200 transformers per year (at its full production

capacity)

Availability of documentation: The feasibility study, the

memorandum between the LLP «Alageum Group»

and JSHP Transformer

логотип

Special Economic Zone «Ontustyk»

The aim of project :

• accelerated development of the region to strengthen the economy of

the RK entering into the global economic system;

• development of textile and sewing industry of the RK;

Implementation period: 2005 – 2030 years

Place of implementation: the South-Kazakhstan oblast, Sairam

region, Lenger highway, 7th km

Funding scheme: The Republican and local budget

Expected result: attraction no less than 50 billion Kazakhstan tenge

Home and foreign investments, creation more than 10 new enterprises,

creation more than 5 thousand new workplaces.

Current status:

Within the framework of State Program on force industrially-

innovative development of the Republic of Kazakhstan for 2010-2014,

next investment projects are realized in the territory of SEZ

«Ontustyk» :

• «Khlopkoprom-Cellulose» ;

• «Oxy Textile» LLP;

• «Kagaz Shahary SEZ» LLP;

• «Production company «AGF group» LLP

Advantages:

-Investors are fully exempted from corporate income tax, tax to

property and land tax;

- Profitable geographical position – proximity to the largest markets-

importers of the light industry production (Russia, China, India);

-The South Kazakhstan region is the unique one on the Customs Union

area, where the cotton is grown up;

-Expansion of commodity market to population of 170 million people

at the expense of the entrance into the One Customs Union.

Infrastructure and resources:

- All necessary engineering infrastructure is brought (electric power,

gas supply, telecommunication, water supply and sewerage system);

-Availability of raw materials resources;

-Availability of a transport and power infrastructure.