investment promotion in energy efficiency and renewable energy

28
Investment Promotion Investment Promotion in Energy Efficiency and Renewable Energy Projects in Energy Efficiency and Renewable Energy Projects under ESCO Fund under ESCO Fund under ESCO Fund under ESCO Fund By By Energy for Environment Foundation; E for E Energy for Environment Foundation; E for E 1

Upload: dokiet

Post on 04-Jan-2017

216 views

Category:

Documents


2 download

TRANSCRIPT

Page 1: Investment Promotion in Energy Efficiency and Renewable Energy

Investment Promotion Investment Promotion

in Energy Efficiency and Renewable Energy Projectsin Energy Efficiency and Renewable Energy Projects

under ESCO Fundunder ESCO Fundunder ESCO Fundunder ESCO Fund

ByBy

Energy for Environment Foundation; E for EEnergy for Environment Foundation; E for E

1

Page 2: Investment Promotion in Energy Efficiency and Renewable Energy

Presentation OutlinePresentation Outline

About E for EAbout E for E

E for E’s Services and Experienceso s Se ces a d pe e ces

ESCO Fund and its facilities

Project Approval Process under ESCO Fund

Verification and Monitoring for ESCO Fund Projects

2

Page 3: Investment Promotion in Energy Efficiency and Renewable Energy

About E for EAbout E for E An independent notAn independent not‐‐forfor‐‐profit organization, founded in profit organization, founded in 20002000

Missions:Missions:

To support both government and private sectors in renewable energy as well as energy and environment conservation

To promote power generation from renewable energy and other To promote power generation from renewable energy and other alternatives by providing policy recommendations to the government and providing financial /technical assistance to project developers and financial institutions

To publicize information and demonstrate technologies on renewable energy and energy conservation

To distribute knowledge strategies and innovations pertaining to renewable To distribute knowledge, strategies and innovations pertaining to renewable energy including energy and environment conservation, and to organize the projects awarded from ENCON Fund

EE for E’s services : Technical Advisory Financial Advisory Information &for E’s services : Technical Advisory Financial Advisory Information &

3

EE for E s services : Technical Advisory,  Financial Advisory, Information & for E s services : Technical Advisory,  Financial Advisory, Information & Outreach Service and Policy StudyOutreach Service and Policy Study

Page 4: Investment Promotion in Energy Efficiency and Renewable Energy

E for E’s Organizational StructureE for E s Organizational Structure

Board of E for E (9)

Chief Executive Director

Deputy Chief Executive Director

• ProjectOperationManager (1) • Senior Information Officer• Executive Secretary (1) Project Operation Manager  (1)• Senior Technical Advisor (2)• Technical Officer (3)

Senior Information Officer • Information Officer (1)• IT Assistant (1)

• Secretary (1)• Accounts Officer (1)• Project Accountant (1)• Administrative Assistant (1)• Administrative Clerk (1)

• Senior Policy Analyst (1) • Senior Financing Advisor

4

• Senior Policy Analyst (1)• Policy Analyst (1)

• Senior Financing Advisor • Project Financing Advisor (1)• Project Financing Analyst (1)

Page 5: Investment Promotion in Energy Efficiency and Renewable Energy

E for E’s ServicesE for E s Services

Technical Cell

Providing  technical  advisory  services  such  as  technical feasibility  studies  of  the  RE  power  plants  and  EE projects,  technical  trouble‐shooting  services  and  any other services in the course of the project development.

RE and EE Project Consultancy 

Service

Financing Cell

Providing  financial  advisory  services  including  sources of  fund,  seeking  projects  for  the  keen  investors,  the financial  feasibility  studies,  and  preparing  financial proposals of RE and EE projects.

Service

Knowledge 

Information & Outreach Cell

p oposa s o a d p ojects.

Providing  right  information  on  RE,  EE,  and  general  energy  issues  to  the specific  target groups and general public,  providing  energy  issues  relating  articles  for 

di d th b it d l i i it

Service

Policy Cell

media and  the website and also organizing community relations program for energy project development.

Providing advisory services about policies andregulations concerning the RE and EE projects and the

RE and EE Policy Development

5

Policy Cell regulations concerning the RE and EE projects and therevision of rules and policy framework to the policymakers.

Page 6: Investment Promotion in Energy Efficiency and Renewable Energy

E for E’s ExperiencesPolicy Study

• Study on Guidelines to promote power generated from wind and solar energy  

• Study on improvement of the regulations for the purchase

Policy Study• Study on Guidelines to promote power generated from wind and solar energy  

• Study on improvement of the regulations for the purchase

Technical Study• Study on strategic plan of RE Development  and Investment for PEA’s subsidiary and Feasibility Study on RE projects for PEA

Technical Study• Study on strategic plan of RE Development  and Investment for PEA’s subsidiary and Feasibility Study on RE projects for PEAStudy on improvement of the regulations for the purchase 

of power generated from Renewable Energy• Study and analysis to determine “Adder” for the purchase of power generated from Renewable Energy 

• Study on Load Forecast Project, for EPPOSt d id li f i l t ti f

Study on improvement of the regulations for the purchase of power generated from Renewable Energy

• Study and analysis to determine “Adder” for the purchase of power generated from Renewable Energy 

• Study on Load Forecast Project, for EPPOSt d id li f i l t ti f

• Technical Feasibility Study on Renewable Energy Power Plants  and energy efficiency projects

•Working as the Independent Engineer to monitor the construction of RE power plant 

• Giving 2nd Opinion on Technical aspect

• Technical Feasibility Study on Renewable Energy Power Plants  and energy efficiency projects

•Working as the Independent Engineer to monitor the construction of RE power plant 

• Giving 2nd Opinion on Technical aspect• Study on guidelines for implementation of Power Development Fund of the Energy Industry Act 2007 for OERC

•Study on guidelines for implementation of Power Development Fund of the Energy Industry Act 2007 for OERC

• Giving  2nd Opinion on  Technical aspect  on feasibility study for finance institution

• Giving  2nd Opinion on  Technical aspect  on feasibility study for finance institution

•UNDP/GEF ProjectRemoval  of the barriers to 

biomass power Generation and

UNDP/GEF ProjectRemoval  of the barriers to 

biomass power Generation and

Financial studyS d id li f i k f bi

Financial studyS d id li f i k f bi

Information Services•Conducting Renewable Energy Analysis and Implementing

Information Services•Conducting Renewable Energy Analysis and Implementing

biomass power Generation and co‐generation in Thailand 

(2000‐2007)  

biomass power Generation and co‐generation in Thailand 

(2000‐2007)  

• Study on guidelines of risk management of biomasspower project development

•Provide financial feasibility Study and Giving 2nd Opinionon financial feasibility study on power plant project

•Manage the ESCO Fund for DEDE to promote investment

• Study on guidelines of risk management of biomasspower project development

•Provide financial feasibility Study and Giving 2nd Opinionon financial feasibility study on power plant project

•Manage the ESCO Fund for DEDE to promote investment

Conducting Renewable Energy Analysis and Implementing Project Activities in Mae Hong Son for UNJP

• Implementation of the “Green Energy Mechanism” (raise fund from  private sector to help people in  remote area by RE)

Conducting Renewable Energy Analysis and Implementing Project Activities in Mae Hong Son for UNJP

• Implementation of the “Green Energy Mechanism” (raise fund from  private sector to help people in  remote area by RE)

6

g pin EE and RE projects

g pin EE and RE projects

by RE)•Biomass Resource Study•Organization of seminar/training on “renewable energy” for Ministry of Energy, Media and Financial Institution

by RE)•Biomass Resource Study•Organization of seminar/training on “renewable energy” for Ministry of Energy, Media and Financial Institution

Page 7: Investment Promotion in Energy Efficiency and Renewable Energy

E for E’s Experiences (Cont)p ( )

linkage to Government Agencies and other stakeholders Staff have work experience in Ministry of Energy and related Government Agencies 

and understand about the Government process and administration

Ha in and establishin the stakeholder net orks d rin the st d and ons ltan Having and establishing the stakeholder networks during the study and consultancy experience in RE and EE Project since E for E founded in 2000, such as network with Government Agencies/ Financial Institutions/ Private Funds/ International Organizations/ Education Institutions/ Project Developers/ Machinery and Equipment Suppliers / Academic / Energy Service Company/ Private Sector involving in Energy Business etc.

7

Page 8: Investment Promotion in Energy Efficiency and Renewable Energy

Policy instruments to promote energy efficiency and renewable energy

Oil Fund Price incentive for biofuelsOil Shortage

Energy Conservation F d

Oil Fund Price incentive for biofuels

•Soft loans•DSM bidding•ESCO venture capital fund

Oil Shortage Prevention and Alleviation Act

Energy Conservation

Act 1992

Fund ESCO venture capital fund•Investment subsidy•Technical assistance

•Building codesL b lli f b ildi

Industrial Product Act

El t i it

•Standards for appliances•Labelling

•Labelling for buildings

Electricity Generating Authority

Act (amendment 1992)

•Utility DSM program•SPP/VSPP regulation•Adder to normal tariff

Energy IndustryEnergy Industry Act 2008 Permits for CHP/DG/RE

TGO CDM, carbon trading 8

Page 9: Investment Promotion in Energy Efficiency and Renewable Energy

About ESCO FundAbout ESCO Fund

Established by Department of Alternative Energy Development d Effi i (DEDE) d th fi i l t f Eand Efficiency (DEDE), under the financial support from Energy 

Conservation Promotion Fund (ENCON Fund)

Size of Fund: 500 MB (1st Phase: October 2008 – September 2010 ) Size of Fund: 500 MB (1 Phase: October 2008  September 2010 ) 

Managed by TWO fund managers appointed by DEDE

‐ Energy for Environment Foundation (E for E) managed 250 MB

‐ The Energy Conservation Foundation of Thailand (ECFT) managed 250 MB

Size of Fund : 500 MB (2nd Phase: October 2010 – September 2012) 

‐ E for E has managed  300 MB

‐ ECFT has managed  200 MB

9

Aim to encourage investment in energy efficiency and renewable energy projects in Thailand

Page 10: Investment Promotion in Energy Efficiency and Renewable Energy

ESCO Fund ObjectivesESCO Fund Objectives

To foster energy service business

To stimulate private investment in energy efficiency and renewable energy projects

To facilitate private sector in reducing energy cost and accessing to revenues from carbon credit

To increase private sector’s confidence in developing EE and RE To increase private sector s confidence in developing EE and RE projects

To enhance financial institution’s confidence in providing loan for EE & RE projectsfor EE & RE projects

To encourage energy savings as well as lessen dependence on energy imports

10

Page 11: Investment Promotion in Energy Efficiency and Renewable Energy

Targets of ESCO FundTargets of ESCO Fund

Primary Targets:

SMEs including business, service, and industrial sectors especially those in energy intensive industries

Investors from both domestic and foreign Investors from both domestic and foreign 

Energy Service Companies (ESCO) as co‐investors, project developers, or technical partners.

Secondary Targets:

Financial Institutions as partners providing loan for the project participants

Credit Guarantee Agencies e.g. insurance companies 

11

Page 12: Investment Promotion in Energy Efficiency and Renewable Energy

ESCO Fund (ESCO Fund (22nd nd Phase)Phase)ESCO Fund (ESCO Fund (22 Phase)Phase)

Energy e gyConservation 

Promotion Fund(ENCON Fund)

ESCO Fund 

500 Million Baht

Investment CommitteeFund Managers:

1. E for E (300 Million Baht) 1. ECFT (200 Million Baht)

Equity InvestmentEquity InvestmentESCO Venture CapitalESCO Venture Capital Equipment  Leasing Equipment  Leasing 

1212

Technical AssistanceTechnical AssistanceCarbon Credit FacilityCarbon Credit Facility Credit Guarantee FacilityCredit Guarantee Facility

Page 13: Investment Promotion in Energy Efficiency and Renewable Energy

Equity Investment

Investment in Energy Efficiency and

R bl E P j tESCO F nd

Equity Investment

Renewable Energy Project

Size of Equity: 10%-50% of total investment

cost but limited to 50 MB per project

ESCO Fund Owner / ESCO

Di id d/ Not as a Majority Shareholder

Return: annual dividend in the proportion

of investmentRE/EE Project

Dividend/ReturnCo-Investment

Investment period: 5 – 7 years or until owner

ready to share buy back, or find a new

t t i t li t i SET/MAI b t

RE/EE Project

Subcontract

strategic partner, or list in SET/MAI, but

limited to 7 years

Exit Price: “Put Option” and“ Call Option”

Sub – contractor-Equipment-Installation / Maintenance

or “Market price”

BOD-seat is needed13

Page 14: Investment Promotion in Energy Efficiency and Renewable Energy

ESCO Venture CapitalESCO Venture Capital

Energy ServiceESCO Co.,Ltd

Co-investment

ESCO Fund RE/EE Project

Energy Performance Contract

ESCO Co.,Ltd(Energy Service

Company)

Dividend /Return)

Venture with Energy Service Company (ESCO): 10% – 30% of registered

capital but limited to 50 MB per project

Not as a Majority Shareholder

Return: annual dividend in the proportion of investment

Investment period: 5 – 7 years or until owner ready to shared buy back Investment period: 5 7 years or until owner ready to shared buy back

or find a new strategic partner, or list in SET/MAI but limited to 5 years

Exit Price: “Put Option” and“ Call Option” or “Market price”

BOD t i d d BOD-seat is needed

14Remark: Because of Registered Capital of Thai ESCO Company is normally low, so this service is not interesting to ESCO 

Page 15: Investment Promotion in Energy Efficiency and Renewable Energy

Equipment LeasingEquipment Leasing

ESCO Fund

Leasing Contract (< 10 million baht)

RE/EE Project

d / S li /

Principal and Interest Repayment

Energy Performance Contract

Equipment purchase Producer/ Supplier/

ESCOEquipment purchase agreement

ESCO Fund

Principal and Interest

agreement

LeasingContractRepayment

ESCO Co.,Ltd(Energy Service Company)

Contract Long-Term Leasing Service in Purchasing

equipment for energy efficiency and

renewable energy

Share Saving LeasingContract

100% of equipment cost but limited to

10 MB per project

Repayment within 5 yearsRE/EE Project

15

Interest rate at 4% per annum

Page 16: Investment Promotion in Energy Efficiency and Renewable Energy

Carbon Credit Facility For large projects, EforE will facilitate

project owners in developing CDM and For small project, EforE will act as

Coordinating/ Managing Entity: CME

Carbon Credit Facility

accessing to CER buyer at lower service rate.

Coordinating/ Managing Entity: CME developing programmatic CDM

CERP jERPA / CDM Revenues

CERProjectCERBuyer

Project Owner LoI

CERBuyer

Project Owners

ESCO Fund

ESCO Fund

ESCO Fund

16Remark: E for E helped to develop a Project Idea Note (PIN) for Solar Power (Korat 1) Co., Ltd.,

one of ESCO Fund’s co-invested projects.

Page 17: Investment Promotion in Energy Efficiency and Renewable Energy

Technical AssistanceTechnical Assistance

ESCO Fund provides technical assistance to encourage energy efficiency projects

by paying energy audit fee but limited to 100,000 baht per project.y p y g gy , p p j The fee must be reimbursed to ESCO Fund if the recommended energy

conservation measures are not implemented.

ESCO Fund RE/EE ProjectESCOService Fee

Energy Service

Refund fee in case not do anything

Remark: Technical Assistance/Energy Audit is mostly complementary service of ESCO Company or Supplier to the customer with free of charge so this service has been

17

Company or Supplier to the customer with free of charge, so this service has beennever used.

Page 18: Investment Promotion in Energy Efficiency and Renewable Energy

Credit Guarantee FacilityC ed t Gua a tee ac ty ESCO Fund guarantees commercial bank for project loans but limited

to 10 million baht P j t ill b h d t 1 75% f t t

Credit Guarantee Contract

Project owner will be charged at 1.75% pa. of guarantee amount Loans guarantee term not more than 5 years

ESCO Fund RE/EE ProjectPaid Fee

Credit Facility

AgreementCredit Guarantee

BankContract

Remark: - Same principle as the Small Business Credit Guarantee Corporation (SBCG)p p p ( )- However, according to the risk management principle, fund manager allows the investor to choose one between Equity Investment or Credit Guarantee Facility and all investors choose Equity Investment.

18

Page 19: Investment Promotion in Energy Efficiency and Renewable Energy

Project Approval ProcessProject Approval ProcessProject Approval ProcessProject Approval Process

Approval Process ENTREPRENEURS / ESCO / INVESTOR EQUITY INVESTMENT

Financial Instruments/services

(1) EFE’s Board of Director

15 – 20 days

/ /

Submit an Application

Propose the Project( h)

ESCO VENTURE CAPITAL

EQUIPMENT LEASING

EQUITY INVESTMENT

(2) DEDE Subcommittee

(3) Investment Committee

15 – 30 days

(Every 3 Month)

Approval/SHA preparation

CARBON CREDIT FACILITY

CREDIT GUARANTEE FACILITY

(3) Investment Committee

ENTREPRENEURS / ESCO / INVESTOR

p p

Signed contract

TECHNICAL ASSISTANT

Submit Shareholders Agreement/Contract

Investment contribution

Drawdown Process

Agreement/Contract

ESCO Fund BudgetingFrom ENCON Fund

Long government’s process  to get project approval is a barrier to ESCO Fund support 19

500 Million BahtDrawdown(45‐60  days)

Page 20: Investment Promotion in Energy Efficiency and Renewable Energy

Primary Conditions for considering the ProjectsPrimary Conditions for considering the ProjectsConditions for Equity Investment Conditions for Equipment Leasing

1. Security of fuel supply in long term 1. Reliability of Technology and Equipment

2. Technological Reliability 2. Guarantee saving and Equipment Performance Guarantee Contract

3. Good financial profile of investors and reasonable return of project

3. Reliability of entrepreneurs/company financial statementreturn of project statement

4. Obtaining Government License /Permit for power plant/ Community Acceptance or related license according to the regulation

4. Personal Guarantee/ Bank Guarantee

5. Requirement Documents

- Feasibility Study Report which including Project Cost, Technology usage, Financial Structure, Return of Project and Fuel Supply Management

5. Requirement Documents

- Feasibility Study Report which including Project Cost, Saving Calculation Method, Payback Period, Project’s Return, How the equipment works,

- Financial Statement for the last three year of Shareholders

- Loan/ Credit Facility Agreement or Term Sheet from bank

j , q p ,Specification of Equipment, M&V Plan

- Copy of electricity bill for the last three year of Company

- Guarantee Saving Agreement

20

- Environment and Safety Assessment report or Environment related report

- Community Acceptance Report or reliable Community Acceptance Plan

Page 21: Investment Promotion in Energy Efficiency and Renewable Energy

Project Verification and Monitoringj g

• Project Risk Mitigation on Technical, Financial, Environmental and Social Issue

• Financial Issue: by Financial Feasibility Study and Due Diligence/Credibility of Investor/others source of fund/ Shareholders Structureof Investor/others source of fund/ Shareholders Structure 

• Technical Issue: by Technical Feasibility Study/ Fuel Potential/reliability of technology and machinery

• Environmental and Social Issue: by site survey/requiring the IEE, ESA, EIA Study/Requiring Public Acceptance/ Government Regulation/PermitP j t A l d t i d i k t d iti ti f ll

Before Develop the Project

• Project Approval determined on risk management and mitigation of all above issues in the appropriate level

•Construction Performance• Following the conditions under the Shareholders Agreement andFollowing the conditions under the Shareholders Agreement and EPC Contract

•Requiring Environmental Standard and Public Hearing/Acceptance• Site Visitation/Spot Check•Construction Performance Report

During Construction Period

p

•Operation Performance• Following the condition under the Shareholders Agreement•Manage through the company Board of Director and ShareholdersDuring

21

•Manage through the company Board of Director and Shareholders which have a seat for ESCO Fund Representative

•Company Annual Report/Financial Statement• Site Visitation/Spot Check

During Operation Period

Page 22: Investment Promotion in Energy Efficiency and Renewable Energy

ESCO Fund Monitoringg

• EforE is monitored by Investment Committee and DEDE.y

• EforE reports the progress, problem, barriers of the project development to Investment Committee and DEDE.

• EforE provides the progress report in every 3 month

(1) EFE’s Board of DirectorReportReport

ENTREPRENEURS / ESCO / INVESTOR(2) DEDE Subcommittee

(3) Investment Committee

p

Monitoring Monitoring

22

Page 23: Investment Promotion in Energy Efficiency and Renewable Energy

List of projects awarded ESCO FUND Phase 1: Equity InvestmentList of projects awarded ESCO FUND Phase 1: Equity Investment

There are 6 RE projects awarded the financial support from ESCO Fund phase 1, under Equity Investment instrument, amounting to 124.01 million baht

Project Location Type of Power Plant Technology Installed

capacity

ESCO FundCo-invest

(Million Baht)Status

1. True Energy Power Lopburi Co.,Ltd Lopburi Biomass Power Pl t Steam Turbine 7.5 MWe 23.25 Started COD in

3 NOV 20111. True Energy Power Lopburi Co.,Ltd Lopburi Plant Steam Turbine 7.5 MWe 23.25 3 NOV 2011

2. Solar Power (Korat 1) Co.,Ltd NakhonRatchasima Solar Farm PV

(Polycrystalline) 6.1 MWe 40.00 Started COD in21 Apr 2010

3. Siam Solar Co., Ltd Saraburi Solar FarmPV (Thin Film:

cadmium telluride)

0.9 MWe 39.20 Started COD in20 Jan 2012telluride)

4. Solar Power (Nakhon Phanom 1) Co.,Ltd

NakhonPhanom Solar Farm PV

(Polycrystalline) 6.1 MWe 18.90 Started COD in 22 Apr 2011

5. Solar Power (Sakon Nakhon 1) Co.,Ltd

SakonNakhon Solar Farm PV

(Polycrystalline) 6.1 MWe 18.90 Started COD in8 Feb 2011

Under

6. Plan Ecoenergy Co., Ltd* Trang Biomass Power Plant

Gasification (Co- generation) 5.3 MWe 22.07

Under construction and is expected to

start COD in end of 2012

23

* Plan Ecoenergy is awarded financial support (Equity Investment) from ESCO Fund phase 1 amount to 22.07 Million Baht and phase 2 amount to 17.03 Million Baht

Page 24: Investment Promotion in Energy Efficiency and Renewable Energy

List of projects awarded ESCO FUND Phase 1: Equipment Leasingp j q p g

ESCO Fund

There are 9 projects awarded the financial support from ESCO Fund phase 1, under Equipment Leasing instrument, amounting to 64.03 million baht

Company /Project Equipment installation LocationESCO Fund

support (Million Baht)

1. Forum Plaza Department Store Chiller Chonburi 9.630

2 C t P k H t l S l W t H ti S t B k k 3 9072. Century Park Hotel Solar Water Heating System Bangkok 3.907

3. Newsomthai Motor Work Co., Ltd.(Automotive part Factory) Voltage Regulator Samut Prakarn 5.564

4 Glod marktech Co LtdSHAW Method of Air Conditioning (SMAC) (at Hall of opium golden triangle park Mae Chiangrai 2 2044. Glod marktech Co., Ltd. (at Hall of opium golden triangle park, Mae 

Fah Luang)Chiangrai 2.204

5. Central City Tower High Efficiency Motor Bangkok 1.695

6. Rongngan A. Yangthai (1992) Co., Ltd. Voltage Regulator Nakhon Pathom 0 897(tires factory) Voltage Regulator Nakhon Pathom 0.897

7. Golden Crown Plaza Hotel Variable Speed Drive : VSD Songkhla 0.434

8. Asian Hatyai Hotel Variable Speed Drive : VSD Songkhla 0.500

24

ESCO Fund-Phase 1 Summary - Total projects awarded: 15 projects, amounting to 188.04 Million

Awarded under Equity Investment: 6 Projects , amounting to 124.01 Million Baht Awarded under Equipment Leasing: 9 Projects, amounting to 64.03 Million Baht

Page 25: Investment Promotion in Energy Efficiency and Renewable Energy

List of projects awarded ESCO FUND Phase 2: Equity InvestmentList of projects awarded ESCO FUND Phase 2: Equity Investment

The present status on ESCO Fund Phase 2 is now extended the approval period for another 6 months so that it will be ended in March 2013. Right now there are 6 RE projects awarded the financial support under Equity Investment instrument amounting to 169.63 million baht

Project Location Type of Power Plant Technology Installed

capacity

ESCO FundCo-invest

(Million Baht)Status

1. Clean Energy 2 Co.,Ltd Chiang Rai Biomass Power Plant Steam Turbine 9.0 MWe 40.00

Under development and is expected to t t COD i 2014Plant start COD in 2014

2. Boon Chareon Green Energy Co.,Ltd. Suphan Buri Biomass Power Plant

Gasification(Co-Generation) 5.0 MWe 50.00

Under development and is expected to start COD in 2014

3. Stepwise Energy Management Co.,Ltd NakhonRatchasima

Biogas Power Plant Cover Lagoon 1.0 MWe 10.00

Under construction and is expected to p gy g , Ratchasima Plant g pstart COD in 2013

4. Maejo Community Enterprises Chiang Mai Micro Hydro Power Plant Turgo 35 kWe 1.70

Under development and is expected to start COD in 2013

5 Krabi Waste to Energy Co Ltd KrabiBiomass 5 MWe

+ Biogas 1 5 MweAnaerobic Baffled Reactor+Gasificat 6 5 MWe 50 00

Under construction and is expected to5. Krabi Waste to Energy Co., Ltd Krabi + Biogas 1.5 Mwe

Power PlantReactor+Gasificat

ion6.5 MWe 50.00 and is expected to

start COD in 2014

6. Plan Ecoenergy Co., Ltd* Trang Biomass Power Plant

Gasification (Co- generation) 5.3 MWe 17.03

Under construction and is expected to start COD in end of

2012

* l d d f l ( ) f d h ll h

25

* Plan Ecoenergy is awarded financial support (Equity Investment) from ESCO Fund phase 1 amount to 22.07 Million Baht and phase 2 amount to 17.03 Million Baht

Note: Project Status as of September 2012

Page 26: Investment Promotion in Energy Efficiency and Renewable Energy

List of projects awarded ESCO FUND Phase 2: Equipment Leasing (1)List of projects awarded ESCO FUND Phase 2: Equipment Leasing (1)

Right now there are 32 projects awarded the financial support under Equipment Leasing instrument amounting to 125.06 million baht

C / j i i ll i iESCO Fund

Company /Project Equipment installation Location support (Million Baht)

Khao Keaw Farm Co., Ltd. (Pig Farm) Gas Engine (for Power generation from biogas) Chanthaburi 1.530

Thai interknit factory Co., Ltd. (Textile Factory) LED + T5+ Evaporative Cooling+VSD Nakhon Pathom 2.140(Textile Factory)

Power Innovation Co., Ltd. Variable Speed Drive : VSD(Jungcelon Phuket Square) Phuket 3.424

Pastina Co., Ltd. (Plastic Factory) LED + T5+ Evaporative Cooling+Heater+Voltage Regulator Bangkok 3.632

Power Innovation Co., Ltd. Variable Speed Drive : VSD(at Platinum Fashion Mall) Bangkok 1.701(at Platinum Fashion Mall) g

Power Innovation Co., Ltd. Variable Speed Drive : VSD(at Ocean Shopping Mall) Chumporn 0.856

Royal Benja Hotel LED Bangkok 2.436Precision Technology Co., Ltd. (Electronics Factory) LED Bangkok 1.887

Lucky Star Cold Storage Co., Ltd. LED Samut Prakarn 2.791Twin Towers Hotel Chiller + Voltage Regulator + LED Bangkok 12.651Green Panel Co.,Ltd. (Particle Board Factory) Voltage Regulator Phetchaburi 9.852

Siam Save Land Trading Co., Ltd. (Convenient Store) LED Ubon Ratchathani 0.841

26

(Convenient Store)Kenmax Co., Ltd. Voltage Regulator Samut Prakarn 0.631Number one Property Co., Ltd. (Apartment) Fluorasave Bangkok 0.974

Number one Land Co., Ltd.(Apartment) Fluorasave Bangkok 0.417

Page 27: Investment Promotion in Energy Efficiency and Renewable Energy

List of projects awarded ESCO FUND Phase 2: Equipment Leasing (2)List of projects awarded ESCO FUND Phase 2: Equipment Leasing (2)

Company /Project Equipment installation LocationESCO Fund

support (Million Baht)

Yongsa-nguan Group Co.,Ltd. Voltage Regulator Ubon Ratchathani 0 355(Convenient Store) Voltage Regulator Ubon Ratchathani 0.355

Material Plast Co., Ltd.(Plastics Factory) Voltage Regulatro + VSD Bangkok 2.074

Power Innovation Co., Ltd. Variable Speed Drive : VSD(at Amari Orchid Pattaya Hotel) Chonburi 1.562

C d Variable Speed Drive : VSD B k k 3Power Innovation Co., Ltd. Variable Speed Drive : VSD(at Union Mall) Bangkok 3.745

Siam Save Land Trading Co., Ltd. (Phase 2)(Convenient Store) LED Ubon Ratchathani 3.351

Nevada Inn Ubon Ratchathani Voltage Regulator Ubon Ratchathani 1.164Royal Mekong Nongkhai Hotel Chiller Nongkhai 6.636

G E iMaxwell 1991 Co., Ltd. Gas Enginefor power generation Nakhon Ratchasima 12.600

The Emerald Hotel LED+ Voltage Regulator Bangkok 4.137Sea Sand Sun Resort and Spa LED Chonburi 1.918Apex Plastech Co., Ltd.(Plastics Factory) Voltage Regulator Bangkok 2.172

Kanchana Fresh Pork Co., Ltd.(Slaughter House) Voltage Regulator+ Ratchaburi 4.166

Shanghai Mansion Boutique Hotel Chiller+LED Bangkok 5.079City Complex Pratunam Chiller Bangkok 14.924

Long Beach Cha-Am Hotel Chiller+High Efficiency Motor+Water Pump+Voltage Regulator+VSD Phetchaburi 6.611

27Note: Project Status as of September 2012

Pump+Voltage Regulator+VSD

Manhattan Hotel Chiller + Voltage Regulator+Water Pump+High Efficiency Motor+VSD Bangkok 7.541

Rong Nam Khang wang singkum Co.,Ltd(Ice Mill) High Efficiency Motor Chiang Mai 1.257

Page 28: Investment Promotion in Energy Efficiency and Renewable Energy

Energy for Environment Foundation (E for E)

99/305 Thetsaban Songkhro Road,Lat Yao, Chatuchak, Bangkok 10900

Tel : 66 2953 9881-4Tel : 66 2953 9881 4Fax : 66 2953 9885

http://www.efe.or.thEmail: [email protected] ; [email protected]

28