Page 1: Investor Presentation Aug-Sept 2012

Aug-Sept 2012

Path to

Production

Page 2: Investor Presentation Aug-Sept 2012

Forward Looking Statements

1

Statements made in this presentation, other than those concerning historical information, should be

considered forward-looking statements which are subject to various risks and uncertainties. Such

forward-looking statements are made based on management’s belief as well as assumptions made by,

and information currently available to, management.

The Company’s actual results may differ materially from the results anticipated in such forward-looking

statements as a result of a variety of factors. Additional information concerning factors that could cause

actual results to materially differ from those in such forward-looking statements is contained in the

Company’s filings with the securities and regulatory authorities.

Note: All currencies are in Canadian dollars unless otherwise noted

Page 3: Investor Presentation Aug-Sept 2012

2

Sage Gold’s short term plans are to develop production on their existing

resource to generate cash flow to fund further exploration and potentially

develop a leading gold mining company in a world class mining camp.

CORPORATE STRUCTURE

CORPORATE VISION

Exchange Symbol: TSX.V – SGX

OTC – SGGDF (USA)

• Shares O/S: 83.3 million

• Shares F/D: 116.6 million

• Current price: $0.055

• 52 week high/low: $0.21/$0.045

• Market Cap: C$ 5 million

• Average Strike Price of Warrants/Options: $0.34

• Proceeds from Warrants/Options: $10.5 million

Page 4: Investor Presentation Aug-Sept 2012

3

Sage Gold Advantage

1. Near Term Production – Clavos Deposit. • Sage Gold has access to SAS’s mill in the area and is able to move into production

quickly and cost effectively - will generate strong cash flow for the company

2. Blue Sky Potential – Clavos Deposit Open at depth and on multiple directions along strike

Management will focus on continuing to increase resources

3. Strong Strategic Partnerships Clavos Property - Sage and St Andrew Goldfields JV partners (60%-40%)

Providing low cost access to mine and mill

Established infrastructure with $46 million spent on underground development

4. Experienced Management Team

5. New NI43-101 Resource Estimate and PEA in Q4 2012

Page 5: Investor Presentation Aug-Sept 2012

4

Clavos Deposit - Highlights Located in the prolific Timmins Mining camp and close geographically (20kms) to

Goldcorp’s (TSX-G) high grade Hoyle Pond mine which has produced more than 2.4

M ozs since 1985 and is still in operation.

Existing infrastructure in place including underground ramp access to the 300m

level, underground levels developed every 25m, power to site, surface ventilation

system, water management system.

Prior gold resource for Clavos reported by SAS in October 2006. The resource was

calculated by Roscoe Postle & Associates (RPA) and comprises 37,000 gold ozs,

143,000 tons @ 8.07 g/t Au in M&I and 110,300 gold ozs.; 529,000 tons @ 6.5 g/t

Au in Inferred ( assays cut to 60g/t)

Suite of Permits in place

Clavos is also located 10kms from the Brigus Gold mill in Stock Township.

Page 6: Investor Presentation Aug-Sept 2012

5

Near Term Production Plans

Q4- 2012

New Resource Study by RPA

Scoping study (PEA)

Revision to Closure Plan

Q1-2 2013

Dewater and Rehab. Mine

Underground and Surface Drilling

Project Financing

Start of initial production

2014 - Commercial Production

CLAVOS DEPOSIT

Timmins, Ontario

Page 7: Investor Presentation Aug-Sept 2012

6

• Lakeshore Gold

→ Timmins Mine now in production

→ Current resources of 1.87M oz Au

• Goldcorp

→ Hollinger Open Pit Scheduled for production by 3Q’12

→ Current resources 900,000 oz Au

• Sage Gold (Clavos)

• Lakeshore Gold (Bell Creek, Vogel)

• St. Andrew Goldfields (Taylor)

• SGX Resources (Tully)

• Lexam - VG Gold - (Paymaster West)

Existing Timmins Gold Projects Clavos Property - In Good Company

Near-Term Production Potential

Advanced Projects

CLAVOS DEPOSIT

Timmins, Ontario

Page 8: Investor Presentation Aug-Sept 2012

7

960 Zone

Sediment

Zone

4.5 KM strike length

Existing

Clavos

CLAVOS DEPOSIT

Timmins, Ontario

OPEN

OPEN

OPEN

Page 9: Investor Presentation Aug-Sept 2012

8

A-B: Photos from hole CL252-13, 63.1-

64.3m, illustrating stylolitic white quartz veining

with visible gold from a stylolitic quartz vein

system with chlorite-carbonate-pyrite altered

wallrock slivers that is consistent in style with

the en echelon vein arrays.

Photos A and B are close-ups of stylolitic

ribboned chlorite-rich bands in the system

partially zone shown in B, containing multiple

grains and blebs of native gold. Note

aggregates of pale grey Fe-carbonate in lower

left portion of photo B.

The vein system occurs adjacent to a narrow

grey porphyry dyke.

A

Underground Drill Core Photos

594.88 gpt Au (17.35 opt) over

1.2m (uncut)

B

CLAVOS DEPOSIT

Timmins, Ontario

Page 10: Investor Presentation Aug-Sept 2012

9

Clavos

Mine

Timmins Gold Camps CLAVOS DEPOSIT

Timmins, Ontario

Page 11: Investor Presentation Aug-Sept 2012

10

Highlights :

Data compilation complete consisting of 150,000m of historical surface drilling

and 40,000m of historical U/G drilling - 9000m+ (SGX) drilled in 2011-2012 –

960 zone plus existing Clavos deposit

3D Geological model of all mineralized zones

Internal capital expenditure estimates

Open at depth and along strike

Exploration upside - new alteration zone north of the 960 zone

- Clavos and 960 zones untested at depth

- potential to more than triple the resource

Blue Sky Potential CLAVOS DEPOSIT

Timmins, Ontario

Page 12: Investor Presentation Aug-Sept 2012

11

Strategic Partnerships

Joint Venture Partnership completed August 2012 with St

Andrew Goldfields (SAS) for the Clavos Deposit in Timmins

Sage fully vested with 60% ownership in Clavos

Existing infrastructure in place

SAS $46 million spent for underground development

Underground ramp access to the 300 metre level

Existing buildings and settling ponds

Revision to Closure plan

New Resource estimate underway by RPA

CLAVOS DEPOSIT

Timmins, Ontario

Page 13: Investor Presentation Aug-Sept 2012

12

2006 Resource – Mine Only

Total M&I 143,000 10.27 8.07 (60g/t) 37,100 (cut) 47,200 (uncut) __________________________________________________________________________ Total Inferred 529,000 6.70 6.49 (60g/t) 110,300 (cut) 114,000 (uncut) __________________________________________________________________________

Note: The 2006 resources are estimated at a cut-off grade of 4 g/t Au, high gold assays are cut to 60g/t Au, minimal horizontal

thickness of 1.5 metres and an average long-term gold price of US$500 per ounce was used.

Strategic Partnerships CLAVOS DEPOSIT

Timmins, Ontario

Category Tonnes Uncut Grade Cut Grade Total Ounces

Page 14: Investor Presentation Aug-Sept 2012

13

BOARD OF DIRECTORS

Patrick J. Mars Chairman and Director

Mr. Mars is an independent consultant specializing in mine financing and analysis with over 30 years of experience in the

investment industry. Mr. Mars has acted as Chairman, CEO, or Director for several public-traded mining companies and is

currently Director of Aura Minerals, Carpathian Gold, Selwyn Resources and Yamana Gold.

Peter Bojtos Director

Mr. Bojtos is a professional engineer with extensive experience in mineral development and production. Since 1996

following a successful career as CEO of several companies, Mr. Bojtos serves on mining company boards as an

independent Director.

Gary Robertson Director

Mr. Robertson is a Certified Financial Planner. He has worked in the financial industry for the past twenty years, and

presently serves on the board of several private companies as well as on the board of six Canadian junior gold mining

companies.

Joe Baylis Director

Mr. Baylis brings over 23 years of domestic and international mining industry experience to the Company. Mr. Baylis

graduated with an LLB from the University of Western Ontario and is a member of the Law Society of Upper Canada.

Sandy Chim Director

Mr. Chim is an international business executive. He is the President and CEO of Century Iron Mines Corp. (TSX-FER), a

director of Augyva Mining Resources Inc. (TSX.V-AUV) and non executive director of Prosperity Minerals Holdings Limited.

Mr.Chim resides in Kowloon, SAR, Hong Kong, PRC.

Mr. Bai is a Beijing, China businessman. He has investment and commercial experiences covering various fields in China

and Vancouver. With more than 20 years of business activities, he has established an extensive business network in

China. Mr.Bai is currently the President of Earnlead Investments Inc., Sino Water Holdings Inc., and has held such

positions since May 2011. He is a director for Century Iron Mines Corporation (TSX.V-FER).

Hua Bai Director

Page 15: Investor Presentation Aug-Sept 2012

14

MANAGEMENT and CONSULTANTS Management

William D. Love VP and Business Development

Ron Reed Chief Financial Officer

Michael Skutezky Secretary and Legal Counsel

Consultants

Peter de la Plante Abitibi 70

Bob Ritchie Mining Engineer

Avrom Howard M.Sc, FGA, P.Geo

Mr. Peter Hubacheck is a consulting geologist and President of W. A. Hubacheck Consultants Ltd. He has over 35

years of experience as a project geologist, exploration manager and Qualified Person for the purposes of NI 43-101,

with experience in the exploration for gold, silver, base metals, uranium and diamonds in Canada and the USA. He

holds a Mining Technologist (1974) diploma from the Haileybury School of Mines and Technology, Haileybury, Ontario

and a B.A.Sc. (Geol. Eng. 1977) degree from the South Dakota School of Mines and Technology, Rapid City, South

Dakota.

Mr. Ritchie is a Professional Engineer with over 40 years of experience in mine management and development,

feasibility studies and mine construction. He has worked with several mining companies including Goldcorp, Noranda

Mines and St. Andrew Goldfields. He was responsible for the construction of the Stock (now Brigus Gold) Mill which is

10 kms from the Clavos mine. Mr. Ritchie is a graduate of the Michigan Technological University with a Bachelor of

Science in Geology Engineering. He is also a Qualified Person (QP) as defined by NI43-101.

Peter Hubacheck P.Geo, QP

C. Nigel Lees President, CEO and Director

Mr. Lees is a founder and past director of TVX Gold Inc., a significant gold producer in North and South America,

which merged into Kinross Gold, listed on the TSX and the New York Stock Exchange. Mr. Lees has over 30 years

experience in the Canadian investment industry and is currently a Director of several publicly traded mining companies

including Yamana Gold.

Mr. Love is a geologist who has been involved in mineral exploration in Canada and was part of the world class Hemlo

discovery team. He was also an institutional equity salesperson in London, England, for a Canadian brokerage firm.

Mr. Love has spent the last fifteen years as a venture capitalist and a corporate finance specialist in a variety of

resource and technology companies.

Mr. Reed is a CGA with an MBA ( Finance) from the NY Institute of Technology. He has more than 20 years of senior

experience in implementing financial business strategies and has been involved in more than 15 acquisition and

divesture transactions. Since 2009 he has been providing CFO services in the mining sector.

Mr.Skutezky was Assistant General Counsel of Royal Bank for 25 years focused on International Project financing

based in Montreal and Toronto, in addition to working in Eastern Europe with Canadian Law Firms. He has recently

formed his own professional corporation for the practice of law and is the principal of Rhodes Capital Corporation.

Page 16: Investor Presentation Aug-Sept 2012

15

Why Invest in Sage Gold

Compliant Resources

- Established resource to fast track production

Near Term Production

- Milling Contract in process with the St. Andrews Mill to deliver ore

Low Capex / Fast Payback

Strong potential to increase tonnage through further in-fill and

exploration drilling

Strategic acquisitions being evaluated to augment the

company's resources and production potential

Ideal Market Timing - Low market capitalization

Page 17: Investor Presentation Aug-Sept 2012

16

Sage Exploration Properties

Joint Venture Potential

• Properties - Onaman - Lynx Deposit, NI43-101 compliant resource

Paint Lake (adjacent to Brookbank Gold Deposit)

Jacobus (Cu/Ni),

Clist Lake (Au)

• Infrastructure in place - Road, Rail, Power

• Underexplored; Potential for large gold deposits - i.e. Red Lake

• Option agreement - MetalCorp (70% interest) in Solomon’s Pillars

• Ongoing negotiations with potential joint venture partners.

Beardmore Geraldton Gold Camp

Page 18: Investor Presentation Aug-Sept 2012

17

Onaman

Yellow = .5% Cu x 3 metres – Cut Off Red = 1% Cu x 3 metres

Lynx NI43-101 Resource

1.936 million tonnes, 1.44% Cu

39.6 g Ag/T, 0.58 g Au/T

Lynx NI43-101 Open Pit Resource 485,000

tonnes 2.1 % Cu, 45.3 g Ag/T, 0.70 g Au/T

at 1% Cu cut off

LYNX DEPOSIT

Beardmore, Ontario

Page 19: Investor Presentation Aug-Sept 2012

18

Contact Information

Investor Cubed Inc. 67 Yonge St., Suite 1000

Toronto, ON M5E 2J8

Tel.: 1-888-258-3323

Fax: 416 363-7977

[email protected]

Neil Simon