Defense Procurement and Acquisition Policy (DPAP)
Presented by:
Invoice, Receipt, Acceptance and Property Transfer (iRAPT)
Government Furnished Property (GFP) for Contractors
Carol A. Vigna (OUSD AT&L - DPAP PDI)[email protected]
Carol Albany (supporting OUSD AT&L - DPAP PDI)[email protected]
www.dodprocurementtoolbox.com
1
Disclaimer
• This information:ØShould not be construed as changing
or modifying any statute, regulation, Department of Defense (DoD) policy or guidance, or any term(s) of any contract with the United States (US) Government or any Department or Agency of the US Government.
2
Training Topics• Background• Usage Benefits• Policy and Guidance• iRAPT System Architecture & GFP Data Flow• iRAPT – Basic System User “Rules”• iRAPT – Contractor GFP Workflows• Questions and Wrap-up
3
Why is Knowing about iRAPT for GFP Important?
• iRAPT enables data exchange related to physical shipment and receipt of all GFP
• Electronic acknowledgement of physical receipt of all GFP items is a requirement of DFARS 252.211-7007
• DoD expects to enhance GFP accountability using iRAPT• iRAPT Provides GFP Visibility which
Ø Supports overall property accountabilityØ Provides visibility of timely GFP provisioningØ Enables contract performance
4
Background (continued)
WAWF “E-Business Suite” contains many different DoD web-based applications
5
BackgroundØOur Focus Today: iRAPT – Invoicing,
Receipt, Acceptance, and Property TransferØSpecifically, iRAPT roles and workflows
in support of GFP reporting by contractors.
6
Today’s Webinar Topics• Background• Usage Benefits• Policy and Guidance• iRAPT System Architecture & GFP Data Flow• iRAPT – Basic System User “Rules”• iRAPT – Contractor GFP Workflows• Questions and Wrap-up
7
iRAPT Usage Benefits• Enables contractors to meet their GFP reporting
requirements – Property Transfer • Enables contractors to meet GFP reporting for
repairs while concurrently invoicing for the repair service – Reparable Receiving Report (RRR)
• Provides early notification of inbound GFP• Provides assurance of receipt• Provides data integration with Item Unique
Identification (IUID) Registry and Component Accountable Property System of Record (APSR)
8
Today’s Webinar Topics• Background• Usage Benefits• Policy and Guidance• iRAPT System Architecture & GFP Data Flow• iRAPT – Basic System User “Rules”• iRAPT – Contractor GFP Workflows• Questions and Wrap-up
9
Policy and Guidance
w Federal Acquisition Regulation (FAR)» Clause 52.245-1 (April 2012)
w Defense Federal Acquisition Regulation Supplement (DFARS)» 252.211-7007 - Reporting of GFP to the DoD UID Registry» Compels Contractors to Report
- Receipt of all GFP - Shipment, Transfer and Disposal of Serially Managed GFP
w DFARS Appendix F requires use of RRR for returning repaired items
10
11
DFARS 252.211-7007:• GFP is either serially managed or not serially managed –
“receipt” is required for all GFP• Serially managed - “An item designated by DoD to be
uniquely tracked, controlled, or managed in repair, maintenance, and/or supply systems by means of its serial number”
• Serially managed GFP may or may not have been assigned a Unique Item Identifier (UII) prior to being provided to a contractor as GFP
• Serially managed items without a registered UII should be reported by the serial number
Policy and Guidance
Today’s Webinar Topics• Background• Usage Benefits• Policy and Guidance• iRAPT System Architecture & GFP Data Flow• iRAPT – Basic System User “Rules”• iRAPT – Contractor GFP Workflows• Questions and Wrap-up
12
GFPAttachment
IRAPTSystemArchitecture&GFPDataFlow
ContractWriting
EDA
IUIDRegistry
iRAPTGFPPropertyTransfer
GFPlistasXML
Recordofpropertytransfer
GFPReceipt&ShipmentNoticePropertyTransfer
PCARSS/PLT
Propertylossordisposal
ComponentAccountablePropertySystems
ShipmentNotice
ShipmentNotice
ContractDeficiencyReportsformissingGFPtermsordata
DCMA
BIReportsofGFPStatus
DLA
DLA
Note:DPASOperational
DLA
GFPList(attachmentinfillablePDF
- TBDIndustry
DoD(MaterielControlActivities)
DoDSupplySystem
Receipt
DLA
Operational
DistributionStandardSystem(reparablereturn)
DLA
Incrementaldeployment FutureCapability
RequiringSystems
CDRsDCMA
13
Today’s Webinar Topics• Background• Usage Benefits• Policy and Guidance• iRAPT System Architecture & GFP Data Flow• iRAPT – Basic System User “Rules”• iRAPT – Contractor GFP Workflows• Questions and Wrap-up
14
• Users must acquire roles for their location code:• Commercial and Government Entity (CAGE) or
CAGE/Extension• Contractor Department of Defense Activity Address Code
(DoDAAC) • Contractor GFP Roles:
Ø“Contractor Property Receiver” - for property receipt document
Ø“Contractor Property Shipper” - for property transfer (shipment) document
• For RRR, required iRAPT role is:Ø“Vendor”
Self-register for these roles with existing WAWF accountToolbox Guide: http://dodprocurementtoolbox.com/cms/sites/default/files/resources/2017-06/Register%20for%20GFP%20Roles.docx
IRAPT – Basic System User “Rules”
15
iRAPT – Basic System User Rules
• Additionally, for document routing purposes:• Government “Property Receiver” and “Ship-To”
(optional) DoDAAC must be valid and active in iRAPT
• DoDAACs of Procuring Contracting Officer (PCO) and Administrative Contracting Office (ACO) must be valid at Defense Automatic Addressing System Center (DAASC)
• View-only roles are also available
16
Today’s Webinar Topics• Background• Usage Benefits• Policy and Guidance• iRAPT System Architecture & GFP Data Flow• iRAPT – Basic System User “Rules”• iRAPT – Contractor GFP Workflows• Questions and Wrap-up
17
iRAPT GFP Contractor Workflows
Scenarios:1. iRAPT Contractor Property Receipt - Shipment Notice
Received from DoD2. iRAPT Contractor Property Receipt –
NO Shipment Notice Received from DoD3. iRAPT Contractor Property Transfers (shipment) to:
» Another Contract» Another Contractor» DoD
4. iRAPT RRR – Return of repaired items on service contract
18
Tutorial structure
wFor each scenario» Data Flow Diagram» Scenario details» Screen shots of manual web
entry
19
iRAPT
Contract w/GFP
Gov’t Property Shipper
Contractor ReceiverItems being
sent IRAPTentry
Inbound GFPemail notice
PropertyAccountability
Organization input can be manual web input or system electronic formatted message
GFP From DoD to ContractorContractor receives email indicating an IRAPT property shipment document is
available to “receipt” against
1. iRAPT Contractor Property Receipt –Shipment Notice Received
20
Sample Shipment Notification Email
21
iRAPTGov’t
PropertyShipper
Contractor Receiver
Report receipt
IUID Registry
Email notice of items receipted
PropertyAccountability
Organization input can be manual web input or system electronic formatted message
Contractor reports receipt of physical items, in response to a shipment notice
(IUID Registry automatically updated to reflect Contractor custody)
1. iRAPT Contractor Property Receipt –Shipment Notice Received
22
23
1. iRAPT Contractor Property Receipt –Shipment Notice Received
Scenario:• Government ships GFP to contractor for use during contract performance
(government still owns, but contractor protects and maintains):Example: Contract #M6700417C0417
12 Tires – “Non-Serially managed”2 Trucks – “Serially managed”
• Government retains ownership of GFP, but Contractor is responsible for protection and maintenance of GFP
• Contractor receives an emailed shipment notification• Contractor receives physical shipment of GFP items• Contractor uses iRAPT to report receipt of all items:
• Via manual web entry (shown) or via batch data submissions, using either Secure Flat File Protocol (SFTP) or Global Exchange (GEX) X12 standards• If batch submissions are needed, see SFTP/EDI Set-up Instructions
on next slide
24
Overall instructions for getting started with WAWF-iRAPT can be found at:https://wawf.eb.mil/xhtml/unauth/web/homepage/vendorGettingStartedHelp.xhtml
As discussed in Step #6, for testing data submission guides prior to production, contractors should contact Technical Support at the Vendor Customer Support Link:
https://wawf.eb.mil/xhtml/unauth/web/homepage/vendorCustomerSupport.xhtml
More detailed information, along with the actual SFTP/EDI guides, can be found at:
http://dodprocurementtoolbox.com/cms/sites/default/files/resources/2016-04/iRAPT%20Web%20Based%20Training%20access.pdf
Additional GFP resources are available at:http://dodprocurementtoolbox.com/site-pages/gfp-resources
SFTP/EDI Set-up Instructions
25
1. iRAPT Contractor Property Receipt –Shipment Notice Received
1. Select the Receipt Folder
2. Select the CAGE or Contractor DoDAAC of the Contract that authorizes the GFP
3. Select the Shipment Number of the Shipmentdocument against which “receipt” is being reported
1. iRAPT Contractor Property Receipt –Shipment Notice Received
26
4. Enter required (and optional) data. PCO and ACO DoDAACs are required (if not entered by shipper)
1. iRAPT Contractor Property Receipt –Shipment Notice Received
27
5. Access Line Item tab and report quantity received of non-serially managed items
1. iRAPT Contractor Property Receipt –Shipment Notice Received
28
6. Access “UID/Serial No.” tab to report receipt of Serially Managed items. If all items are being receipted, use the “Receive All” button. Example: One UID’d item and one Serial Numbered item are shipped and receipted.
1. iRAPT Contractor Property Receipt –Shipment Notice Received
Note: If the items are Serially Managed, the Contractor can add UII and SN if not entered on the shipment document
29
7. Access Header tab, click “Received” at the bottom, enter date and click “Signature”8. Enter your IRAPT password to complete the receipt reporting.9. An email will be automatically transmitted to the shipper to alert them that the shipment has been receipted and the IUID Registry will be updated to show items are in the Contractor’s custody.
1. iRAPT Contractor Property Receipt –Shipment Notice Received
30
31
2. iRAPT Contractor Property Receipt –NO Shipment Notice Received
Scenario:• Contractor “physically” receives GFP items to be used
during performance of a contract
• Contractor has not received an emailed shipment notification; no shipment document in “receipt folder”
• When items physically arrive, Contractor uses iRAPT to report receipt of all GFP items
• Government retains ownership of GFP, but Contractor is responsible for protection and maintenance of GFP
32
• Data required to unilaterally report receipt:Ø Receiver (CAGE or Contractor DoDAAC)Ø Contract Number and TypeØ PCO and ACO DoDAACsØ Item Number (just a sequential)Ø Product ID – Use the Product Identifiers (IDs) from the
GFP Attachment (National Stock Number (NSN), Part Number AND CAGE, or Model Number); additional product IDs can be added
Ø Quantity, Unit of Measure (UoM), and DescriptionØ Serial Number or UII for items on the Serially Managed
section of the GFP Attachment
2. iRAPT Contractor Property Receipt –NO Shipment Notice Received
iRAPTGov’t
PropertyShipper
Contractor Receiver
Report receipt
IUID Registry
Email notice of items receipted
PropertyAccountability
Organization input can be manual web input or system electronic formatted message
Contractor unilaterally reports receipt of physical items (IUID Registry automatically updated to reflect
Contractor custody)
Identify contract anditem data
2. iRAPT Contractor Property Receipt –NO Shipment Notice Received
33
1. When there is no shipment document, the Contractor must create the PropertyReceipt document by selecting “Create Document”
2. Contractor selects the source of the property based on the physical item packagingor other information.
2. iRAPT Contractor Property Receipt –NO Shipment Notice Received
34
3. Contractor enters required contract data (Contract Number and Type), then selectsProperty Receiver (This is you… the CAGE or Contractor DoDAAC of Prime Contract that authorizes GFP)and clicks “Next” (Optionally, enter the physical Ship To, if different from the Receiver)4. Enter PCO and ACO, click “Next” and see Header tab5. Enter Shipment Number and Date (from physical information)
2. iRAPT Contractor Property Receipt –NO Shipment Notice Received
35
6. Select Line Item Tab (“CLIN/SLIN”), enter info about the first item type being receipted.Required Data: Item Number (just a sequential), Product ID – Use the Product IDs from the GFP Attachment (NSN, Part Number AND CAGE, or Model Number),Quantity, UoM, and Description
2. iRAPT Contractor Property Receipt –NO Shipment Notice Received
36
7. If the items are on the Serially Managed tab of the GFP Attachment, select the UID/Serial No. tab, and enter the UII or the SN. The number of UIIs and SNs must sum to the number of items being receipted for that line.
If the item has a data matrix, scan the derived UII into the UII field. Enter Y to “2D” and, if the item is Equipment - select property category E, if the item is Material, select property category M. Click “Save UID.”
IRAPT requires any GFP UII to already exist in the Registry. If the UII hasn’t been registered (or isn’t intended to be a UID), IRAPT will throw an error. In that case, receipt using the item Serial Number.
2. iRAPT Contractor Property Receipt –No Shipment Notice Received
37
Items listed on the Serially Managed Items section of the GFP Attachment that do not have a registered UID data matrix will be receipted by their Serial Number. (Exception: if you are the Original Enterprise Manufacture (OEM) and can guarantee that the Data Matrix is intended to be a UID, Register the item’s UII as GFP in the IUID Registry before receipting as GFP). If these are Reparables (there is a contract for repairing the items) you can report the condition code of the items to satisfy the DFARS requirement.
Remember to click“Save”!!
Return to the “CLIN/SLIN” tab and click “Save CLIN/SLIN” at the bottom of the page
2. iRAPT Contractor Property Receipt –NO Shipment Notice Received
38
8. Return to the “Header” tab, then sign and date the property receipt.
2. iRAPT Contractor Property Receipt –NO Shipment Notice Received
39
iRAPTContractor
ShipperGov’t
PropertyReceiver
Email noticeof property shipment
Property Shipment
entered in IRAPT
PropertyAccountability
Organization input can be manual web input or system electronic formatted message
Returning GFP from ContractorReceiver can be:
DoD, Another Contractor, or Another Contract within the same CAGE
3. iRAPT Contractor Property Transfers
40
iRAPTContractor
ShipperEmail
notification of items receipted
IUID Registry
Items receivedAgainst Property
Shipment
PropertyAccountability
Organization input can be manual web input or system electronic formatted message
Gov’tPropertyReceiver
Recipient reports receipt in IRAPTShipper receives email notification of the “receipt”
IUID Registry automatically updated to show new custodian
3. iRAPT Contractor Property Transfers
41
42
3. iRAPT Contractor Property Transfers
• IRAPT “property transfers” should be input for:• Property Transfer to Another Contract (same CAGE)• Property Transfer to Another Contractor (or different CAGE
of same contractor)• Contractor Property Transfer to DoD
• All are very similar and follow a common workflow.• Only some of the initial data elements vary so
scenarios have been aggregated for discussion• Exceptions:
• Shipment is to a Subcontractor – No entry• GFP no longer needed - Plant Clearance Asset
Reutilization Screening System (PCARSS)• GFP damaged or lost - Property Loss Tool (PLT)
Contractor to:
Losing Contract
Gaining Contract
Shipper Receiver ReceiptRequired
Contractor Yes Optional Yes Yes YesDoD Yes No Yes Yes YesContract (same CAGE)
Yes Yes Yes No No
1. Select Property Transfer, Contractor Property Shipper, Create Document
2. Select recipient of shipment: DoD, another Contractor, or another contract-same CAGE
Data required for Property Shipment to each recipient type
3. iRAPT Contractor Property Transfers
43
4. Enter PCO and ACO; click Next
5. Enter Shipment Number and Date
3. Enter the Contract data, click “Next”
3. iRAPT Contractor Property Transfers
44
• Continue - Add Line Items and UIIs or Serial Numbers of items being shipped, just like on unilateral receipt.
• Note: If the items have been marked with UID while in contractor custody after receipt, the item must be “converted” from Non-UII to UII GFP in the Registry. This is a manual process on the IUID Registry web site.
• Note: If you assigned a virtual UII to GFP item when it was receipted, the item must be physically marked with an IUID data matrix prior to returning to DoD or shipping to another contractor.
3. iRAPT Contractor Property Transfers
45
iRAPT
DoDAcceptor
Contractor RRR
PropertyAccountability
Organization input can be manual web input or system electronic formatted message
Returning Reparable GFP to DoDvia the IRAPT Reparables Receiving Report (RRR)
Repair Services are Accepted for paymentRepaired Items generate a “spawned” Property Shipment
Recipient
4. iRAPT RRR
46
IRAPT RRR ContractorReceiptEmail notice
IUID Registry
PropertyAccountability
Organization input can be manual web input or system electronic formatted message
DoDAcceptor
Reparables Receiving ReportDoD Accepts the repair service
Receipt is reported against spawned Shipment documentUpdates Registry Automatically
Recipient
4. iRAPT RRR
47
48
• The RRR is used to deliver items that have been repaired as a service back to the Government.
• The RRR allows the contractor to meet their GFP reporting requirement, while simultaneously submitting an invoice for the repair service
• The Contractor requires the role of “Vendor” for submitting RRRs.
4. iRAPT RRR
3. Enter Pay DoDAAC - If Contract found in EDA, data will pre-populate
1. Select “Create Document” under Vendor tab
2. Select CAGE and enter Contract Number and Type
4. iRAPT RRR
49
4. Select Reparables Receiving Report and indicate whether Inspection and Acceptance are Source, Destination, or Other, based on Contract terms
4. iRAPT RRR
50
5. Enter Required Data: Admin DoDAAC, Ship To Location Code, PCO, ACO,Shipment Number, and Date
4. iRAPT RRR
51
6. Enter line Item data and UID or SN of items being returned after repairTip: The Item No.is a CLIN, so must be 4 characters
7. For each CLIN, select the UID/Ser No. tab and enter the UII or SN of the reparable item, and optionally enter the Condition Code
4. iRAPT RRR
Tip: The number of UIIs plus Serial Numbers must equal the quantity shipped
52
Submit
8. Return to the Header tab (remember to select whether this is final shipment) andclick the “Submit” button
4. iRAPT RRR
53
54
Note: Government Acceptor must accept the RRR AND Government Receiver must receipt the “spawned” Property Transfer before the custody will transfer back to Government in the IUID Registry.
4. iRAPT RRR
Additional Information Resources
GFP Policyhttp://www.acq.osd.mil/dpap/pdi/gfp/index.html
55
Training, Tools and Resources
www.dodprocurementtoolbox.com
Training Certificates
56
Please send your request to Katherine Phyfe:
[email protected] include the date of the webinar and if you want to be on the GFP Training
email distribution list.
If you have access to Google Forms, please follow the link below to fill out a
request:https://docs.google.com/forms/d/e/1FAIp
QLSeZnqUKKvoNRttNQ4jlwavP94GimaMrfzMqyPqej9niKh14Zw/viewform?c=0
&w=1
57
Questions and Wrap-up