Iron Horse Trail
Dublin Boulevard
Overcrossing
Community Meeting
6:00-7:30 PM
December 3, 2018
![Page 2: Iron Horse Trail Dublin Boulevard Overcrossing](https://reader034.vdocuments.net/reader034/viewer/2022051203/6277c4ebd0e1d72179772f6a/html5/thumbnails/2.jpg)
• Sign-in (6:00-6:10)
• Presentation (6:10-6:30)
1. Welcome
2. Project Background
3. Project Details
4. Project Schedule
5. Next Steps
• Open House (6:30-7:30)
![Page 3: Iron Horse Trail Dublin Boulevard Overcrossing](https://reader034.vdocuments.net/reader034/viewer/2022051203/6277c4ebd0e1d72179772f6a/html5/thumbnails/3.jpg)
• Iron Horse Trail Feasibility Study
• Alameda CTC funded the Study
• City of Dublin supported Alameda CTC
consultant on preparing and finalizing the Study
• Study was coordinated with Scarlett Drive
Extension and the Community Park projects
which are both being constructed by The
Boulevard developer
![Page 4: Iron Horse Trail Dublin Boulevard Overcrossing](https://reader034.vdocuments.net/reader034/viewer/2022051203/6277c4ebd0e1d72179772f6a/html5/thumbnails/4.jpg)
![Page 5: Iron Horse Trail Dublin Boulevard Overcrossing](https://reader034.vdocuments.net/reader034/viewer/2022051203/6277c4ebd0e1d72179772f6a/html5/thumbnails/5.jpg)
Key Recommendations:
• Striping, signing, traffic signal improvements at Dougherty Road crossing (completed)
• Bicycle facilities through BART station to close gap in trail (in design)
• Bicycle/pedestrian bridge over Dublin Boulevard (in design)
![Page 6: Iron Horse Trail Dublin Boulevard Overcrossing](https://reader034.vdocuments.net/reader034/viewer/2022051203/6277c4ebd0e1d72179772f6a/html5/thumbnails/6.jpg)
![Page 7: Iron Horse Trail Dublin Boulevard Overcrossing](https://reader034.vdocuments.net/reader034/viewer/2022051203/6277c4ebd0e1d72179772f6a/html5/thumbnails/7.jpg)
![Page 8: Iron Horse Trail Dublin Boulevard Overcrossing](https://reader034.vdocuments.net/reader034/viewer/2022051203/6277c4ebd0e1d72179772f6a/html5/thumbnails/8.jpg)
![Page 9: Iron Horse Trail Dublin Boulevard Overcrossing](https://reader034.vdocuments.net/reader034/viewer/2022051203/6277c4ebd0e1d72179772f6a/html5/thumbnails/9.jpg)
![Page 10: Iron Horse Trail Dublin Boulevard Overcrossing](https://reader034.vdocuments.net/reader034/viewer/2022051203/6277c4ebd0e1d72179772f6a/html5/thumbnails/10.jpg)
![Page 11: Iron Horse Trail Dublin Boulevard Overcrossing](https://reader034.vdocuments.net/reader034/viewer/2022051203/6277c4ebd0e1d72179772f6a/html5/thumbnails/11.jpg)
![Page 12: Iron Horse Trail Dublin Boulevard Overcrossing](https://reader034.vdocuments.net/reader034/viewer/2022051203/6277c4ebd0e1d72179772f6a/html5/thumbnails/12.jpg)
![Page 13: Iron Horse Trail Dublin Boulevard Overcrossing](https://reader034.vdocuments.net/reader034/viewer/2022051203/6277c4ebd0e1d72179772f6a/html5/thumbnails/13.jpg)
![Page 14: Iron Horse Trail Dublin Boulevard Overcrossing](https://reader034.vdocuments.net/reader034/viewer/2022051203/6277c4ebd0e1d72179772f6a/html5/thumbnails/14.jpg)
• Finalize design – Fall 2019
• Future Phases – Funding Dependent
![Page 15: Iron Horse Trail Dublin Boulevard Overcrossing](https://reader034.vdocuments.net/reader034/viewer/2022051203/6277c4ebd0e1d72179772f6a/html5/thumbnails/15.jpg)
• Refine design elements such as bridge aesthetics, lighting, etc.
• Hold a Public Meeting
• Refine bridge interface to park and roadway
• Finalize construction documents
For more information contact:
Obaid Khan