IS THE INSTALLATION OF MINI HYDROPOWER TURBINES IN
WATER TRANSMISSION SYSTEM PIPELINES COST
EFFECTIVE?
Supervisors: Professor Angus Simpson and Jinzhe Gong
![Page 2: IS THE INSTALLATION OF MINI HYDROPOWER TURBINES IN …](https://reader030.vdocuments.net/reader030/viewer/2022012707/61a7fd332c89976a7a3506a0/html5/thumbnails/2.jpg)
Who is responsible with preventing this?
• Australia one of the largest CO2 emitters per capita.
• 85% of our emissions from energy generation.
![Page 3: IS THE INSTALLATION OF MINI HYDROPOWER TURBINES IN …](https://reader030.vdocuments.net/reader030/viewer/2022012707/61a7fd332c89976a7a3506a0/html5/thumbnails/3.jpg)
Mini Hydropower - Dreams into Reality?
![Page 4: IS THE INSTALLATION OF MINI HYDROPOWER TURBINES IN …](https://reader030.vdocuments.net/reader030/viewer/2022012707/61a7fd332c89976a7a3506a0/html5/thumbnails/4.jpg)
-add sik animations -make title pages for each section The Hahndorf Dissipator
![Page 5: IS THE INSTALLATION OF MINI HYDROPOWER TURBINES IN …](https://reader030.vdocuments.net/reader030/viewer/2022012707/61a7fd332c89976a7a3506a0/html5/thumbnails/5.jpg)
• Murray Bridge to Onkaparinga (MBO) Pipeline
• Pumped at Murray Bridge
• Rising main to Summit Storage
• Released through Hahndorf Dissipator
• Into Onkaparinga River
• Water supply for Southern Adelaide
50 km
long
1.4 - 1.7
Diameter
![Page 6: IS THE INSTALLATION OF MINI HYDROPOWER TURBINES IN …](https://reader030.vdocuments.net/reader030/viewer/2022012707/61a7fd332c89976a7a3506a0/html5/thumbnails/6.jpg)
Hahndorf Dissipator
![Page 7: IS THE INSTALLATION OF MINI HYDROPOWER TURBINES IN …](https://reader030.vdocuments.net/reader030/viewer/2022012707/61a7fd332c89976a7a3506a0/html5/thumbnails/7.jpg)
Hydraulics at the Dissipator
![Page 8: IS THE INSTALLATION OF MINI HYDROPOWER TURBINES IN …](https://reader030.vdocuments.net/reader030/viewer/2022012707/61a7fd332c89976a7a3506a0/html5/thumbnails/8.jpg)
Mt Bold
Reservoir
Hahndorf
Dissipator
Summit
Storage Murray River
Pumping
Station
EL 296m
EL 205m
EL 401m EL 3m
100 m head difference
![Page 9: IS THE INSTALLATION OF MINI HYDROPOWER TURBINES IN …](https://reader030.vdocuments.net/reader030/viewer/2022012707/61a7fd332c89976a7a3506a0/html5/thumbnails/9.jpg)
• Traditionally flows varied from 1-4 m3/s at through the Dissipator.
• EPANET Modelling
• As turbine flow increases, so does the head losses.
Turbine Flow
![Page 10: IS THE INSTALLATION OF MINI HYDROPOWER TURBINES IN …](https://reader030.vdocuments.net/reader030/viewer/2022012707/61a7fd332c89976a7a3506a0/html5/thumbnails/10.jpg)
• The bigger the turbine, greater power output
• Power range from 0.9-2.63 MW
• 1 MW = can power 1000 homes!!
Turbine Power Output
![Page 11: IS THE INSTALLATION OF MINI HYDROPOWER TURBINES IN …](https://reader030.vdocuments.net/reader030/viewer/2022012707/61a7fd332c89976a7a3506a0/html5/thumbnails/11.jpg)
Turbine Selection
•EPANET computations and (Benzon et al. 2016) to find a range of turbine types.
![Page 12: IS THE INSTALLATION OF MINI HYDROPOWER TURBINES IN …](https://reader030.vdocuments.net/reader030/viewer/2022012707/61a7fd332c89976a7a3506a0/html5/thumbnails/12.jpg)
Selection of Turbine Type
• Research indicated Turgo most suitable due to constant efficiency across varying flows.
• Tamar Hydro deemed 3-jet Turgo most appropriate.
![Page 13: IS THE INSTALLATION OF MINI HYDROPOWER TURBINES IN …](https://reader030.vdocuments.net/reader030/viewer/2022012707/61a7fd332c89976a7a3506a0/html5/thumbnails/13.jpg)
But what size is optimal?
![Page 14: IS THE INSTALLATION OF MINI HYDROPOWER TURBINES IN …](https://reader030.vdocuments.net/reader030/viewer/2022012707/61a7fd332c89976a7a3506a0/html5/thumbnails/14.jpg)
AEMO Electrical Energy Prices
• Provides wholesale price of energy every 30 minutes. • Prices are capped between -$1000 and $14,000 per MWh.
Energy Consumption Error 2016/17
Down from 2.2% in 2015/16
![Page 15: IS THE INSTALLATION OF MINI HYDROPOWER TURBINES IN …](https://reader030.vdocuments.net/reader030/viewer/2022012707/61a7fd332c89976a7a3506a0/html5/thumbnails/15.jpg)
AEMO Price Prediction Accuracy
• Created 12 hours in advance. • Shows accuracy decreases with time. • Energy price order of magnitude is almost equivalent.
![Page 16: IS THE INSTALLATION OF MINI HYDROPOWER TURBINES IN …](https://reader030.vdocuments.net/reader030/viewer/2022012707/61a7fd332c89976a7a3506a0/html5/thumbnails/16.jpg)
The Feasibility Scenarios
![Page 17: IS THE INSTALLATION OF MINI HYDROPOWER TURBINES IN …](https://reader030.vdocuments.net/reader030/viewer/2022012707/61a7fd332c89976a7a3506a0/html5/thumbnails/17.jpg)
Scenario 1: The Idealised Returns
• Data - 8 years of historic data utilised (ignoring Millennium Drought years of 2001-2009). (used 2010-2017)
• Assumes operator monitors spot prices throughout the day every 30 minutes.
• Ranks historic daily spot prices from highest to lowest and transfers flow.
• Turbine can turn on/off every 10 mins.
• Purpose to use scenarios for NPV analysis. Fortran Model
![Page 18: IS THE INSTALLATION OF MINI HYDROPOWER TURBINES IN …](https://reader030.vdocuments.net/reader030/viewer/2022012707/61a7fd332c89976a7a3506a0/html5/thumbnails/18.jpg)
Scenario 2: Practical Operations
• Frequency analysis over 8 years to find average monthly spot price peaks.
• Assumes that the operator will transfer flow volume in historically known high priced times.
• Outside these times, spot prices are ranked (as per scenario 1).
• Water demands aren’t realistically known on daily time scale.
Fortran Model
![Page 19: IS THE INSTALLATION OF MINI HYDROPOWER TURBINES IN …](https://reader030.vdocuments.net/reader030/viewer/2022012707/61a7fd332c89976a7a3506a0/html5/thumbnails/19.jpg)
• Is the system optimised for hydropower generation?
• Can flow regulation be altered to earn additional profits subject to environmental and reservoir regulations?
• How will the system cope with an increase in future demand?
Scenario 3: Maximising Profits
Fortran & SOURCE Model
![Page 20: IS THE INSTALLATION OF MINI HYDROPOWER TURBINES IN …](https://reader030.vdocuments.net/reader030/viewer/2022012707/61a7fd332c89976a7a3506a0/html5/thumbnails/20.jpg)
Thinking to the Future
![Page 21: IS THE INSTALLATION OF MINI HYDROPOWER TURBINES IN …](https://reader030.vdocuments.net/reader030/viewer/2022012707/61a7fd332c89976a7a3506a0/html5/thumbnails/21.jpg)
Introduction to Multiple Plausible Future Scenarios
What will most likely affect the feasibility of Mini Hydropower in the near future?
1. An increase in residential rooftop solar power and eventual battery storage installation.
2. An increase in market competition due to public educational programs.
3. Victoria closing baseload power concurrently with South Australia’s investment of renewable energy sources.
4. The increase in export rates of natural gas.
5. Instantaneous fluxes in oil trading in the Middle East and Asia.
6. Taxes and incentive programs aimed at emissions abatement and renewable investment.
7. Buy back of base load power stations (electricity prices reduce as South Australia becomes less dependent on the Heywood Interconnector with Victoria).
![Page 22: IS THE INSTALLATION OF MINI HYDROPOWER TURBINES IN …](https://reader030.vdocuments.net/reader030/viewer/2022012707/61a7fd332c89976a7a3506a0/html5/thumbnails/22.jpg)
Multiple Plausible Future Scenarios - Demands
• Changes in Southern Adelaide Water Demands
• Dependent on: • Population Change
• SRES Scenario A2 and B2
• Water reduction strategies
• Magnitude changes found every 5 years
![Page 23: IS THE INSTALLATION OF MINI HYDROPOWER TURBINES IN …](https://reader030.vdocuments.net/reader030/viewer/2022012707/61a7fd332c89976a7a3506a0/html5/thumbnails/23.jpg)
Multiple Plausible Future Scenarios – AEMO Spot Prices
• Likely changes in spot prices over next 25 years (ARENA)
• Renewable Energy Targets (RETs) expected
• 3 electricity demand cases (Low, medium, high)
• Fixed vs. flexible RETs
• Magnitude changes found every 5 years
![Page 24: IS THE INSTALLATION OF MINI HYDROPOWER TURBINES IN …](https://reader030.vdocuments.net/reader030/viewer/2022012707/61a7fd332c89976a7a3506a0/html5/thumbnails/24.jpg)
Economic Analysis
![Page 25: IS THE INSTALLATION OF MINI HYDROPOWER TURBINES IN …](https://reader030.vdocuments.net/reader030/viewer/2022012707/61a7fd332c89976a7a3506a0/html5/thumbnails/25.jpg)
• 25 year design life of turbine.
• Range of discount rates explored for decision maker.
NPV formula
![Page 26: IS THE INSTALLATION OF MINI HYDROPOWER TURBINES IN …](https://reader030.vdocuments.net/reader030/viewer/2022012707/61a7fd332c89976a7a3506a0/html5/thumbnails/26.jpg)
Turbine Capital Costs
• Maintenance cost = 4% of turbine capital (IRENA 2012)
![Page 27: IS THE INSTALLATION OF MINI HYDROPOWER TURBINES IN …](https://reader030.vdocuments.net/reader030/viewer/2022012707/61a7fd332c89976a7a3506a0/html5/thumbnails/27.jpg)
Site Capital Costs
• 4.7 million to set up Hahndorf Dissipator site.
![Page 28: IS THE INSTALLATION OF MINI HYDROPOWER TURBINES IN …](https://reader030.vdocuments.net/reader030/viewer/2022012707/61a7fd332c89976a7a3506a0/html5/thumbnails/28.jpg)
Let’s see some results!
![Page 29: IS THE INSTALLATION OF MINI HYDROPOWER TURBINES IN …](https://reader030.vdocuments.net/reader030/viewer/2022012707/61a7fd332c89976a7a3506a0/html5/thumbnails/29.jpg)
Final Results - Scenario 1
![Page 30: IS THE INSTALLATION OF MINI HYDROPOWER TURBINES IN …](https://reader030.vdocuments.net/reader030/viewer/2022012707/61a7fd332c89976a7a3506a0/html5/thumbnails/30.jpg)
Final Results - Scenario 2
![Page 31: IS THE INSTALLATION OF MINI HYDROPOWER TURBINES IN …](https://reader030.vdocuments.net/reader030/viewer/2022012707/61a7fd332c89976a7a3506a0/html5/thumbnails/31.jpg)
Final Results - Scenario 3
![Page 32: IS THE INSTALLATION OF MINI HYDROPOWER TURBINES IN …](https://reader030.vdocuments.net/reader030/viewer/2022012707/61a7fd332c89976a7a3506a0/html5/thumbnails/32.jpg)
Perfect Forecasting Scenarios – Payback Period
Capital Recovery (Years)
Scenario 1 11.48
Scenario 2 12.43
Scenario 3 7.12 (NA)
![Page 33: IS THE INSTALLATION OF MINI HYDROPOWER TURBINES IN …](https://reader030.vdocuments.net/reader030/viewer/2022012707/61a7fd332c89976a7a3506a0/html5/thumbnails/33.jpg)
Final Results - Future Scenarios
![Page 34: IS THE INSTALLATION OF MINI HYDROPOWER TURBINES IN …](https://reader030.vdocuments.net/reader030/viewer/2022012707/61a7fd332c89976a7a3506a0/html5/thumbnails/34.jpg)
Final Results - Payback Period (Future Scenarios)
![Page 35: IS THE INSTALLATION OF MINI HYDROPOWER TURBINES IN …](https://reader030.vdocuments.net/reader030/viewer/2022012707/61a7fd332c89976a7a3506a0/html5/thumbnails/35.jpg)
Conclusions…