issue 352 - rolls-royce holdings

17
© Rolls-Royce Page 1 of 17 August 2021 NTS Index Issue 352 Number & Issue Date Issued NTS Description Status / Comment 543 1 Aug-21 Release of Civil and Defence SABRe Edition 4 Version 1.0 542 1 Jul-21 Civil Aerospace Operations Summer Shutdown Scope: Group Indirect Suppliers 541 1 Jul-21 Civil Aerospace Operations Summer Shutdown Scope: Civil Aerospace Suppliers 540 1 Jul-21 Updates to our UK General Conditions of Purchase for Goods and Services (“GCPs”) 539 1 May-21 The New Maintenance Repair & Overhaul (MRO) Services Interface Document 538 1 May-21 Civil Aerospace Operations Announcement 537 1 May-21 Containment & Problem Investigation Service Provider 536 1 May-21 Requirements of REACH Authorisation 535 1 Apr-21 Dimensional Measurement Rounding Rules 534 1 Apr-21 Adoption of the International Standard Strain Rate for Tensile Testing 533 1 Apr-21 Delivery Address Change 532 1 Mar-21 Supplier Cost of Non-Quality Values Supersedes NTS 385 531 1 Feb-21 Launch of iValua Platform New Procurement and Supplier Management Operating System 530 1 Feb-21 RRES 90009 - Requirements for Design and Development Activities 529 1 Feb-21 Export Classification and Authorisation Form (ECAF) Update to NTS 408 528 1 Feb-21 Brexit UK Government Communications 527 1 Feb-21 REACH and Brexit - Compliance with the European Union and UK REACH Regulation 526 1 Jan-21 Thermocouple Calibration - AMS2750F Update to NTS 525 525 1 Jan-21 Thermocouple Calibration - AMS2750F 524 1 Jan-21 Coronavirus (COVID-19) and SABRe compliance Update to NTS 502 523 1 Dec-20 Rolls-Royce Supplier Cyber Security Standards 522 1 Dec-20 Brexit UK Government Communications

Upload: others

Post on 03-Oct-2021

4 views

Category:

Documents


0 download

TRANSCRIPT

1NTS Index Issue 352
NTS Description Status / Comment
543 1 Aug-21 Release of Civil and Defence SABRe Edition 4 Version 1.0
542 1 Jul-21 Civil Aerospace Operations Summer Shutdown Scope: Group Indirect Suppliers
541 1 Jul-21 Civil Aerospace Operations Summer Shutdown Scope: Civil Aerospace Suppliers
540 1 Jul-21 Updates to our UK General Conditions of Purchase for Goods and Services (“GCPs”)
539 1 May-21 The New Maintenance Repair & Overhaul (MRO) Services Interface Document
538 1 May-21 Civil Aerospace Operations Announcement
537 1 May-21 Containment & Problem Investigation Service Provider
536 1 May-21 Requirements of REACH Authorisation
535 1 Apr-21 Dimensional Measurement Rounding Rules
534 1 Apr-21 Adoption of the International Standard Strain Rate for Tensile Testing
533 1 Apr-21 Delivery Address Change
532 1 Mar-21 Supplier Cost of Non-Quality Values Supersedes NTS 385
531 1 Feb-21 Launch of iValua Platform – New Procurement and Supplier Management Operating System
530 1 Feb-21 RRES 90009 - Requirements for Design and Development Activities
529 1 Feb-21 Export Classification and Authorisation Form (ECAF) Update to NTS 408
528 1 Feb-21 Brexit – UK Government Communications
527 1 Feb-21 REACH and Brexit - Compliance with the European Union and UK REACH Regulation
526 1 Jan-21 Thermocouple Calibration - AMS2750F Update to NTS 525
525 1 Jan-21 Thermocouple Calibration - AMS2750F
524 1 Jan-21 Coronavirus (COVID-19) and SABRe compliance Update to NTS 502
523 1 Dec-20 Rolls-Royce Supplier Cyber Security Standards
522 1 Dec-20 Brexit – UK Government Communications
© Rolls-Royce Page 2 of 17 August 2021
NTS Index Issue 352
520 1 Dec-20 Engagement of University Technology Centres (UTC)
519 1 Nov-20 Proposed Interim Defense Federal Acquisition Regulation Supplement (DFARS) Rule
518 1 Nov-20 Conflict Minerals 2021 (2020 reporting year)
517 1 Nov-20 Changes to the Civil Aerospace Strategic Procurement Team
516 1 Oct-20 Brexit – UK Government Communications
515 1 Oct-20 Strategic Export control declaration – Supply Chain DECAF
514 1 Oct-20 Supporting Gulfstream’s new Flagship – the G700 with the Pearl 700
513 1 Oct-20 Brexit – UK Government Communications
512 1 Sept-20 Prohibited Telecommunications and Video Surveillance Services
511 1 Aug-20 Civil Operations Facilities Review
510 1 Aug-20 Trichloroethylene for Degreasing
509 1 Aug-20 Compliance with the Persistent Organic Pollutant’s (POPs) Regulation in the European Union
508 1 Jun-20 Changes in Civil OE organisation structure
507 5 Jun-20 COVID-19 UK Government Business Support Mechanisms Update to NTS 495/499/501/503
506 1 May-20 Release of Aerospace SABRe Edition 3 Version 1.3
505 1 May-20 Rolls-Royce Defence Supplier Update on COVID-19
504 1 May-20 Foreign Object Debris (FOD) event which caused disruption to Airbus
503 4 May-20 COVID-19 UK Government Business Support Mechanisms Update to NTS 495/499/501
502 1 May-20 Coronavirus (COVID-19) and SABRe compliance
501 3 Apr-20 COVID-19 UK Government Business Support Mechanisms Update to NTS 495 and 499
500 1 Apr-20 Updates to TX0206 and TX0855 Quality Acceptance Forms
499 2 Apr-20 COVID-19 UK Government Business Support Mechanisms Update to NTS 495
© Rolls-Royce Page 3 of 17 August 2021
NTS Index Issue 352
498 1 Apr-20 Change to SABRe Protection, Packaging and Labelling Guidelines
497 1 Apr-20 Defence Naval SABRe 3 Release
496 1 Apr-20 COVID-19 Temporary Extension Policy With Regard to Expiring NDT Certificates
495 1 Apr-20 COVID-19 UK Government Business Support Mechanisms
494 1 Apr-20 COVID-19 update for Indirect suppliers
493 1 Mar-20 Accelerated measures for our UK Operations
492 1 Mar-20 Coronavirus (COVID-19) Cleaning
491 1 Mar-20 Rolls-Royce Defence Supplier Update on COVID-19
490 1 Mar-20 COVID-19 Message from EVP Procurement - Defence
489 1 Mar-20 COVID-19 Message from Chief Procurement Officer – Civil Aerospace
488 1 Mar-20 Coronavirus (COVID-19)
487 1 Mar-20 Global Supplier Approval Certificate - Aerospace
486 1 Mar-20 Requirements of REACH Authorisation
485 1 Feb-20 Organisation Announcement – Operations Leadership Team
484 1 Feb-20 Coronavirus (2019 Novel Coronavirus) – Supply Chain Management
483 1 Jan-20 United Kingdom (UK) exit from the European Union (EU) on 31st January 2020
482 1 Dec-19 Conflict Minerals 2020 (2019 reporting year)
481 1 Dec-19 Problem investigation Service Provider - Pilot
480 1 Dec-19 Effect of Replicating Media on the Capability of Fluorescent Penetrant Inspection
479 1 Nov-19 Improving Delivery Performance
478 1 Nov-19 Introduction of Model based Definition Technical Data Package
477 1 Nov-19 Release of Aerospace SABRe Edition 3 Development Configuration Part (DCP)
476 1 Oct-19 FAIr delegation for suppliers
© Rolls-Royce Page 4 of 17 August 2021
NTS Index Issue 352
475 1 Oct-19 Cyber Security information relating vulnerabilities reported by the UK National Cyber Security Centre
474 1 Oct-19 RRES 90000 Engineering Control of Production Source and Method Update
473 1 Oct-19 Application of 3 Dimensional Structured Light (3DSL) Measurement
472 1 Sept-19 Change of address – Plant 2102 Deliveries
471 1 Sept-19 Company change of address to Kings Place, London Supersedes NTS 468
470 1 Sept-19 United Kingdom (UK) exit from the European Union (EU) on 31st October 2019
469 1 Aug-19 Rolls-Royce Digital Supply Chain App
468 1 Aug-19 Rolls-Royce plc Registered Office Superseded by NTS 471
467 1 Aug-19 Senior Purchasing Executive and Supplier Management Executive Appointments
466 1 Jun-19 Civil Aerospace Chief Metrologist
465 1 Jun-19 Containment Service Provider - Reminder
464 1 May-19 Supplier Quality Management System Requirements – GS3001
463 1 May-19 Engagement of Third-Party Engineering Resource
462 1 Mar-19 Returns / Rejects Process for Goods and Services
461 1 Mar-19 United Kingdom (UK) exit from the European Union (EU) Update to NTS 441/451/457
460 1 Mar-19 Important information for UK Suppliers supplying goods outside of the UK
459 1 Mar-19 Cyber Security information and recommendations
458 1 Mar-19 NTS 2019 Commissioned Overcheck Policy
457 1 Feb-19 United Kingdom (UK) exit from the European Union (EU) on 29 March 2019
Update to NTS 441/451
455 1 Jan-19 RB211-535E4-B-75 Tupolev Engines - End of Life Disposal
454 1 Jan-19 Changes to Rolls-Royce’s European Civil Design Organisation Approval (DOA)
Update to NTS 451
453 1 Jan-19 Update to the Rolls-Royce Global Supplier Code of Conduct
452 1 Jan-19 Civil Aerospace Operations Leadership Team update
451 1 Dec-18 United Kingdom (UK) exit from the European Union (EU) on 29 March 2019
Reissue NTS 441
450 1 Dec-18 eDAR Status Update Updates to NTS 424, 426, 430, 433 and 438
449 1 Dec-18 Requirements for Design Make/Design Only Suppliers – RRES 90009
448 1 Dec-18 Release of Aerospace SABRe Edition 3 Version 1.2
447 1 Dec-18 Conflict Minerals 2018 / 2019 reporting
© Rolls-Royce Page 5 of 17 August 2021
NTS Index Issue 352
446 1 Nov-18 NEW Concession and Deviation Permit submission and management requirements
445 1 Nov-18 e-FAIr / Net-Inspect Aerospace Update Update following issue of NTS 423
444 1 Nov-18 Awareness of the Procurement Privacy Notice
443 1 Nov-18 Updates to Vendor Technical Publications and Associated Technical Data
442 1 Oct-18 Assent Compliance, Inc. – 2019 Procurement Information Booklet (PIB)
441 1 Oct-18 United Kingdom (UK) exit from the European Union (EU) on 29 March 2019
440 1 Sept-18 Rolls-Royce Raynesway Smoke-Free Notice
439 1 Sept-18 Amendment to the Non-Purchase Order invoice payment process
437 1 Sept-18 Organisational Announcement
436 1 Aug-18 Sharing export controlled technical information through the Request For Quotation (RFQ) process via Exostar ForumPass
435 1 Aug-18 Release of Aerospace SABRe Edition 3 Version 1.1
434 1 Aug-18 Introduction of SABRe 3 Control Systems Supplemental Document
433 1 Jul-18 e-DAR Status Update
432 1 Jun-18 Rolls-Royce Siemens NX Software upgrade
431 1 Jun-18 Civil Aerospace Procurement organisational announcement
430 1 May-18 e-DAR WebEx Training
429 1 Apr-18 Organisational Announcement
428 1 Apr-18 Engineering Control Specification – RRES93000
427 1 Apr-18 Release of SABRe Edition 3
426 1 Mar-18 “What’s Coming” WebEx on e-DAR
425 1 Mar-18 Small Business Classifications/Certifications
424 1 Mar-18 New electronic DAR submission process
423 1 Mar-18 e-FAIr / Net-Inspect Aerospace Mandate
422 1 Feb-18 Civil Aerospace Change of Delivery Addresses
421 1 Jan-18 Supply Chain "Brexit" survey
420 1 Jan-18 Adoption of aerospace industry Process Failure Mode and Effects Analysis (PFMEA) and Control Plans standard
419 1 Jan-18 Defence Aerospace Change of Delivery Addresses
418 1 Jan-18 Introduction of Rolls-Royce Global Specifications
417 1 Dec-17 Requirements of REACH Authorisation
416 1 Nov-17 Assent Compliance Inc.- Materials Declaration
415 1 Nov-17 2018 REACH Registration
414 1 Oct-17 V2500 - Requirements for Concessions and Deviation Permits
413 1 Oct-17 Impact of Kobe Steel self-declaration of the Overwriting of the
NTS Index Issue 352
412 1 Oct-17 eFAIr / Net-Inspect Access and upgrade requirements
411 1 Oct-17 U.S Government FARS/DFARS (Flowdowns) to the Global Supplier Portal
410 1 Sept-17 Assent Compliance, Inc. – 2018 Procurement Information Booklet (PIB)
409 1 Aug-17 Defence Aerospace Change of Delivery Addresses
408 1 Jun-17 Export Classification and Authorisation Form (ECAF)
407 1 May-17 Requirements of REACH authorisation
406 1 May-17 Planned changes to RRES 90009 section 6.3.12 (Non- Conformance)
405 1 May-17 Prevention of non-conforming formed profiles from grinding processes
404 1 Apr-17 Up-issue of RRP 50000
403 2 Apr-17 V2500 Design Transfer from Rolls-Royce to PWAEI Issue 2 (21st Apr) replaces Issue 1 (10th Mar)
402 1 Feb-17 Updated Quality Requirements and Key Product Characteristics
401 1 Jan-17 RRES90057 - Materials and processes to be avoided
400 1 Jan-17 Logistics Optimisation – Rolls-Royce Inbound Transport
399 1 Nov-16 Assent Compliance Inc. – Purchasing Information and Compliance Platform
398 1 Nov-16 2017 Procurement Information Booklet (PIB)
397 1 Nov-16 Definition Alteration Request (DAR) - Global DAR Form
396 1 Sep-16 Introduction of Engineering Supplier Interface Document (ESID)
395 1 Aug-16 Update to concession / deviation permit form
394 1 Jul-16 V2500 Design Transfer from Rolls-Royce to Pratt & Whitney Aero Engines International
No longer current
393 1 Jul-16 Comparison of actual drawing revision level
392 1 Jul-16 Managing supply chain threats caused by REACH authorisation
391 1 Jun-16 Hazardous chemical substances used in the manufacture of Rolls-Royce products
390 1 Jun-16 European Union Biocidal Product Regulation (BPR)
389 1 May-16 Adoption of industry problem solving standard
388 1 May-16 Rolls-Royce Counterfeit Parts Policy
387 1 May-16 Relaxation of Sanctions on Iran - Rolls-Royce plc Exploring Business Opportunities with Potential Iranian Customers
386 1 Apr-16 Trichloroethylene for Degreasing
385 1 Feb-16 Supplier Cost of Non-Quality Values No longer current - withdrawn
384 1 Feb-16 Rolls-Royce Civil Aerospace Leadership Team
383 1 Jan-16 V2500 Design Transfer from Rolls-Royce to Pratt & Whitney No longer current
382 1 Jan-16 Conflict Minerals - the Dodd-Frank Act
381 1 Dec-15 Adoption of aerospace supplier quality common training for self- release delegates
380 1 Nov-15 2016 Procurement Information Booklet (PIB)
NTS Index Issue 352
379 1 Oct-15 Export Control Compliance page released on the Rolls-Royce Global Supplier Portal
378 1 Oct-15 Improvements to part classification nomenclature
377 1 Sep-15 Adoption of aerospace industry Measurement Systems Analysis (MSA) standard
376 1 Jun-15 New Government Security Classification system, Rolls-Royce Submarines supplier implementation
375 1 Jun-15 Attempted acquisition of Airbus aircraft by Al Naser Airlines (Iraq) for Mahan Air (Iran)
374 1 May-15 Availability of Bostik “Never-Seez” products in Europe - Update
Supersedes NTS359
372 1 May-15 Global Supplier Code of Conduct
371 1 Mar-15 New Government Security Classification Rolls-Royce Submarines Expected Implementation
370 1 Feb-15 Unique identification and direct part marking
369 1 Jan-15 Conflict Minerals and the Dodd-Frank Act – 2015 Supersedes NTS344
368 2 Jan-15 Adoption of aerospace industry problem solving standard Issue 2 (23rd Jan) replaces Issue 1 (19th Dec)
367 1 Nov-14 2014 Holiday Notice No longer current
366 1 Nov-14 2015 Procurement Information Booklet (PIB) No longer current
365 1 Nov-14 Export data on shipping documentation
364 1 Sep-14 Company change of address to 62 Buckingham Gate, London
363 1 Aug-14 Changes to monthly supplier scorecard & Red Flag process
362 2 Aug-14 Sale of Energy Business – Changes to SAP Plant Code 1300 Issue 2 (8th Aug) replaces Issue 1 (30th Jul)
361 1 Jul-14 Changes to the Conformance Control Features (CCF) process for civil large engines
360 1 Jun-14 MRO supply chain Nadcap requirements
359 1 Jun-14 Availability of Bostik “Never-Seez” products in Europe No longer current (superseded by NTS374)
358 1 May-14 SABRe labelling requirements for serialised materiel Supersedes NTS355
357 1 May-14 Compliance with Country of Origin Supersedes NTS264
356 1 May-14 Compliance with Customs and Trade Partnership Against Terrorism (C-TPAT)
Supersedes NTS264
355 1 Feb-14 SABRe labelling requirements for serialised materiel No longer current (superseded by NTS358)
354 1 Jan-14 Requirements relating to electronics sourcing and supply chain control
353 1 Jan-14 Importer Security Filing (ISF) Instructions Supersedes NTS287
352 1 Dec-13 2013 Holiday Notice No longer current
351 1 Nov-13 Introducing SABRe Addendums
350 1 Nov-13 2014 Procurement Information Booklet (PIB) No longer current
349 1 Oct-13 Clarification of delegation for production permits
348 1 Sep-13 Changes to SABRe Protection, Packaging & Labelling
© Rolls-Royce Page 8 of 17 August 2021
NTS Index Issue 352
347 1 Aug-13 United States of America (US) export reform – supplier requirements
346 1 Aug-13 Product Introduction Training
345 1 Jul-13 Confirmation of supplier data for Exostar
344 1 May-13 Conflict Minerals – the Dodd-Frank Act No longer current (superseded by NTS369)
343 1 May-13 Changes to Exostar Supply Chain Platform
342 1 Apr-13 Clarification of Nadcap requirements for Hot Isostatic Pressing (HIP) suppliers
341 1 Apr-13 Compliance “round table” – doing business with the United States Government
340 1 Mar-13 Changes to monthly supplier scorecard
339 1 Mar-13 Maintenance Repair and Overhaul (MRO) supply chain Nadcap requirements
338 1 Feb-13 Enhanced receipting mechanism for serialised material
337 1 Feb-13 Supply Chain Management – European REACH Regulation
336 1 Dec-12 Changes to Exostar Supply Chain Platform
335 1 Dec-12 Acceptance of United States Government Priority Rated
(DPAS) Orders
334 1 Nov-12 2013 Procurement Information Booklet (PIB) No longer current
333 2 Dec-12 Exports of TP400 Military Goods
332 1 Oct-12 Holiday Notice No longer current
331 1 Aug-12 Global PLM NX Upgrade
330 1 May-12 Supplier Finance programme - Systems Upgrade
329 1 Apr-12 SABRe Edition 2 (Supplier Requirements) - April 2012 No longer current
328 1 Apr-12 SAP Migration on 5th - 8th of April, 2012 No longer current
327 1 Apr-12 European Union REACH Regulation Registration Due Date No longer current
326 2 Mar-12 SAP Migration on 5th - 8th of April, 2012 No longer current
325 2 Mar-12 RR Energy Systems - Package and Driven Equipment
324 1 Mar-12 RR Energy: PPL Specification Revision
323 1 Feb-12 Concession Liability for BR 725 Programme
322 1 Jan-12 Alternatives to Trichloroethylene for the degreasing
321 1 Jan-12 Rolls-Royce Nuclear Sector (submarines) SABRe STEP
320 1 Dec-11 RR Energy: SABRe Labelling Requirements
319 1 Dec-11 GTS (R&O) Supply Chain Nadcap requirements
318 1 Dec-11 2012 Procurement Information Booklet (PIB) No longer current
317 1 Nov-11 REACH implementation in the Nuclear sector
316 1 Nov-11 Holiday Notice No longer current
315 1 Oct-11 New REACH restriction on Cadmium Braze Alloy
314 1 May-11 RR Energy : Global Engineering Standard Spreadsheet
313 1 Mar-11 SAP Upgrade No longer current
312 1 Mar-11 Pressure Equipment Directive (PED) 97/23/EC
311 1 Feb-11 Phase 2 deployment of Electronic FAIR and CCF Tracking
310 1 Feb-11 Domestic Routing Instructions for RR Corporation (USA) No longer current
309 1 Jan-11 Readability of Direct Part Markings to JES131 No longer current
308 1 Jan-11 Rolls-Royce: Supplier Release Process
307 1 Jan-11 UK VAT zero-rating of goods / services for aircraft
306 1 Dec-10 Supply Chain Platform 2.1 Implementation
305 1 Dec-10 Scorecard Delivery Metrics and Red Flag process
No longer current
NTS Index Issue 352
304 1 Nov-10 Perfect Delivery check sheet No longer current
303 1 Nov-10 Procurement Information Booklet No longer current
302 1 Oct-10 JST Serialization Guidelines
301 1 Oct-10 Holiday Notice
No longer current
No longer current
299 1 Oct-10 Trent Engine Assembly Build Transfer to RR Singapore
298 1 Aug-10 SABRe Source Change No longer current
297 1 Jul-10 Material Supplier Approval & Verification Requirements No longer current
296 1 Jul-10 CEVA Logistics UK Technology Upgrade
295 2 Jun-10 Weight / Stacking Limitations of Packaged Product No longer current
294 2 Jun-10 European Union REACH Regulation
No longer current
293 1 May-10 Concession Liability for JSF (F-136 & LiftFan) Programmes
No longer current
292 1 Apr-10 Domestic Routing Instructions for Rolls-Royce Corporation No longer current
291 1 Apr-10 Supplier Finance Program
290 1 Jan-10 Rolls-Royce: UK Aftermarket Warehousing Consolidation No longer current
289 2 Jan 10 Relocation of Rolls-Royce / CEVA X Dock No longer current
288 1 Jan-10 Rolls-Royce: Supplier Release Process No longer current
287 1 Jan-10 Importer Security Filing (ISF) Instructions No longer current (superseded by NTS353)
286 1 Nov-09 GSP, Electronic FAIR & CCF Tracking No longer current
285 2 Jan-09 RR Nuclear Sector (Submarines) QA Requirements No longer current
284 1 Nov-09 Engineering Specification Requirements
283 1 Nov-09 Global Specifications and Supplier Approvals
282 1 Oct-09 Individual Sub-contacting report No longer current
281 1 Oct-09 Suppliermanager retirement / decommissioning (GSP) No longer current
280 1 Oct-09 Confirmation of Payment Terms
279 1 Oct-09 Holiday Notice No longer current
278 1 Sep-09 Delivery Red Flag No longer current
277 3 Sep-09 UK Aftermarket Warehousing Consolidation No longer current
276 1 Aug-09 Non-Conformance Control GRS Indianapolis Form (GT-12006) No longer current
275 1 Jul-09 SABRe Control of Documents and Records No longer current
274 1 Jul-09 Global Supplier Portal (GSP) No longer current
273 1 Jun-09 SABRe Business Unit Topic Applications & Outsourced Engineering
No longer current
272 1 Jul-09 SABRe Supplier Release Process No longer current
271 1 Jun-09 Machine Readable Identification – Quality Acceptance No longer current
270 1 Jun-09 Change of delivery address of components for MT30 Derby Module Build
No longer current
268 1 Apr-09 Global Purchasing Organisation Change
267 1 Mar-09 Global Supplier Portal (GSP)
266 1 Mar-09 Purchase Order statement for re-melt stock (Classified Parts)
265 1 Mar-09 All RRC (Indianapolis USA) Suppliers Mandated DPM Compliance (Reference: EDI 460)
264 1 Feb-09 Compliance with U.S. Government Regulations No longer current (superseded by NTS356 & NTS357)
263 1 Feb-09 U.S. Contractor Code of Business and Conduct
262 1 Feb-09 Quality Alert – Material Certification
© Rolls-Royce Page 10 of 17 August 2021
NTS Index Issue 352
261 1 Jan-09 Balanced Quality Scorecard No longer current
260 1 Dec-08 Rolls-Royce Corporation requirements for Direct Shipment
259 1 Dec-08 U.S. Contractor Code of Business and Conduct No longer current
258 1 Nov-08 Electronic Processes (GSP) No longer current
257 1 Nov-08 Holiday Notice No longer current
256 1 Nov-08 SABRe Protection Packaging and Labelling: Additional Training No longer current
255 1 Oct-08 Design Make Nadcap Requirements No longer current
254 1 Oct-08 Relocation of Rolls-Royce / CEVA X Dock No longer current
253 1 Oct-08 Notification Requirements when delivering FAIR parts
252 1 Oct-08 New 10 + 2 Import/Export Rules No longer current
251 1 Oct-08 SABRe Protection Packaging and Labelling: Major re-write No longer current
250 1 Sep-08 Global Supplier Portal (GSP) No longer current
249 1 Sep-08 SABRe Product Verification – Measurement Systems Analysis
No longer current
248 1 Sep-08 Blasting Grit & Glass Bead Contamination No longer current
247 1 Sep-08 Protection of Intellectual Property on portable storage devices
246 1 Jul-08 Magnetic Particle Procedures EIS 901, replacing EIS 900
245 1 Jul-08 Request for information by PRI-Nadcap
244 1 Jun-08 Rolls-Royce: REACH Training Seminar / Workshop (USA Suppliers)
No longer current
243 1 Jun-08 SABRe Protection Packaging and Labelling: Recording of weight on Secondary & Primary packaging
No longer current
242 1 Apr-08 Rolls-Royce Plc: PC DMIS Version 3.7 – Hexagon CMM No longer current
241 1 Apr-08 Rolls-Royce Marine (Submarines): Potential For Silicone Cross Contamination
240 1 Mar-08 Changes to Accommodation Part Numbers
239 1 Feb-08 Management of Material or Parts Obsolescence
238 1 Feb-08 Rolls-Royce Marine (Submarines): Adoption of the NTS Process
No longer current
237 1 Jan-08 New Packaging Requirements (Rolls-Royce Corporation) No longer current
236 1 Jan-08 Rolls-Royce Corporation: Automated Clearing House (ACH) Payments
235 1 Nov-07 Requirements to support Product Integrity Investigations No longer current
234 1 Nov-07 Rolls-Royce Energy Systems (Mt. Vernon) & Power Engineering (Liverpool): Protection, Packaging & Labelling
233 1 Nov-07 Rolls-Royce Energy Systems (Mt. Vernon) & Power Engineering (Liverpool): Adoption of the NTS Process & SABRe Awareness
232 1 Nov-07 Aerospace Standard (AS) Rubber “O” Ring Seals: Minor amendment to packaging / labelling requirements
231 1 Oct-07 MFR CAGE Codes No longer current
230 1 Sep-07 Revised supplier delivery arrangements to Rolls-Royce Bristol U.K.
No longer current
229 1 Sep-07 Changes to Concession Strategy on Marine Trent (MT) 30 Engines
228 2 Aug-07 Control and Testing of Forgings (Rolls-Royce Corporation). No longer current
© Rolls-Royce Page 11 of 17 August 2021
NTS Index Issue 352
225 1 Jul-07 Global ERP Convergence: Rolls-Royce Corporation (Exostar Mailbox)
224 1 Jul-07 Global ERP Convergence: Rolls-Royce Corporation (General Communication)
223 1 Jul-07 Global ERP Convergence: Rolls-Royce Corporation (Initial Communication)
No longer current
222 1 Jul-07 Exostar Sourcepass Registration for Suppliers.
221 1 Jun-07 Revisions to Packaging and Identification of Rubber Products (including composite metallic / non-metallic and rubber assemblies).
Supersedes NTS204
220 1 May-07 Engineering Control of Manufacturing Source and Method.
219 1 May-07 Requirements Relating to Electronics Design, Sourcing and Supply Chain Control.
Supersedes NTS174 & 181
218 1 May-07 Rolls-Royce U.K. Aero Repair & Overhaul FAIR Policy. No longer current
217 1 May-07 Concession Liability for Trent 1000 Development Engine Programmes.
216 1 May-07 Concession Liability for JSF-136 Development Engine Programmes.
215 1 May-07 Concession Liability for JSF-135 Development Engine Programmes.
214 1 Mar-07 Standard Parts Requiring Qualification Testing.
213 1 Mar-07 Withdrawal of Cerrobend Metallic Fillers.
212 1 Mar-07 Engineering Control of Manufacturing Source and Method. No longer current
211 2 Mar-07 Temporary Part Marking Compliance - AEM Extended. Supersedes NTS209
210 1 Mar-07 Civil Aerospace Change of Delivery Address.
209 1 Feb-07 Temporary Part Marking Compliance. No longer current
208 1 Jan-07 Use of SAE Aerospace Material Specifications (AMS).
207 1 Jan-07 No Purchase Order No Payment.
206 1 Jan-07 Supplier Total Evaluation Process - 2007 Update. No longer current
205 1 Dec-06 Supply Chain Simplification Update. No longer current
204 1 Oct-06 Packaging and Identification of Rubber Products. No longer current
203 1 Oct-06 Recording and Storage of Dimensional Inspection Data for components designated as “Critical”.
No longer current (refer to SABRe - Control of Documents and Records for appropriate detail)
202 1 Oct-06 EJ200 Engine - Part Marking Requirements.
201 2 Jul-11 Component Care Process. Updated July 2011
200 1 Aug-06 Application of Component Proving on Pegasus Engine Parts.
199 1 Aug-06 Supply Chain Simplification Update. No longer current
198 1 Aug-06 REACH - European Union Chemical Regulation.
197 1 Aug-06 Communication of Purchasing Documents. No longer current
196 1 Aug-06 Reporting Standard for Laboratory Test Results. No longer current
195 1 Aug-06 Machine Readable Identification, Rolls-Royce Naval Business.
Supersedes NTS177
194 1 Jul-06 Guidance for suppliers engaged in the fitting of Thin Wall Inserts.
No longer current
193 2 Jul-06 Management of Material or Parts Obsolescence. No longer current
© Rolls-Royce Page 12 of 17 August 2021
NTS Index Issue 352
192 1 Jun-06 Identification Requirements for EJ200 Transfer of Work share Parts (i.e., parts designed by MTU, ordered by Rolls- Royce).
191 1 May-06 Supply Chain Simplification Programme. No longer current
190 1 Apr-06 Revised NTS Format and Presentation. No longer current
189 1 n/a n/a Document not issued
188 1 Apr-06 E-Manifest Receipting Label Requirements. No longer current
187 1 Apr-06 Certified Release Inspector Process (UK Aerospace). No longer current
186 1 Mar-06 Introduction of on-line Procurement Information Booklet (PIB).
No longer current
185 1 Mar-06 Global Component Repair Services Americas - Implementation of SABRe.
No longer current
183 1 Mar-06 Advanced Quality Planning Requirements. No longer current
182 1 Mar-06 Working to SABRe Requirements. No longer current
181 1 Mar-06 Restrictions concerning the use of Tin - Lead Solder in Electronics.
No longer current
180 1 Mar-06 Concession Liability for development Engine Programmes. No longer current
179 1 n/a n/a Document not issued
178 1 Feb-06 United States Executive Order 13201: Posting Requirements.
No longer current
177 1 Jan-06 Direct Part Marking for Marine Components. No longer current
176 1 Jan-06 System Upgrade to the SDRO online service. No longer current
175 1 Jan-06 Component Serialisation. No longer current
174 1 Jan-06 Electronic Industry restrictions concerning the use of Tin - Lead Solder.
No longer current
173 1 Dec-05 Rolls-Royce V2500 Engines - Transfer to Rolls-Royce Deutschland Ltd & Co. KG.
No longer current
172 1 n/a n/a Not issued
171 2 Apr-06 Request for Information on DFAR’s 252.225-7014, Preference for Domestic Specialty Metals.
No longer current
170 1 Oct-05 Potential Hazard - Silicone Oil Contamination on Engineering / Manufacturing Processes.
169 1 n/a n/a Not issued
168 1 Jul-05 Root Cause and Corrective Action required for all supplier Concessions to Rolls-Royce Corporation.
No longer current
167 1 n/a n/a Not issued
166 1 n/a n/a Not issued
165 1 May-05 Changes to Rolls-Royce 9000 SABRe Website: Revised Layout, Presentation and Publication Dates
No longer current
163 2 Apr-05 Rolls-Royce Corporation Acknowledgement of Receipt of Supplier Response to NTS 163.
No longer current
162 1 Feb-05 Final Component Identification Marks - Direct Part Marking (Machine Readable Identification).
161 1 Feb-05 Quality Red Flag Process. No longer current
160 1 Feb-05 Configuration Management for EDS 733 Rolls-Royce Corporation Suppliers.
No longer current
159 1 Jan-05 Cost of Non-Quality Charge Back for Rolls-Royce Canada Aero Suppliers.
No longer current
NTS Index Issue 352
158 1 Jan-05 European Union and UK regulatory restrictions and controls on the use of Nonylphenol and Nonylphenol Ethoxylate in fluids.
No longer current (refer to applicable regulatory requirements for appropriate detail)
157 1 Dec-04 UID / Machine Readable FAIR Requirements for Rolls- Royce Corporation suppliers.
No longer current
156 1 Nov-04 Unapproved Parts Production - Western Coupling Corporation, Mojave, CA.
No longer current
155 1 Nov-04 Unapproved Parts Distribution - Sky Controls Incorporated (SCI), Sun Valley, CA.
No longer current
152 1 Aug-04 Banned Chemicals.
No longer current (refer to applicable E.U. and/or relevant national legislation for appropriate detail)
151 1 Jul-04 AMS 2640 - Magnetic Particle Inspection.
No longer current (refer to Rolls-Royce Corporation Specification EIS900 for appropriate detail)
150 1 Jul-04 AMS 2645 - Fluorescent Penetrant Inspection.
No longer current (refer to Rolls-Royce Corporation Specification EIS1169 for appropriate detail)
149 1 n/a n/a Not issued
148 2 Jun-04 RR 9000 SABRe Source Change Process. No longer current
147 1 Jun-04 Final Dimensional Inspection. No longer current
146 1 Apr-04 Closure of “Supplier DAR” Mailbox for Rolls-Royce Corporation suppliers.
No longer current
144 1 n/a n/a Not issued
143 1 Mar-04 Government - Industry Data Exchange Program (GIPED) Alert.
No longer current
142 1 Mar-04 Rolls-Royce plc Quality System Requirements for Aluminium and Magnesium Ingot Suppliers for Casting Manufacture.
No longer current (refer to SABRe & MLC104)
141 1 Mar-04 “Quality Red Flag” Process Introduction - Quality Improvements.
No longer current
140 1 Feb-04 Commissioned Over-check Policy. No longer current
139 1 Mar-04 Classified Parts Process RESA Form Revision for Rolls- Royce Corporation suppliers.
No longer current
138 1 Jan-04 Canadian Implementation of ISPM 15 (Wood Packing Legislation).
No longer current
137 2 Dec-03 Cost of Non-Quality Charge Back for Rolls-Royce Energy Suppliers.
No longer current
136 1 Nov-03 Rolls-Royce Canada Aero Business Implementation of “RR 9000 SABRe - Supplier Advanced Business Relationship.
No longer current
135 1 Oct-03 Changes to Concession Application Process for Rolls-Royce Corporation suppliers.
No longer current
134 2 Oct-03 Rolls-Royce Supplier Environmental Survey. No longer current
133 1 Dec-03 FAIR Requirements Clarification for Rolls-Royce Corporation No longer current
© Rolls-Royce Page 14 of 17 August 2021
NTS Index Issue 352
suppliers.
132 1 Oct-03 Standardisation of Supplier Scorecard to Global Template for Rolls-Royce Corporation.
No longer current
131 1 Feb-04 Change of Delivery Address. No longer current
130 1 Sep-03 Supply Chain Re-structuring (SCR) - Logistics Interface - UK Regional Purchasing.
No longer current
129 1 Aug-03 International Aerospace Quality Group - General Assembly Meeting.
No longer current
128 1 Aug-03 Energy Business - Goods Receipting Warehouse Transfer. No longer current
127 1 Jul-03 Updates to the 3-in-1 Process Documentation. No longer current
126 1 Jul-03 Electronic Data Requirements for Engineering Changes (DAR).
No longer current
125 1 Jul-03 Exostar Charging. No longer current
124 2 Jul-03 Change in Electronic Concession Submittal Process for Rolls-Royce Corporation.
No longer current
123 1 Jun-03 SABRe - Source Change Process. No longer current
122 1 May-03 Change in website addresses for Rolls-Royce Corporation Specification Index and Rolls-Royce Corporation Supplier Quality Requirements.
No longer current
121 1 May-03 Raychem Non-conforming Sockets. No longer current
120 1 Apr-03 Perry Johnson Registrars Inc. suspension of RAB for Rolls- Royce Corporation and Rolls-Royce plc suppliers.
No longer current
119 1 Apr-03 SAP Energy / Marine Implementation. No longer current
118 1 Feb-03 PB Fasteners / Applies to all Rolls-Royce Corporation and Rolls-Royce plc suppliers.
No longer current
117 2 Mar-03 Approved Source Listings / Applies to all RRC suppliers. No longer current
116 2 Mar-04 Control of N.D.T. No longer current
115 1 Nov-02 Request for approval of Supplier Serialisation Authorisation (applicable to Rolls-Royce Corporation suppliers only).
No longer current
114 1 Nov-02 Potentially Defective Co-ordinate Measuring Machines. No longer current
113 1 Nov-02 E Business Procurement - Corporate Portal Specifications supplied by Rolls-Royce plc - Final Notice (for Rolls-Royce Deutschland suppliers only).
No longer current
112 1 Nov-02 U.S. Government Suspension of RMA Enterprises, 24940 Tibbetts Avenue, Valencia CA 91355.
No longer current
111 1 Oct-02 Revision to the Rolls-Royce Corporation Supplier Quality Manual (Rev. H).
No longer current
110 1 - New Invoice Delivery Address (Marine Only) - Restricted Circulation.
No longer current
109 1 Oct-02 Rolls-Royce Corporation Implementation of “RR 9000 SABRe - Supplier Advanced Business Relationship (Reference NTS 104 Issue 1, dated 13 August 2002).
No longer current
108 1 Sep-02 EJ 200 Programme - Quality Policy. No longer current
107 1 Nov-02 E Business Procurement - Rolls-Royce Corporation Specifications On-Line (for Rolls-Royce Corporation suppliers only).
No longer current
106 2 Dec-02 E Business Procurement - Supplier Information Space (Suppliers to Rolls-Royce Deutschland Ltd. & Co. KG).
No longer current
105 1 Aug-02 Standard Data Records Office - Withdrawal of Paper Updating Service.
No longer current
NTS Index Issue 352
104 1 Aug-02 Rolls-Royce Corporation Implementation of “RR 9000 SABRe Supplier Advanced Business Relationship”.
No longer current
103 1 Jul-02 Final Component Identification Marks. No longer current
102 1 Jul-02 Contamination of Engine Components. No longer current
101 1 Jun-02 SAP Wave 2 Implementation. No longer current
100 1 n/a n/a Not issued
99 1 Mar-02 Rolls-Royce Procurement Organisation. No longer current
98 1 Mar-02 Final Notice - E Business Procurement - Corporate Portal Specifications supplied by Rolls-Royce plc.
No longer current
97 1 Mar-02 Communication to Suppliers (March 2002). No longer current
96 1 Jan-02 SABRe (Supplier Advanced Business Relationship) Website Address.
No longer current
95 1 Jan-02 Control of Thread Rolling Manufacturers. No longer current
94 1 Dec-01 Statement from the Director of Procurement: UK Aerospace Programmes.
No longer current
93 1 Oct-01 Statement from the Director of Procurement. No longer current
92 1 Oct-01 SABRe Manual on the Internet. No longer current
91 2 Jul-01 E Business Procurement - Supplier Information Space. No longer current
90 1 May-01 E Business Procurement. No longer current
89 1 - Supplier Quality Renaissance: Supplier Over-check Policy. No longer current
88 1 Apr-01 Repair Variation Process. No longer current
87 1 Feb-01 Proforma for Rolls-Royce Deutschland Suppliers only (issued direct from SMT Leaders in Germany).
No longer current
86 1 Feb-01 Supplier Quality Renaissance (Wave 4). No longer current
85 1 - Goods Receipting during Christmas 2000. No longer current
84 1 Oct-00 Supplier Quality Renaissance (Wave 3). No longer current
83 1 Oct-00 Split Batch Control NTS. No longer current
82 2 Sep-00 Evaluation and Control of “Special Processes”. No longer current
81 1 Aug-00 SABRe No longer current
80 1 Aug-00 Supplier Quality Renaissance. No longer current
79 1 Aug-00 Rolls-Royce Standard Stationary Items. No longer current
78 1 May-00 Supplier Quality Renaissance. No longer current
77 1 May-00 Invoice Payments for Goods & Services. No longer current
76 1 - Data Card Control for Group 1 and 2 Bonds. No longer current
75 1 May-00 Qualification and Approval of Non-Destructive Testing Personnel.
No longer current
74 1 - Receipting Labels and Bar Coding Standards. No longer current
73 1 Feb-00 Control of Thread Rolling Manufacturers. No longer current
72 1 De-99 Early Deliveries. No longer current
71 1 Oct-99 Proposed Changes to SQM 016. No longer current
70 1 Aug-99 Purchase Order Re-Plan. No longer current
69 1 Aug-99 Purchase Order Re-Plan. No longer current
68 1 Jul-99 Early Deliveries. No longer current
67 1 - The Use of Independent Test Houses. No longer current
66 1 n/a n/a Not issued
65 1 May-99 ISO 14001 Environmental Management System. No longer current
64 2 May-99 Use of Concession Application Form No. 617240 / 2. No longer current
NTS Index Issue 352
63 1 - Contamination of Engine Components (February 1999). No longer current
62 1 - The Diminishing Quality of FAIR’s. No longer current
61 1 - Year 2000 Readiness. No longer current
60 2 - Two Part Epoxy Paste Adhesive Eccobond 104 supplied to MSRR 9016.
No longer current
59 1 - Non-Destructive Testing. No longer current (refer to controlling specifications for detail)
58 1 - Use of “Special Processes” (e.g., Electro Discharge Machining).
No longer current
57 1 - Alleged Fraudulent Quality Control of Key Aircraft Parts. No longer current
56 2 - Control of Tooling, Consumables and other aids to manufacture, used to produce Classified Parts.
No longer current
55 2 - Merlin Two-Part Purchase Orders. No longer current
54 1 - Use of Eye Glass when inspecting parts under Ultra Violet Light.
No longer current
52 1 - Responsibility for obtaining Specifications and Documents in connection with Rolls-Royce order.
No longer current
51 1 - Change of Delivery Address / Responsibility for obtaining Specifications and Documents in connection with Rolls- Royce orders.
No longer current
50 1 - JAR 145 / FAR 145 Approved Organisations. No longer current
49 2 - Replacement of Asbestos Material and verification of the equivalent of substitute materials.
No longer current
48 1 - Procurement of Non MSRR General Machining Grade Materials for Roll-Royce designed engine application component manufacture.
No longer current
47 1 - Safety Data Sheets. No longer current
46 1 - Change of Forging Stock to Machined Bar by Heat Treatment.
No longer current
45 1 n/a n/a Not issued
44 1 - The Control of Electrochemical Etch Marking of Parts. No longer current
43 1 - Contract Review Procedure. No longer current
42 1 - Withdrawal of MSRR 9111 and MSRR 9213. No longer current
41 1 - Bar Coding of Deliverables. No longer current
40 1 - Ultra Violet Lights. No longer current
39 1 - Proposed Changes within Rolls-Royce Procurement. No longer current
38 1 - U.S. Import / Export Regulations. No longer current
37 1 - Prevention of Computer Viruses. No longer current
36 1 - Goods Receiving Problems. No longer current
35 1 n/a n/a Not issued
34 1 - Control of N.D.T. No longer current
33 2 Nov-94 Third Party Quality Systems Approval - Status Review. No longer current
32 1 - Use of Rolls-Royce name, approvals and data. No longer current
31 1 Mar-94 Ozone Depleting Substances. No longer current
30 1 - Non-Destructive Testing. No longer current (refer to controlling specifications for detail)
29 1 - The withdrawal of SQVP & SSV. No longer current
© Rolls-Royce Page 17 of 17 August 2021
NTS Index Issue 352
Issue Notice - Global distribution of paper copies of NTS documents ceased from publication of NTS 96 onwards. All current NTS’ can be accessed via the Global Supplier Portal: https://suppliers.rolls-royce.com
28 1 - Introduction of Bar Coded Receipts to Rolls-Royce Derby. No longer current
27 1 - Rockwell Hardness Testing Blocks. No longer current
26 3 - Approval requirements for NDT Methods, Penetrant & Visual Inspection (RPS 702 & 709) for Unclassified Parts only when called out via a Laboratory Control Document.
No longer current (refer to RPS’ for appropriate detail)
25 1 - United States Fastener Quality Act (i.e. Dingle Bill) of 1990. No longer current
24 1 - Use of Adhesive Labels on Engine Parts. No longer current
23 1 - Montreal Protocol & Chlorinated Hydrocarbon Solvents. No longer current
22 1 - Degreasing prior to application of Fluorescent Penetrant. No longer current
21 1 - NDT Training and Approval. No longer current
20 1 - Fasteners produced by SPS Technologies, Aerospace Divisions.
No longer current
19 1 - Trimos Sylva Horizontal Measuring Units. No longer current
18 1 - Release Documentation for Classified Parts. No longer current
17 1 - Penetrant Inspection. No longer current
16 1 - Document Not Issued. Cancelled
15 1 - Data Card Approval. No longer current
14 1 Mar-90 Packaging of Parts. No longer current
13 1 Oct-89 FAIRs. No longer current
12 1 n/a n/a Not issued
11 1 Sep-89 Use of parts from Aerodyne Investment Casting Inc. No longer current
10 1 - Use of high intensity 125 Watt UV Lamps for Fluorescent Penetrant & M.P.I. purposes.
No longer current
9 1 Nov-89 Post process washing / cleaning / neutralising. No longer current
8 1 n/a n/a Not issued
7 1 Jul-89 Reduction of the Rolls-Royce plc supplier network. No longer current
6 1 - Residual Magnetism. No longer current
5 1 - Use of Metallic Encapsulants. No longer current
4 1 - Release Conditions. No longer current
3 1 - Sensitivity of Titanium alloys to Surface Contamination by Cadmium or Chlorinated Solvents.
No longer current
2 1 - Processing Solutions - Antimony Inhibitor Ban. No longer current
1 1 - Bar Material to BS.80. No longer current