Issues Affecting the Electricity T&D System in North America Global Utility Summit Los Angeles, Nov 17, 2008 Presented by WK (Bill) Marshall Senior Associate

Upload: zoltan

Post on 11-Jan-2016

32 views

Category:

Documents


0 download

DESCRIPTION

Issues Affecting the Electricity T&D System in North America. Global Utility Summit Los Angeles, Nov 17, 2008 Presented by WK (Bill) Marshall Senior Associate. Personal Background. Retired President, now Independent Consultant. SPC. Why Visit Southern California?. - PowerPoint PPT Presentation

TRANSCRIPT

Page 1: Issues Affecting the Electricity T&D System in North America

Issues Affecting the Electricity T&D System in North America

Global Utility SummitLos Angeles, Nov 17, 2008

Presented by WK (Bill) Marshall

Senior Associate

Page 2: Issues Affecting the Electricity T&D System in North America

2

Personal Background

Retired President, nowIndependent Consultant

SPC

Page 3: Issues Affecting the Electricity T&D System in North America

3

Why Visit Southern California?

Page 4: Issues Affecting the Electricity T&D System in North America

4

System Development Challenge

Balancing the policy drivers

Consumers

Reliable Supply

Acceptable Environmental Prices Sustainability

Page 5: Issues Affecting the Electricity T&D System in North America

5

Complicating Factors

• Generation issues- Fuel costs and availability- Climate change (and other emission issues)- Renewable requirements

• Distribution issues- Demand response- Distributed generation- “Smart” components

• Transmission ownership, access and benefits

Page 6: Issues Affecting the Electricity T&D System in North America

6

Fossil Fuel Prices in $/MBtu(Conventional Unit Electricity Cost in Cents/kWh)

Source – US DOE NY Harbour HFO, NYMEX Appalachian coal, NYMEX Henry Hub natural gas

0.00

2.00

4.00

6.00

8.00

10.00

12.00

14.00

16.00

18.00

20.00

Coal

HF Oil

Nat Gas

2002 | 2003 | 2004 | 2005 | 2006 | 2007 | 2008

Page 7: Issues Affecting the Electricity T&D System in North America

7

From David Hughes - NRCan

Forecast Demand

Page 8: Issues Affecting the Electricity T&D System in North America

8

From David Hughes - NRCan

Page 9: Issues Affecting the Electricity T&D System in North America
Page 10: Issues Affecting the Electricity T&D System in North America

10

NE - Reliance on Natural Gas

Summer 2000 Summer 2006

Total: 30,931 MWTotal: 23,975 MW

OtherRenewables1,092 MW

4.6%

Pumped Storage1,679 MW

7.0%

Hydro1,626 MW

6.8%

Coal2,814 MW

11.7%

Nuclear4,359 MW

18.2%

Oil8,150 MW

34.0%

Natural Gas4,255 MW

17.7%

Oil7,549 MW

24.4%

Nuclear4,448 MW

14.4%

Coal2,846 MW

9.2%

Hydro1,691 MW

5.5%

Pumped Storage1,672 MW

5.4%

Other Renewables

922 MW3.0%

Natural Gas11,803 MW

38.1%

Note: Units in the “Other Renewables” category include those fueled by biomass, refuse, and wind.

Original Slide from ISO-NE

Page 11: Issues Affecting the Electricity T&D System in North America

11

Climate Change

• Growing international issue

• Increasing state and provincial issue

• Regional climate change initiatives- Northeast and west

• Targeted reductions- Kyoto – 6% from 1990 by 2012- Canada – 20% from 2006 by 2020- G8 – 50% from 2006 by 2050 (Electricity??)- USA - ?????

Page 12: Issues Affecting the Electricity T&D System in North America

12

Page 13: Issues Affecting the Electricity T&D System in North America

13

Renewable Development

• Major wind increases- Texas, California, Mid West, Alberta, Maritimes

• Many aggressive state RPS requirements- Partly climate change strategy- Partly hedge on fossil fuels

• Possible national RPS of 20%

• Integration issues need resolution- Transmission access and delivery- Distributed distribution connections- Balancing

Page 14: Issues Affecting the Electricity T&D System in North America

14

14www.nbso.ca

NE States Seek Renewable Energy: Requirements to Increase 500%: 2006 - 2015

• 6.5% RPS requirement in 2015 equivalent to:

– 3,750 MW of wind, or

– 1,600 MW of biomass

• Proposed renewable projects in New England total 1,900 MW– Not all renewables qualify for

RPS

RPS Requirement as a % of Energy in New England (2015)

93.5%

6.5%

NE RPS RequirementNE Energy From Other Sources

Original Slide from ISO-NE

Page 15: Issues Affecting the Electricity T&D System in North America

15

Page 16: Issues Affecting the Electricity T&D System in North America

16

Relative Transmission Costs

• Transmission benefits are large yet costs are relatively small

Total Electricity Cost

Transmission 6-10%

Distribution 15-30%

Generation 60-75%

Transmission

Distribution

Generation

Page 17: Issues Affecting the Electricity T&D System in North America

17

Transmission Benefits

• Increased Reliability• Lower system losses• Lower rates for end use customers• Reduced congestion• Improved competition• Greater supply diversity• Lower emissions• Environment siting of generation• National security

Page 18: Issues Affecting the Electricity T&D System in North America

18

Transmission Development

• Investment has lagged load growth

• Significant congestion has resulted

• Regulatory changes have not helped- OATT physical rights- Locational pricing and financial rights- Minimum interconnection standards

• Reliability margins have shrunk

• 2003 blackout focused attention

Page 19: Issues Affecting the Electricity T&D System in North America

19

Transmission Questions

• Why no investment?

• Why continued congestion?

• Some reasons- Cost differential across the congested interfaces- Winners and losers- Disproportionate value- Intra-state concerns- State versus regional interests

Page 20: Issues Affecting the Electricity T&D System in North America

20

New Transmission Paradigm

• Energy Policy Act 2005- Add Section 219 to Federal Power Act- Provide incentives for transmission development

• DOE identification of “National Interest Electricity Transmission Corridors” (NIETC)

• FERC incentive rule issued July 20, 2006- Higher ROE- 100% CWIP- Recover prudent pre-commercial costs- Approval by state or designation by DOE as NIETC not

required but worthwhile

Page 21: Issues Affecting the Electricity T&D System in North America

21

DOE NIETC East

Congestion in the Eastern

Interconnection

Page 22: Issues Affecting the Electricity T&D System in North America

22

Transmission Projects

SPC

NIETC Hydro Renewable Market

Page 23: Issues Affecting the Electricity T&D System in North America

23

Mandatory Reliability Standards

• FERC empowered through Energy Policy Act- Approve standards- Issue sanctions up to $1,000,000 per day

• Actions are a response to 9/11, 2003 Blackout and security concerns

• NERC designated “Electric Reliability Organization”

• Consequences?- Increased reliability- Increased equipment, labour and related costs

Page 24: Issues Affecting the Electricity T&D System in North America

24

“Smart” Grid

• Transmission actions- Reduce reliance on SPSs - Increase demand response for market and control- Improve SCADA systems

• Distribution actions- Real time monitoring- Two way smart metering and load control- Feeder balancing - Enhanced restoration and service

Page 25: Issues Affecting the Electricity T&D System in North America

25

Moving to the T&D Future

Page 26: Issues Affecting the Electricity T&D System in North America

26

HR - The Final Challenge

• Work force is old and retiring (CEA Study)- 50% of transmission workers will retire in 10 years- Only 7% of trades below age 30

• Looming shortfall at a time of significant growth with new technologies

• Challenge is huge- Transfer existing experience and knowledge- Train new workers with new and old skills- Work smarter- Do more with less

Page 27: Issues Affecting the Electricity T&D System in North America

27

Time For Action!

“When you get to the fork in the road, take it!”

Yogi Berra