Istech Energy EP-5 Pte Ltd

ISTECH GROUP

Yangon

October, 2014

ISTECH ENERGY EP-5 PTE LTD

Istech Energy EP-5 Pte Ltd

Start Up, Exploration &

Drilling Experience & Optimization

Istech Energy EP-5 Pte Ltd

START UP

Istech Energy EP-5 Pte Ltd

First and foremost thing is to find a right Local Partner

Plan activities at every stage well in advance,

the weather window is very limited, lasts for only 6 months in most of the areas

Get familiarize with the local Laws,

procedures and systems Plan and carry out ESIA and Seismic API at

the earliest keeping weather window in view

Istech Energy EP-5 Pte Ltd

Challenges: Younger and experienced human talent is at

scarce, keep it in view Limitation on Banking Limitation in Communication Infrastructure Myanmar is a beautiful country, people are

very humble and cooperative, but, there are limitations, keep in mind

Istech Energy EP-5 Pte Ltd

EXPLORATION

Istech Energy EP-5 Pte Ltd

Myanmar has still got many untapped areas

for Exploration There are proven fields of Hydrocarbon Chauk and Yenangyaung, Mann field and Htaukshabin etc., to name a few

Istech Energy EP-5 Pte Ltd

Three main prospecting areas Onshore, namely Upper Myanmar (Chindwin Basin) Central Myanmar (Central & Minbu Basins) Lower Myanmar (Pyay &Delta Embayments)

Istech Energy EP-5 Pte Ltd

Istech Energy EP-5 Pte Ltd

DRILLING EXPERIENCES

Istech Energy EP-5 Pte Ltd

Lot of emphasis is required while finalizing;

Well prognosis

Mud policy

as there are chances of encountering

High pressure / High Temperature zones,

Long clay formations

Istech Energy EP-5 Pte Ltd

Challenges faced:

Finding Drilling Rig

Getting Ancillary service providers

Limited or lack of infrastructure

Means to handle exigencies

Istech Energy EP-5 Pte Ltd

OPTIMIZATON

Istech Energy EP-5 Pte Ltd

Thorough planning well in advance

Careful consideration of subsurface geology

Precaution for possible HP/HT encounters

Controlled drilling for reservoir safety

Proper Casing and Mud design

Proper well control equipment

Istech Energy EP-5 Pte Ltd

Hiring experienced local talent

Good interactions and coordination with

MOGE, concerned Government Agencies

and Local bodies etc.