[it infrastructure overview] paul ashurst executive director, eis global network services it...
TRANSCRIPT
[IT INFRASTRUCTURE OVERVIEW]
Paul AshurstExecutive Director, EIS Global Network Services
IT Corporate
IT INFRASTRUCTURE OVERVIEW
• Agenda
• Overview of key IT Infrastructure components
• MC: what we know and don’t know today
• Key IT deliverables
• Next steps for IT
SPE Global Wide Area Network
• 75+ locations• MPLS = any-to-any connectivity• Riverbed WAN acceleration = 60% coverage• Exponential growth in bandwidth usage….!
20022003200520072009201120120
50
100
150
200
250
300
Total Volume (TB) per month
Total Volume (TB) per month
SPTN Connectivity – Status Update
DBB PHX Cap
Marina del Rey / Studio LotLondon
Budapest CE
10 GE
2 x 10 GE
GigE
2 x 10 GE
10 GE
ChandlerDatacenter
Singapore SPENA
Global MPLS WAN
For simplicity, LA and London metro regions shown collapsed; multiple 10G paths exist within these regional metros.
GigE*upgraded from 100Mb
*upgraded from 622Mb1 x 10 GE1 x 10 GE
*upgraded from 622Mb *upgraded from 2 x 622Mb
*upgraded from 100Mb
100M
Madrid AXN Encompass
GigE*upgraded from 100Mb *upgraded from 100Mb
London connectivity
Golden Square
Internet
Enterprise IT Systems
Docklands
2 x GigE
2 x 10 GE
*currently evaluating 10GE upgrade options
2 dark fibre pairs lit at 10GE. Diversely routed
London North Route
London South Route
EU Data Centre – Global Switch, Docklands
6
• Tier 3 Data Centre. Fully redundant power & cooling• Can sustain 72 hours power outage• Dual 10Gb connectivity – full resiliency thru entire path• Network Core & Distribution layers – scalable• Future expansion can be geographically separate• Hosts Vision and Provys for SPT EMEA
MC: Core IT Infrastructure Deliverables
• The technical infrastructure will:
• Generate approx. 1TB per day of transcoded content
• Include 180 TB of disk storage and 2.1PB of tape storage
• receive approx. 1TB inbound data per day
• Generate 1.6TB of new content will be transferred to playout, per day (this includes approx. 365GB/day of content to non-linear platforms)
Within Golden Square there will be new work areas developed
Media Centre components will be used by staff in Golden Square, Budapest and Madrid.
MC must interface with other applications & systems hosted elsewhere within SPE
Media Centre – what do we know today? What will IT deliver?
Build the Data Centre Network Infrastructure - ensure interoperability with the rest of the SPE network
Amend/upgrade the Golden Square office network
Ensure sufficient connectivity to & from Media Centre
Allow for future expansion
Build the Data Centre! Space, power, equipment racks, cabling etc..
Provide ongoing support
Media Centre – Next Steps for IT?
What are the actual data centre power, space & cabling requirements?
Refine IT scope further!
What are the exact locations of the users?
What are the client requirements per location?
What are the projected future changes?
Obtain vendor quotes for network Bill of Material + hosting setup and recurring charges
Refine IT infrastructure delivery timeline (see next page for estimated)
Develop IT Infrastructure Terms of Reference
Mobilise Resources!
IT Infrastructure – Draft Implementation Timeline
MONTH 5MONTH 4MONTH 3MONTH 2MONTH 1 MONTH 6 MONTH 7
IT Infrastructure Readiness
IT Infrastructure Build-out
Place Orders
Testing & Sign-off
Pre-stage configurations
IT Design & Documentation
Hypercare
DC Facility Ready
Project Greenlight
Equipment OnsiteDRAF
T
MONTH 8 MONTH 9 MONTH 10