it methodology webinardownloads.projectinsight.net/training/it-methodology... · 2016. 9. 21. ·...
TRANSCRIPT
![Page 1: IT Methodology Webinardownloads.projectinsight.net/training/it-methodology... · 2016. 9. 21. · The 3rd Wednesday of Every Month 8:00 am Pacific - 11:00 am Eastern Time IT Methodology](https://reader036.vdocuments.net/reader036/viewer/2022071219/6057a81d32ea25601c263d12/html5/thumbnails/1.jpg)
IT Methodology Webinar
Initiate Project Intelligence®
IT Methodology Webinar
Incorporate Organizational Process & Governance
![Page 2: IT Methodology Webinardownloads.projectinsight.net/training/it-methodology... · 2016. 9. 21. · The 3rd Wednesday of Every Month 8:00 am Pacific - 11:00 am Eastern Time IT Methodology](https://reader036.vdocuments.net/reader036/viewer/2022071219/6057a81d32ea25601c263d12/html5/thumbnails/2.jpg)
Things to Know…
All participants will be on mute
Questions are welcome
Ask questions in the question box
We DO NOT send out PDU certificates
May be valid for PDU credit (self-report session)
• - For more information check out article on Webinars and PDUs
• http://www.projectinsight.net/support/kb/webinars-and-pdus
![Page 4: IT Methodology Webinardownloads.projectinsight.net/training/it-methodology... · 2016. 9. 21. · The 3rd Wednesday of Every Month 8:00 am Pacific - 11:00 am Eastern Time IT Methodology](https://reader036.vdocuments.net/reader036/viewer/2022071219/6057a81d32ea25601c263d12/html5/thumbnails/4.jpg)
Schedule a customized demo today!
+1 (949) 476-6499 x3
Request info: www.projectinsight.net
Project Insight
![Page 6: IT Methodology Webinardownloads.projectinsight.net/training/it-methodology... · 2016. 9. 21. · The 3rd Wednesday of Every Month 8:00 am Pacific - 11:00 am Eastern Time IT Methodology](https://reader036.vdocuments.net/reader036/viewer/2022071219/6057a81d32ea25601c263d12/html5/thumbnails/6.jpg)
Who’s on the call?
I am a Project Manager
I am a Business or Operational Manager
I am a software developer or software tester
I am a member of an organizational PMO, governance or quality assurance function
I want a better understanding of IT Methodology
![Page 7: IT Methodology Webinardownloads.projectinsight.net/training/it-methodology... · 2016. 9. 21. · The 3rd Wednesday of Every Month 8:00 am Pacific - 11:00 am Eastern Time IT Methodology](https://reader036.vdocuments.net/reader036/viewer/2022071219/6057a81d32ea25601c263d12/html5/thumbnails/7.jpg)
Established 2007 – Ottawa, Canada
Nurturing organizational efficiency through IT Methodology knowledge & expertise
Support and promote a community with evolving IT Methodology knowledge and expertise
Maintain, optimize, promote and support the delivery of IT methodology products and
lifecycles proven to increase operational performance
Administration and oversight of QAIassist Integrated Methodology (QAIassist-IM) and formal
certifications – “Foundation” & “Practitioner”
Support practitioners and authorized affiliates in acquiring and delivering IT Methodology
knowledge and expertise
Who is QAIassist?
![Page 8: IT Methodology Webinardownloads.projectinsight.net/training/it-methodology... · 2016. 9. 21. · The 3rd Wednesday of Every Month 8:00 am Pacific - 11:00 am Eastern Time IT Methodology](https://reader036.vdocuments.net/reader036/viewer/2022071219/6057a81d32ea25601c263d12/html5/thumbnails/8.jpg)
Nurturing efficiency through IT Methodology knowledge & expertise across the globe
Over 200 countries
Wide array of industries (manufacturing, banking, health, insurance, consulting)
More than 50 unique webinars
Over 10,000 webinar registrants
Executives
Operational & Delivery Managers
Project Managers
Business Analysts and Architects
Application Developers & Testers
Corporate PMO, Quality Assurance, Continuous Improvement
Consultants
IT Methodology Webinar Audience
![Page 9: IT Methodology Webinardownloads.projectinsight.net/training/it-methodology... · 2016. 9. 21. · The 3rd Wednesday of Every Month 8:00 am Pacific - 11:00 am Eastern Time IT Methodology](https://reader036.vdocuments.net/reader036/viewer/2022071219/6057a81d32ea25601c263d12/html5/thumbnails/9.jpg)
Share IT Methodology knowledge
Develop IT methodology understanding &
expertise
Provide additional insight into several IT (project
management, software development, software
testing) methodologies
Discuss best practices on incorporating an
organizational IT methodology
Promote ongoing dialog and feedback with
webinar audience (questions, email, survey)
QAIassist 2016 Series - Goals
![Page 10: IT Methodology Webinardownloads.projectinsight.net/training/it-methodology... · 2016. 9. 21. · The 3rd Wednesday of Every Month 8:00 am Pacific - 11:00 am Eastern Time IT Methodology](https://reader036.vdocuments.net/reader036/viewer/2022071219/6057a81d32ea25601c263d12/html5/thumbnails/10.jpg)
The 3rd Wednesday of Every Month
8:00 am Pacific - 11:00 am Eastern Time
IT Methodology Concepts (60 mins)
This series of six webinars will be presented on a bi-monthly basis. Each webinar will provide you with a context, overview, terminology and general understanding of information technology (IT) methodology.
IT Methodology – Tutorials (60 mins)
This series of five webinars will be presented on a bi-monthly basis. Each session is designed to offer a more “hands on” perspective – bridging the concepts into a practical utilization.
2016 Schedule
![Page 11: IT Methodology Webinardownloads.projectinsight.net/training/it-methodology... · 2016. 9. 21. · The 3rd Wednesday of Every Month 8:00 am Pacific - 11:00 am Eastern Time IT Methodology](https://reader036.vdocuments.net/reader036/viewer/2022071219/6057a81d32ea25601c263d12/html5/thumbnails/11.jpg)
Concepts V - Incorporate Organizational Process & Governance
Goals
Review IT Methodology context
Differentiate “PROJECT” from “PROCESS”
Establish “PROCESS” characteristics
Identify “PROCESS” benefits
Discuss “PROCESS” implementation
![Page 12: IT Methodology Webinardownloads.projectinsight.net/training/it-methodology... · 2016. 9. 21. · The 3rd Wednesday of Every Month 8:00 am Pacific - 11:00 am Eastern Time IT Methodology](https://reader036.vdocuments.net/reader036/viewer/2022071219/6057a81d32ea25601c263d12/html5/thumbnails/12.jpg)
Establish a context for IT Methodologies (noun and verb)
IT Methodology (noun) - “Project” versus “Organizational Process”
“Organizational Process” Characteristics (repeatability, predictability, measurability)
“Organizational Process” Benefits (corporate planning, staffing flexibility/opportunity,
consistent delivery & quality, accountability, continuous improvement)
“Organizational Process” Implementation Considerations
Recap
Concepts V – Incorporate Organizational Process & Governance
Agenda
![Page 13: IT Methodology Webinardownloads.projectinsight.net/training/it-methodology... · 2016. 9. 21. · The 3rd Wednesday of Every Month 8:00 am Pacific - 11:00 am Eastern Time IT Methodology](https://reader036.vdocuments.net/reader036/viewer/2022071219/6057a81d32ea25601c263d12/html5/thumbnails/13.jpg)
IT Methodology Context - (noun/verb), hierarchy, depictions, concept of deliverable
IT Methodology (noun) - “Project” versus “Organizational Process”
“Organizational Process” Characteristics (repeatability, predictability, measurability)
“Organizational Process” Benefits (corporate planning, staffing flexibility/opportunity,
consistent delivery & quality, accountability, continuous improvement)
“Organizational Process” Implementation Considerations
Recap
Concepts V – Incorporate Organizational Process & Governance
Agenda
![Page 14: IT Methodology Webinardownloads.projectinsight.net/training/it-methodology... · 2016. 9. 21. · The 3rd Wednesday of Every Month 8:00 am Pacific - 11:00 am Eastern Time IT Methodology](https://reader036.vdocuments.net/reader036/viewer/2022071219/6057a81d32ea25601c263d12/html5/thumbnails/14.jpg)
Terms, Terms and more Terms
IT Framework, IT Methodology, IT Lifecycle
Non Standard usage in terminology
Terms are used interchangeably between organizations and across the IT industry
Examples include
• Project Management Methodology/Lifecycle/Framework
• Software Development Methodology/Lifecycle (SDLC)/Framework
• Software Testing Methodology/Lifecycle/Framework
Every IT organization is using an IT Methodology or IT Lifecycle or IT Framework
![Page 15: IT Methodology Webinardownloads.projectinsight.net/training/it-methodology... · 2016. 9. 21. · The 3rd Wednesday of Every Month 8:00 am Pacific - 11:00 am Eastern Time IT Methodology](https://reader036.vdocuments.net/reader036/viewer/2022071219/6057a81d32ea25601c263d12/html5/thumbnails/15.jpg)
IT Methodology/Lifecycle - Noun
All Methodologies/Lifecycles (RUP, QAIassist-IM, PMI, Prince2) define, utilize and
rely on their own pre-defined structure, naming conventions, and terminology
Hierarchy/Structure
Methodology/Lifecycle (ie Project Management, Software Development , Software Testing)
Phase/Stage (ie Initiate, Planning, Design, Closeout)
Deliverable/Artifact/Work Product (ie Project Charter, Testing Strategy)
Activity (tasks performed to complete deliverables, artifacts, work products)
![Page 16: IT Methodology Webinardownloads.projectinsight.net/training/it-methodology... · 2016. 9. 21. · The 3rd Wednesday of Every Month 8:00 am Pacific - 11:00 am Eastern Time IT Methodology](https://reader036.vdocuments.net/reader036/viewer/2022071219/6057a81d32ea25601c263d12/html5/thumbnails/16.jpg)
“Deliverable/Artifact/Work Product”versus “Activity”
Building an IT Application
Deliverable (Artifact, Work Product)
Business Case
Project Plan
User Acceptance Test Plan
Activity (non-Deliverable, non-Artifact, non Work Product)
Reviewing business need with Operational Management, Business Analysts and End-Users
Meeting with Stakeholders to acquire approval of Project Plan
Discussing User Acceptance Testing objectives and priorities with testing team
![Page 17: IT Methodology Webinardownloads.projectinsight.net/training/it-methodology... · 2016. 9. 21. · The 3rd Wednesday of Every Month 8:00 am Pacific - 11:00 am Eastern Time IT Methodology](https://reader036.vdocuments.net/reader036/viewer/2022071219/6057a81d32ea25601c263d12/html5/thumbnails/17.jpg)
QAIassist Integrated Methodology
![Page 18: IT Methodology Webinardownloads.projectinsight.net/training/it-methodology... · 2016. 9. 21. · The 3rd Wednesday of Every Month 8:00 am Pacific - 11:00 am Eastern Time IT Methodology](https://reader036.vdocuments.net/reader036/viewer/2022071219/6057a81d32ea25601c263d12/html5/thumbnails/18.jpg)
![Page 19: IT Methodology Webinardownloads.projectinsight.net/training/it-methodology... · 2016. 9. 21. · The 3rd Wednesday of Every Month 8:00 am Pacific - 11:00 am Eastern Time IT Methodology](https://reader036.vdocuments.net/reader036/viewer/2022071219/6057a81d32ea25601c263d12/html5/thumbnails/19.jpg)
![Page 20: IT Methodology Webinardownloads.projectinsight.net/training/it-methodology... · 2016. 9. 21. · The 3rd Wednesday of Every Month 8:00 am Pacific - 11:00 am Eastern Time IT Methodology](https://reader036.vdocuments.net/reader036/viewer/2022071219/6057a81d32ea25601c263d12/html5/thumbnails/20.jpg)
![Page 21: IT Methodology Webinardownloads.projectinsight.net/training/it-methodology... · 2016. 9. 21. · The 3rd Wednesday of Every Month 8:00 am Pacific - 11:00 am Eastern Time IT Methodology](https://reader036.vdocuments.net/reader036/viewer/2022071219/6057a81d32ea25601c263d12/html5/thumbnails/21.jpg)
“Deliverable/Artifact/Work Product”Attributes
Tangible (pre-defined informational requirements)
can be identified and defined (resource, completion dates, cost) on Project Schedule
can be assigned (populating information requirements) to project team member(s)
can be referenced by project team members to support creation of other deliverables
can be formally reviewed and officially authorized
will alter in status (authored, reviewed, approved, archived, referenced) throughout life of project
Project Schedule used to reflect evolving deliverable status/progress (risks, issues, percentage complete)
can be placed under formal configuration management – re: with evolving status
can be accessed for future reference (application support and maintenance)
![Page 22: IT Methodology Webinardownloads.projectinsight.net/training/it-methodology... · 2016. 9. 21. · The 3rd Wednesday of Every Month 8:00 am Pacific - 11:00 am Eastern Time IT Methodology](https://reader036.vdocuments.net/reader036/viewer/2022071219/6057a81d32ea25601c263d12/html5/thumbnails/22.jpg)
Methodology/Lifecycle – Verb
“Waterfall” Methodology/Lifecycle
a single iteration through the methodology/lifecycle (noun)
deliverables/artifacts defined, assigned, and documented
formal structure required
“Agile” Methodology/Lifecycle
more than a single iteration through a methodology/lifecycle (noun)
limited deliverable creation
formal structure not required
![Page 23: IT Methodology Webinardownloads.projectinsight.net/training/it-methodology... · 2016. 9. 21. · The 3rd Wednesday of Every Month 8:00 am Pacific - 11:00 am Eastern Time IT Methodology](https://reader036.vdocuments.net/reader036/viewer/2022071219/6057a81d32ea25601c263d12/html5/thumbnails/23.jpg)
QAIassist Integrated Methodology
![Page 24: IT Methodology Webinardownloads.projectinsight.net/training/it-methodology... · 2016. 9. 21. · The 3rd Wednesday of Every Month 8:00 am Pacific - 11:00 am Eastern Time IT Methodology](https://reader036.vdocuments.net/reader036/viewer/2022071219/6057a81d32ea25601c263d12/html5/thumbnails/24.jpg)
QAIassist Integrated Methodology
![Page 25: IT Methodology Webinardownloads.projectinsight.net/training/it-methodology... · 2016. 9. 21. · The 3rd Wednesday of Every Month 8:00 am Pacific - 11:00 am Eastern Time IT Methodology](https://reader036.vdocuments.net/reader036/viewer/2022071219/6057a81d32ea25601c263d12/html5/thumbnails/25.jpg)
QAIassist Integrated Methodology
![Page 26: IT Methodology Webinardownloads.projectinsight.net/training/it-methodology... · 2016. 9. 21. · The 3rd Wednesday of Every Month 8:00 am Pacific - 11:00 am Eastern Time IT Methodology](https://reader036.vdocuments.net/reader036/viewer/2022071219/6057a81d32ea25601c263d12/html5/thumbnails/26.jpg)
QAIassist Integrated Methodology
![Page 27: IT Methodology Webinardownloads.projectinsight.net/training/it-methodology... · 2016. 9. 21. · The 3rd Wednesday of Every Month 8:00 am Pacific - 11:00 am Eastern Time IT Methodology](https://reader036.vdocuments.net/reader036/viewer/2022071219/6057a81d32ea25601c263d12/html5/thumbnails/27.jpg)
QAIassist Integrated Methodology
![Page 28: IT Methodology Webinardownloads.projectinsight.net/training/it-methodology... · 2016. 9. 21. · The 3rd Wednesday of Every Month 8:00 am Pacific - 11:00 am Eastern Time IT Methodology](https://reader036.vdocuments.net/reader036/viewer/2022071219/6057a81d32ea25601c263d12/html5/thumbnails/28.jpg)
QAIassist Integrated Methodology
![Page 29: IT Methodology Webinardownloads.projectinsight.net/training/it-methodology... · 2016. 9. 21. · The 3rd Wednesday of Every Month 8:00 am Pacific - 11:00 am Eastern Time IT Methodology](https://reader036.vdocuments.net/reader036/viewer/2022071219/6057a81d32ea25601c263d12/html5/thumbnails/29.jpg)
QAIassist Integrated Methodology
![Page 30: IT Methodology Webinardownloads.projectinsight.net/training/it-methodology... · 2016. 9. 21. · The 3rd Wednesday of Every Month 8:00 am Pacific - 11:00 am Eastern Time IT Methodology](https://reader036.vdocuments.net/reader036/viewer/2022071219/6057a81d32ea25601c263d12/html5/thumbnails/30.jpg)
QAIassist Integrated Methodology
![Page 31: IT Methodology Webinardownloads.projectinsight.net/training/it-methodology... · 2016. 9. 21. · The 3rd Wednesday of Every Month 8:00 am Pacific - 11:00 am Eastern Time IT Methodology](https://reader036.vdocuments.net/reader036/viewer/2022071219/6057a81d32ea25601c263d12/html5/thumbnails/31.jpg)
QAIassist Integrated Methodology
![Page 32: IT Methodology Webinardownloads.projectinsight.net/training/it-methodology... · 2016. 9. 21. · The 3rd Wednesday of Every Month 8:00 am Pacific - 11:00 am Eastern Time IT Methodology](https://reader036.vdocuments.net/reader036/viewer/2022071219/6057a81d32ea25601c263d12/html5/thumbnails/32.jpg)
IT Methodology Context - (noun/verb), hierarchy, depictions, concept of deliverable
IT Methodology (noun) - “Project” versus “Organizational Process”
“Organizational Process” Characteristics (repeatability, predictability, measurability)
“Organizational Process” Benefits (corporate planning, staffing flexibility/opportunity,
consistent delivery & quality, accountability, continuous improvement)
“Organizational Process” Implementation Considerations
Recap
Concepts V – Incorporate Organizational Process & Governance
Agenda
![Page 33: IT Methodology Webinardownloads.projectinsight.net/training/it-methodology... · 2016. 9. 21. · The 3rd Wednesday of Every Month 8:00 am Pacific - 11:00 am Eastern Time IT Methodology](https://reader036.vdocuments.net/reader036/viewer/2022071219/6057a81d32ea25601c263d12/html5/thumbnails/33.jpg)
IT Methodology Context - (noun/verb), hierarchy, depictions, concept of deliverable
IT Methodology (noun) - “Project” versus “Organizational Process”
“Organizational Process” Characteristics (repeatability, predictability, measurability)
“Organizational Process” Benefits (corporate planning, staffing flexibility/opportunity,
consistent delivery & quality, accountability, continuous improvement)
“Organizational Process” Implementation Considerations
Recap
Concepts V – Incorporate Organizational Process & Governance
Agenda
![Page 34: IT Methodology Webinardownloads.projectinsight.net/training/it-methodology... · 2016. 9. 21. · The 3rd Wednesday of Every Month 8:00 am Pacific - 11:00 am Eastern Time IT Methodology](https://reader036.vdocuments.net/reader036/viewer/2022071219/6057a81d32ea25601c263d12/html5/thumbnails/34.jpg)
Project Context
![Page 35: IT Methodology Webinardownloads.projectinsight.net/training/it-methodology... · 2016. 9. 21. · The 3rd Wednesday of Every Month 8:00 am Pacific - 11:00 am Eastern Time IT Methodology](https://reader036.vdocuments.net/reader036/viewer/2022071219/6057a81d32ea25601c263d12/html5/thumbnails/35.jpg)
QAIassist Integrated Methodology
![Page 36: IT Methodology Webinardownloads.projectinsight.net/training/it-methodology... · 2016. 9. 21. · The 3rd Wednesday of Every Month 8:00 am Pacific - 11:00 am Eastern Time IT Methodology](https://reader036.vdocuments.net/reader036/viewer/2022071219/6057a81d32ea25601c263d12/html5/thumbnails/36.jpg)
QAIassist Integrated Methodology
![Page 37: IT Methodology Webinardownloads.projectinsight.net/training/it-methodology... · 2016. 9. 21. · The 3rd Wednesday of Every Month 8:00 am Pacific - 11:00 am Eastern Time IT Methodology](https://reader036.vdocuments.net/reader036/viewer/2022071219/6057a81d32ea25601c263d12/html5/thumbnails/37.jpg)
QAIassist Integrated Methodology
![Page 38: IT Methodology Webinardownloads.projectinsight.net/training/it-methodology... · 2016. 9. 21. · The 3rd Wednesday of Every Month 8:00 am Pacific - 11:00 am Eastern Time IT Methodology](https://reader036.vdocuments.net/reader036/viewer/2022071219/6057a81d32ea25601c263d12/html5/thumbnails/38.jpg)
QAIassist Integrated Methodology
![Page 39: IT Methodology Webinardownloads.projectinsight.net/training/it-methodology... · 2016. 9. 21. · The 3rd Wednesday of Every Month 8:00 am Pacific - 11:00 am Eastern Time IT Methodology](https://reader036.vdocuments.net/reader036/viewer/2022071219/6057a81d32ea25601c263d12/html5/thumbnails/39.jpg)
Project Management - Lifecycle
![Page 40: IT Methodology Webinardownloads.projectinsight.net/training/it-methodology... · 2016. 9. 21. · The 3rd Wednesday of Every Month 8:00 am Pacific - 11:00 am Eastern Time IT Methodology](https://reader036.vdocuments.net/reader036/viewer/2022071219/6057a81d32ea25601c263d12/html5/thumbnails/40.jpg)
Project Management - ContextObjectives
Establish Project
Plan (Resources, Deliverables, Activities, Quality, Risk)
Execute & Control (Plans)
Deliver to Users on Time and Budget
Audience/Roles
Business Stakeholders
Project Managers
Business Analysts
System Architects & Analysts
Programmers & Testers
End Users
![Page 41: IT Methodology Webinardownloads.projectinsight.net/training/it-methodology... · 2016. 9. 21. · The 3rd Wednesday of Every Month 8:00 am Pacific - 11:00 am Eastern Time IT Methodology](https://reader036.vdocuments.net/reader036/viewer/2022071219/6057a81d32ea25601c263d12/html5/thumbnails/41.jpg)
QAIassist Integrated Methodology
![Page 42: IT Methodology Webinardownloads.projectinsight.net/training/it-methodology... · 2016. 9. 21. · The 3rd Wednesday of Every Month 8:00 am Pacific - 11:00 am Eastern Time IT Methodology](https://reader036.vdocuments.net/reader036/viewer/2022071219/6057a81d32ea25601c263d12/html5/thumbnails/42.jpg)
Software Development - Lifecycle
![Page 43: IT Methodology Webinardownloads.projectinsight.net/training/it-methodology... · 2016. 9. 21. · The 3rd Wednesday of Every Month 8:00 am Pacific - 11:00 am Eastern Time IT Methodology](https://reader036.vdocuments.net/reader036/viewer/2022071219/6057a81d32ea25601c263d12/html5/thumbnails/43.jpg)
Software Development - ContextObjectives
Enhance project team communications
Define formal user requirements
Design solution to satisfy user requirements
Build desired functionality
Audience/Roles
Business Stakeholders
Project Managers
Business Analysts & Architects
Programmers & Testers
End Users
![Page 44: IT Methodology Webinardownloads.projectinsight.net/training/it-methodology... · 2016. 9. 21. · The 3rd Wednesday of Every Month 8:00 am Pacific - 11:00 am Eastern Time IT Methodology](https://reader036.vdocuments.net/reader036/viewer/2022071219/6057a81d32ea25601c263d12/html5/thumbnails/44.jpg)
QAIassist Integrated Methodology
![Page 45: IT Methodology Webinardownloads.projectinsight.net/training/it-methodology... · 2016. 9. 21. · The 3rd Wednesday of Every Month 8:00 am Pacific - 11:00 am Eastern Time IT Methodology](https://reader036.vdocuments.net/reader036/viewer/2022071219/6057a81d32ea25601c263d12/html5/thumbnails/45.jpg)
Software Testing - Lifecycle
![Page 46: IT Methodology Webinardownloads.projectinsight.net/training/it-methodology... · 2016. 9. 21. · The 3rd Wednesday of Every Month 8:00 am Pacific - 11:00 am Eastern Time IT Methodology](https://reader036.vdocuments.net/reader036/viewer/2022071219/6057a81d32ea25601c263d12/html5/thumbnails/46.jpg)
Software Testing - ContextObjectives
Enhance project team communications
Enable testing activities to begin from project startup
Correlate expected and authorized requirements with application being delivered
Users verify final solution
Audience/Roles
Business Stakeholders
Project Managers
Business Analysts & Architects
Programmers & Testers
End Users
![Page 47: IT Methodology Webinardownloads.projectinsight.net/training/it-methodology... · 2016. 9. 21. · The 3rd Wednesday of Every Month 8:00 am Pacific - 11:00 am Eastern Time IT Methodology](https://reader036.vdocuments.net/reader036/viewer/2022071219/6057a81d32ea25601c263d12/html5/thumbnails/47.jpg)
Project Context
![Page 48: IT Methodology Webinardownloads.projectinsight.net/training/it-methodology... · 2016. 9. 21. · The 3rd Wednesday of Every Month 8:00 am Pacific - 11:00 am Eastern Time IT Methodology](https://reader036.vdocuments.net/reader036/viewer/2022071219/6057a81d32ea25601c263d12/html5/thumbnails/48.jpg)
Process Context
![Page 49: IT Methodology Webinardownloads.projectinsight.net/training/it-methodology... · 2016. 9. 21. · The 3rd Wednesday of Every Month 8:00 am Pacific - 11:00 am Eastern Time IT Methodology](https://reader036.vdocuments.net/reader036/viewer/2022071219/6057a81d32ea25601c263d12/html5/thumbnails/49.jpg)
Process Context (all organizational projects)
Lifecycles
Project Management
Software Development
Software Testing
Benefits
Planning, Executing, Delivering
Requirements Definition, User Approval
Successfully Tested Authorized Functionality
![Page 50: IT Methodology Webinardownloads.projectinsight.net/training/it-methodology... · 2016. 9. 21. · The 3rd Wednesday of Every Month 8:00 am Pacific - 11:00 am Eastern Time IT Methodology](https://reader036.vdocuments.net/reader036/viewer/2022071219/6057a81d32ea25601c263d12/html5/thumbnails/50.jpg)
IT Methodology Context - (noun/verb), hierarchy, depictions, concept of deliverable
IT Methodology (noun) - “Project” versus “Organizational Process”
“Organizational Process” Characteristics (repeatability, predictability, measurability)
“Organizational Process” Benefits (corporate planning, staffing flexibility/opportunity,
consistent delivery & quality, accountability, continuous improvement)
“Organizational Process” Implementation Considerations
Recap
Concepts V – Incorporate Organizational Process & Governance
Agenda
![Page 51: IT Methodology Webinardownloads.projectinsight.net/training/it-methodology... · 2016. 9. 21. · The 3rd Wednesday of Every Month 8:00 am Pacific - 11:00 am Eastern Time IT Methodology](https://reader036.vdocuments.net/reader036/viewer/2022071219/6057a81d32ea25601c263d12/html5/thumbnails/51.jpg)
IT Methodology Context - (noun/verb), hierarchy, depictions, concept of deliverable
IT Methodology (noun) - “Project” versus “Organizational Process”
“Organizational Process” Characteristics (repeatability, predictability, measurability)
“Organizational Process” Benefits (corporate planning, staffing flexibility/opportunity,
consistent delivery & quality, accountability, continuous improvement)
“Organizational Process” Implementation Considerations
Recap
Concepts V – Incorporate Organizational Process & Governance
Agenda
![Page 52: IT Methodology Webinardownloads.projectinsight.net/training/it-methodology... · 2016. 9. 21. · The 3rd Wednesday of Every Month 8:00 am Pacific - 11:00 am Eastern Time IT Methodology](https://reader036.vdocuments.net/reader036/viewer/2022071219/6057a81d32ea25601c263d12/html5/thumbnails/52.jpg)
Organizational Process - Characteristics
Lifecycle/Methodology/Process
Project Management
Software Development
Software Testing
Characteristics
Repeatability
Predictability
Measurability
![Page 53: IT Methodology Webinardownloads.projectinsight.net/training/it-methodology... · 2016. 9. 21. · The 3rd Wednesday of Every Month 8:00 am Pacific - 11:00 am Eastern Time IT Methodology](https://reader036.vdocuments.net/reader036/viewer/2022071219/6057a81d32ea25601c263d12/html5/thumbnails/53.jpg)
Organizational Process - Repeatability
Lifecycle/Process
Project Management
Software Development
Software Testing
Results
Specific tasks, and work products (deliverables) pre-defined
Projects are regularly delivered on time and within budget
Quality is inherent in the process and the product/service being delivered
![Page 54: IT Methodology Webinardownloads.projectinsight.net/training/it-methodology... · 2016. 9. 21. · The 3rd Wednesday of Every Month 8:00 am Pacific - 11:00 am Eastern Time IT Methodology](https://reader036.vdocuments.net/reader036/viewer/2022071219/6057a81d32ea25601c263d12/html5/thumbnails/54.jpg)
Organizational Process - Predictability
Context
Project Management
Software Development
Software Testing
Results
Specific roles and responsibilities are pre-defined
Product/Service delivery more efficient
Corporate planning (budgeting and staff forecasting) becomes more reliable
![Page 55: IT Methodology Webinardownloads.projectinsight.net/training/it-methodology... · 2016. 9. 21. · The 3rd Wednesday of Every Month 8:00 am Pacific - 11:00 am Eastern Time IT Methodology](https://reader036.vdocuments.net/reader036/viewer/2022071219/6057a81d32ea25601c263d12/html5/thumbnails/55.jpg)
Organizational Process - Measurability
Context
Project Management
Software Development
Software Testing
Results
Repeatable & Predictable = Measurable
Measurable = Basis of Ongoing Improvement
Ongoing Improvement = Operational Performance and Quality (product & process)
![Page 56: IT Methodology Webinardownloads.projectinsight.net/training/it-methodology... · 2016. 9. 21. · The 3rd Wednesday of Every Month 8:00 am Pacific - 11:00 am Eastern Time IT Methodology](https://reader036.vdocuments.net/reader036/viewer/2022071219/6057a81d32ea25601c263d12/html5/thumbnails/56.jpg)
IT Methodology Context - (noun/verb), hierarchy, depictions, concept of deliverable
IT Methodology (noun) - “Project” versus “Organizational Process”
“Organizational Process” Characteristics (repeatability, predictability, measurability)
“Organizational Process” Benefits (corporate planning, staffing flexibility/opportunity,
consistent delivery & quality, accountability, continuous improvement)
“Organizational Process” Implementation Considerations
Recap
Concepts V – Incorporate Organizational Process & Governance
Agenda
![Page 57: IT Methodology Webinardownloads.projectinsight.net/training/it-methodology... · 2016. 9. 21. · The 3rd Wednesday of Every Month 8:00 am Pacific - 11:00 am Eastern Time IT Methodology](https://reader036.vdocuments.net/reader036/viewer/2022071219/6057a81d32ea25601c263d12/html5/thumbnails/57.jpg)
IT Methodology Context - (noun/verb), hierarchy, depictions, concept of deliverable
IT Methodology (noun) - “Project” versus “Organizational Process”
“Organizational Process” Characteristics (repeatability, predictability, measurability)
“Organizational Process” Benefits (corporate planning, staffing flexibility/opportunity,
consistent delivery & quality, accountability, continuous improvement)
“Organizational Process” Implementation Considerations
Recap
Concepts V – Incorporate Organizational Process & Governance
Agenda
![Page 58: IT Methodology Webinardownloads.projectinsight.net/training/it-methodology... · 2016. 9. 21. · The 3rd Wednesday of Every Month 8:00 am Pacific - 11:00 am Eastern Time IT Methodology](https://reader036.vdocuments.net/reader036/viewer/2022071219/6057a81d32ea25601c263d12/html5/thumbnails/58.jpg)
Organizational Process – Corporate Planning
Context
Project Management
Software Development
Software Testing
Benefits
Establishes benchmark of operational capacity
Benchmark of operational capacity utilized for strategic and intermediate (budget and staff) planning
![Page 59: IT Methodology Webinardownloads.projectinsight.net/training/it-methodology... · 2016. 9. 21. · The 3rd Wednesday of Every Month 8:00 am Pacific - 11:00 am Eastern Time IT Methodology](https://reader036.vdocuments.net/reader036/viewer/2022071219/6057a81d32ea25601c263d12/html5/thumbnails/59.jpg)
Organizational Process – Staff Flexibility
Context
Project Management
Software Development
Software Testing
Benefits
Transportable Skills
Variability of Environment
Exposure to cross functional business functions and applications
Career Evolution
![Page 60: IT Methodology Webinardownloads.projectinsight.net/training/it-methodology... · 2016. 9. 21. · The 3rd Wednesday of Every Month 8:00 am Pacific - 11:00 am Eastern Time IT Methodology](https://reader036.vdocuments.net/reader036/viewer/2022071219/6057a81d32ea25601c263d12/html5/thumbnails/60.jpg)
Organizational Process – Consistent Delivery & Quality
Context
Project Management
Software Development
Software Testing
Benefits
Repeatable process efficiency
Verifiable utilization ensures process has been applied – results in delivery of quality in product/service
![Page 61: IT Methodology Webinardownloads.projectinsight.net/training/it-methodology... · 2016. 9. 21. · The 3rd Wednesday of Every Month 8:00 am Pacific - 11:00 am Eastern Time IT Methodology](https://reader036.vdocuments.net/reader036/viewer/2022071219/6057a81d32ea25601c263d12/html5/thumbnails/61.jpg)
Organizational Process – Accountability
Context
Project Management
Software Development
Software Testing
Benefits
Predefined Operational Roles
Predefined benchmark for evaluation
Formal review and audit of process
Feedback mechanism for resource evaluation
![Page 62: IT Methodology Webinardownloads.projectinsight.net/training/it-methodology... · 2016. 9. 21. · The 3rd Wednesday of Every Month 8:00 am Pacific - 11:00 am Eastern Time IT Methodology](https://reader036.vdocuments.net/reader036/viewer/2022071219/6057a81d32ea25601c263d12/html5/thumbnails/62.jpg)
Organizational Process – Continuous Improvement
Context
Project Management
Software Development
Software Testing
Benefits
Process can be measured/metrics
Metrics can be evaluated and utilized to revise/enhance process
Corporate Maturity - Cultural
![Page 63: IT Methodology Webinardownloads.projectinsight.net/training/it-methodology... · 2016. 9. 21. · The 3rd Wednesday of Every Month 8:00 am Pacific - 11:00 am Eastern Time IT Methodology](https://reader036.vdocuments.net/reader036/viewer/2022071219/6057a81d32ea25601c263d12/html5/thumbnails/63.jpg)
IT Methodology Context - (noun/verb), hierarchy, depictions, concept of deliverable
IT Methodology (noun) - “Project” versus “Organizational Process”
“Organizational Process” Characteristics (repeatability, predictability, measurability)
“Organizational Process” Benefits (corporate planning, staffing flexibility/opportunity,
consistent delivery & quality, accountability, continuous improvement)
“Organizational Process” Implementation Considerations
Recap
Concepts V – Incorporate Organizational Process & Governance
Agenda
![Page 64: IT Methodology Webinardownloads.projectinsight.net/training/it-methodology... · 2016. 9. 21. · The 3rd Wednesday of Every Month 8:00 am Pacific - 11:00 am Eastern Time IT Methodology](https://reader036.vdocuments.net/reader036/viewer/2022071219/6057a81d32ea25601c263d12/html5/thumbnails/64.jpg)
IT Methodology Context - (noun/verb), hierarchy, depictions, concept of deliverable
IT Methodology (noun) - “Project” versus “Organizational Process”
“Organizational Process” Characteristics (repeatability, predictability, measurability)
“Organizational Process” Benefits (corporate planning, staffing flexibility/opportunity,
consistent delivery & quality, accountability, continuous improvement)
“Organizational Process” Implementation Considerations
Recap
Concepts V – Incorporate Organizational Process & Governance
Agenda
![Page 65: IT Methodology Webinardownloads.projectinsight.net/training/it-methodology... · 2016. 9. 21. · The 3rd Wednesday of Every Month 8:00 am Pacific - 11:00 am Eastern Time IT Methodology](https://reader036.vdocuments.net/reader036/viewer/2022071219/6057a81d32ea25601c263d12/html5/thumbnails/65.jpg)
Implementation Considerations - Corporate Objectives
Governance – Organizations have developed and are utilizing their corporate process(es) –
these organizations want to ensure the process(es) they have developed are applied effectively.
Specialized staff are dedicated to lead these initiatives (PMO) - process scope can vary
Quality Assurance – Organizations have a belief that the quality of their products and services
rely and are dependent on how effectively the organizational process(es) are being followed.
Specialized staff are dedicated to perform ongoing process reviews and audits
Continuous Improvement– Organizations recognize that operational performance (and
corporate culture) can be continually improved when the processes incorporate a metric
component. The metrics can be used to measure performance (schedule, cost, quality) of how
the products/services are being developed and delivered. Dedicated resources are used to
acquire and disseminate metric information to operational management
![Page 66: IT Methodology Webinardownloads.projectinsight.net/training/it-methodology... · 2016. 9. 21. · The 3rd Wednesday of Every Month 8:00 am Pacific - 11:00 am Eastern Time IT Methodology](https://reader036.vdocuments.net/reader036/viewer/2022071219/6057a81d32ea25601c263d12/html5/thumbnails/66.jpg)
Implementation Considerations - Existing Corporate Maturity
Every organization is using a process ( IT Methodology or IT Lifecycle or IT
Framework) to deliver products and/or services
Optimized – IT Methodology is recognized and aligned with business objectives and routinely
delivers to operational needs and expectations – metrics for continuous improvement
Maximized – IT Methodology is recognized and aligned with business objectives and regularly
delivers to operational needs and expectations – no metrics for continuous improvement
Utilized – IT Methodology is recognized yet inconsistently applied resulting in deviations
(schedule, cost, quality) of the products/services being delivered
Chaotic – IT Methodology is not recognized, process(es) are not applied
![Page 67: IT Methodology Webinardownloads.projectinsight.net/training/it-methodology... · 2016. 9. 21. · The 3rd Wednesday of Every Month 8:00 am Pacific - 11:00 am Eastern Time IT Methodology](https://reader036.vdocuments.net/reader036/viewer/2022071219/6057a81d32ea25601c263d12/html5/thumbnails/67.jpg)
Implementation Considerations - Cornerstones for Success
Establish Ownership/Steering Committee – have a champion
Identify and designate “process” experience/expertise (in-house/other)
Identify the scope of the process/methodology (ie Project Management, Software Development,
Software Testing) or phase or deliverables that will bring value once implemented – define the
piece of pie
Designate the initiative as a project – apply PM practices (initiate, plan, execute & control,
closeout) to guide the project implementation
Continuous communication (across the organization) from process development through process
training through process implementation
Incorporate an implementation feedback loop (how process is being applied) to ownership
through formal organizational body (PMO, QA, Governance)
![Page 68: IT Methodology Webinardownloads.projectinsight.net/training/it-methodology... · 2016. 9. 21. · The 3rd Wednesday of Every Month 8:00 am Pacific - 11:00 am Eastern Time IT Methodology](https://reader036.vdocuments.net/reader036/viewer/2022071219/6057a81d32ea25601c263d12/html5/thumbnails/68.jpg)
Implementation Considerations – terms, terms and more terms
Every organization is using an
IT Methodology or IT Lifecycle or IT Framework
(PROCESS)
![Page 69: IT Methodology Webinardownloads.projectinsight.net/training/it-methodology... · 2016. 9. 21. · The 3rd Wednesday of Every Month 8:00 am Pacific - 11:00 am Eastern Time IT Methodology](https://reader036.vdocuments.net/reader036/viewer/2022071219/6057a81d32ea25601c263d12/html5/thumbnails/69.jpg)
IT Methodology Context - (noun/verb), hierarchy, depictions, concept of deliverable
IT Methodology (noun) - “Project” versus “Organizational Process”
“Organizational Process” Characteristics (repeatability, predictability, measurability)
“Organizational Process” Benefits (corporate planning, staffing flexibility/opportunity,
consistent delivery & quality, accountability, continuous improvement)
“Organizational Process” Implementation Considerations
Recap
Concepts V – Incorporate Organizational Process & Governance
Agenda
![Page 70: IT Methodology Webinardownloads.projectinsight.net/training/it-methodology... · 2016. 9. 21. · The 3rd Wednesday of Every Month 8:00 am Pacific - 11:00 am Eastern Time IT Methodology](https://reader036.vdocuments.net/reader036/viewer/2022071219/6057a81d32ea25601c263d12/html5/thumbnails/70.jpg)
IT Methodology Context - (noun/verb), hierarchy, depictions, concept of deliverable
IT Methodology (noun) - “Project” versus “Organizational Process”
“Organizational Process” Characteristics (repeatability, predictability, measurability)
“Organizational Process” Benefits (corporate planning, staffing flexibility/opportunity,
consistent delivery & quality, accountability, continuous improvement)
“Organizational Process” Implementation Considerations
Recap
Concepts V – Incorporate Organizational Process & Governance
Agenda
![Page 71: IT Methodology Webinardownloads.projectinsight.net/training/it-methodology... · 2016. 9. 21. · The 3rd Wednesday of Every Month 8:00 am Pacific - 11:00 am Eastern Time IT Methodology](https://reader036.vdocuments.net/reader036/viewer/2022071219/6057a81d32ea25601c263d12/html5/thumbnails/71.jpg)
2016 Schedule
The 3rd Wednesday of Every Month
8:00 am Pacific - 11:00 am Eastern Time
IT Methodology Concepts (60 mins)
This series of six webinars will be presented on a bi-monthly basis. Each webinar will provide you with a context, overview, terminology and general understanding of information technology (IT) methodology.
IT Methodology – Tutorials (60 mins)
This series of five webinars will be presented on a bi-monthly basis. Each session is designed to offer a more “hands on” perspective – bridging the concepts into a practical utilization.
![Page 72: IT Methodology Webinardownloads.projectinsight.net/training/it-methodology... · 2016. 9. 21. · The 3rd Wednesday of Every Month 8:00 am Pacific - 11:00 am Eastern Time IT Methodology](https://reader036.vdocuments.net/reader036/viewer/2022071219/6057a81d32ea25601c263d12/html5/thumbnails/72.jpg)
2016 “Concepts” Schedule
The 3rd Wednesday of Month (Jan, Mar, May, Jul, Sept, Nov)
8:00 am Pacific - 11:00 am Eastern Time
IT Methodology Concepts (60 mins)
Methodology for the IT Landscape - (Jan)
Apply PM Fundamentals to IT - (Mar)
Leverage the Software Development Lifecycle - (May)
Explore the Software Testing Lifecycle - (Jul)
Incorporate Organizational Process Governance - ( Sept)
Implementing IT Methodology - (Nov)
![Page 73: IT Methodology Webinardownloads.projectinsight.net/training/it-methodology... · 2016. 9. 21. · The 3rd Wednesday of Every Month 8:00 am Pacific - 11:00 am Eastern Time IT Methodology](https://reader036.vdocuments.net/reader036/viewer/2022071219/6057a81d32ea25601c263d12/html5/thumbnails/73.jpg)
2016 “Concepts” Schedule
The 3rd Wednesday of Month (Jan, Mar, May, Jul, Sept, Nov)
8:00 am Pacific - 11:00 am Eastern Time
IT Methodology Concepts (60 mins)
Methodology for the IT Landscape - (Jan)
Apply PM Fundamentals to IT - (Mar)
Leverage the Software Development Lifecycle - (May)
Explore the Software Testing Lifecycle - (Jul)
Incorporate Organizational Process Governance - ( Sept)
Implementing IT Methodology - (Nov)
![Page 74: IT Methodology Webinardownloads.projectinsight.net/training/it-methodology... · 2016. 9. 21. · The 3rd Wednesday of Every Month 8:00 am Pacific - 11:00 am Eastern Time IT Methodology](https://reader036.vdocuments.net/reader036/viewer/2022071219/6057a81d32ea25601c263d12/html5/thumbnails/74.jpg)
2016 “Tutorials” Schedule
The 3rd Wednesday of Month (Feb, Apr, Jun, Aug, Oct)
8:00 am Pacific - 11:00 am Eastern Time
IT Methodology Tutorials (60 mins)
Applying IT Methodology to Project Initiation - (Feb)
Project Planning & Design with IT in Mind - (Apr)
Executing Projects with IT Methodologies - (Jun)
Project Control & Verification - (Aug)
Project Close & Delivery - ( Oct)
![Page 75: IT Methodology Webinardownloads.projectinsight.net/training/it-methodology... · 2016. 9. 21. · The 3rd Wednesday of Every Month 8:00 am Pacific - 11:00 am Eastern Time IT Methodology](https://reader036.vdocuments.net/reader036/viewer/2022071219/6057a81d32ea25601c263d12/html5/thumbnails/75.jpg)
Body of Knowledge
Methodology/Lifecycle/Deliverables – www.qaiassist.com
Project Management, Software Development, Software Testing
Body of Knowledge (Library) – www.qaiassist.com
Methodology Origin – origins of methodology – identifies the differences
between the path we take (noun) and how we proceed (verb) down that path
Context & Overview – provides a general overview of IT Methodology and how
it can be applied within an organization
Deliverable Descriptions - provides general descriptions for all the deliverables
of the QAIassist Integrated Methodology
![Page 76: IT Methodology Webinardownloads.projectinsight.net/training/it-methodology... · 2016. 9. 21. · The 3rd Wednesday of Every Month 8:00 am Pacific - 11:00 am Eastern Time IT Methodology](https://reader036.vdocuments.net/reader036/viewer/2022071219/6057a81d32ea25601c263d12/html5/thumbnails/76.jpg)
Until Next Session…
Keep Posing your Questions – call or send your questions in (Denise and/or Cameron)
Explore the QAIassist Body of Knowledge – refer to the QAIassist Body of Knowledge (sample deliverables, whitepapers, blog articles) – (www-qaiassist.com)
QAIassist Practitioner - find out more about becoming QAIassist certified “Foundation”, “Practitioner”
Tell your friends - tell your friends, coworkers and colleagues about the Project Insight/QAIassist webinars – invite them to join us at the next session
Continuing Follow Up – send out a survey at the completion of every webinar, follow up with attendees to obtain their suggestions and recommendation
![Page 78: IT Methodology Webinardownloads.projectinsight.net/training/it-methodology... · 2016. 9. 21. · The 3rd Wednesday of Every Month 8:00 am Pacific - 11:00 am Eastern Time IT Methodology](https://reader036.vdocuments.net/reader036/viewer/2022071219/6057a81d32ea25601c263d12/html5/thumbnails/78.jpg)
Join us!
YouTube
![Page 79: IT Methodology Webinardownloads.projectinsight.net/training/it-methodology... · 2016. 9. 21. · The 3rd Wednesday of Every Month 8:00 am Pacific - 11:00 am Eastern Time IT Methodology](https://reader036.vdocuments.net/reader036/viewer/2022071219/6057a81d32ea25601c263d12/html5/thumbnails/79.jpg)
Learn more…
Schedule a customized demo today
+1 (949) 476-6499 x3
Request info: www.projectinsight.net
Contact QAIassist
+1 (613) 523-0052
Request info: www.qaiassist.com
![Page 80: IT Methodology Webinardownloads.projectinsight.net/training/it-methodology... · 2016. 9. 21. · The 3rd Wednesday of Every Month 8:00 am Pacific - 11:00 am Eastern Time IT Methodology](https://reader036.vdocuments.net/reader036/viewer/2022071219/6057a81d32ea25601c263d12/html5/thumbnails/80.jpg)
Sign up for more!
IT Methodology & Agile
PM training
Leadership
Product training
Check out the videos
PI Community