Knowledge & IT Service CentreIT Services Operational Plan 2005
IT Support Services
Strategic Goal Responsibility Milestones Measurement Target Status
Enhancing Teaching, Learning and Research
Responsibility Milestones Measurement Target Status
Establish measures of the services (including costs) of providing Teaching Computer Laboratory Support
Susan McLennan Develop appropriate measures; Develop systems for recording data
collected;
KPI's identified Costs of support
identified.
Work in partnership with academic staff to ensure all problems in teaching computers laboratories are reported and logged
Susan McLennan Meet with other faculties in addition to Business to understand their needs and issues;
Regular meetings with faculties to be established
ECU Advantage Student Laptop Trial – Sem 1
Mark Ridge Laptops for Semester 1 rolled out Laptops for Semester 1 delivered to students
Support for laptops in place Collection of laptops at end of
semesterECU Advantage – A Sustainable Advantage
Mark Ridge Work with Executive in defining the sustainable advantage
Define support process Resolve software licensing issues
Support processes agreed Roles and responsibilities
agreed Software issues resolved
Engaging with the Professions and Professional Life
Responsibility Milestones Measurement Target Status
Implement a "Best Practice" framework for IT Services
ITSS Senior staff Ensure ITSS staff have training/understanding in ITIL;
Encourage other IT areas to participate; Provide the opportunity for an additional
six (min) to undertake the Service Management Foundations course and exam.
ITIL Framework implemented throughout IT
On-going All ITSS staff attended overview or attended Foundations course;
Other managers have attended Foundations course;
Membership to appropriate Professional bodies
Mark Ridge Help Desk Institute; IT Service Management Foundation; ACS
On-going
Building Partnerships, Pathways and Precincts
Responsibility Milestones Measurement Target Status
Develop partnerships with key suppliers ie. IBM, HP,
ITSS Management Team Leverage partnership for industry leaders to present and
Present
Page 1 of 13
Knowledge & IT Service CentreIT Services Operational Plan 2005
IT Support Services
Strategic Goal Responsibility Milestones Measurement Target Status
Managesoft, Moncrieff etc.) share knowledge with ITSS staff. ations from partner organisations on new technologies
Investigate delivery of services by students
ITSS Management Team Identify what services could be provided by students (ie Student Help Desk, Laptop programme, student orientation)
Use of students for support
Investigate Shared Services -Joint negotiation for products and services
Utilise appropriate CAUDIT licensing agreements;
Best value purchasing of technology and services.
On-going
Improving Outcomes for Students and Staff
Responsibility Milestones Measurement Target Status
Plan for Apple Mac SOE MKIII Rollout
Mark Ridge Identify Rollout Team and Responsibilities Work with Faculties to establish Customer
Working Party Plan Rollout Place Orders
Team Established Customer Working Party
Established Rollout plan in place and
communicated Orders placed for delivery in
2006Provide Services catalog for students
Susan McLennan Service details collected; Service Catalog published
Provide Services catalog for staff Yvonne Wallwork Service details collected; Service Catalog publishedEstablish measures of the usage and its profiles in the Megalabs
Susan McLennan Develop appropriate measures; Collect data
Publish data.
Investigate setting up an orientation for students
Susan McLennan Work with relevant departments to coordinate orientation;
Student orientation schedules scheduled
Investigate setting up an orientation for staff
Yvonne Wallwork Work with relevant departments (PDC) to coordinate orientation;
Successful staff orientations;
Develop seamless IT Service IT Managers Change Help Desk name to Service Desk; Ensure all IT service requests are logged
through Service Desk; Work with other IT groups to resolve
issues at beginning; Remote support for staff computers; Develop OLA's with ITI, IDS and IS; Re-initiate Senior IT staff meetings
Extending support hours Mark Ridge Apply for budget Funding provided
Page 2 of 13
Knowledge & IT Service CentreIT Services Operational Plan 2005
IT Support Services
Strategic Goal Responsibility Milestones Measurement Target Status
Align the Megalab support hours to the same as the Library
Investigate IT – Media Services integrated services
Mark Ridge Work with other managers (ITI and KAS) to evaluate options;
Help Desk System Mark Ridge/Ven Boujos/ David Sizer
Implementation of Change Management Implementation of Configuration
Management Implementation of Web Based incident
reporting
Complete installation of Help Desk system modules
Service Requests, Incident Management and Problem management modules Installed
Enhance Service Level Agreements
Mark Ridge Work with the other IT Managers to refine SLA's relating to Service Centres and corporate applications
Seek funding for IT Liaisons Set timelines for SLA review
Bi-annual meetings with Faculties/Centres
Newly drafted SLA's developed
ITSS staff/resource allocation 2005 and beyond
ITSS Managers Align staff profiles with services provided to customers
Review staff numbers per campus for projected student/staff numbers for 2005 onwards
Review the impact of “ManageSoft” to the staff desktop, are our resources where they need to be(do we have the right skilled people)
Review work-load shifts for coordinators
Review staff rotation Move of all ITSS staff
from Churchlands campus; Greater use and
understanding of Managesoft environment by CSO staff;
Transition of Coordinator roles to align with processes;
Strengthening Enterprise and Resource Base
Responsibility Milestones Measurement Target Status
Be involved in the design of the new Resources Building at JO and in particular the Megalab
Mark Ridge/Sue McLennan Signed-off design of new buildig
IT Documentation ITSS Managers Ensure an appropriate level of documentation is available for all ITSS staff;
Strategies to keep documentation up-to-date;
Page 3 of 13
Knowledge & IT Service CentreIT Services Operational Plan 2005
IT Infrastructure ServicesStrategic Goal Responsibility Milestones Measurement Target Status Comments
Enhancing Teaching, Learning and Research
Responsibility Milestones Measurement Target Status Comments
Multimedia Projector Installations
Charlie King Existing locations at ML, JO and CH (upgrade); and
New locations (CampusWest JO, Stagehouse II ML, Building 8 JO).
Faculty satisfaction with new multimedia hardware;
Faculty sign-off. Mount Lawley complete; Churchlands complete. Building 8A (JO)
complete; Stagehouse II (ML)
complete; CampusWest (Building 2)
complete; CampusWest (Building 1)
underway; Joondalup underway.
This project needs to be documented and closed. The Media Services Brief needs to be completed urgently.
Priority C
SNAP Wired Network Points Chris Blanksby New item. Wired network points within MegaLabs.
Priority B
Bunbury WAN enhancement Steve Johnston Authority to purchase Placement of purchase
order Installation Commissioning
Bunbury satisfaction with new network service.
Bunbury sign-off. New item. A redundant connection to Bunbury needs to be established in 2004. There is a greater reliance on the data network within the University.
The National Communications Fund (NCF) tender can be used for selection of this network service.
Priority C
Wireless Campus Project Chris Blanksby Tender Selection Implementation Commissioning
Wireless coverage. Wireless coverage for all meeting areas, teaching areas and 90% of the campus.
New item. Subject to funding (SIF bid).
Priority A
Library SunRay Installation and Upgrade
Paul Midgley / Keith Lambert Replacement of JavaStations in the library with SunRay hardware;
Upgrade of software, etc. to cover Library requirements
Replacement of all JavaStations;
Library satisfaction with new installation.
Library sign-off. Installation complete; Initial upgrade complete; Second upgrade
underway.
The future of SunRays within the library needs to be considered between IT (IT Infrastructure and IT Support Services in particular) and Library.
Priority C
Engaging with the Professions and Professional Life
Responsibility Milestones Measurement Target Status Comments
Page 4 of 13
Knowledge & IT Service CentreIT Services Operational Plan 2005
IT Infrastructure ServicesStrategic Goal Responsibility Milestones Measurement Target Status Comments
Collegial Groups Steve Johnston Identify appropriate collegial groups which may be of value to IT Infrastructure.
Relevance of membership against IT Infrastructure activities.
Meeting attendance, conference attendance, reports, etc.
Appropriate activities coverage.
Enhance our effectiveness by the gaining of expert knowledge from collegial groups.
New item. IT Infrastructure is currently involved in the following collegial groups: AARNet (Australian Academic and Research Network) ATUG (Australian Telecommunications Users Group) TUG (Tivoli Users Group) CAUDIT (Council of Australian Directors of Information
Technology) ACS (Australian Computer Society) OUG (Oracle Users Group) Other Perth Universities
Priority C
Implement a best practice for delivery of IT Services (ITIL)
IT Management Team New item. IT Infrastructure Library
Priority A
Building Partnerships, Pathways and Precincts
Responsibility Milestones Measurement Target Status Comments
WALAP authentication project
Peter Austin Tender process (including selection);
Installation and commissioning of hardware; and
Production connection between Universities.
Installation behind Alteon WSM.
Shared authentication information between Universities – and shared services;
Project completion sign-off (by all Universities);
Tender complete; Hardware installation
complete; Provisioning complete (in
production); Documentation to be
completed.
ECU and UWA are effectively in production with the WALAP system;
Other Universities are working towards production systems.
The ECU system needs to be networked behind the Alteon WSM.
Priority B
Telecommunications Restructure
Chris Blanksby / Brian Lambert
Modification of existing networks to terminate voice services in the Perth CBD;
Tender for provision of telecommunications services (as per new termination point).
Reduction in telecommunications services;
Direct telecommunications savings to Faculties (with no service degradation).
Waiting completion of prerequisite works.
Microwave decommissioning scheduled for completion in December 2003;
The tender for telecommunications services is expected to be operated in January 2004;
Priority B
Develop Partnerships with Key Suppliers
New item. Cabling – vendor to be selected
Media – vendor to be selected
Page 5 of 13
Knowledge & IT Service CentreIT Services Operational Plan 2005
IT Infrastructure ServicesStrategic Goal Responsibility Milestones Measurement Target Status Comments
Servers – IBM
Network – Nortel Networks
Telecommunications – AAPT / TelstraPriority B
Improving Outcomes for Students and Staff
Responsibility Milestones Measurement Target Status Comments
Benchmarking and Key Performance Indicators
Steve Johnston Selection of appropriate KPI’s for each functional area;
Selection of appropriate KPI’s for IT Infrastructure.
Provision of data, etc. for IT KPI’s
Provision of data, etc. for KITSC KPI”s.
A set of KPI’s per section;
An agreed set of KPI’s defined, and in place;
Procedures established for provision and maintenance of data, etc.
New item. Sub-projects may be required to implement certain KPI’s, and to ensure that appropriate measures are taken.
CAUDIT benchmarks will need to be reported, and should be taken into consideration when establishing the KPI’s.
KPI’s to be considered: Uptime (e-mail, network, directory services, etc) Responsiveness; Throughput; Systems measures (CPU utilisation, disk usage, etc).
Priority A
E-Trust Peter Austin Connection of Blackboard;
Connection of Innopac; Connection of other
internal web applications requiring web authentication as required;
E-trust being used as an authentication source.
Connection of appropriate systems.
New item. E-trust is to be used as the authentication source for web-based applications.
E-trust is currently being established as the source of Blackboard user authentication via LDAP;
Priority B
Student E-mail Upgrade Peter Austin Purchase, installation and commissioning of new hardware and software;
Decommissioning of ‘echidna’ – old student e-mail system.
Student e-mail satisfaction;
Improved feedback by students, as measured by survey.
Project complete1. This project is being consumed by the “Student Portal Project”;
There are concerns that e-mail may not be appropriately addressed;
The existing student e-mail hardware is not appropriate, is aging, and requires urgent replacement.
Priority C
Messaging and Collaboration
Peter Austin Purchase, installation and commissioning of new hardware and software;
Migration of all staff to exchange server hardware for e-mail;
100% migration. Purchase, installation and commissioning of new hardware and software complete;
Migration of GroupWise is effectively complete.
Decommissioning of the GroupWise servers will commence in December, 2003.
Completion of this project is expected by the end of 2003. Non-GroupWise users are being targeted as part of the
Intel SOE roll-out (November 2003 – March 2004).
1 New works on the student e-mail system have been commissioned by the Student Services Centre – this work is underway, but is separate to the 2002/2003 e-mail upgrade.
Page 6 of 13
Knowledge & IT Service CentreIT Services Operational Plan 2005
IT Infrastructure ServicesStrategic Goal Responsibility Milestones Measurement Target Status Comments
Migration of all GroupWise users to exchange;
Migration of all POP/IMAP users to exchange; and
Decommissioning of old GroupWise hardware.
Clean-up stage has commenced.
Priority B
ADS Directory Introduction Peter Austin / Chris Blanksby
Purchase, installation and commissioning of new hardware and software;
Migration of directory queries to make use of ADS database;
Decommissioning of NDS directory;
Decommissioning of NDS (and IPX) within the entire University network.
Nil reliance of use of NDS/IPX and full decommissioning.
Purchase, installation and commissioning of ADS domain controllers complete;
Migration of student networks to ADS complete;
Removal of staff NDS tree will be completed as part of the Intel SOE roll-out (November 2003 – March 2004).
An ADS upgrade is currently in progress (Windows 2003 ADS).
Priority B
Server Consolidation Keith Lambert Purchase, installation and commissioning of new hardware and software;
Development of Server Replacement Policy;
Confirmation of staffing levels within the Enterprise Systems Group;
Improved server management within the University;
Improved server security; Staffing levels for
Enterprise Systems Support.
Approved server replacement policy;
Approved server documentation;
Confirmed staffing levels.
Purchase, installation and commissioning of SAN hardware complete;
Purchase, installation and commissioning of hardware (other than ERP systems) complete;
Purchase of Backup hardware and software complete;
Commissioning of backup hardware and software underway.
Additional tasks as raised by the Server Consolidation Steering Committee.
Priority A
Voicemail Upgrade Brian Lambert / Chris Blanksby
Purchase, installation and commissioning of new hardware and software;
Decommissioning of existing Voicemail hardware;
Service improvement. Provision of network FAX;
Provision of voicemail/e-mail integration.
Waiting completion of prerequisite works.
Microwave decommissioning scheduled for December 2003.
Priority B
Exchange Archiving Project Peter Austin Publication of tender Selection
Page 7 of 13
Knowledge & IT Service CentreIT Services Operational Plan 2005
IT Infrastructure ServicesStrategic Goal Responsibility Milestones Measurement Target Status Comments
Implementation Commissioning
Accessibility of archived e-mail and the ability retain e-mail as required (without the limitation of disk space).
Time taken to backup exchange data store.
Optimum performance and availability of the exchange server;
Backup of exchange data store in 4 hours or less.
Tender process complete.
Procurement underway. Implementation planning
started.
The issue of ‘archiving’ v ‘journaling’ has been raised, and needs to be addressed by IT Infrastructure along with Information Security and Records Management.
Priority B
Modempool Services Steve Johnston / Chris BlanksbyIn conjunction with IT Support Services
New item. The Modempool service needs to be decommissioned (or substantially changed);
Measure dissatisfaction; Working party: Ven Boujos, Steve Johnston, Chris
Blanksby, etc.Priority A
Strengthening Enterprise and Resource Base
Responsibility Milestones Measurement Target Status Comments
Internet Cost Management Steve Johnston Introduction of hardware and software tools to control, measure and manage traffic;
Tender for provision of reporting software;
Purchase, installation and commissioning of reporting software;
Provision of Internet Accounting to Faculties and Centres;
Reduction and devolution of internet cost;
Internet cost reduced to beneath $600k;
100% of Internet cost devolved to Faculties/Centres by usage.
Introduction of hardware and software commenced;
Tender/purchase for reporting software underway.
Tender for Internet Cost Accounting Software was commenced in September 2003. There were no responses to this tender document.
Priority A
Proxy Appliance Installation Chris Blanksby Product selection; Purchase, installation
and commissioning of proxy appliance;
Purchase, installation and commissioning of duplicate proxy appliance;
Proxy use for all purposes;
Reliable proxy service.
100% of proxiable traffic presented via proxy.
Project complete. This item may be closed.
AARNet PoP – Network Restructure
Chris Blanksby Relocation of AARNet PoP (Point of Presence);
Provision of redundant connections to the Internet via Perth CBD;
Relocation of services; Relocation of services. Project complete. This item may be closed.
Page 8 of 13
Knowledge & IT Service CentreIT Services Operational Plan 2005
IT Infrastructure ServicesStrategic Goal Responsibility Milestones Measurement Target Status Comments
VoIP Project Brian Lambert / Chris Blanksby
Proof of concept; Product selection; Purchase, installation
and commissioning of VoIP hardware (for trunking only);
Decommissioning of 1993 Microwave Network.
Network usage; Service provision (no
degradation of service).
Decommissioning of 1993 Microwave Network (Metropolitan Area).
Proof of concept underway.
IP telephony for voice trunking has been put on hold. A project for full VoIP will be conducted in 2004/2005 for
installation of VoIP equipment into the Joondalup Resources Building.
Priority C
Alteon Firewall Installation Chris Blanksby Product selection; Purchase, installation
and commissioning of Firewall;
Purchase, installation and commissioning of duplicate firewall.
Firewall protection. 100% of network protected by firewall (between University network and Internet).
Project complete. This item may be closed.
Backup & Disaster Recovery Michael Grant / Keith Lambert
Development of IT Backup and Disaster Recovery document (in consultation with all University Stakeholders);
Development of implementation strategy;
Documentation completed, accepted and implemented.
Reference of implementation plan to SIMSC.
IT Backup and Disaster Recovery plan is complete and has been approved.
Final Backup and Disaster Recovery document as been approved.
Planning is required for implementation of the recommendations of this document.
Priority A
IT Infrastructure Documentation Project
Steve Johnston, Chris Blanksby, Keith Lambert, Brian Lambert, Peter Austin
Framework for documentation (ITIL compatible);
Creation of documentation repository;
Creation of documentation framework and templates;
Documentation procedures, etc.
Systems, network, hardware, etc. and procedures documented in a secure, but accessible location.
New item.
Priority A
Page 9 of 13
Knowledge & IT Service CentreIT Services Operational Plan 2005
Information Delivery SystemsStrategic Goal Responsibility Milestones Measurement Target Status
Enhancing Teaching, Learning and Research
Responsibility Milestones Measurement Target Status
Migrate Blackboard to a LINUX/INTEL Platform
Chris Cooper Servers installed and configuredBlackboard setup on LINUX/INTEL serversBlackboard user testing completed.
Servers signed off.Migration from SUN completedUser acceptance testing signed off
Live January 2005. WIP – servers ordered.
Courses Management System(CMS)
Rick Movick Fees publication website
Unit offering & Fees Management
VET Course Management
nterfaces to other systems using XMLPackaging for sale
User sign off October 2004January 2005
January 2005
Completed.Planned
In progress
Callista Research upgrades Lesley Reynoldson Development of RAI and ETHICS modules
User signoff February 2005 In progress
Unit Information Management System
Rick Movick Functional RequirementDevelop Prototype
User signoff July 2004January 2005
CompletedIn progress
Single LMS Rick Movick
Engaging with the Professions and Professional Life
Responsibility Milestones Measurement Target Status
Join key Oracle User groups Doug Trewenack Identify membership groups Memberships completed February 2004 Planned
HES HRIS Karen Harris Continuing participation in HES: Concept e8.07
reconciliation and audit
Reconciliation and Audit completed September 2004 Planned
Concept User Group Karen Harris Continuing participationAttend local user group Network via email forum with other user organisations
Influence on Concept product directionImplementing product incorporating ideas from other user organizations
Ongoing ongoing
Join Oracle User Group Satish K Bedekar Apply for WA Oracle User Group membership
Membership Completed February 2004 Planned
Join COGNOS User Group Satish K Bedekar Apply for COGNOS User Group Membership
Membership Completed February 2004 Planned
Page 10 of 13
Knowledge & IT Service CentreIT Services Operational Plan 2005
Information Delivery SystemsStrategic Goal Responsibility Milestones Measurement Target Status
Building Partnerships, Pathways and Precincts
Responsibility Milestones Measurement Target Status
Explore new channels for revenue R. Movick Package UTEI, CMS & ETHICS Systems package enabledAgreements signed with Redbell
April 2005 Planned
Oracle D.Trewenack Implement BATPROD and CAT9 Databases using Oracle’s 9iRAC
Successful operation January 2004 Configuring initial cluster server
EMC D.Trewenack ECU/EMC Press release Completion February 2004 Planned
HES HRIS R&D Karen Harris Collaboration with other HES universities to develop Business requirements to fast track development in Concept
HES meeting, agree on focus initiative and BRS developed
October 2003 planned
Improving Outcomes for Students and Staff
Responsibility Milestonese Measurement Target Status
Central Authentication upgrade Rick Movick Feed to TIM/TAM User signoff March 2005 Planned
Digital Portal (Staff & Students) Rick Movick Project Scope developed Acceptance & signoff July 2005 Planned
Australia Post mail barcodes Business Analysts QAS Incorporated into ERP systems In-house mail labels barcoded and barcode values incorporated for mailhouses
March 2005 Planned
Strengthening Enterprise and Resource Base
Responsibility Milestones Measurement Target Status
Callista SMS Upgrades Rick MovickKaren Harris
Lighthouse 2 – implementedLighthouse 3 – ImplementedMinor upgrade
User acceptance & signoff January 2005March 2005September 2005
PlannedPlannedPlanned
Concept upgrades Karen Harris Version e8.07 minor release 2Version e8.07 minor release 3Version e8.07 minor release 2
Implemented in production Implemented in productionImplemented in production
January 2005June 2005December 2005 – January 2006
PlannedPlannedPlanned
HR Web Kiosk, additional functional implementation
Karen Harris ECU staff email aliases loaded into HR database and maintainedDevelop procedures to automate updating of users for workflowSupport implementation of additional functionality
Leave bookings implemented in kiosk for next centre/faculty – phase 1Leave bookings rolled out to other centres/facultiesPlan for next functionality to be implemented via kiosk
September 2004 Planned
Page 11 of 13
Knowledge & IT Service CentreIT Services Operational Plan 2005
Information Delivery SystemsStrategic Goal Responsibility Milestones Measurement Target Status
Upgrade supportive systems Lesley Reynoldson Submission for SIMSC SIMSC approval February 2005 Planned
Technology Skills Training Rick Movick Develop a skills register to support applications.Gap analysis completed
Training schedule completedStaff trained.
December 2004Training to be completed by June 2005
PlannedPlanned
Contingency staff support Rick Movick Develop & implement framework Staff able to provide backup support in other systems
April 2005 Planned
Development & Evaluation environments
Rick MovickSteve Johnston
SOE WIN2K Test and QA serversOracle Test and QA serversOracle RAC Linux on Intel evaluation.
SOE Win2K servers accepted by IDSOracle RAC evaluation completed.
February 2005 Planned
Oracle R11i Implementation Satish K BedekarRick Movick
Project Scope AgreedFinalize Tender/Quote SpecificationInvite Tender/Quotes from selected vendors and Evaluate TendersProject Funding approvedProject PEP FinalizedSet up new software in Dev envSet up new software in QA envUser Testing and Acceptance Go LivePost Implementation Review
Project Scoping Document SignedTender/Quote Specification SignedEvaluate Tender/Quotes and Recommend Preferred SupplierContract Signed with the VendorPEP Document SignedDevelopment Environment availableQA Environment availableUser Acceptance signed offNew Software in ProductionSign off on Post Imp Review document
April 2005 Planned
Data Warehouse Satish K Bedekar Warehouse installed IDS Management Sign off March 2005 Planned
Strategic Business Reporting Satish Bedekar & Business Analysts Prototype 2 new reportsDevelop remaining reports
User signoff November 2004March 2005
In progressPlanned
Eshop enhancements Satish Bedekar Accept full range of tuition fees User signoff April 2005 Planned
ONESTOP Upgrade Rick Movick Upgrade Clients to latest versionUpgrade to use Oracle Database
User signoff January 2005 Planned
Page 12 of 13
Knowledge & IT Service CentreIT Services Operational Plan 2005
Information Delivery SystemsStrategic Goal Responsibility Milestones Measurement Target Status
Establish Development and ECU main Web server Environments
Chris Cooper Liaise with ITI for WIN/INTEL and INTEL/LINUX server platforms to be established.SUN Web servers to be replaced by INTEL/LINUX as part of server consolidation.
User signoff January 2005 In progress
Establish Key Performance Indicators
Business Analysts Database to collect dataMeasures and benchmarks established
Accepted by Director KITSC February 2005 Planned
Page 13 of 13